- CERCLA TCRA at burn sites in Rocky Mtn NP, CO
- Solicitation number
- 140P2123R0008
About this file
This document summarizes a request for proposals for a CERCLA time-critical removal action at burn sites in Rocky Mountain National Park, Colorado. The National Park Service seeks a contractor to conduct confirmation sampling and removal of ash, debris, and contaminated soil at up to four locations impacted by the 2020 East Troublesome wildfire. Services include waste characterization, transport, and disposal. Sampling and risk assessments are also required, with options for additional sites and analyses. The solicitation is set aside for small businesses and offers are due approximately 30 days after posting to SAM.gov. The contract type will be firm-fixed-price and subject to Davis-Bacon wage rates, with a magnitude between $1M-$5M.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Form 2 Contract Price Schedule Contract Price Schedule, RFP 140P2123R0008 Offeror name:
INSTRUCTIONS
Enter price for all line items; failure to do so may render the offer non-responsive. On lump-sum-priced line items, provide the total price only. If no specific line item exists for a portion of the work, include the costs in a related item. In case of multiplication errors, the corrected amount using stated unit price multiplied by estimated quantity governs over line item total price. In case of summation error, the total corrected amount governs. Complete this sheet, save as PDF, and return with other documents listed in RFP.
| All work shall be performed in accordance with Attachment 1, Statement of Work (SOW), and wage determinations. Refer to Section 12 of the SOW for line item definitions. Unit abbreviations: LS = lump sum; TN = ton; CY = cubic yard |
| The estimated quantities listed below will be used for price evaluation purposes and are not a guarantee of future quantities. If needed to meet site remediation goals, the government may require the contractor to perform excavation, disposal, importation, and/or testing in accordance with the SOW. This work will be authorized by the Contracting Officer in writing and formalized by unilateral contract modification. Refer to Paragraphs G.1, H.7, and H.8 of the RFP. |
| ITEM AND DESCRIPTION | Unit | Estimated Quantity | Unit Price | LINE ITEM TOTAL PRICE |
| Item 1: Base Contract support tasks – includes those listed in Sections 3 and 4 and all activities not separately listed in the SOW or identified below; excludes tasks labeled as options in the SOW. | LS | -- | -- | |
| Item 2: Collect, containerize, transport, and dispose of approximately 10 presumed PCB light ballasts from Betty Dick Garage Site | LS | -- | -- | |
| Location: Moraine Park (MP) Stables Area (Base Contract) | ||||
| Item 3: Mobilization, erosion/stormwater controls, work site controls, IDW, site restoration, and demobilization | LS | -- | -- | |
| Item 4: Collect/Excavate ash, debris, metal and soil (includes labor, materials, equipment, safety/PPE, dust control, environmental oversight) | TN | 133 | $ - 0 | |
| Item 5: Transport of non-RCRA hazardous materials presumed to contain friable asbestos | TN | 133 | $ - 0 | |
| Item 6: Characterization and disposal of non-RCRA hazardous materials presumed to contain friable asbestos | TN | 133 | $ - 0 | |
| Item 7: Import and placement of clean fill, grading, permanent site stabilization | CY | 124 | $ - 0 | |
| Location: Green Mountain-Onahu Ranch Area (GM) (Base contract) | ||||
| Item 8: Mobilization, erosion/stormwater controls, work site controls, IDW, site restoration, and demobilization | LS | -- | -- | |
| Item 9: Collect/Excavate ash, debris, metal and soil (includes labor, materials, equipment, safety/PPE, dust control, environmental oversight, arch monitoring) | TN | 1341 | $ - 0 | |
| Item 10: Transport of non-RCRA hazardous materials presumed to contain friable asbestos | TN | 1341 | $ - 0 | |
| Item 11: Characterization and disposal of non-RCRA hazardous materials presumed to contain friable asbestos | TN | 1341 | $ - 0 | |
| Item 12: Transport scrap metal for recycle, including any recycling fees | CY | 24 | $ - 0 | |
| Item 13: CABI ACM Inspection/testing of standing chimneys/ pumphouse and report | LS | -- | -- | |
| Item 14: Demolition of poured concrete slabs/foundations and standing chimneys/pumphouse | TN | 277 | $ - 0 | |
| Item 15: Transport of non-RCRA hazardous concrete | TN | 277 | $ - 0 | |
| Item 16: Disposal of non-RCRA hazardous concrete | TN | 277 | $ - 0 | |
| Item 17: Import and placement of clean fill, grading, permanent site stabilization, revegetation | CY | 1512 | $ - 0 | |
| Item 18: Confirmation sampling, analyses, and data validation for all Sampling Units at Moraine Park Stables and Green Mountain / Onahu Ranch Area Sites (metals, dioxins/furans) | LS | -- | -- | |
| Item 19: Confirmation asbestos inspection and sampling for all Sites at Moraine Park Stables and Green Mountain / Onahu Ranch Area Sites | LS | -- | -- | |
| TOTAL FOR ITEMS 1 through 19: | $ - 0 | |||
| Option GM-1: Collection, containerizing, characterization, transport, and disposal of miscellaneous hazmat/hazardous waste items (up to 100 pounds) | LS | -- | -- | |
| Option S-1: Additional confirmation sampling, analyses, and data validation per Sampling Unit at Moraine Park Stables and Green Mountain / Onahu Ranch Area Sites (metals, dioxins/furans) | EA | -- | -- | |
| Optional Location: Betty Dick Garage (BDG) | ||||
| Option BDG-1: Contract support tasks – includes those listed in Sections 3 and 4 and all activities not separately listed in the SOW or identified below. | LS | -- | -- | |
| Option BDG-2: Mobilization, erosion/stormwater controls, work site controls, IDW, site restoration, and demobilization | LS | -- | -- | |
| Option BDG-3: Collect/Excavate ash, debris, metal and soil (includes labor, materials, equipment, safety/PPE, dust control, environmental oversight, arch monitoring, transport to staging area and loading onto trucks) | TN | 46 | $ - 0 | |
| Option BDG-4: Transport of non-RCRA hazardous materials presumed to contain friable asbestos | TN | 46 | $ - 0 | |
| Option BDG-5: Characterization and disposal of non-RCRA hazardous materials presumed to contain friable asbestos | TN | 46 | $ - 0 | |
| Option BDG-6: Transport scrap metal for recycle, including any recycling fees | TN | 10 | $ - 0 | |
| Option BDG-7: Grading/contouring of soil removal area | LS | -- | -- | |
| Option SBDG-1: Confirmation sampling, analyses, and data validation for two Sampling Units at Betty Dick Garage Site (metals, dioxins/furans) | LS | -- | -- | |
| Option SBDG-2: Confirmation asbestos inspection and sampling for Betty Dick Ranch Garage Site | LS | -- | -- | |
| TOTAL FOR OPTIONS BDG-1 through BDG-7 and SBDG-1 and SBDG-2: | $ - 0 | |||
| Option SBDG-3: Additional confirmation sampling, analyses, and data validation per Sampling Unit at Betty Dick Garage Site (metals, dioxins/furans) | EA | -- | -- | |
| Optional Location: Fern Lake Ranger Station (FLR) | ||||
| Option FLR-1: Contract support tasks – includes those listed in Sections 3 and 4 and all activities not separately listed in the SOW or identified below. | LS | -- | -- | |
| Option FLR-2: Mobilization, erosion/stormwater controls, work site controls, IDW, site restoration, and demobilization | LS | -- | -- | |
| Option FLR-3: Collect/Excavate ash, debris, metal and soil (includes labor, materials, equipment, safety/PPE, dust control, environmental oversight, arch monitoring, transport to staging area and loading onto trucks) | TN | 24 | $ - 0 | |
| Option FLR-4: Transport of non-RCRA hazardous materials presumed to contain friable asbestos | TN | 24 | $ - 0 | |
| Option FLR-5: Characterization and disposal of non-RCRA hazardous materials presumed to contain friable asbestos | TN | 24 | $ - 0 | |
| Option FLR-6: Grading/contouring of soil removal area | LS | -- | -- | |
| Option SFLR-1: Confirmation sampling, analyses, and data validation for one Sampling Units at Fern Lake Ranger Station Site (metals, dioxins/furans) | LS | -- | -- | |
| Option SFLR-2: Confirmation asbestos inspection and sampling for Fern Lake Ranger Station Site | LS | -- | -- | |
| TOTAL FOR OPTIONS FLP-1 through FLP-6 and SFLR-1 and SFLR-2: | $ - 0 | |||
| Option SFLR-3: Additional confirmation sampling, analyses, and data validation per Sampling Unit at Fern Lake Ranger Station Site (metals, dioxins/furans) | EA | -- | -- | |
| Optional Risk Assessments | ||||
| Option A: Perform Human Health Risk Assessment | LS | -- | -- | |
| Option B: Perform Screening Level Ecological Risk Assessment | LS | -- | -- | |
| Option C: Perform Baseline Ecological Risk Assessment | LS | -- | -- |
TCRA at Rocky Mountain NP &F Page &P of &N