Form_5_-_Relevant_Experience.docx
DOCX document 18 KB Posted
- Attached to
- CERCLA TCRA at burn sites in Rocky Mtn NP, CO
- Solicitation number
- 140P2123R0008
About this file
This request for proposals solicits a firm-fixed-price construction contract to conduct a time-critical removal action under the Comprehensive Environmental Response, Compensation, and Liability Act at up to four locations within Rocky Mountain National Park that burned in a 2020 wildfire. The contractor will remove debris including vegetation, ash, wood, contaminated soil, structures, concrete, metal articles, trees, stumps, light ballasts, containers, waste, and equipment from twenty-two burn sites. In addition to base requirements, the solicitation includes options for additional site cleanups, risk assessments, and sampling. Proposals are due approximately 30 days after posting of the request for proposals on the System for Award Management website. The National Park Service will award a best value contract to the responsible small business offeror whose proposal represents the best overall value.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation #140P2123R0008, Conduct TCRA under CERCLA Rocky Mountain NP
FORM 5: Relevant Experience READ CAREFULLY: The purpose of this form is for the offeror to list projects (preferably performed during the past five (5) years) that are similar to the work described in this solicitation and from whom the government may gather past performance information. Work performed as prime or subcontractor may be included. The number of projects listed shall not exceed ten (10) and shall be numbered consecutively, beginning with the most recent project. Use this form to address your familiarity with the Scope of Work described in the plans and specifications and with the capability criteria described in the Request for Proposal.
It is especially important that the offeror disclose instances in which their past performance may be considered by others to be less than fully satisfactory. The offeror should tell their side of the story and describe remedial corrective action that has been taken or will be taken to correct the deficiency. Failure to do so may result in a determination that an offeror has been less than candid with the Government, which could result in an unfavorable assessment of the offeror’s past performance record.
NAME OF CONTRACTOR/OFFEROR:
On this project the offeror was a ☐ Prime or ☐ Subcontractor.
PROJECT NAME:
Project Location:
Name of Owner:
Address of Owner:
Telephone Number:
Project Value:
Dates of Construction:
DESCRIPTION OF THE PROJECT AND SCOPE OF OFFEROR’S WORK:
PERFORMANCE REMARKS:
File details come from the government source that posted it. Updated .