This document appears to be a Submittal Register related to a federal construction contract opportunity for the renovation of Building 454 at Columbus AFB. The Submittal Register lists a wide range of construction-related submittals that the contractor must provide, such as shop drawings, product data, samples, design data, test reports, certificates, manufacturer's instructions, and operation and maintenance data across various divisions including concrete, masonry, metals, wood, thermal and moisture protection, doors and windows, finishes, specialties, fire protection, plumbing, HVAC, electrical, and telecommunications. The key details of the related federal contract opportunity include:

  • Solicitation Number: FA302224R0009
  • Name: B454 Convert Hanger 4
  • Description: Full renovation of Building 454 into a new Wash Rack facility, to be accomplished in accordance with the Statement of Work, 100% Design, 100% Specifications, and all related Air Force requirements.
  • Estimated Value: Between $5,000,000 and $10,000,000
  • Proposal Due Date: 12:00 PM CST on Monday, August 26, 2024
  • Site Visit: 9:00 AM CST on Tuesday, August 13, 2024 (attendance must be coordinated with POC by 1:00 PM CST on Monday, August 12, 2024)
  • Additional RFIs Due: 5:00 PM CST on Friday, August 16, 2024

The federal agency involved is the Department of the Air Force, Air Education and Training Command.

View the file

Other files for this federal contract opportunity

Other files attached to B454 Convert Hanger 4, newest first.
File Type Posted
Geotechnical Report.pdf PDF
B454 RFIs Answers clarification.docx DOCX document
B454 RFIs with Answers.pdf PDF
Solicitation Amendment FA302224R00090004 SF 30.pdf PDF
Solicitation Amendment FA302224R00090003 SF 30.pdf PDF
Solicitation Amendment FA302224R00090002 SF 30.pdf PDF
Solicitation Amendment FA302224R00090001 SF 30.pdf PDF
MFR Contractor CUI Training Acknowledgment for Solicitations.pdf PDF
B454 - Statement of Work.pdf PDF
Wage Determination DBA MS20240045.pdf PDF
Appendix A - Cost Breakdown.xlsx XLSX spreadsheet
Solicitation - FA302224R0009.pdf PDF
Contractor CUI Training Slides.pptx PPTX presentation
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 73 PAGES

COLUMBUS AFB B454

01 45 35 SD-01 Preconstruction Submittals

G ROSIOR Letter of Acceptance

G ROProject Manual

3.1.2Written NDT Practices

SD-06 Test Reports

3.1.2Daily Reports

3.1.1Biweekly Reports

SD-07 Certificates

2.1AISC Certified Steel Fabricator

Steel Truss Plant Quality

Assurance Program

Wood Truss Plant Quality

Assurance Program

AC472 Accreditation

2.1Steel Joist Institute Membership

Certified Plant

2.1Certificate of Compliance

G ROSpecial Inspector of Record

1.5 G ROSpecial Inspector

3.1.2Qualification Records

SD-11 Closeout Submittals

3.1.2 G ROInterim Report

3.1.2 G ROComprehensive Final Report

02 41 00 SD-01 Preconstruction Submittals

G RODemolition Plan

1.2.2 G RODeconstruction Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 73 PAGES

02 41 00 1.11Existing Conditions

SD-07 Certificates

1.7 G RONotification

SD-11 Closeout Submittals

3.3.2Receipts

03 01 00 SD-01 Preconstruction Submittals

1.5.3 G ROQualifications

1.5.5 G ROWork Plan

1.6.1 G ROWork Plan

1.5.2 G ROQuality Control Plan

SD-03 Product Data

2.5Conventional Concrete

2.6Polymers

2.7Miscellaneous Materials And

Equipment

SD-04 Samples

2.4Reinforcement And

Reinforcement Supports

2.6Polymers

2.7Miscellaneous Materials And

Equipment

SD-05 Design Data

1.5.1 G RORepair Procedures

2.8 G ROMixture Proportioning

SD-06 Test Reports

2.8Mixture Proportioning

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 73 PAGES

03 01 00 3.1.5Quality Control

3.2.3Quality Control

3.3.3Quality Control

3.4.3Quality Control

3.5.3Quality Control

1.6.2Tolerence Report

2.5Conventional Concrete

2.6Polymers

2.7Miscellaneous Materials And

Equipment

SD-07 Certificates

1.5.3Qualifications

2.4Reinforcement And

Reinforcement Supports

2.5Conventional Concrete

2.6Polymers

SD-08 Manufacturer’s Instructions

2.2Equipment For Concrete

Preparation

2.5Conventional Concrete

2.6Polymers

2.7Miscellaneous Materials And

Equipment

03 30 00 SD-01 Preconstruction Submittals

Concrete Curing Plan

1.6.5 G ROQuality Control Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 73 PAGES

03 30 00 1.6.6 G ROQuality Control Personnel

Certifications

1.6.6Quality Control Organizational

Chart

1.6.8 G ROLaboratory Accreditation

1.6.2.1 GForm Removal Schedule

3.3.8Maturity Method Data

SD-02 Shop Drawings

1.6.2.2 G ROReinforcing Steel

SD-03 Product Data

2.4.5Joint Sealants

2.4.4Joint Filler

2.1Formwork Materials

Recycled Aggregate Materials

2.3.1Cementitious Materials

Vapor Retarder and Vapor Barrier

2.4.1Concrete Curing Materials

2.6Reinforcement

2.4.3.1Liquid Chemical Floor Hardeners and Sealers

2.3.4Admixtures

2.6.5Reinforcing Fibers

Mechanical Reinforcing Bar

Connectors

2.2.1Waterstops

Local/Regional Materials

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 73 PAGES

03 30 00 2.2.2Biodegradable Form Release

Agent

2.4.2Nonshrink Grout

SD-05 Design Data

1.6.1.1 G ROConcrete Mix Design

SD-06 Test Reports

1.6.1.1 G ROConcrete Mix Design

1.6.3.1Fly Ash

1.6.3.1Pozzolan

1.6.3.2Slag Cement

1.6.3.3Aggregates

1.6.3.4 G ROFiber-Reinforced Concrete

3.14.3.3 G ROCompressive Strength Tests

Air Content

3.14.3.1Slump Tests

2.3.2Water

SD-07 Certificates

2.6.1Reinforcing Bars

1.8Welder Qualifications

Safety Data Sheets

Forest Stewardship Council

(FSC) Certification

1.6.6.2Field Testing Technician and

Testing Agency

SD-08 Manufacturer’s Instructions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 73 PAGES

03 30 00 2.4.3.1Liquid Chemical Floor Hardeners and Sealers

2.4.5Joint Sealants

2.4.1Curing Compound

04 20 00 SD-02 Shop Drawings

3.3.3.1 G ROCut CMU

3.4.1.1 G RODetail Drawings

SD-03 Product Data

1.5.1 G ROHot Weather Procedures

1.5.2 G ROCold Weather Procedures

G ROCement

2.4.1.1 G ROCementitious Materials

SD-04 Samples

1.3.1.1 G ROMock-Up Panel

2.2.2.2 G ROConcrete Masonry Units (CMU)

2.4.1.3 G ROAdmixtures for Masonry Mortar

2.6.2 G ROAnchors, Ties, and Bar

Positioners

2.6.3 G ROJoint Reinforcement

SD-05 Design Data

2.1.2 G ROMasonry Compressive Strength

2.2.2.3Fire-Rated Concrete Masonry

Units

3.2.5 G ROBracing Calculations

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 73 PAGES

04 20 00 2.2.2.3Fire-Rated Concrete Masonry

Units

3.6.1.1Field Testing of Mortar

3.6.1.2Field Testing of Grout

Prism Tests

SD-07 Certificates

1.3.2Special Masonry Inspector

Qualifications

2.2.2.2Concrete Masonry Units (CMU)

2.2.2.4Concrete Brick

2.2.3Precast Concrete Units

2.4.1.1Cementitious Materials

2.4.1.3Admixtures for Masonry Mortar

2.4.2.2Admixtures for Grout

2.6.2Anchors, Ties, and Bar

Positioners

2.6.3Joint Reinforcement

SD-08 Manufacturer’s Instructions

2.4.1.3Admixtures for Masonry Mortar

2.4.2.2Admixtures for Grout

SD-10 Operation and Maintenance

Data

3.8Take-Back Program

SD-11 Closeout Submittals

2.2.2.2.1 SRecycled Content

05 05 20 SD-01 Preconstruction Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 73 PAGES

05 05 20 1.5.1.1 G ROInstaller Qualifications

1.5.1.2 G ROPost-Installed Anchor Special

Inspector Qualifications

SD-03 Product Data

2.1.1.3 G ROMechanical Anchors in Concrete

2.1.1.4 G ROAdhesive Anchor System in

Concrete

2.1.1.5 G ROMechanical and Adhesive

Anchors in Masonry

3.1.3 G RONon-Shrink, Non-Metallic Grout

SD-06 Test Reports

3.3.3 G ROPost-Installed Anchor Special

Inspections Report

SD-07 Certificates

2.1.1.1 G ROPost-Installed Anchor

Certification

SD-08 Manufacturer’s Instructions

2.1.1.2 G ROManufacturer's Printed

Installation Instructions

3.1.3 G RONon-Shrink, Non-Metallic Grout

1.5Manufacturer's Material Safety

Data Sheets

05 05 23.16 SD-01 Preconstruction Submittals

3.2 G OCWelding Quality Assurance Plan

SD-03 Product Data

1.3 GWelding Procedure Qualifications

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 73 PAGES

05 05 23.16 1.3.4Welder, Welding Operator, and

Tacker Qualification

1.3.2Previous Qualifications

1.3.3 GPre-Qualified Procedures

2.2Welding Electrodes and Rods

SD-06 Test Reports

3.3Nondestructive Testing

3.2Weld Inspection Log

SD-07 Certificates

1.3.1Certified Welding Procedure

Specifications (WPS)

1.3.1Certified Brazing Procedure

Specifications (BPS)

1.3.1Certified Procedure Qualification

Records (PQR)

1.3.1Certified Welder Performance

Qualifications (WPQ)

1.3.1Certified Brazer Performance

Qualifications (BPQ)

1.3.5Certified Welding Inspector

1.3.5Nondestructive Testing Personnel

05 12 00 SD-01 Preconstruction Submittals

1.4.1.1 G ROErection and Erection Bracing

Drawings

SD-02 Shop Drawings

1.4.2 G ROFabrication Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 73 PAGES

05 12 00 SD-03 Product Data

2.5.2Shop Primer

2.4.1Welding Electrodes and Rods

2.4.2Non-Shrink Grout

Tension Control Bolts

2.2.1 SRecycled Content for Structural

Steel

2.2.2 SRecycled Content for Structural

Steel Tubing

SD-05 Design Data

1.4.3 G RODesign Calculations for Steel

Connections

1.4.2 G ROShoring and Temporary Bracing

SD-06 Test Reports

2.5.2Class B Coating

2.3Bolts, Nuts, and Washers

3.6.1.2Weld Inspection Reports

3.6.3.1Bolt Testing Reports

SD-07 Certificates

2.2Steel

2.3Bolts, Nuts, and Washers

1.3AISC Structural Steel Fabricator

Quality Certification

1.3AISC Structural Steel Erector

Quality Certification

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 73 PAGES

05 12 00 1.4.4.1Welding Procedures and

Qualifications

2.4.1Welding Electrodes and Rods

3.6.1.1Certified Welding Inspector

3.6.1.2NDT Technician

3.4Welding Procedure Specifications

(WPS)

05 40 00 SD-02 Shop Drawings

1.6.1 G OCFraming Components

SD-03 Product Data

2.1Studs, Joists

2.1 SRecycled Content of Steel

Products

SD-07 Certificates

1.4Load-Bearing Cold-Formed Metal

Framing

3.2.1Welds

05 51 33 SD-02 Shop Drawings

2.3Ladders

SD-03 Product Data

2.3Ladders

2.3.2Ladder Safety Devices

SD-07 Certificates

1.3Fabricator Certification for Ladder

Assembly

06 10 00 SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 73 PAGES

06 10 00 Plastic Lumber

Fiberboard Wall Sheathing

1.8Fire-retardant Treatment

1.4.4Structural-use and OSB Panels

Adhesives

SD-06 Test Reports

1.4.5Preservative-treated

SD-07 Certificates

1.7Preservative Treatment

SIndoor Air Quality for Aerosol

Adhesives

SIndoor Air Quality for Non-aerosol

Adhesives

SD-10 Operation and Maintenance

Data

Take-back Program

06 20 00 SD-02 Shop Drawings

1.3 G RODetail Drawings Indicating All

Wood Assemblies

SD-03 Product Data

2.1 G ROWood Products

2.3 G ROCountertops

1.4 G ROITreated Wood Products

2.2 G ROFascias and Trim

2.6 GHardware and Accessories

SD-04 Samples

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 73 PAGES

06 20 00 1.5 G ROSamples

SD-07 Certificates

1.7.1.1 GCertificates of Grade

06 61 16 SD-02 Shop Drawings

1.4.2 G RODetail Fabrication Drawings

3.1 G ROInstallation

SD-03 Product Data

2.1.1 G ROSolid Polymer

2.2.2 S ROIndoor air quality for solid surface

seam and sealant products

SD-04 Samples

2.1 G ROMaterial

2.3.5 G ROCounter Tops

SD-06 Test Reports

2.1.1Test Report Results

SD-07 Certificates

1.4.1Qualifications

2.1.1 S ROIndoor Air Quality for solid

surface fabrication products

SD-10 Operation and Maintenance

Data

2.1.1 G ROSolid Polymer

07 11 13 SD-07 Certificates

1.3Materials

07 13 53 SD-03 Product Data

1.3 G ROManufacturer's Standard Details

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 73 PAGES

07 13 53 2.2 G ROElastomeric Waterproofing Sheet

Material

2.4 G ROProtection Board

1.4 G ROPrimers, Adhesives, and Mastics

2.2 G ROPrimers, Adhesives, and Mastics

SD-06 Test Reports

2.2 G ROElastomeric Waterproofing Sheet

Material

G ROField Quality Control

SD-07 Certificates

2.2Elastomeric Waterproofing Sheet

Material

1.4 G ROPrimers, Adhesives, and Mastics

2.2 G ROPrimers, Adhesives, and Mastics

1.7 G ROSpecial Warranties

1.7 G ROSpecial Warranties

2.1.1 G ROCertificates Of Compliance

2.1.2 G ROCertificates Of Compliance

SD-08 Manufacturer’s Instructions

1.4 G ROPrimers, Adhesives, and Mastics

2.2 G ROPrimers, Adhesives, and Mastics

SD-11 Closeout Submittals

2.1.1 G ROCertificates Of Compliance

2.1.2 G ROCertificates Of Compliance

07 21 13 SD-03 Product Data

1.3 G ROManufacturer's Standard Details

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 73 PAGES

07 21 13 2.1 G ROBlock or Board Insulation

2.2 G ROVapor Retarder

2.3 G ROPressure Sensitive Tape

1.4 G ROProtection Board or Coatings

2.5 G ROAccessories

2.1.5 SRecycled Content for Block or

Board Insulation

SD-07 Certificates

2.1 G ROBlock or Board Insulation

2.2 G ROVapor Retarder

2.4 G ROProtection Board or Coating

1.8 G ROSpecial Warranties

1.8 G ROSpecial Warranties

2.1.6 SIndoor Air Quality For Block Or

Board Insulation

SD-08 Manufacturer’s Instructions

2.1Block or Board Insulation

2.5.1Adhesive

07 60 00 SD-02 Shop Drawings

2.2.1 G ROExposed Sheet Metal

3.1.13 G ROGutters

3.1.14 G RODownspouts

3.1.23 G ROExpansion Joints

3.1.10 GBase Flashing

3.1.11 G ROCounterflashing

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 73 PAGES

07 60 00 3.1.24 G ROFlashing at Roof Penetrations and Equipment Supports

3.1.19 G ROOpen Valley Flashing

3.1.20 G ROEave Flashing

2.1 SRecycled Content

SD-03 Product Data

2.2.13 G ROCool Roof

SD-04 Samples

1.4.2 G ROFinish Samples

SD-07 Certificates

2.2.12.1 G ROWarranty on Finishes

SD-08 Manufacturer’s Instructions

1.4.3 G ROInstructions for Installation

3.5 G ROQuality Control Plan

SD-10 Operation and Maintenance

Data

1.4.3 G ROCleaning and Maintenance

07 61 14.00 20 SD-02 Shop Drawings

1.2.5 G RORoofing

SD-03 Product Data

2.1 G RORoofing Panels

2.1 SEnergy Star Label for Steel

Roofing Product

2.1.1 SRecycled Content for Steel

Roofing Product

2.1 SHeat Island Reduction

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 73 PAGES

07 61 14.00 20 2.3Attachment Clips

2.4.1Closures

2.4Accessories

2.4.2Fasteners

2.4.3Sealants

2.5Insulation

1.7 G ROWarranty

SD-04 Samples

2.1Panel

2.4Accessories

2.4.3Sealants

2.2Intermediate Support

SD-05 Design Data

1.5Design Calculations

SD-06 Test Reports

3.6Field Inspection

1.3.3Structural Performance

1.6.6Finish

SD-07 Certificates

1.6.3Manufacturer's Technical

Representative

1.6.4Installer's Qualifications

2.1 G ROCoil Stock

SD-08 Manufacturer’s Instructions

3.3 G ROInstallation

SD-11 Closeout Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 73 PAGES

07 61 14.00 20 3.8Information Card

1.7Warranty

08 11 13 SD-02 Shop Drawings

2.1 G RODoors

2.1 G RODoors

2.4 G ROFrames

2.4 G ROFrames

2.2Accessories

SD-03 Product Data

2.1 G RODoors

2.1 SRecycled Content for Steel Door

Product

2.4 G ROFrames

2.4 SRecycled Content for Steel Frame

Product

2.2Accessories

08 14 00 SD-02 Shop Drawings

2.1 G RODoors

SD-03 Product Data

2.1 G RODoors

2.1.1.1 SRecycled Content for Door Cores

2.2Accessories

2.3.6Water-resistant Sealer

1.5Warranty

G ROFire Resistance Rating

SD-04 Samples

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 73 PAGES

08 14 00 2.3.5.2 G RODoor Finish Colors

SD-06 Test Reports

2.4Cycle-Slam

2.4Hinge Loading Resistance

SD-07 Certificates

1.3.1Certificates of Grade

2.1.1.1 SIndoor Air Quality for

Particleboard and Agrifiber Door

Cores

SD-11 Closeout Submittals

1.5Warranty

08 31 00 SD-02 Shop Drawings

1.3 G ROAccess Doors And Panels

SD-03 Product Data

1.3 G ROAccess Doors And Panels

1.3.2 G ROHardware

2.2.8 G ROAccessories

2.1 SRecycled Content

SD-04 Samples

2.5 G ROFinishes

08 33 23 SD-02 Shop Drawings

2.2.1 G ROOverhead Coiling Doors

2.2.3 G ROCounterbalancing Mechanism

2.2.4 G ROManual Door Operators

2.2.1.3 G ROBottom Bars

2.1.1.1 G ROGuides

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 73 PAGES

08 33 23 2.2.3.1 G ROMounting Brackets

2.2.2.2 G ROHood

2.1.1.1 G ROInstallation Drawings

SD-03 Product Data

2.2.1 G ROOverhead Coiling Doors

2.2.2 G ROHardware

2.2.3 G ROCounterbalancing Mechanism

2.2.4 G ROManual Door Operators

2.2.1.1 SRecycled content for steel curtain

slats

SRecycled content for stainless steel curtain slats

SD-05 Design Data

2.2.1 G ROOverhead Coiling Doors

2.2.2 G ROHardware

2.2.3 G ROCounterbalancing Mechanism

2.2.4 G ROManual Door Operators

SD-10 Operation and Maintenance

Data

1.3.2 G ROOperation and Maintenance

Manuals

SD-11 Closeout Submittals

1.3.1 G ROWarranty

08 34 16.10 SD-01 Preconstruction Submittals

1.4.1 G ROManufacturer's Qualifications

1.4.2 G ROInstaller's Qualifications

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 73 PAGES

08 34 16.10 SD-02 Shop Drawings

2.1 G ROHorizontal Rolling Steel Doors

SD-05 Design Data

2.1 G ROHorizontal Rolling Steel Doors

1.3.1 G RODoor Compliance Matrix

SD-10 Operation and Maintenance

Data

2.1 G ROHorizontal Rolling Steel Doors

08 51 13 SD-02 Shop Drawings

2.1 G ROWindows

1.7Fabrication Drawings

SD-03 Product Data

2.1 G ROWindows

2.1 SRecycled Content of Aluminum

Windows

2.2.6.1 G ROHardware

2.2.2 G ROFasteners

1.8 G ROWindow Performance

2.4 G ROThermal-Barrier Windows

2.2.8 G ROScreens

2.1.6 G ROWeatherstripping

2.2.6 G ROAccessories

2.2.3Adhesives

1.8.4 G ROThermal Performance

1.8.4 SEnergy Star Label For Residential

Aluminum Window Products

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 73 PAGES

08 51 13 SD-04 Samples

1.3.3.1Finish Sample

1.3.3.2Window Sample

SD-05 Design Data

2.1 G ROStructural Calculations for

Deflection

1.3.4 G RODesign Analysis

SD-06 Test Reports

1.3.5Minimum Condensation

Resistance Factor

SD-10 Operation and Maintenance

Data

2.1 G ROWindows

1.5Plastic Identification

08 71 00 SD-02 Shop Drawings

1.3 G ROManufacturer's Detail Drawings

1.3 G ROVerification of Existing Conditions

1.5 G ROHardware Schedule

2.3.5 G ROKeying System

SD-03 Product Data

2.3 G ROHardware Items

SD-08 Manufacturer’s Instructions

3.1Installation

SD-10 Operation and Maintenance

Data

1.5 G ROHardware Schedule

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 73 PAGES

08 71 00 SD-11 Closeout Submittals

1.6.1Key Bitting

08 81 00 SD-03 Product Data

2.3Insulating Glass

1.3Glazing Accessories

2.4.3.1Sealants

SD-04 Samples

2.3Insulating Glass

2.4.2Glazing Compound

2.4.5Tape

2.4.5Sealing Tapes

SD-08 Manufacturer’s Instructions

2.4Setting and Sealing Materials

3.2Glass Setting

SD-11 Closeout Submittals

1.7.1Insulated Glass Units

08 91 00 SD-02 Shop Drawings

1.4Wall Louvers

SD-03 Product Data

2.2Metal Wall Louvers

2.3Door Louvers

SD-04 Samples

1.5 G ROWall Louver Samples

1.5 G RODoor Louver Samples

09 22 00 SD-02 Shop Drawings

2.1 G ROMetal Support Systems

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 73 PAGES

09 22 00 SD-03 Product Data

2.1Metal Support Systems

2.1 SRecycled Content for Metal

Support Systems

09 29 00 SD-03 Product Data

2.1.3Cementitious Backer Units

Glass Mat Water-Resistant

Gypsum Tile Backing Board

2.1.2Water-Resistant Gypsum Backing

Board

Glass Mat Covered or Reinforced

Gypsum Sheathing

Glass Mat Covered or Reinforced

Gypsum Sheathing Sealant

2.1.7Accessories

2.1.1Gypsum Board

2.1.1 SRecycled Content for Gypsum

Board

SRecycled Content for Paper

Facing and Gypsum Cores

2.1.4 SVOC Content of Joint Compound

SD-06 Test Reports

G ROASTM E90 Factory Test Report

SD-07 Certificates

2.1 G ROAsbestos Free Materials

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 73 PAGES

09 29 00 2.1.1 SIndoor Air Quality for Gypsum

Board

2.1.6 SIndoor Air Quality for Non-aerosol

Adhesives

2.1.6 SIndoor Air Quality for Aerosol

Adhesives

09 30 10 SD-02 Shop Drawings

3.2 G RODetail Drawings

SD-03 Product Data

2.1.1 G ROPorcelain Tile

2.1.1 SRecycled Content for Porcelain

Tile

2.1.2 G ROMosaic Tile

2.1.3 G ROGlazed Ceramic Wall Tile

2.1.3 SRecycled Content for Glazed

Ceramic Wall Tile

2.1 G ROTransition Strips

2.6.1 G ROTransition Strips

G ROMetal Strips

2.2 G ROSetting-Bed

2.4 G ROMortar, Grout, and Adhesive

2.2.6Reinforcing Wire Fabric

2.5.1 G ROCementitious Backer Units

2.5.2 G ROGlass-Mat Gypsum

Water-Resistant Backing Board

2.7 G ROWaterproof Membrane

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 73 PAGES

09 30 10 2.8 G ROCrack Isolation Membrane

SD-04 Samples

2.1 G ROTile

2.1 G ROAccessories

2.1 G ROTransition Strips

2.6.1 G ROTransition Strips

2.4.3 G ROGrout

SD-07 Certificates

2.4 SIndoor Air Quality for Adhesives

2.4.4 SIndoor Air Quality for Sealants

1.3.2Water Absorption Rates

SD-08 Manufacturer’s Instructions

3.8Manufacturer's Approved

Cleaning Instructions

SD-10 Operation and Maintenance

Data

G ROGauged Porcelain Tile

2.1.1 G ROPorcelain Tile

2.1.3 G ROGlazed Ceramic Wall Tile

2.1 G ROTransition Strips

2.6.1 G ROTransition Strips

09 51 00 SD-02 Shop Drawings

2.1 G RODrawings

SD-03 Product Data

G ROAcoustical Ceiling Systems

GFire Resistive Ceilings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 73 PAGES

09 51 00 2.2.1.1 SRecycled Content for Type III

Ceiling Tiles

2.1.1 G ROAcoustical Performance

SD-04 Samples

2.2 G ROAcoustical Units

2.2.1.1 G ROAcoustical Ceiling Tiles

SD-07 Certificates

2.2.1.1 SIndoor Air Quality for Type III

Ceiling Tiles

09 67 23.16 SD-03 Product Data

2.1 G ROJoint Sealant

2.2 G ROEpoxy Mortar Flooring System

2.3 G ROWhite Aluminum Oxide Non-Skid

Grit

SD-05 Design Data

1.3.3.1Environmental Control System

SD-06 Test Reports

1.3.4.1 G ROJoint Sealant Test Report

2.2.1 G ROPrimer Coat

2.2.2 G ROEpoxy Mortar Coat

2.2.3 G ROGrout Coat

2.2.4 G ROUrethane Topcoat

2.3 G ROWhite Aluminum Oxide Non-Skid

Grit

1.7 G ROPatch Test Demonstration

1.3.4.2 G RODaily Inspection Report

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 73 PAGES

09 67 23.16 3.12.3 G ROAdhesion Testing

SD-07 Certificates

1.3.2 G ROCoating Work Plan

1.3.5.5 G ROQualifications of Coating

Contractors

1.3.5.6 G ROJoint Sealant Certificates

1.3.5.7 G ROEpoxy Mortar Flooring System

Certificates

1.3.5.1Qualifications of Certified

Industrial Hygienist (CIH)

1.3.5.2Qualifications of Certified

Protective Coatings Specialist

(PCS)

1.3.5.3Qualifications of Coating

Inspection Company

1.3.5.4Qualifications of QC Specialist

Coating Inspector

1.8 G ROWarranty

SD-08 Manufacturer’s Instructions

1.3.6.1 G ROJoint Sealant Manufacturer's

Instructions

1.3.6.2 G ROEpoxy Mortar Flooring System

Manufacturer's Instructions

1.3.6.3 G ROWater-Based Alkaline Degreaser

SD-11 Closeout Submittals

3.12.2.2 G ROInspection Logbook

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 73 PAGES

09 90 00 SD-02 Shop Drawings

3.10Piping Identification

SD-03 Product Data

2.1 G ROCoating

2.1Product Data Sheets

Sealant

SD-04 Samples

2.2 G ROColor

SD-07 Certificates

1.5.5.2 G ROQualification Testing

1.5.4Indoor Air Quality for Paints and

Primers

1.5.4Indoor Air Quality for

Consolidated Latex Paints

SD-08 Manufacturer’s Instructions

3.2.1Application Instructions

2.1Mixing

1.7.1Manufacturer's Safety Data

Sheets

SD-10 Operation and Maintenance

Data

2.1 G ROCoatings

10 14 00.20 SD-02 Shop Drawings

1.3.2 G RODetail Drawings

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 73 PAGES

10 14 00.20 2.1 G RORoom Identification And

Directional Signage System

2.2 G ROExit Door Tactile Sign

2.3 G RODoor Tags

SD-04 Samples

1.3.1 G ROInterior Signage

2.1 G RORoom Identification And

Directional Signage System

2.2 G ROExit Door Tactile Sign

2.3 G RODoor Tags

SD-10 Operation and Maintenance

Data

3.2 G ROApproved Manufacturer's

Instructions

3.2.2 G ROProtection and Cleaning

10 28 13 SD-02 Shop Drawings

2.1 G ROProduct Schedule

SD-03 Product Data

2.1 SRecycled content for stainless

steel toilet accessories

G ROItem A5090

2.1.3 GItem A5109

2.1.4 G ROItem A5202

SD-07 Certificates

Baby Changing Stations

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 73 PAGES

10 28 13 SD-10 Operation and Maintenance

Data

2.1.3 G ROItem A5109

2.1.4 G ROItem A5202

10 44 16 SD-02 Shop Drawings

2.1.1Fire Extinguishers

GRO

Part 2Accessories

Part 2Cabinets

2.2.2Wall Brackets

1.5Schedule

SD-03 Product Data

2.1.1Fire Extinguishers

GRO

Part 2Accessories

Part 2Cabinets

2.2.2Wall Brackets

3.2.1Replacement Parts List

SD-04 Samples

1.3.1Equipment Samples

GRO

SD-07 Certificates

2.1.1Fire Extinguishers Certifications

GRO

1.4Manufacturer's Warranty with

Inspection Tag

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 73 PAGES

10 51 13 SD-02 Shop Drawings

2.1 G ROTypes

1.4 G ROLocation

3.1Installation

3.2Numbering system

SD-03 Product Data

2.2Material

Locking Devices

2.3.2Handles

2.2.3Finish

2.3components

3.1Assembly

SD-04 Samples

1.5.1 G ROColor chips

21 13 13 SD-01 Preconstruction Submittals

1.2.3 GQualified Fire Protection Engineer

(QFPE)

FP

FP

FP

1.4.2.1 GSprinkler System Designer

1.4.2.2 GSprinkler System Installer

SD-02 Shop Drawings

1.2.1.1 GShop Drawing

FP

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 73 PAGES

21 13 13 2.2.1 GPipe

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

2.3.1.2 GFittings

2.3.4 GValves

2.3.5 GRiser Check Valves

2.8.5 GRelief Valves

2.7 GSprinklers

2.3.3 GPipe Hangers and Supports

2.4.1 GSprinkler Alarm Switch

2.4.2 GValve Supervisory (Tamper)

Switch

2.6 GFire Department Connection

2.5 GBackflow Prevention Assembly

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 73 PAGES

21 13 13 2.8.6 GAir Vent

2.3.3 GSeismic Bracing

2.1.2 GNameplates

SD-05 Design Data

2.3.3 GSeismic Bracing

FP

FP

1.2.1.2 GHydraulic Calculations

SD-06 Test Reports

3.7.1 GTest Procedures

FP

SD-07 Certificates

3.7.2.1 GVerification of Compliant

Installation

FP

FP

3.7.2.2 GRequest for Government Final

Test

SD-10 Operation and Maintenance

Data

3.9 GOperating and Maintenance

(O&M) Instructions

FP

FP

1.6 GSpare Parts

SD-11 Closeout Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 73 PAGES

21 13 13 3.9As-built drawings

21 30 00 SD-01 Preconstruction Submittals

1.3Fire Pump Installation Related

Submittals

1.7.1 GQualified Fire Protection Engineer

(QFPE)

FP

SD-02 Shop Drawings

3.3.1 GInstallation Drawings

FP

FP

FP

FP

3.10.2 GAs-Built Drawings

3.3.2 GPiping Layout

3.3.2 GPump Room

SD-03 Product Data

2.1 GCatalog Data

FP

FP

FP

FP

FP

FP

1.6 GSpare Parts

3.8.2 GPreliminary Tests

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 73 PAGES

21 30 00 3.8 GField Tests

1.7.7 GManufacturer's Representative

3.10.1 GField Training

3.8.3Air Force Final Acceptance Test

SD-06 Test Reports

3.8.2 GPreliminary Tests

FP

3.8.3Air Force Final Acceptance Test

SD-07 Certificates

1.7.1Qualified Fire Protection Engineer

(QFPE)

1.7.2 GQualifications of Welders

FP

FP

FP

FP

1.7.4 GQualifications of Installer

1.7.5 GPreliminary Test Certification

1.7.6 GFinal Test Certification

SD-10 Operation and Maintenance

Data

3.10.1 GOperating and Maintenance

Instructions

FP

FP

2.13 GFlow Meter

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 37 OF 73 PAGES

22 00 00 SD-02 Shop Drawings

3.9.1 GPlumbing System

SD-03 Product Data

3.9.1.1 GBackflow Prevention Assemblies

2.6.2 GShower Faucets

2.4.2 SWaterSense Label for Lavatory

Faucet

2.4Fixtures

2.4.1Flush Valve Water Closets

2.4.1 SWaterSense Label for Flush

Valve Water Closet

2.4.2Wall Hung Lavatories

2.4.3Kitchen Sinks

2.4.4Service Sinks

2.4.5 GDrinking-Water Coolers

2.4.5 SEnergy Star Label for Electric

Water Cooler

2.4.6 SEnergy Star Label for Wheelchair

Electric Water Cooler

2.6.2 SWaterSense Label for

Showerhead

2.9 GWater Heaters

2.9.1.1 SEnergy Star Label for Gas

Storage Water Heater

2.9.2 SEnergy Star Label for Gas

Instantaneous Water Heater

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 38 OF 73 PAGES

22 00 00 2.10 GPumps

1.5.1Welding

3.4 GVibration-Absorbing Features

3.9.1Plumbing System

SD-06 Test Reports

3.9Tests, Flushing and Disinfection

3.9.1.1 GTest of Backflow Prevention

Assemblies

SD-07 Certificates

1.3Materials and Equipment

2.1.1Bolts

SD-10 Operation and Maintenance

Data

3.9.1 GPlumbing System

23 05 48.19 SD-02 Shop Drawings

3.1Coupling and Bracing

3.3Flexible Couplings or Joints

2.2Equipment Restraint

1.2.4 GContractor Designed Bracing

SD-03 Product Data

3.1 GCoupling and Bracing

3.3 GFlexible Couplings Or Joints

2.2 GEquipment Restraint

1.2.4 GContractor Designed Bracing

2.5Snubbers

3.9Anchor Bolts

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 39 OF 73 PAGES

23 05 48.19 2.2.2Vibration Isolators

SD-05 Design Data

1.2.4Design Calculations

SD-06 Test Reports

3.9 GAnchor Bolts

23 05 93 SD-02 Shop Drawings

1.3.3 GTAB Schematic Drawings and

Report Forms

SD-03 Product Data

1.3 GEquipment and Performance

Data

SD-06 Test Reports

3.3.5 GCompleted Pre-Final DALT

Report

3.3.8 GCertified Final DALT Report

SD-07 Certificates

1.5.1 GIndependent TAB Agency and

Personnel Qualifications

3.7 GDALT and TAB Procedures

Summary

3.7 GCompleted Pre-Final DALT Work

Checklist

3.3.2Advance Notice Of Pre-Final Dalt

Field Work

23 07 00 SD-02 Shop Drawings

3.2.2.4 GMICA Plates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 40 OF 73 PAGES

23 07 00 2.3Pipe Insulation Systems

3.2Pipe Insulation Systems

3.3Duct Insulation Systems

2.5Equipment Insulation Systems

2.3.1 SRecycled content for insulation

materials

SD-03 Product Data

2.3 GPipe Insulation Systems

3.2 GPipe Insulation Systems

3.3 GDuct Insulation Systems

2.5 GEquipment Insulation Systems

SD-04 Samples

2.2.1.3 GThermal Insulation

3.1.1 GDisplay Samples

SD-07 Certificates

2.2.1 SIndoor air quality for adhesives

SD-08 Manufacturer’s Instructions

2.3 GPipe Insulation Systems

3.2 GPipe Insulation Systems

3.3 GDuct Insulation Systems

2.5 GEquipment Insulation Systems

23 09 00 SD-02 Shop Drawings

3.2 GDDC Contractor Design Drawings

3.2 GDraft As-Built Drawings

3.2 GFinal As-Built Drawings

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 41 OF 73 PAGES

23 09 00 1.8.3 GProgramming Software

1.8.4 GController Application Programs

1.8.1 GConfiguration Software

1.8.2 GController Configuration Settings

2.2 GManufacturer's Product Data

1.8.5 GNiagara Framework Supervisory

Gateway Backups

1.8.6 GNiagara Framework Engineering

Tool

1.5 GNiagara Framework Wizards

SD-06 Test Reports

1.9.1 GPre-Construction Quality Control

(QC) Checklist

1.9.2 GPost-Construction Quality Control

(QC) Checklist

3.4.2 GStart-Up Testing Report

3.5.1 GPVT Procedures

3.5.3 GPVT Report

SD-10 Operation and Maintenance

Data

3.6 GOperation and Maintenance

(O&M) Instructions

3.8.1 GTraining Documentation

SD-11 Closeout Submittals

2.4 GEnclosure Keys

3.1.6.1 GPassword Summary Report

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 42 OF 73 PAGES

23 09 00 1.9.3 GCloseout Quality Control (QC)

Checklist

23 11 20 SD-02 Shop Drawings

1.5.2 GGas Piping System

2.2 GGas Piping System

3.3 GGas Piping System

SD-03 Product Data

2.2.9 GPipe and Fittings

1.5.2 GGas Equipment Connectors

1.5.2 GGas Piping System

2.2 GGas Piping System

3.3 GGas Piping System

2.1 GPipe Coating Materials

2.6 GPressure Regulators

2.7.1 GPressure Regulators

2.4 GRisers

2.2.7 GTransition Fittings

2.3 GValves

2.2.3 GWarning and Identification Tape

2.7.2 GGas Meter

SD-06 Test Reports

3.18 GTesting

3.18.1 GPressure Tests

3.18.2 GTest with Gas

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 43 OF 73 PAGES

23 11 20 1.5.1 GWelders Procedures and

Qualifications

1.5.1 GAssigned Number, Letter, or

Symbol

SD-08 Manufacturer’s Instructions

2.1 GPipe Coating Materials

SD-10 Operation and Maintenance

Data

1.3.1 GGas Facility System and

Equipment Operation

1.3.2 GGas Facility System Maintenance

1.3.3 GGas Facility Equipment

Maintenance

23 23 00 SD-02 Shop Drawings

2.3 GRefrigerant Piping System

SD-03 Product Data

2.3Refrigerant Piping System

1.5.2Spare Parts

3.5Refrigerant Piping Tests

3.1Verification of Dimensions

SD-06 Test Reports

3.5Refrigerant Piping Tests

SD-07 Certificates

2.1Service Organization

SD-10 Operation and Maintenance

Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 44 OF 73 PAGES

23 23 00 1.5 GMaintenance

3.4 GOperation and Maintenance

Manuals

3.4 GDemonstrations

23 30 00 SD-02 Shop Drawings

1.4.4 GDetail Drawings

SD-03 Product Data

2.9.1.1Insulated Nonmetallic Flexible

Duct Runouts

2.9.1.1Duct Connectors

2.9.2 GDuct Access Doors

2.9.3 GManual Balancing Dampers

2.9.6.1Diffusers

2.9.6.2Registers and Grilles

2.9.7Louvers

2.10.1.1Centrifugal Fans

2.10.1.2In-Line Centrifugal Fans

2.10.1.3Centrifugal Type Power Wall

Ventilators

2.10.1.4Ceiling Exhaust Fans

2.10.1.4 SPL-109-58 label for ceiling

exhaust fan product

2.11.1Electric Unit Heaters

1.4.5Test Procedures

1.2.1.2 GDiagrams

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILE…