Form 66 -- Submittal Register -- B454.pdf
PDF 731 KB Posted
- Attached to
- B454 Convert Hanger 4 Federal contract opportunity
- Solicitation number
- FA302224R0009
About this file
This document appears to be a Submittal Register related to a federal construction contract opportunity for the renovation of Building 454 at Columbus AFB. The Submittal Register lists a wide range of construction-related submittals that the contractor must provide, such as shop drawings, product data, samples, design data, test reports, certificates, manufacturer's instructions, and operation and maintenance data across various divisions including concrete, masonry, metals, wood, thermal and moisture protection, doors and windows, finishes, specialties, fire protection, plumbing, HVAC, electrical, and telecommunications. The key details of the related federal contract opportunity include:
- Solicitation Number: FA302224R0009
- Name: B454 Convert Hanger 4
- Description: Full renovation of Building 454 into a new Wash Rack facility, to be accomplished in accordance with the Statement of Work, 100% Design, 100% Specifications, and all related Air Force requirements.
- Estimated Value: Between $5,000,000 and $10,000,000
- Proposal Due Date: 12:00 PM CST on Monday, August 26, 2024
- Site Visit: 9:00 AM CST on Tuesday, August 13, 2024 (attendance must be coordinated with POC by 1:00 PM CST on Monday, August 12, 2024)
- Additional RFIs Due: 5:00 PM CST on Friday, August 16, 2024
The federal agency involved is the Department of the Air Force, Air Education and Training Command.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Geotechnical Report.pdf | ||
| B454 RFIs Answers clarification.docx | DOCX document | |
| B454 RFIs with Answers.pdf | ||
| Solicitation Amendment FA302224R00090004 SF 30.pdf | ||
| Solicitation Amendment FA302224R00090003 SF 30.pdf | ||
| Solicitation Amendment FA302224R00090002 SF 30.pdf | ||
| Solicitation Amendment FA302224R00090001 SF 30.pdf | ||
| MFR Contractor CUI Training Acknowledgment for Solicitations.pdf | ||
| B454 - Statement of Work.pdf | ||
| Wage Determination DBA MS20240045.pdf | ||
| Appendix A - Cost Breakdown.xlsx | XLSX spreadsheet | |
| Solicitation - FA302224R0009.pdf | ||
| Contractor CUI Training Slides.pptx | PPTX presentation |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 73 PAGES
COLUMBUS AFB B454
01 45 35 SD-01 Preconstruction Submittals
G ROSIOR Letter of Acceptance
G ROProject Manual
3.1.2Written NDT Practices
SD-06 Test Reports
3.1.2Daily Reports
3.1.1Biweekly Reports
SD-07 Certificates
2.1AISC Certified Steel Fabricator
Steel Truss Plant Quality
Assurance Program
Wood Truss Plant Quality
Assurance Program
AC472 Accreditation
2.1Steel Joist Institute Membership
Certified Plant
2.1Certificate of Compliance
G ROSpecial Inspector of Record
1.5 G ROSpecial Inspector
3.1.2Qualification Records
SD-11 Closeout Submittals
3.1.2 G ROInterim Report
3.1.2 G ROComprehensive Final Report
02 41 00 SD-01 Preconstruction Submittals
G RODemolition Plan
1.2.2 G RODeconstruction Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 73 PAGES
02 41 00 1.11Existing Conditions
SD-07 Certificates
1.7 G RONotification
SD-11 Closeout Submittals
3.3.2Receipts
03 01 00 SD-01 Preconstruction Submittals
1.5.3 G ROQualifications
1.5.5 G ROWork Plan
1.6.1 G ROWork Plan
1.5.2 G ROQuality Control Plan
SD-03 Product Data
2.5Conventional Concrete
2.6Polymers
2.7Miscellaneous Materials And
Equipment
SD-04 Samples
2.4Reinforcement And
Reinforcement Supports
2.6Polymers
2.7Miscellaneous Materials And
Equipment
SD-05 Design Data
1.5.1 G RORepair Procedures
2.8 G ROMixture Proportioning
SD-06 Test Reports
2.8Mixture Proportioning
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 73 PAGES
03 01 00 3.1.5Quality Control
3.2.3Quality Control
3.3.3Quality Control
3.4.3Quality Control
3.5.3Quality Control
1.6.2Tolerence Report
2.5Conventional Concrete
2.6Polymers
2.7Miscellaneous Materials And
Equipment
SD-07 Certificates
1.5.3Qualifications
2.4Reinforcement And
Reinforcement Supports
2.5Conventional Concrete
2.6Polymers
SD-08 Manufacturer’s Instructions
2.2Equipment For Concrete
Preparation
2.5Conventional Concrete
2.6Polymers
2.7Miscellaneous Materials And
Equipment
03 30 00 SD-01 Preconstruction Submittals
Concrete Curing Plan
1.6.5 G ROQuality Control Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 73 PAGES
03 30 00 1.6.6 G ROQuality Control Personnel
Certifications
1.6.6Quality Control Organizational
Chart
1.6.8 G ROLaboratory Accreditation
1.6.2.1 GForm Removal Schedule
3.3.8Maturity Method Data
SD-02 Shop Drawings
1.6.2.2 G ROReinforcing Steel
SD-03 Product Data
2.4.5Joint Sealants
2.4.4Joint Filler
2.1Formwork Materials
Recycled Aggregate Materials
2.3.1Cementitious Materials
Vapor Retarder and Vapor Barrier
2.4.1Concrete Curing Materials
2.6Reinforcement
2.4.3.1Liquid Chemical Floor Hardeners and Sealers
2.3.4Admixtures
2.6.5Reinforcing Fibers
Mechanical Reinforcing Bar
Connectors
2.2.1Waterstops
Local/Regional Materials
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 73 PAGES
03 30 00 2.2.2Biodegradable Form Release
Agent
2.4.2Nonshrink Grout
SD-05 Design Data
1.6.1.1 G ROConcrete Mix Design
SD-06 Test Reports
1.6.1.1 G ROConcrete Mix Design
1.6.3.1Fly Ash
1.6.3.1Pozzolan
1.6.3.2Slag Cement
1.6.3.3Aggregates
1.6.3.4 G ROFiber-Reinforced Concrete
3.14.3.3 G ROCompressive Strength Tests
Air Content
3.14.3.1Slump Tests
2.3.2Water
SD-07 Certificates
2.6.1Reinforcing Bars
1.8Welder Qualifications
Safety Data Sheets
Forest Stewardship Council
(FSC) Certification
1.6.6.2Field Testing Technician and
Testing Agency
SD-08 Manufacturer’s Instructions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 73 PAGES
03 30 00 2.4.3.1Liquid Chemical Floor Hardeners and Sealers
2.4.5Joint Sealants
2.4.1Curing Compound
04 20 00 SD-02 Shop Drawings
3.3.3.1 G ROCut CMU
3.4.1.1 G RODetail Drawings
SD-03 Product Data
1.5.1 G ROHot Weather Procedures
1.5.2 G ROCold Weather Procedures
G ROCement
2.4.1.1 G ROCementitious Materials
SD-04 Samples
1.3.1.1 G ROMock-Up Panel
2.2.2.2 G ROConcrete Masonry Units (CMU)
2.4.1.3 G ROAdmixtures for Masonry Mortar
2.6.2 G ROAnchors, Ties, and Bar
Positioners
2.6.3 G ROJoint Reinforcement
SD-05 Design Data
2.1.2 G ROMasonry Compressive Strength
2.2.2.3Fire-Rated Concrete Masonry
Units
3.2.5 G ROBracing Calculations
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 73 PAGES
04 20 00 2.2.2.3Fire-Rated Concrete Masonry
Units
3.6.1.1Field Testing of Mortar
3.6.1.2Field Testing of Grout
Prism Tests
SD-07 Certificates
1.3.2Special Masonry Inspector
Qualifications
2.2.2.2Concrete Masonry Units (CMU)
2.2.2.4Concrete Brick
2.2.3Precast Concrete Units
2.4.1.1Cementitious Materials
2.4.1.3Admixtures for Masonry Mortar
2.4.2.2Admixtures for Grout
2.6.2Anchors, Ties, and Bar
Positioners
2.6.3Joint Reinforcement
SD-08 Manufacturer’s Instructions
2.4.1.3Admixtures for Masonry Mortar
2.4.2.2Admixtures for Grout
SD-10 Operation and Maintenance
Data
3.8Take-Back Program
SD-11 Closeout Submittals
2.2.2.2.1 SRecycled Content
05 05 20 SD-01 Preconstruction Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 73 PAGES
05 05 20 1.5.1.1 G ROInstaller Qualifications
1.5.1.2 G ROPost-Installed Anchor Special
Inspector Qualifications
SD-03 Product Data
2.1.1.3 G ROMechanical Anchors in Concrete
2.1.1.4 G ROAdhesive Anchor System in
Concrete
2.1.1.5 G ROMechanical and Adhesive
Anchors in Masonry
3.1.3 G RONon-Shrink, Non-Metallic Grout
SD-06 Test Reports
3.3.3 G ROPost-Installed Anchor Special
Inspections Report
SD-07 Certificates
2.1.1.1 G ROPost-Installed Anchor
Certification
SD-08 Manufacturer’s Instructions
2.1.1.2 G ROManufacturer's Printed
Installation Instructions
3.1.3 G RONon-Shrink, Non-Metallic Grout
1.5Manufacturer's Material Safety
Data Sheets
05 05 23.16 SD-01 Preconstruction Submittals
3.2 G OCWelding Quality Assurance Plan
SD-03 Product Data
1.3 GWelding Procedure Qualifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 73 PAGES
05 05 23.16 1.3.4Welder, Welding Operator, and
Tacker Qualification
1.3.2Previous Qualifications
1.3.3 GPre-Qualified Procedures
2.2Welding Electrodes and Rods
SD-06 Test Reports
3.3Nondestructive Testing
3.2Weld Inspection Log
SD-07 Certificates
1.3.1Certified Welding Procedure
Specifications (WPS)
1.3.1Certified Brazing Procedure
Specifications (BPS)
1.3.1Certified Procedure Qualification
Records (PQR)
1.3.1Certified Welder Performance
Qualifications (WPQ)
1.3.1Certified Brazer Performance
Qualifications (BPQ)
1.3.5Certified Welding Inspector
1.3.5Nondestructive Testing Personnel
05 12 00 SD-01 Preconstruction Submittals
1.4.1.1 G ROErection and Erection Bracing
Drawings
SD-02 Shop Drawings
1.4.2 G ROFabrication Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 73 PAGES
05 12 00 SD-03 Product Data
2.5.2Shop Primer
2.4.1Welding Electrodes and Rods
2.4.2Non-Shrink Grout
Tension Control Bolts
2.2.1 SRecycled Content for Structural
Steel
2.2.2 SRecycled Content for Structural
Steel Tubing
SD-05 Design Data
1.4.3 G RODesign Calculations for Steel
Connections
1.4.2 G ROShoring and Temporary Bracing
SD-06 Test Reports
2.5.2Class B Coating
2.3Bolts, Nuts, and Washers
3.6.1.2Weld Inspection Reports
3.6.3.1Bolt Testing Reports
SD-07 Certificates
2.2Steel
2.3Bolts, Nuts, and Washers
1.3AISC Structural Steel Fabricator
Quality Certification
1.3AISC Structural Steel Erector
Quality Certification
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 73 PAGES
05 12 00 1.4.4.1Welding Procedures and
Qualifications
2.4.1Welding Electrodes and Rods
3.6.1.1Certified Welding Inspector
3.6.1.2NDT Technician
3.4Welding Procedure Specifications
(WPS)
05 40 00 SD-02 Shop Drawings
1.6.1 G OCFraming Components
SD-03 Product Data
2.1Studs, Joists
2.1 SRecycled Content of Steel
Products
SD-07 Certificates
1.4Load-Bearing Cold-Formed Metal
Framing
3.2.1Welds
05 51 33 SD-02 Shop Drawings
2.3Ladders
SD-03 Product Data
2.3Ladders
2.3.2Ladder Safety Devices
SD-07 Certificates
1.3Fabricator Certification for Ladder
Assembly
06 10 00 SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 73 PAGES
06 10 00 Plastic Lumber
Fiberboard Wall Sheathing
1.8Fire-retardant Treatment
1.4.4Structural-use and OSB Panels
Adhesives
SD-06 Test Reports
1.4.5Preservative-treated
SD-07 Certificates
1.7Preservative Treatment
SIndoor Air Quality for Aerosol
Adhesives
SIndoor Air Quality for Non-aerosol
Adhesives
SD-10 Operation and Maintenance
Data
Take-back Program
06 20 00 SD-02 Shop Drawings
1.3 G RODetail Drawings Indicating All
Wood Assemblies
SD-03 Product Data
2.1 G ROWood Products
2.3 G ROCountertops
1.4 G ROITreated Wood Products
2.2 G ROFascias and Trim
2.6 GHardware and Accessories
SD-04 Samples
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 73 PAGES
06 20 00 1.5 G ROSamples
SD-07 Certificates
1.7.1.1 GCertificates of Grade
06 61 16 SD-02 Shop Drawings
1.4.2 G RODetail Fabrication Drawings
3.1 G ROInstallation
SD-03 Product Data
2.1.1 G ROSolid Polymer
2.2.2 S ROIndoor air quality for solid surface
seam and sealant products
SD-04 Samples
2.1 G ROMaterial
2.3.5 G ROCounter Tops
SD-06 Test Reports
2.1.1Test Report Results
SD-07 Certificates
1.4.1Qualifications
2.1.1 S ROIndoor Air Quality for solid
surface fabrication products
SD-10 Operation and Maintenance
Data
2.1.1 G ROSolid Polymer
07 11 13 SD-07 Certificates
1.3Materials
07 13 53 SD-03 Product Data
1.3 G ROManufacturer's Standard Details
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 73 PAGES
07 13 53 2.2 G ROElastomeric Waterproofing Sheet
Material
2.4 G ROProtection Board
1.4 G ROPrimers, Adhesives, and Mastics
2.2 G ROPrimers, Adhesives, and Mastics
SD-06 Test Reports
2.2 G ROElastomeric Waterproofing Sheet
Material
G ROField Quality Control
SD-07 Certificates
2.2Elastomeric Waterproofing Sheet
Material
1.4 G ROPrimers, Adhesives, and Mastics
2.2 G ROPrimers, Adhesives, and Mastics
1.7 G ROSpecial Warranties
1.7 G ROSpecial Warranties
2.1.1 G ROCertificates Of Compliance
2.1.2 G ROCertificates Of Compliance
SD-08 Manufacturer’s Instructions
1.4 G ROPrimers, Adhesives, and Mastics
2.2 G ROPrimers, Adhesives, and Mastics
SD-11 Closeout Submittals
2.1.1 G ROCertificates Of Compliance
2.1.2 G ROCertificates Of Compliance
07 21 13 SD-03 Product Data
1.3 G ROManufacturer's Standard Details
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 73 PAGES
07 21 13 2.1 G ROBlock or Board Insulation
2.2 G ROVapor Retarder
2.3 G ROPressure Sensitive Tape
1.4 G ROProtection Board or Coatings
2.5 G ROAccessories
2.1.5 SRecycled Content for Block or
Board Insulation
SD-07 Certificates
2.1 G ROBlock or Board Insulation
2.2 G ROVapor Retarder
2.4 G ROProtection Board or Coating
1.8 G ROSpecial Warranties
1.8 G ROSpecial Warranties
2.1.6 SIndoor Air Quality For Block Or
Board Insulation
SD-08 Manufacturer’s Instructions
2.1Block or Board Insulation
2.5.1Adhesive
07 60 00 SD-02 Shop Drawings
2.2.1 G ROExposed Sheet Metal
3.1.13 G ROGutters
3.1.14 G RODownspouts
3.1.23 G ROExpansion Joints
3.1.10 GBase Flashing
3.1.11 G ROCounterflashing
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 73 PAGES
07 60 00 3.1.24 G ROFlashing at Roof Penetrations and Equipment Supports
3.1.19 G ROOpen Valley Flashing
3.1.20 G ROEave Flashing
2.1 SRecycled Content
SD-03 Product Data
2.2.13 G ROCool Roof
SD-04 Samples
1.4.2 G ROFinish Samples
SD-07 Certificates
2.2.12.1 G ROWarranty on Finishes
SD-08 Manufacturer’s Instructions
1.4.3 G ROInstructions for Installation
3.5 G ROQuality Control Plan
SD-10 Operation and Maintenance
Data
1.4.3 G ROCleaning and Maintenance
07 61 14.00 20 SD-02 Shop Drawings
1.2.5 G RORoofing
SD-03 Product Data
2.1 G RORoofing Panels
2.1 SEnergy Star Label for Steel
Roofing Product
2.1.1 SRecycled Content for Steel
Roofing Product
2.1 SHeat Island Reduction
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 73 PAGES
07 61 14.00 20 2.3Attachment Clips
2.4.1Closures
2.4Accessories
2.4.2Fasteners
2.4.3Sealants
2.5Insulation
1.7 G ROWarranty
SD-04 Samples
2.1Panel
2.4Accessories
2.4.3Sealants
2.2Intermediate Support
SD-05 Design Data
1.5Design Calculations
SD-06 Test Reports
3.6Field Inspection
1.3.3Structural Performance
1.6.6Finish
SD-07 Certificates
1.6.3Manufacturer's Technical
Representative
1.6.4Installer's Qualifications
2.1 G ROCoil Stock
SD-08 Manufacturer’s Instructions
3.3 G ROInstallation
SD-11 Closeout Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 73 PAGES
07 61 14.00 20 3.8Information Card
1.7Warranty
08 11 13 SD-02 Shop Drawings
2.1 G RODoors
2.1 G RODoors
2.4 G ROFrames
2.4 G ROFrames
2.2Accessories
SD-03 Product Data
2.1 G RODoors
2.1 SRecycled Content for Steel Door
Product
2.4 G ROFrames
2.4 SRecycled Content for Steel Frame
Product
2.2Accessories
08 14 00 SD-02 Shop Drawings
2.1 G RODoors
SD-03 Product Data
2.1 G RODoors
2.1.1.1 SRecycled Content for Door Cores
2.2Accessories
2.3.6Water-resistant Sealer
1.5Warranty
G ROFire Resistance Rating
SD-04 Samples
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 73 PAGES
08 14 00 2.3.5.2 G RODoor Finish Colors
SD-06 Test Reports
2.4Cycle-Slam
2.4Hinge Loading Resistance
SD-07 Certificates
1.3.1Certificates of Grade
2.1.1.1 SIndoor Air Quality for
Particleboard and Agrifiber Door
Cores
SD-11 Closeout Submittals
1.5Warranty
08 31 00 SD-02 Shop Drawings
1.3 G ROAccess Doors And Panels
SD-03 Product Data
1.3 G ROAccess Doors And Panels
1.3.2 G ROHardware
2.2.8 G ROAccessories
2.1 SRecycled Content
SD-04 Samples
2.5 G ROFinishes
08 33 23 SD-02 Shop Drawings
2.2.1 G ROOverhead Coiling Doors
2.2.3 G ROCounterbalancing Mechanism
2.2.4 G ROManual Door Operators
2.2.1.3 G ROBottom Bars
2.1.1.1 G ROGuides
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 73 PAGES
08 33 23 2.2.3.1 G ROMounting Brackets
2.2.2.2 G ROHood
2.1.1.1 G ROInstallation Drawings
SD-03 Product Data
2.2.1 G ROOverhead Coiling Doors
2.2.2 G ROHardware
2.2.3 G ROCounterbalancing Mechanism
2.2.4 G ROManual Door Operators
2.2.1.1 SRecycled content for steel curtain
slats
SRecycled content for stainless steel curtain slats
SD-05 Design Data
2.2.1 G ROOverhead Coiling Doors
2.2.2 G ROHardware
2.2.3 G ROCounterbalancing Mechanism
2.2.4 G ROManual Door Operators
SD-10 Operation and Maintenance
Data
1.3.2 G ROOperation and Maintenance
Manuals
SD-11 Closeout Submittals
1.3.1 G ROWarranty
08 34 16.10 SD-01 Preconstruction Submittals
1.4.1 G ROManufacturer's Qualifications
1.4.2 G ROInstaller's Qualifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 73 PAGES
08 34 16.10 SD-02 Shop Drawings
2.1 G ROHorizontal Rolling Steel Doors
SD-05 Design Data
2.1 G ROHorizontal Rolling Steel Doors
1.3.1 G RODoor Compliance Matrix
SD-10 Operation and Maintenance
Data
2.1 G ROHorizontal Rolling Steel Doors
08 51 13 SD-02 Shop Drawings
2.1 G ROWindows
1.7Fabrication Drawings
SD-03 Product Data
2.1 G ROWindows
2.1 SRecycled Content of Aluminum
Windows
2.2.6.1 G ROHardware
2.2.2 G ROFasteners
1.8 G ROWindow Performance
2.4 G ROThermal-Barrier Windows
2.2.8 G ROScreens
2.1.6 G ROWeatherstripping
2.2.6 G ROAccessories
2.2.3Adhesives
1.8.4 G ROThermal Performance
1.8.4 SEnergy Star Label For Residential
Aluminum Window Products
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 73 PAGES
08 51 13 SD-04 Samples
1.3.3.1Finish Sample
1.3.3.2Window Sample
SD-05 Design Data
2.1 G ROStructural Calculations for
Deflection
1.3.4 G RODesign Analysis
SD-06 Test Reports
1.3.5Minimum Condensation
Resistance Factor
SD-10 Operation and Maintenance
Data
2.1 G ROWindows
1.5Plastic Identification
08 71 00 SD-02 Shop Drawings
1.3 G ROManufacturer's Detail Drawings
1.3 G ROVerification of Existing Conditions
1.5 G ROHardware Schedule
2.3.5 G ROKeying System
SD-03 Product Data
2.3 G ROHardware Items
SD-08 Manufacturer’s Instructions
3.1Installation
SD-10 Operation and Maintenance
Data
1.5 G ROHardware Schedule
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 73 PAGES
08 71 00 SD-11 Closeout Submittals
1.6.1Key Bitting
08 81 00 SD-03 Product Data
2.3Insulating Glass
1.3Glazing Accessories
2.4.3.1Sealants
SD-04 Samples
2.3Insulating Glass
2.4.2Glazing Compound
2.4.5Tape
2.4.5Sealing Tapes
SD-08 Manufacturer’s Instructions
2.4Setting and Sealing Materials
3.2Glass Setting
SD-11 Closeout Submittals
1.7.1Insulated Glass Units
08 91 00 SD-02 Shop Drawings
1.4Wall Louvers
SD-03 Product Data
2.2Metal Wall Louvers
2.3Door Louvers
SD-04 Samples
1.5 G ROWall Louver Samples
1.5 G RODoor Louver Samples
09 22 00 SD-02 Shop Drawings
2.1 G ROMetal Support Systems
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 73 PAGES
09 22 00 SD-03 Product Data
2.1Metal Support Systems
2.1 SRecycled Content for Metal
Support Systems
09 29 00 SD-03 Product Data
2.1.3Cementitious Backer Units
Glass Mat Water-Resistant
Gypsum Tile Backing Board
2.1.2Water-Resistant Gypsum Backing
Board
Glass Mat Covered or Reinforced
Gypsum Sheathing
Glass Mat Covered or Reinforced
Gypsum Sheathing Sealant
2.1.7Accessories
2.1.1Gypsum Board
2.1.1 SRecycled Content for Gypsum
Board
SRecycled Content for Paper
Facing and Gypsum Cores
2.1.4 SVOC Content of Joint Compound
SD-06 Test Reports
G ROASTM E90 Factory Test Report
SD-07 Certificates
2.1 G ROAsbestos Free Materials
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 73 PAGES
09 29 00 2.1.1 SIndoor Air Quality for Gypsum
Board
2.1.6 SIndoor Air Quality for Non-aerosol
Adhesives
2.1.6 SIndoor Air Quality for Aerosol
Adhesives
09 30 10 SD-02 Shop Drawings
3.2 G RODetail Drawings
SD-03 Product Data
2.1.1 G ROPorcelain Tile
2.1.1 SRecycled Content for Porcelain
Tile
2.1.2 G ROMosaic Tile
2.1.3 G ROGlazed Ceramic Wall Tile
2.1.3 SRecycled Content for Glazed
Ceramic Wall Tile
2.1 G ROTransition Strips
2.6.1 G ROTransition Strips
G ROMetal Strips
2.2 G ROSetting-Bed
2.4 G ROMortar, Grout, and Adhesive
2.2.6Reinforcing Wire Fabric
2.5.1 G ROCementitious Backer Units
2.5.2 G ROGlass-Mat Gypsum
Water-Resistant Backing Board
2.7 G ROWaterproof Membrane
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 73 PAGES
09 30 10 2.8 G ROCrack Isolation Membrane
SD-04 Samples
2.1 G ROTile
2.1 G ROAccessories
2.1 G ROTransition Strips
2.6.1 G ROTransition Strips
2.4.3 G ROGrout
SD-07 Certificates
2.4 SIndoor Air Quality for Adhesives
2.4.4 SIndoor Air Quality for Sealants
1.3.2Water Absorption Rates
SD-08 Manufacturer’s Instructions
3.8Manufacturer's Approved
Cleaning Instructions
SD-10 Operation and Maintenance
Data
G ROGauged Porcelain Tile
2.1.1 G ROPorcelain Tile
2.1.3 G ROGlazed Ceramic Wall Tile
2.1 G ROTransition Strips
2.6.1 G ROTransition Strips
09 51 00 SD-02 Shop Drawings
2.1 G RODrawings
SD-03 Product Data
G ROAcoustical Ceiling Systems
GFire Resistive Ceilings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 73 PAGES
09 51 00 2.2.1.1 SRecycled Content for Type III
Ceiling Tiles
2.1.1 G ROAcoustical Performance
SD-04 Samples
2.2 G ROAcoustical Units
2.2.1.1 G ROAcoustical Ceiling Tiles
SD-07 Certificates
2.2.1.1 SIndoor Air Quality for Type III
Ceiling Tiles
09 67 23.16 SD-03 Product Data
2.1 G ROJoint Sealant
2.2 G ROEpoxy Mortar Flooring System
2.3 G ROWhite Aluminum Oxide Non-Skid
Grit
SD-05 Design Data
1.3.3.1Environmental Control System
SD-06 Test Reports
1.3.4.1 G ROJoint Sealant Test Report
2.2.1 G ROPrimer Coat
2.2.2 G ROEpoxy Mortar Coat
2.2.3 G ROGrout Coat
2.2.4 G ROUrethane Topcoat
2.3 G ROWhite Aluminum Oxide Non-Skid
Grit
1.7 G ROPatch Test Demonstration
1.3.4.2 G RODaily Inspection Report
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 73 PAGES
09 67 23.16 3.12.3 G ROAdhesion Testing
SD-07 Certificates
1.3.2 G ROCoating Work Plan
1.3.5.5 G ROQualifications of Coating
Contractors
1.3.5.6 G ROJoint Sealant Certificates
1.3.5.7 G ROEpoxy Mortar Flooring System
Certificates
1.3.5.1Qualifications of Certified
Industrial Hygienist (CIH)
1.3.5.2Qualifications of Certified
Protective Coatings Specialist
(PCS)
1.3.5.3Qualifications of Coating
Inspection Company
1.3.5.4Qualifications of QC Specialist
Coating Inspector
1.8 G ROWarranty
SD-08 Manufacturer’s Instructions
1.3.6.1 G ROJoint Sealant Manufacturer's
Instructions
1.3.6.2 G ROEpoxy Mortar Flooring System
Manufacturer's Instructions
1.3.6.3 G ROWater-Based Alkaline Degreaser
SD-11 Closeout Submittals
3.12.2.2 G ROInspection Logbook
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 73 PAGES
09 90 00 SD-02 Shop Drawings
3.10Piping Identification
SD-03 Product Data
2.1 G ROCoating
2.1Product Data Sheets
Sealant
SD-04 Samples
2.2 G ROColor
SD-07 Certificates
1.5.5.2 G ROQualification Testing
1.5.4Indoor Air Quality for Paints and
Primers
1.5.4Indoor Air Quality for
Consolidated Latex Paints
SD-08 Manufacturer’s Instructions
3.2.1Application Instructions
2.1Mixing
1.7.1Manufacturer's Safety Data
Sheets
SD-10 Operation and Maintenance
Data
2.1 G ROCoatings
10 14 00.20 SD-02 Shop Drawings
1.3.2 G RODetail Drawings
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 73 PAGES
10 14 00.20 2.1 G RORoom Identification And
Directional Signage System
2.2 G ROExit Door Tactile Sign
2.3 G RODoor Tags
SD-04 Samples
1.3.1 G ROInterior Signage
2.1 G RORoom Identification And
Directional Signage System
2.2 G ROExit Door Tactile Sign
2.3 G RODoor Tags
SD-10 Operation and Maintenance
Data
3.2 G ROApproved Manufacturer's
Instructions
3.2.2 G ROProtection and Cleaning
10 28 13 SD-02 Shop Drawings
2.1 G ROProduct Schedule
SD-03 Product Data
2.1 SRecycled content for stainless
steel toilet accessories
G ROItem A5090
2.1.3 GItem A5109
2.1.4 G ROItem A5202
SD-07 Certificates
Baby Changing Stations
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 73 PAGES
10 28 13 SD-10 Operation and Maintenance
Data
2.1.3 G ROItem A5109
2.1.4 G ROItem A5202
10 44 16 SD-02 Shop Drawings
2.1.1Fire Extinguishers
GRO
Part 2Accessories
Part 2Cabinets
2.2.2Wall Brackets
1.5Schedule
SD-03 Product Data
2.1.1Fire Extinguishers
GRO
Part 2Accessories
Part 2Cabinets
2.2.2Wall Brackets
3.2.1Replacement Parts List
SD-04 Samples
1.3.1Equipment Samples
GRO
SD-07 Certificates
2.1.1Fire Extinguishers Certifications
GRO
1.4Manufacturer's Warranty with
Inspection Tag
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 73 PAGES
10 51 13 SD-02 Shop Drawings
2.1 G ROTypes
1.4 G ROLocation
3.1Installation
3.2Numbering system
SD-03 Product Data
2.2Material
Locking Devices
2.3.2Handles
2.2.3Finish
2.3components
3.1Assembly
SD-04 Samples
1.5.1 G ROColor chips
21 13 13 SD-01 Preconstruction Submittals
1.2.3 GQualified Fire Protection Engineer
(QFPE)
FP
FP
FP
1.4.2.1 GSprinkler System Designer
1.4.2.2 GSprinkler System Installer
SD-02 Shop Drawings
1.2.1.1 GShop Drawing
FP
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 73 PAGES
21 13 13 2.2.1 GPipe
FP
FP
FP
FP
FP
FP
FP
FP
FP
FP
FP
FP
FP
FP
2.3.1.2 GFittings
2.3.4 GValves
2.3.5 GRiser Check Valves
2.8.5 GRelief Valves
2.7 GSprinklers
2.3.3 GPipe Hangers and Supports
2.4.1 GSprinkler Alarm Switch
2.4.2 GValve Supervisory (Tamper)
Switch
2.6 GFire Department Connection
2.5 GBackflow Prevention Assembly
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 73 PAGES
21 13 13 2.8.6 GAir Vent
2.3.3 GSeismic Bracing
2.1.2 GNameplates
SD-05 Design Data
2.3.3 GSeismic Bracing
FP
FP
1.2.1.2 GHydraulic Calculations
SD-06 Test Reports
3.7.1 GTest Procedures
FP
SD-07 Certificates
3.7.2.1 GVerification of Compliant
Installation
FP
FP
3.7.2.2 GRequest for Government Final
Test
SD-10 Operation and Maintenance
Data
3.9 GOperating and Maintenance
(O&M) Instructions
FP
FP
1.6 GSpare Parts
SD-11 Closeout Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 73 PAGES
21 13 13 3.9As-built drawings
21 30 00 SD-01 Preconstruction Submittals
1.3Fire Pump Installation Related
Submittals
1.7.1 GQualified Fire Protection Engineer
(QFPE)
FP
SD-02 Shop Drawings
3.3.1 GInstallation Drawings
FP
FP
FP
FP
3.10.2 GAs-Built Drawings
3.3.2 GPiping Layout
3.3.2 GPump Room
SD-03 Product Data
2.1 GCatalog Data
FP
FP
FP
FP
FP
FP
1.6 GSpare Parts
3.8.2 GPreliminary Tests
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 73 PAGES
21 30 00 3.8 GField Tests
1.7.7 GManufacturer's Representative
3.10.1 GField Training
3.8.3Air Force Final Acceptance Test
SD-06 Test Reports
3.8.2 GPreliminary Tests
FP
3.8.3Air Force Final Acceptance Test
SD-07 Certificates
1.7.1Qualified Fire Protection Engineer
(QFPE)
1.7.2 GQualifications of Welders
FP
FP
FP
FP
1.7.4 GQualifications of Installer
1.7.5 GPreliminary Test Certification
1.7.6 GFinal Test Certification
SD-10 Operation and Maintenance
Data
3.10.1 GOperating and Maintenance
Instructions
FP
FP
2.13 GFlow Meter
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 37 OF 73 PAGES
22 00 00 SD-02 Shop Drawings
3.9.1 GPlumbing System
SD-03 Product Data
3.9.1.1 GBackflow Prevention Assemblies
2.6.2 GShower Faucets
2.4.2 SWaterSense Label for Lavatory
Faucet
2.4Fixtures
2.4.1Flush Valve Water Closets
2.4.1 SWaterSense Label for Flush
Valve Water Closet
2.4.2Wall Hung Lavatories
2.4.3Kitchen Sinks
2.4.4Service Sinks
2.4.5 GDrinking-Water Coolers
2.4.5 SEnergy Star Label for Electric
Water Cooler
2.4.6 SEnergy Star Label for Wheelchair
Electric Water Cooler
2.6.2 SWaterSense Label for
Showerhead
2.9 GWater Heaters
2.9.1.1 SEnergy Star Label for Gas
Storage Water Heater
2.9.2 SEnergy Star Label for Gas
Instantaneous Water Heater
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 38 OF 73 PAGES
22 00 00 2.10 GPumps
1.5.1Welding
3.4 GVibration-Absorbing Features
3.9.1Plumbing System
SD-06 Test Reports
3.9Tests, Flushing and Disinfection
3.9.1.1 GTest of Backflow Prevention
Assemblies
SD-07 Certificates
1.3Materials and Equipment
2.1.1Bolts
SD-10 Operation and Maintenance
Data
3.9.1 GPlumbing System
23 05 48.19 SD-02 Shop Drawings
3.1Coupling and Bracing
3.3Flexible Couplings or Joints
2.2Equipment Restraint
1.2.4 GContractor Designed Bracing
SD-03 Product Data
3.1 GCoupling and Bracing
3.3 GFlexible Couplings Or Joints
2.2 GEquipment Restraint
1.2.4 GContractor Designed Bracing
2.5Snubbers
3.9Anchor Bolts
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 39 OF 73 PAGES
23 05 48.19 2.2.2Vibration Isolators
SD-05 Design Data
1.2.4Design Calculations
SD-06 Test Reports
3.9 GAnchor Bolts
23 05 93 SD-02 Shop Drawings
1.3.3 GTAB Schematic Drawings and
Report Forms
SD-03 Product Data
1.3 GEquipment and Performance
Data
SD-06 Test Reports
3.3.5 GCompleted Pre-Final DALT
Report
3.3.8 GCertified Final DALT Report
SD-07 Certificates
1.5.1 GIndependent TAB Agency and
Personnel Qualifications
3.7 GDALT and TAB Procedures
Summary
3.7 GCompleted Pre-Final DALT Work
Checklist
3.3.2Advance Notice Of Pre-Final Dalt
Field Work
23 07 00 SD-02 Shop Drawings
3.2.2.4 GMICA Plates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 40 OF 73 PAGES
23 07 00 2.3Pipe Insulation Systems
3.2Pipe Insulation Systems
3.3Duct Insulation Systems
2.5Equipment Insulation Systems
2.3.1 SRecycled content for insulation
materials
SD-03 Product Data
2.3 GPipe Insulation Systems
3.2 GPipe Insulation Systems
3.3 GDuct Insulation Systems
2.5 GEquipment Insulation Systems
SD-04 Samples
2.2.1.3 GThermal Insulation
3.1.1 GDisplay Samples
SD-07 Certificates
2.2.1 SIndoor air quality for adhesives
SD-08 Manufacturer’s Instructions
2.3 GPipe Insulation Systems
3.2 GPipe Insulation Systems
3.3 GDuct Insulation Systems
2.5 GEquipment Insulation Systems
23 09 00 SD-02 Shop Drawings
3.2 GDDC Contractor Design Drawings
3.2 GDraft As-Built Drawings
3.2 GFinal As-Built Drawings
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 41 OF 73 PAGES
23 09 00 1.8.3 GProgramming Software
1.8.4 GController Application Programs
1.8.1 GConfiguration Software
1.8.2 GController Configuration Settings
2.2 GManufacturer's Product Data
1.8.5 GNiagara Framework Supervisory
Gateway Backups
1.8.6 GNiagara Framework Engineering
Tool
1.5 GNiagara Framework Wizards
SD-06 Test Reports
1.9.1 GPre-Construction Quality Control
(QC) Checklist
1.9.2 GPost-Construction Quality Control
(QC) Checklist
3.4.2 GStart-Up Testing Report
3.5.1 GPVT Procedures
3.5.3 GPVT Report
SD-10 Operation and Maintenance
Data
3.6 GOperation and Maintenance
(O&M) Instructions
3.8.1 GTraining Documentation
SD-11 Closeout Submittals
2.4 GEnclosure Keys
3.1.6.1 GPassword Summary Report
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 42 OF 73 PAGES
23 09 00 1.9.3 GCloseout Quality Control (QC)
Checklist
23 11 20 SD-02 Shop Drawings
1.5.2 GGas Piping System
2.2 GGas Piping System
3.3 GGas Piping System
SD-03 Product Data
2.2.9 GPipe and Fittings
1.5.2 GGas Equipment Connectors
1.5.2 GGas Piping System
2.2 GGas Piping System
3.3 GGas Piping System
2.1 GPipe Coating Materials
2.6 GPressure Regulators
2.7.1 GPressure Regulators
2.4 GRisers
2.2.7 GTransition Fittings
2.3 GValves
2.2.3 GWarning and Identification Tape
2.7.2 GGas Meter
SD-06 Test Reports
3.18 GTesting
3.18.1 GPressure Tests
3.18.2 GTest with Gas
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 43 OF 73 PAGES
23 11 20 1.5.1 GWelders Procedures and
Qualifications
1.5.1 GAssigned Number, Letter, or
Symbol
SD-08 Manufacturer’s Instructions
2.1 GPipe Coating Materials
SD-10 Operation and Maintenance
Data
1.3.1 GGas Facility System and
Equipment Operation
1.3.2 GGas Facility System Maintenance
1.3.3 GGas Facility Equipment
Maintenance
23 23 00 SD-02 Shop Drawings
2.3 GRefrigerant Piping System
SD-03 Product Data
2.3Refrigerant Piping System
1.5.2Spare Parts
3.5Refrigerant Piping Tests
3.1Verification of Dimensions
SD-06 Test Reports
3.5Refrigerant Piping Tests
SD-07 Certificates
2.1Service Organization
SD-10 Operation and Maintenance
Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 44 OF 73 PAGES
23 23 00 1.5 GMaintenance
3.4 GOperation and Maintenance
Manuals
3.4 GDemonstrations
23 30 00 SD-02 Shop Drawings
1.4.4 GDetail Drawings
SD-03 Product Data
2.9.1.1Insulated Nonmetallic Flexible
Duct Runouts
2.9.1.1Duct Connectors
2.9.2 GDuct Access Doors
2.9.3 GManual Balancing Dampers
2.9.6.1Diffusers
2.9.6.2Registers and Grilles
2.9.7Louvers
2.10.1.1Centrifugal Fans
2.10.1.2In-Line Centrifugal Fans
2.10.1.3Centrifugal Type Power Wall
Ventilators
2.10.1.4Ceiling Exhaust Fans
2.10.1.4 SPL-109-58 label for ceiling
exhaust fan product
2.11.1Electric Unit Heaters
1.4.5Test Procedures
1.2.1.2 GDiagrams
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILE…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .