This document is Standard Form 30 Amendment 006 for Solicitation FN1585-25, addressing engineering services for UNICOR's Federal Prison Industries dust collection system evaluation at FCC Coleman-Medium. The amendment provides detailed responses to 16 contractor questions, including clarifications on site visit documentation, drawing availability, and technical requirements. Key technical specifications include: client requires new static pressure calculations for dust collection systems, new air balance (CFM) sketches, installation of fire dampers in fire-rated walls, and balancing dampers for system optimization. Additional technical details revealed include manufacturer information for the existing dust collection system (E.S.I. MODEL 16AN ROTARY VALVE, Serial No. IG406700) and confirmation that a floor diagram schematic has been uploaded to Sam.gov. The questionnaire period ended March 5, 2025, with the solicitation focusing on engineering assessment of the wood furniture factory's dust collection infrastructure at the Coleman, Florida facility.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/ MODIFICATION OF CONTRACT

AMENDMENT OF

SOLICITATION/ MODIFICATION

OF CONTRACTAMENDMENT

PAGE OF PAGES

2. AMENDMENT/MODIFICATION NO.

3. EFFECTIVE DATE

4. REQUISITION/PURCHASE REQ. NO.

5. PROJECT NO. (If applicable)

A0006

03/11/2025

6. ISSUED BY

CODE

7. ADMINISTERED BY (If other than Item 6)

UNICOR, Federal Prison Industries 400 First Street NW Washington, DC 20534

See Block 6

8. NAME AND ADDRESS OF CONTRACTOR (No., street, country, State and Zip Code)

(x)

9A. AMENDMENT OF SOLICITATION NO.

FN1585-25

X

9B. DATED (SEE ITEM 11)

12/11/2024

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENT OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and the date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment number. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(X)

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, Appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103 (b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF :

X

D. OTHER (Specify type of modification and authority) FAR 15.206 Amending the Solicitation

E. IMPORTANT : Contractor is not, X is required to sign this document and return 1 copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

See Attachment A.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

Peyton Perry, Contract Specialist

15B. CONTRACTOR/OFFEROR

15C. DATE SIGNED

16B. UNITED STATES OF AMERICA

16C. DATE SIGNED

BY

(Signature of the person authorized to sign)

(Signature of contracting officer)

NSN 7540-01-152-8070

PREVIOUS EDITION UNUSABLE

30-105

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR(48 CFR) 53.243

Amendment 6 FN1585-25 Engineer Services

This amendment is written to answer questions asked during additional question phase:

1.0 When does the questionnaire period end? March 5, 2025

2.0 Can the client provide a list of attendees for both site visit? No

3.0 Can a 3D scan be performed within the workshop? No. However, a floor diagram with location of equipment has been uploaded to Sam.gov.

4.0 Can any existing mechanical, fire protection, architectural and / or shop equipment drawings of the building be provided prior to the bid? The Procurement Department has not received authorization to release this information.

5.0 Can any current drawings showing the equipment locations and / or the mechanical duct routing / connections be provided prior to the bid?

A floor diagram schematic has been uploaded to Sam.gov

6.0 Are there any existing CAD files of the building?

There is a floor diagram uploaded in Sam.gov. Otherwise, there are no other CAD files of the building that can be shared.

7.0 Could the air quality report that indicated the issues with the dust collection system be provided prior to the bid?

The air quality studies will be posted to Sam.gov at the same time as these questions.

8.0 Can any drawings or other resources indicating the air balance (CFM) at each piece of equipment for all four dust collection systems be provided prior to the bid?

There may be information meeting this requirement in the air quality studies.

Otherwise, UNICOR does not have this information.

9.0 Can the manufacturer’s data on the dust collection system or the make and model be provided prior to the bid?

Manufacturer: E.S.I. / MODEL 16AN ROTARY VALVE / Serial No. IG406700

10.0 Is the total cfm of each duct collection system available and can it be provided prior to bid?

There may be information meeting this requirement in the air quality studies.

Otherwise, UNICOR does not have this information.

11.0 Are the manufacturer's recommendations for cfm for dust collection for each piece of equipment available and can they be provided prior to bid?

UNICOR does not have this information

12.0 Can all photos taken during either site visit be uploaded as an attachment?

All photos have been uploaded to Sam.gov

13.0 Does the client require new static pressure calculations for every dust collection system? Yes

14.0 Does the client require new sketch / drawing indicating the air balance (CFM) for each piece of equipment and dust collect collection system? Yes

15.0 During the site visit there was a discussion about the lack of fire dampers within the exterior walls; is it the client’s preference for fire dampers to be added in all fire rated walls? Yes

16.0 During the site visit it was noticed that the current duct system has zero balancing dampers; is it the client’s preference for balancing dampers to be installed as required for balancing the system? Yes

Except as provided herein, all other terms and conditions remain unchanged.

AMENDMENT OF SOLICITATION/ MODIFICATION OF CONTRACT

File details come from the government source that posted it. Updated .