This document summarizes a request for proposals for a CERCLA time-critical removal action at burn sites in Rocky Mountain National Park, Colorado. The National Park Service seeks a contractor to conduct confirmation sampling and removal of ash, debris, soil and structures at up to four locations impacted by the 2020 East Troublesome wildfire. Work includes characterization, transportation and disposal of materials, including asbestos, grading and restoration. The base scope addresses two locations, while options exist for additional sites. The contractor must also perform risk assessments and further sampling and analysis if required. Proposals are due approximately 30 days from posting at SAM.gov pursuant to a small business set-aside under NAICS code 562910. The contract type will be firm-fixed-price and subject to Davis-Bacon wage rates, with estimated value between $1-5 million.

View the file

Other files

File Type Posted
Attachment_7a_Revised_Wage_Determination_CO20230002_Larimer_5-12-2023_0004.pdf PDF
Attachment_9a_Clarifications_52_-_62_140P2123R0008_0004.pdf PDF
Sol_140P2123R0008_Amd_0004.pdf PDF
Sol_140P2123R0008_Amd_0003.pdf PDF
Sol_140P2123R0008_Amd_0002.pdf PDF
Form_2_Price_Schedule_(corrected_5-10-23)_0002.xlsx XLSX spreadsheet
Attachment_9_Clarifications_1-51_0002.pdf PDF
Attachment_4_-_East_Troublesome_Wildfire_SAP_Draft_Final_0001.pdf PDF
Sol_140P2123R0008_Amd_0001.pdf PDF
Attachment_2_-_Rocky_Mountain_National_Park_East_Troublesome_Fire_Draft_Site_Data_Tables.pdf PDF
Form_5_-_Relevant_Experience.docx DOCX document
Form_2_Price_Schedule_(after_SOL_review).xlsx XLSX spreadsheet
FAQs_for_RFP_140P2123R0008.pdf PDF
Sol_140P2123R0008.pdf PDF
Attachment_1_-_Statement_of_Work.pdf PDF
Form_1_SF1442_-_RFP_140P2123R0008.pdf PDF
Attachment_7_-_Wage_Determination_CO20230002_Larimer_4-6-2023.pdf PDF
Form_4_-_Limitations_on_Subcontracting_compliance_worksheet.xlsx XLSX spreadsheet
Attachment_3_-_Colorado_Department_of_Public_Health_and_Environmental_East_Troublesome_Wildfire_Guidance_with_Disposal_Form.pdf PDF
Form_3_-_FAR_representations.docx DOCX document
Form_6_-_General_References.docx DOCX document
Attachment_5_-_Rocky_Mountain_National_Park_East_Troublesome_Fire_Final_Identification_and_quantification_of_debris_memo.pdf PDF
Attachment_8_-_Wage_Determination_CO20230003_Grand_2-24-2023.pdf PDF
Attachment_6_-_Archeological_Monitoring_Requirements.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Form 2 Contract Price Schedule Contract Price Schedule, RFP 140P2123R0008 Offeror name:

INSTRUCTIONS

Enter price for all line items; failure to do so may render the offer non-responsive. On lump-sum-priced line items, provide the total price only. If no specific line item exists for a portion of the work, include the costs in a related item. In case of multiplication errors, the corrected amount using stated unit price multiplied by estimated quantity governs over line item total price. In case of summation error, the total corrected amount governs. Complete this sheet, save as PDF, and return with other documents listed in RFP.

All work shall be performed in accordance with Attachment 1, Statement of Work (SOW), and wage determinations. Refer to Section 12 of the SOW for line item definitions. Unit abbreviations: LS = lump sum; TN = ton; CY = cubic yard
The estimated quantities listed below will be used for price evaluation purposes and are not a guarantee of future quantities. If needed to meet site remediation goals, the government may require the contractor to perform excavation, disposal, importation, and/or testing in accordance with the SOW. This work will be authorized by the Contracting Officer in writing and formalized by unilateral contract modification. Refer to Paragraphs G.1, H.7, and H.8 of the RFP.
ITEM AND DESCRIPTIONUnitEstimated QuantityUnit PriceLINE ITEM TOTAL PRICE
Item 1: Base Contract support tasks – includes those listed in Sections 3 and 4 and all activities not separately listed in the SOW or identified below; excludes tasks labeled as options in the SOW.LS----
Item 2: Collect, containerize, transport, and dispose of approximately 10 presumed PCB light ballasts from Betty Dick Garage SiteLS----
Location: Moraine Park (MP) Stables Area (Base Contract)
Item 3: Mobilization, erosion/stormwater controls, work site controls, IDW, site restoration, and demobilizationLS----
Item 4: Collect/Excavate ash, debris, metal and soil (includes labor, materials, equipment, safety/PPE, dust control, environmental oversight)TN133$ - 0
Item 5: Transport of non-RCRA hazardous materials presumed to contain friable asbestosTN133$ - 0
Item 6: Characterization and disposal of non-RCRA hazardous materials presumed to contain friable asbestosTN133$ - 0
Item 7: Import and placement of clean fill, grading, permanent site stabilizationCY124$ - 0
Location: Green Mountain-Onahu Ranch Area (GM) (Base contract)
Item 8: Mobilization, erosion/stormwater controls, work site controls, IDW, site restoration, and demobilizationLS----
Item 9: Collect/Excavate ash, debris, metal and soil (includes labor, materials, equipment, safety/PPE, dust control, environmental oversight, arch monitoring)TN1341$ - 0
Item 10: Transport of non-RCRA hazardous materials presumed to contain friable asbestosTN1341$ - 0
Item 11: Characterization and disposal of non-RCRA hazardous materials presumed to contain friable asbestosTN1341$ - 0
Item 12: Transport scrap metal for recycle, including any recycling feesCY24$ - 0
Item 13: CABI ACM Inspection/testing of standing chimneys/ pumphouse and reportLS----
Item 14: Demolition of poured concrete slabs/foundations and standing chimneys/pumphouseTN277$ - 0
Item 15: Transport of non-RCRA hazardous concreteTN277$ - 0
Item 16: Disposal of non-RCRA hazardous concreteTN277$ - 0
Item 17: Import and placement of clean fill, grading, permanent site stabilization, revegetationCY1512$ - 0
Item 18: Confirmation sampling, analyses, and data validation for all Sampling Units at Moraine Park Stables and Green Mountain / Onahu Ranch Area Sites (metals, dioxins/furans)LS----
Item 19: Confirmation asbestos inspection and sampling for all Sites at Moraine Park Stables and Green Mountain / Onahu Ranch Area SitesLS----
TOTAL FOR ITEMS 1 through 19:$ - 0
Option GM-1: Collection, containerizing, characterization, transport, and disposal of miscellaneous hazmat/hazardous waste items (up to 100 pounds)LS----
Option S-1: Additional confirmation sampling, analyses, and data validation per Sampling Unit at Moraine Park Stables and Green Mountain / Onahu Ranch Area Sites (metals, dioxins/furans)EA----
Optional Location: Betty Dick Garage (BDG)
Option BDG-1: Contract support tasks – includes those listed in Sections 3 and 4 and all activities not separately listed in the SOW or identified below.LS----
Option BDG-2: Mobilization, erosion/stormwater controls, work site controls, IDW, site restoration, and demobilizationLS----
Option BDG-3: Collect/Excavate ash, debris, metal and soil (includes labor, materials, equipment, safety/PPE, dust control, environmental oversight, arch monitoring, transport to staging area and loading onto trucks)TN46$ - 0
Option BDG-4: Transport of non-RCRA hazardous materials presumed to contain friable asbestosTN46$ - 0
Option BDG-5: Characterization and disposal of non-RCRA hazardous materials presumed to contain friable asbestosTN46$ - 0
Option BDG-6: Transport scrap metal for recycle, including any recycling feesCY10$ - 0
Option BDG-7: Grading/contouring of soil removal areaLS----
Option SBDG-1: Confirmation sampling, analyses, and data validation for two Sampling Units at Betty Dick Garage Site (metals, dioxins/furans)LS----
Option SBDG-2: Confirmation asbestos inspection and sampling for Betty Dick Ranch Garage SiteLS----
TOTAL FOR OPTIONS BDG-1 through BDG-7 and SBDG-1 and SBDG-2:$ - 0
Option SBDG-3: Additional confirmation sampling, analyses, and data validation per Sampling Unit at Betty Dick Garage Site (metals, dioxins/furans)EA----
Optional Location: Fern Lake Ranger Station (FLR)
Option FLR-1: Contract support tasks – includes those listed in Sections 3 and 4 and all activities not separately listed in the SOW or identified below.LS----
Option FLR-2: Mobilization, erosion/stormwater controls, work site controls, IDW, site restoration, and demobilizationLS----
Option FLR-3: Collect/Excavate ash, debris, metal and soil (includes labor, materials, equipment, safety/PPE, dust control, environmental oversight, arch monitoring, transport to staging area and loading onto trucks)TN24$ - 0
Option FLR-4: Transport of non-RCRA hazardous materials presumed to contain friable asbestosTN24$ - 0
Option FLR-5: Characterization and disposal of non-RCRA hazardous materials presumed to contain friable asbestosTN24$ - 0
Option FLR-6: Grading/contouring of soil removal areaLS----
Option SFLR-1: Confirmation sampling, analyses, and data validation for one Sampling Units at Fern Lake Ranger Station Site (metals, dioxins/furans)LS----
Option SFLR-2: Confirmation asbestos inspection and sampling for Fern Lake Ranger Station SiteLS----
TOTAL FOR OPTIONS FLP-1 through FLP-6 and SFLR-1 and SFLR-2:$ - 0
Option SFLR-3: Additional confirmation sampling, analyses, and data validation per Sampling Unit at Fern Lake Ranger Station Site (metals, dioxins/furans)EA----
Optional Risk Assessments
Option A: Perform Human Health Risk AssessmentLS----
Option B: Perform Screening Level Ecological Risk AssessmentLS----
Option C: Perform Baseline Ecological Risk AssessmentLS----