This document appears to be an Appendix A - Cost Breakdown worksheet that is part of a federal contract opportunity. The contract opportunity is for the renovation of Building 454 into a new Wash Rack facility at Columbus Air Force Base. The solicitation number is FA302224R0009, and the range of magnitude for the procurement is between $5,000,000.00 and $10,000,000.00.
The cost breakdown worksheet includes line items for bonds and insurance, mobilization, architecture and engineering design, materials, equipment, labor, and miscellaneous charges. The proposal is due by 12:00 PM CST on Monday, August 26, 2024. A site visit is scheduled for Tuesday, August 13, 2024 at 9:00 AM CST, and additional RFIs must be submitted by 5:00 PM CST on Friday, August 16, 2024. Contractors must complete CUI training and sign an acknowledgment form to gain access to the drawings and other CUI documentation.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Geotechnical Report.pdf | ||
| B454 RFIs Answers clarification.docx | DOCX document | |
| B454 RFIs with Answers.pdf | ||
| Solicitation Amendment FA302224R00090004 SF 30.pdf | ||
| Solicitation Amendment FA302224R00090003 SF 30.pdf | ||
| Solicitation Amendment FA302224R00090002 SF 30.pdf | ||
| Solicitation Amendment FA302224R00090001 SF 30.pdf | ||
| B454 - Statement of Work.pdf | ||
| Wage Determination DBA MS20240045.pdf | ||
| Solicitation - FA302224R0009.pdf | ||
| Contractor CUI Training Slides.pptx | PPTX presentation | |
| Form 66 -- Submittal Register -- B454.pdf | ||
| MFR Contractor CUI Training Acknowledgment for Solicitations.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Appendix A |
| CONSTRUCTION PRICE PROPOSAL BREAKDOWN |
| VENDOR'S INFORMATION |
| Name: |
| Address: |
| Phone Number: |
| Email: |
| Cage Code: |
| SOLICITATION INFORMATION | ||||
| Title of Project: | ||||
| Solicitation Number: | ||||
| Days proposal good for: | ||||
| BONDS AND INSURANCE | QTY | UNIT OF ISSUE | PRICE | TOTAL |
| Certificate of Insurance | 1 | |||
| Performance Bonds | 1 | |||
| Payment Bonds | 1 | |||
| Bid Bonds | 1 | |||
| MOBILIZATION | QTY | UNIT OF ISSUE | PRICE | TOTAL |
| ARCHITECTURE AND ENGINEERING DESIGN | QTY | UNIT OF ISSUE | PRICE | TOTAL |
| 35% Design's | ||||
| 65% Design's | ||||
| 95% Design's | ||||
| 100% Design's (Construction Set) | ||||
| MATERIAL | QTY | UNIT OF ISSUE | PRICE | TOTAL |
| EQUIPMENT | QTY | UNIT OF ISSUE | PRICE | TOTAL |
| LABOR | HOURS | UNIT OF ISSUE | RATE | AMOUNT |
| MISCELLANEOUS CHARGES | QTY | UNIT OF ISSUE | PRICE | TOTAL |
| CONSTRUCTION PROJECT | GRAND TOTAL | |||
| GENERAL INFORMATION | ||||
| The purpose of the requested information in the attached worksheets is to assist government personnel in the review and evaluation of proposals submitted by offerors. Offerors are reminded that the responsibility for providing adequate supporting data and attachments lies solely with them. Further, the offeror shall bear the burden of proof in establishing reasonableness of proposed pricing; therefore, it is in the offeror’s best interest to submit a fully supportable and well-prepared cost proposal. The basis and rationale for all proposed costs should be provided as part of the proposal so that Government personnel can place reliance on the information as current, complete and accurate. Further, FAR 15.403-4 sets forth those circumstances in which offerors are required to submit other than certified cost or pricing data. |
supportable and well-prepared propsal. The basis and rationale for all proposed pricing should be provided as part of the proposal so that Government personnel can place reliance on the information as current, complete and accurate.