Floyd Little Athletic Center Flooring Project Manual

This is a Project Manual addendum prepared by the City of New Haven, Connecticut, Department of Engineering, for the flooring replacement project at the Floyd Little Athletic Center located at 480 Sherman Parkway, New Haven, Connecticut. The project scope includes removal of existing resilient flooring and installation of new flooring systems in a large hallway, atrium/lobby, two vestibules, and four two-story stairways. Work also encompasses repair of aluminum curtain wall sill plates in vestibules and performance of moisture mitigation on the slab-on-grade foundation. The flooring installation will consist of walk-off carpeting in vestibules, rubber flooring in stairways, and rubber flooring with multi-colored patterns in the hallway and atrium/lobby areas. The project will be executed under a single prime contract with the City of New Haven as the owner and Melissa Kops, City Engineer, serving as the architect and owner's representative. The owner will occupy the premises during construction with the exception of areas under active construction, and the contractor must maintain a nonsmoking environment within 50 feet of building entrances and operable windows.

The specification documents establish detailed requirements for moisture vapor emission control, resilient tile installation, and walk-off carpeting, with all materials required to meet specific performance standards including ASTM compliance, fire-test ratings of Class I, and environmental certifications such as Greenguard Gold and Red-List Free designations. Moisture control systems must include a 25-year extended warranty from a factory-trained certified applicator, and all adhesives are limited to specified volatile organic compound (VOC) content not exceeding 60 g/L for rubber floor adhesives and 50 g/L for carpet adhesives. The contractor is required to maintain ambient temperatures within manufacturer-recommended ranges, perform substrate preparation to ASTM F710 standards with a minimum concrete surface profile of CSP 3, and provide a 48-hour curing period before allowing traffic in completed areas. Carpet installation requires a 10-year warranty on materials and workmanship, with extra carpet materials of 10 percent of the installed amount to be provided for future maintenance purposes.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Floyd Little Athletic Center Flooring

Project Manual

May 27, 2026 Bid Documents photo of existing conditions

City of New Haven The Honorable Justin M. Elicker, Mayor

Giovanni Zinn, P.E., City Engineer

ARCHITECT

Department of Engineering

200 Orange Street New Haven, CT 06510 Contact: Melissa Kops

203.946.6447

Floyd Little Athletic Center Flooring May 27, 2026

TABLE OF CONTENTS

000110 - 1

SECTION 000110 - TABLE OF CONTENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

All of the following are on the bid portal:

BIDDING REQUIREMENTS

BID FORMS

GENERAL CONDITIONS

DIVISION 01 - GENERAL REQUIREMENTS

Section 011000 Summary

DIVISION 02 – EXISTING CONDITIONS

Section 024210 Existing Floor Removal

DIVISION 09 – FINISHES

Section 090561 Moisture Vapor Emission Control Section 096510 Resilient Tile Section 096810 Walk-Off Carpeting

ATTACHMENTS (Separate File)

Floyd Little Moisture Probing Report

DRAWINGS (Separate File)

A1.1 Flooring Plan and Notes

END OF TABLE OF CONTENTS

SUMMARY 011000 - 1

SECTION 011000 - SUMMARY

PART 1 - GENERAL

1.1 SUMMARY

A. This Section includes the following:

1. Work covered by the Contract Documents.

2. Use of premises.

3. Owner's occupancy requirements.

4. Specification formats and conventions.

1.2 WORK COVERED BY CONTRACT DOCUMENTS

A. Project Identification: Floyd Little Athletic Center Flooring

1. Project Location: 480 Sherman Parkway, New Haven, CT 06511

B. Owner: City of New Haven

1. Owner's Representative and Architect: Melissa Kops

C. The Work consists of the following:

1. This project involves the flooring replacement for a large hallway and atrium/ lobby, two vestibules, and four two-story stairways. Remove existing resilient flooring. Repair aluminum curtain wall sill plate in vestibules. Perform moisture mitigation on slab-on-grade. Install walk off mat in vestibules, rubber flooring in stairs and rubber flooring with a pattern in multiple colors in the hallway and atrium/ lobby.

D. Project will be constructed under a single prime contract.

1.3 USE OF PREMISES

A. General: Contractor shall have limited use of premises for construction operations as indicated on Drawings by the Contract limits.

B. Use of Site: Limit use of premises to work in areas indicated. Do not disturb portions of Project site beyond areas in which the Work is indicated. Coordinate staging area and building access with the Owner before starting Work.

1. Owner Occupancy: Allow for Owner occupancy of Project site and use by the public.

2. Driveways and Entrances: Keep driveways, parking, loading areas, and entrances serving premises clear and available to Owner, Owner's employees, and emergency vehicles at all times. Do not use these areas for parking or storage of materials.

SUMMARY 011000 - 2

a. Schedule deliveries to minimize use of driveways and entrances.

b. Schedule deliveries to minimize space and time requirements for storage of materials and equipment on-site.

C. Use of Existing Building: Maintain existing building in a weathertight condition throughout construction period. Repair damage caused by construction operations. Protect building and its occupants during construction period.

1.4 OWNER'S OCCUPANCY REQUIREMENTS

A. Partial Owner Occupancy: Owner will occupy the premises during entire construction period, with the exception of areas under construction. Cooperate with Owner during construction operations to minimize conflicts and facilitate Owner usage. Perform the Work so as not to interfere with Owner's operations. Maintain existing exits, unless otherwise indicated.

1. Maintain access to existing walkways, corridors, and other adjacent occupied or used facilities. Do not close or obstruct walkways, corridors, or other occupied or used facilities without written permission from Owner and authorities having jurisdiction.

1.5 WORK RESTRICTIONS

A. Nonsmoking Building: Smoking is not permitted within the building or within 50 feet of entrances, operable windows, or outdoor air intakes.

1.6 SPECIFICATION FORMATS AND CONVENTIONS

A. Specification Format: The Specifications are organized into Divisions and Sections using the 16-division format and CSI/CSC's "MasterFormat" numbering system.

1. Division 1: Sections in Division 1 govern the execution of the Work of all Sections in the Specifications.

B. Specification Content: The Specifications use certain conventions for the style of language and the intended meaning of certain terms, words, and phrases when used in particular situations.

These conventions are as follows:

1. Abbreviated Language: Language used in the Specifications and other Contract Documents is abbreviated. Words and meanings shall be interpreted as appropriate.

Words implied, but not stated, shall be inferred as the sense requires. Singular words shall be interpreted as plural, and plural words shall be interpreted as singular where applicable as the context of the Contract Documents indicates.

2. Imperative mood and streamlined language are generally used in the Specifications.

Requirements expressed in the imperative mood are to be performed by Contractor.

Occasionally, the indicative or subjunctive mood may be used in the Section Text for clarity to describe responsibilities that must be fulfilled indirectly by Contractor or by others when so noted.

a. The words "shall," "shall be," or "shall comply with," depending on the context, are implied where a colon (:) is used within a sentence or phrase.

SUMMARY 011000 - 3

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION (Not Used)

END OF SECTION 01100END OF SECTION 01100

EXISTING FLOOR REMOVAL 024210 - 1

SECTION 024210 – EXISTING FLOOR REMOVAL

PART 1 - SUMMARY

1.1 Section Includes: All labor, materials, equipment, and services to removal of existing flooring at locations indicated on drawings and as specified herein.

1.2 The work shall also include the following:

A. Removal of resilient flooring.

PART 2 - PRODUCTS (not used)

PART 3 - EXECUTION

3.1 Site Conditions:

A. There are no known electrical floor boxes in the flooring removal area.

3.2 Removal of Existing Flooring and Adhesive:

A. Keep exterior doors and windows open when weather permits and operate ventilation fans at maximum capacity during flooring and adhesive removal.

B. Remove existing flooring and wall base and adhesive from areas indicated and legally dispose of materials off site.

C. Vacuum floor immediately after existing flooring has been removed.

D. Thoroughly clean wall base area of adjacent walls.

END OF SECTION 024210

MOISTURE VAPOR EMISSION CONTROL 090561 - 1

SECTION 090561 - MOISTURE VAPOR EMISSION CONTROL

PART 1 - GENERAL

1.1 SUMMARY

A. This Section includes a single-coat, fast-curing, 100% solids epoxy moisture management system formulated to suppress excessive moisture vapor emissions in existing concrete and underlayment prior to installing flooring.

1. One-Coat Moisture Control System

2. Primer

3. Two-Part, Low Viscosity Rigid Polyurethane Crack & Joint Repair

4. Semi-Rigid Joint Sealant

5. Self-Leveling Underlayment

1.2 REFERENCES

A. ASTM F2170 - Relative Humidity in Concrete Floor Slabs Using in situ Probes

B. ASTM F710 - Standard Practice for Preparing Concrete Floors to Receive Resilient Flooring

C. ASTM C1583 - Standard Test Method for Tensile Strength of Concrete Surfaces and the Bond Strength or Tensile Strength of Concrete Repair and Overlay Materials by Direct Tension

D. ASTM E96 - Standard Test Methods for Water Vapor Transmission of Materials

E. ASTM D1308 - Standard Test Method for Effect of Household Chemicals on Clear and Pigmented Organic Finishes

F. ASTM F3010 – Two-Component Resin Based Membrane-Forming Moisture Mitigation Systems for Use Under Resilient Floor Coverings.

G. ASTM D2369 – Standard Test Method for Volatile Content of Coatings

H. ASTM D4263 - Standard Test Method for Indicating Moisture in Concrete by the Plastic Sheet Method

1.3 SUBMITTALS

A. Product Data: Submit manufacturer's product data. Include manufacturer’s Safety Data Sheets.

B. Qualification Data: For Installer

MOISTURE VAPOR EMISSION CONTROL 090561 - 2

1.4 QUALITY ASSURANCE

A. Installation of the product must be completed by a factory-trained applicator using mixing equipment and tools approved by the manufacturer.

B. Manufacturer Experience: Provide products of this section by companies which have successfully specialized in production of this type of work for not less than 3 years. Contact Manufacturer Representative prior to installation.

1.5 WARRANTY

A. Provide a 25-year extended Warranty. Certified applicator must file a pre-installation checklist with the manufacturer and receive written confirmation of the approval to proceed in order to obtain the extended Warranty.

1.6 DELIVERY, STORAGE AND HANDLING

A. Deliver products in original packaging, labeled with product identification, manufacturer, batch number and shelf life.

B. Store products in a dry area with temperature maintained between 50° and 85° F (10° and 29° C) and protect from direct sunlight.

C. Handle products in accordance with manufacturer's printed recommendations.

1.7 PROJECT CONDITIONS

A. Do not install material below 50° F (10° C) surface and air temperatures. These temperatures must also be maintained during and for 48 hours after the installation of products included in this section. Install quickly if substrate is warm and follow Manufacturer’s warm weather instructions.

PART 2 - PRODUCTS

2.1 MOISTURE VAPOR EMISSION CONTROL

A. One-Coat Moisture Control System for Concrete to Receive Underlayments and Toppings

1. Basis of Design Products:

a. ARDEX MC™ RAPID; Manufactured by ARDEX Americas, USA, (724) 2035000, www.ardexamericas.com

2. Performance and Physical Properties: Meet or exceed the following values for material cured at 70° F+/-3°F (21° C+/-3°C) and 50% +/-5% relative humidity:

a. Application: Manual

b. Material Requirements on CSP 3 Prepared Concrete: Approx. 250 - 270 sq. ft. (25 m2) per mixed unit for 10 mils, and approx. 170 – 190 sq. ft. (16 – 18 m2) per unit for 14 mils

c. Permeability (ASTM E96): 0.06 perms

MOISTURE VAPOR EMISSION CONTROL 090561 - 3

d. 14 pH solution (ASTM D1308): No effect

e. Working Time: 20 minutes

f. Pot Life: 20 minutes

g. VOC: 19.9 g/L, A+B, ASTM D2369

h. Walkable: Minimum of 4 hours

i. Prime and Install Underlayment: Minimum 4 hours, maximum 24 hour

2.2 HYDRAULIC CEMENT UNDERLAYMENT

A. Hydraulic Cement-based Self-Leveling Underlayment.

1. Basis of Design Products:

a. ARDEX V 1200™

1) Primer: ARDEX P 82™ Ultra Prime

2. Performance and Physical Properties: Meet or exceed the following values for material cured at 70° F+/-3°F (21° C+/-3°C) and 50% +/-5% relative humidity:

1) Application: Barrel Mix or Pump

2) Flow Time: 10 minutes

3) Final Set: Approx. 90 minutes iv. Compressive Strength: 4500 psi (315 kg/cm2) at 28 days, ASTM C109M.

4) Flexural Strength: 1000 psi (70 kg/cm2) at 28 days, ASTM C348.

5) VOC: 0

B. Water shall be clean, potable, and sufficiently cool (not warmer than 70°F).

2.3 CRACK AND JOINT REPAIR

A. Low Viscosity Rigid Polyurethane Crack and Joint Repair

1. Basis of Design Products:

a. ARDEX ARDIFIX™

B. Semi-Rigid Joint Sealant;

1. Basis of Design Products:

a. ARDEX ARDISEAL™ Rapid Plus Semi-Rigid Joint Sealant

PART 3 - EXECUTION

3.1 PREPARATION

A. Concrete Subfloors: Prepare substrate in accordance with manufacturer’s instructions.

1. Prior to proceeding please refer to ASTM F710 Standard Practice for Preparing Concrete

Floors to Receive Resilient Flooring. All concrete subfloors must be sound, solid, clean, and free of all oil, grease, dirt, curing compounds and any substance that might act as a bond breaker before application.

2. Mechanical preparation of the surface is required to obtain a minimum ICRI concrete surface profile of 3 (CSP 3). This substrate preparation must be by mechanical means, such as shot blasting.

MOISTURE VAPOR EMISSION CONTROL 090561 - 4

3. The concrete must have a minimum tensile strength of at least 150 psi (10.5 kg/cm2) for areas to receive normal foot traffic, and 200 psi (14 kg/cm2) for areas of heavy commercial traffic when tested in accordance with ASTM C1583.

4. Prior to beginning the installation, the relative humidity within the concrete can be measured (ASTM F2170). No standing water shall be present.

5. If the concrete substrate is too uneven to provide a uniform film thickness of the Moisture Control System (typically CSP 6 or higher), the substrate can be pre-smoothed. Please contact Manufacturer for guidance.

B. Crack and Joint Treatment

1. Dormant control joints and dormant cracks greater than a hairline (1/32’’ / 0.79 mm) must be pre-filled with Low Viscosity Rigid Polyurethane Crack and Joint Repair.

Dormant cracks and dormant control joints must be filled in strict accordance with the installation instructions provided by the Manufacturer. Once the dormant cracks and dormant control joints have been filled properly, broadcast sand to refusal, and allow these areas to cure thoroughly. Wearing an N-95 dust mask is recommended when broadcasting sand. Remove all excess sand prior to proceeding with the Moisture Control System installation.

2. All moving joints and moving cracks must be honored up through the Moisture Control System, the underlayment and the floor covering by installing a fully flexible sealing compound designed specifically for use in moving joints.

3.2 APPLICATION OF MOISTURE CONTROL SYSTEM:

A. Examine substrates and conditions under which materials will be installed. Do not proceed with installation until unsatisfactory conditions are corrected.

B. Coordinate installation with adjacent work to ensure proper sequence of construction. Protect adjacent areas from contact due to mixing and handling of materials.

C. Mixing: Comply with manufacturer's printed instructions and the following.

1. Each individual 22 lb. (10 kg) unit contains separate, pre-measured quantities of hardener

(Part B) and the resin (Part A). After opening each container, stir the individual components thoroughly before blending. The hardening agent (Part B) is added to the resin (Part A).

2. Pour all of the hardener into the resin portion and stir thoroughly for a minimum of 3 minutes using a low speed drill and an epoxy mixing paddle. Once mixed, pour some of the epoxy back into the hardener container, stir for 10 seconds, and then pour all of the contents back into the resin container. Mix for an additional 30 seconds before applying.

D. Application: Comply with manufacturer's printed instructions and the following.

1. The required thickness for the Moisture Control System is dependent on application.

Please refer to the technical data sheet for more information.

2. Apply the freshly mixed Moisture Control System at the minimum thickness specified in the technical data sheet to the prepared concrete surface in a uniform direction with a short-nap paint roller or notched squeegee with back-rolling for smoother surfaces, and a longer nap roller for more uneven substrates. To minimize the potential for pinhole formation, work the Moisture Control System into the surface with the roller to ensure maximum penetration. The Moisture Control System can also be worked into the surface with a paintbrush for hard to reach areas and corners.

MOISTURE VAPOR EMISSION CONTROL 090561 - 5

3. A sand broadcast is required for certain applications; see the technical data sheet. Where required, sand broadcast must proceed while the Moisture Control System is still in a fresh state (maximum 20 minutes). Wearing an N-95 dust mask is recommended when broadcasting sand.

4. Following the application of Moisture Control System and primer (if needed) or sand broadcast, install the selected Underlayment as outlined in the technical data sheet.

5. It is not necessary to re-test the substrate for moisture emissions prior to installing the coating or floor covering.

3.3 APPLICATION OF UNDERLAYMENT

A. Examine substrates and conditions under which materials will be installed. Do not proceed with installation until unsatisfactory conditions are corrected.

B. Coordinate installation with adjacent work to ensure proper sequence of construction. Protect adjacent areas from contact due to mixing and handling of materials.

C. Mixing: Comply with manufacturer's printed instructions.

D. For pump installations, Underlayment shall be mixed using the Manufacturer recommended Automatic Mixing Pumps. Contact the Manufacturer for complete pump operation instructions.

E. When mixing sanded materials, it is recommended to use a “gutter hook” vacuum attachment in combination with a wet/dry vacuum and HEPA dust extraction vacuum system. Additionally, each bag should be handled with care and emptied slowly to avoid creating a plume of dust.

Contact the Manufacturer for more details on air quality management.

F. Application: Comply with manufacturer's printed instructions.

G. Curing

1. Underlayment can be walked on in 2-3 hours after installation. The cure time required prior to installing finish flooring will vary with the thickness of the underlayment installation and the type of flooring being installed. Contact the manufacturer for information regarding recommended cure times.

3.4 FIELD QUALITY CONTROL

A. Where specified, field sampling of the products is to be done by taking an entire unopened bag/unit of the product being installed to an independent testing facility to perform testing.

There is no in-situ test method applicable for this system.

3.5 PROTECTION

A. Prior to the installation of the finish flooring, the surface of the underlayment should be protected from abuse by other trades by the use of plywood, Masonite or other suitable protection course.

END OF SECTION 090561

RESILIENT FLOOR TILE 096510 - 1

SECTION 096510 - RESILIENT FLOOR TILE

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Rubber floor tile.

2. Rubber stairway flooring and treads

1.2 SUBMITTALS

A. Product Data: For each type of product indicated including adhesives and VOC content.

B. Shop Drawings: For each type of floor tile. Include floor tile layouts, edges, columns, doorways, enclosing partitions, built-in furniture, cabinets, and cutouts.

C. Samples: Full-size units of each color and pattern of floor tile required.

D. Maintenance data.

1.3 QUALITY ASSURANCE

A. Fire-Test-Response Characteristics: As determined by testing identical products according to ASTM E 648 or NFPA 253 by a qualified testing agency.

1. Critical Radiant Flux Classification: Class I, not less than 0.45 W/sq. cm.

B. Environmental Health Characteristics:

1. Material Toxicity: Red-List Free demonstrated by a Declare label, Health Product Declaration, or Letter from the manufacturer.

2. Indoor Air Quality: Greenguard Gold

1.4 PROJECT CONDITIONS

A. Maintain ambient temperatures within range recommended by manufacturer in spaces to receive floor tile.

B. Until Substantial ComplBetion, maintain ambient temperatures within range recommended by manufacturer.

C. Close spaces to traffic during floor tile installation.

D. Close spaces to traffic for 48 hours after floor tile installation.

RESILIENT FLOOR TILE 096510 - 2

PART 2 - PRODUCTS

2.1 SPORTS RUBBER FLOOR TILE

A. Products: Subject to compliance with requirements, provide one of the following or equal:

1. Mondo Rubber International, Inc.; Valor

2. Nora Rubber Flooring; Norament 992 Grano

3. Roppe Corporation, USA; Armour Multi-use Rubber Tile

4. Tarkett North America; Triumph

B. Tile Standard: ASTM F 1344

C. Wearing Surface: Hammered.

D. Thickness: 6mm minimum

E. Durability: Able to withstand traffic from athletic shoes with metal spikes

F. Colors and Patterns: As selected by Architect from full range of manufacturer colors.

G. Base: Where indicated on the plan provide matching Type TS rubber base in color as selected from the manufacturer’s full range.

1. Height: 4”

2. Profile: No Cove

2.2 STAIRWAY RUBBER FLOORING

A. Products: Subject to compliance with requirements, provide rubber stair tread, risers, and matching landings from one of the following manufacturers or equal:

1. Mannington Commercial, Burke Collection

2. Mondo Rubber International, Inc.

3. Nora Rubber Flooring

4. Roppe Corporation, USA

5. Tarkett North America

B. Tile Standard ASTM F2169: Class 2 embossed, Group 2 for visually impaired, Grade 1

C. Wearing Surface: Hammered

D. Thickness: 1/8” minimum

E. Colors and Patterns: As selected by Architect from full range of manufacturer colors.

F. Base: Provide matching Type TS rubber base in color as selected from the manufacturer’s full range.

1. Height: 4”

2. Profile: No Cove

RESILIENT FLOOR TILE 096510 - 3

2.3 INSTALLATION MATERIALS

A. Adhesives: Water-resistant type recommended by manufacturer to suit floor tile and substrate conditions indicated.

1. Use adhesives that comply with the following limits for VOC content when calculated according to 40 CFR 59, Subpart D (EPA Method 24):

a. Rubber Floor Adhesives: Not more than 60 g/L.

PART 3 - EXECUTION

3.1 PREPARATION

A. Prepare substrates according to manufacturer's written instructions to ensure adhesion of resilient products. Refer to Specification Section 090561 Moisture Vapor Emission Control.

B. Concrete Substrates: Prepare according to ASTM F 710.

1. Verify that substrates are dry and free of curing compounds, sealers, and hardeners.

2. Remove substrate coatings and other substances that are incompatible with adhesives and that contain soap, wax, oil, or silicone, using mechanical methods recommended by manufacturer. Do not use solvents.

3. Alkalinity and Adhesion Testing: Perform tests recommended by manufacturer. Proceed with installation only after substrates pass testing.

4. Moisture Testing: Perform tests recommended by floor covering manufacturer as needed.

See the attached moisture testing that was performed in the adjacent track area. Assuming similar conditions in the hallway, we have specified moisture mitigation. Proceed with installation only after substrates pass testing.

C. Fill cracks, holes, and depressions in substrates with trowelable leveling and patching compound and remove bumps and ridges to produce a uniform and smooth substrate.

D. Do not install floor tiles until they are same temperature as space where they are to be installed.

1. Move resilient products and installation materials into spaces where they will be installed at least 48 hours in advance of installation.

E. Sweep and vacuum clean substrates to be covered by resilient products immediately before installation.

3.2 FLOOR TILE INSTALLATION

A. Comply with manufacturer's written instructions for installing floor tile.

B. Lay out floor tiles from center marks established with principal walls, discounting minor offsets, so tiles at opposite edges of room are of equal width. Adjust as necessary to avoid using cut widths that equal less than one-half tile at perimeter.

1. Lay tiles square with room axis in pattern indicated

RESILIENT FLOOR TILE 096510 - 4

C. Match floor tiles for color and pattern by selecting tiles from cartons in the same sequence as manufactured and packaged, if so numbered. Discard broken, cracked, chipped, or deformed tiles.

1. Lay tiles with grain running in one direction.

D. Scribe, cut, and fit floor tiles to butt neatly and tightly to vertical surfaces and permanent fixtures including built-in furniture, cabinets, pipes, outlets, and door frames.

E. Extend floor tiles into toe spaces, door reveals, closets, and similar openings. Extend floor tiles to center of door openings.

F. Maintain reference markers, holes, and openings that are in place or marked for future cutting by repeating on floor tiles as marked on substrates. Use chalk or other nonpermanent, nonstaining marking device.

G. Adhere floor tiles to flooring substrates using a full spread of adhesive applied to substrate to produce a completed installation without open cracks, voids, raising and puckering at joints, telegraphing of adhesive spreader marks, and other surface imperfections.

3.3 CLEANING AND PROTECTION

A. Comply with manufacturer's written instructions for cleaning and protection of floor tile.

B. Cover floor tile until Substantial Completion.

END OF SECTION 096510

WALK-OFF CARPETING 096810 - 1

SECTION 096810 – WALK-OFF CARPETING

PART 1 - GENERAL

1.1 SUMMARY

A. This Section includes walk-off carpeting

1.2 SUBMITTALS

A. Product Data: For each product indicated.

B. Shop Drawings: Show the following:

1. Carpet type, color, and dye lot.

2. Pattern of installation.

3. Edge, transition, and other accessory strips.

4. Transition details to other flooring materials.

C. Samples: For each color and texture required.

1. Carpet: Color book for selection

2. Exposed Edge, Transition, and other Accessory Stripping: color chain for selection

D. Maintenance data.

1.3 QUALITY ASSURANCE

A. Installer Qualifications: An experienced installer who is certified by the Floor Covering Installation Board or who can demonstrate compliance with its certification program requirements.

B. Environmental Health Characteristics:

1. Material Toxicity: Red-List Free demonstrated by a Declare label, Health Product Declaration, or Letter from the manufacturer.

2. Indoor Air Quality: Greenguard Gold

3. Environmental Requirements: Provide carpet tile that complies with testing and product requirements of Carpet and Rug Institute's "Green Label Plus" program.

1.4 DELIVERY, STORAGE, AND HANDLING

A. Comply with CRI 104, Section 5, "Storage and Handling."

WALK-OFF CARPETING 096810 - 2

1.5 PROJECT CONDITIONS

A. Comply with CRI 104, Section 7.2, "Site Conditions; Temperature and Humidity" and Section 7.12, "Ventilation."

B. Environmental Limitations: Do not install carpet until wet work in spaces is complete and dry, and ambient temperature and humidity conditions are maintained at the levels indicated for Project when occupied for its intended use.

C. Do not install carpet over concrete slabs until slabs have received moisture mitigation are sufficiently dry to bond with adhesive and concrete slabs have pH range recommended by carpet tile manufacturer.

1.6 WARRANTY

A. Special Warranty for Carpet: Manufacturer's standard form in which manufacturer agrees to repair or replace components of carpet installation that fail in materials or workmanship within specified warranty period. Failures include, but are not limited to, more than 10 percent loss of face fiber, edge raveling, snags, runs, loss of tuft bind strength, dimensional stability, and delamination.

1. Warranty Period: 10 years from date of Substantial Completion.

1.7 EXTRA MATERIALS

A. Furnish extra materials described below, before installation begins, that match products installed and that are packaged with protective covering for storage and identified with labels describing contents.

1. Carpet: 10 percent of amount installed of field color.

PART 2 - PRODUCTS

2.1 WALK-OFF CARPET

A. Products: Subject to compliance with requirements, provide walk-off carpet from one of the following manufacturers or equal:

1. Interface; Step Repeat Collection

2. Mannington Commercial; Frixtion Collection with Revolve backing

3. Tarkett North America; Abrasive Action with powerbond backing

2.2 INSTALLATION ACCESSORIES

A. Adhesives: Water-resistant, mildew-resistant, nonstaining, pressure-sensitive type to suit products and subfloor conditions indicated, that complies with flammability requirements for installed carpet and is recommended by carpet manufacturer for releasable installation.

WALK-OFF CARPETING 096810 - 3

1. VOC Limits: Provide adhesives with VOC content not more than 50 g/L when calculated according to 40 CFR 59, Subpart D (EPA method 24).

PART 3 - EXECUTION

3.1 INSTALLATION

A. General: Comply with CRI 104 and with carpet tile manufacturer's written installation instructions.

B. Installation Method: As recommended in writing by carpet manufacturer

C. Extend carpet into toe spaces, door reveals, closets, open-bottomed obstructions, removable flanges, alcoves, and similar openings.

D. Install pattern parallel to walls and borders.

END OF SECTION 096810

000110_TableofContents
011000_Summary
024210_ExistingFloorRemoval
090561_MoistureVaporEmissionControl.docx
096510_ResilientFloorTile
096810_WalkOffCarpeting