Floyd Little Athletic Center Flooring
Solicitation number
2026-ITB-369
Issued by
New Haven County, Connecticut

About this file

This is a flooring plan and addendum document for the City of New Haven's Floyd Little Athletic Center flooring replacement project located at 480 Sherman Parkway in Connecticut. The project scope encompasses the removal of all existing flooring and adhesive from a large hallway, atrium/lobby, two vestibules, and four two-story stairways, with subsequent installation of new sports rubber flooring in multiple colors, walk-off carpet in vestibules, stairwell rubber flooring, and rubber wall base. The work includes concrete slab preparation through shot blasting to achieve required concrete surface profile, installation of moisture mitigation systems rated for 100% relative humidity conditions, underlayment installation up to 1/8 inch as needed, and modification of door thresholds per the provided door threshold schedule which specifies 41 individual threshold locations with varying undercut measurements and transition requirements. The document is dated May 27, 2026, with Addendum #1 issued on June 11, 2026, and includes detailed flooring specifications and a ground floor plan at 1/16 inch equals 1 foot scale.

The project also requires repair work on the aluminum curtain wall sill plate at the front and back vestibules and exterior storefront, involving removal and reinstallation of cover caps, sealant replacement, deteriorated aluminum repair using Bondo with touch-up paint, installation of low-expanding closed cell spray foam, and drainage maintenance. Contractors must obtain all necessary permits, selecting "pay at counter" to allow the Building Department to adjust municipality permit fees, with contractors paying only state permit fees. Materials should be sourced from a single supplier where possible, installed per manufacturer recommendations, and all work must comply with the General Conditions posted on the City of New Haven's Purchasing Division website. The contractor is responsible for temporary partitions and weather-tight construction during work, coordination of dumpster placement, and protection of existing construction elements including structure, ceiling grid, walls, glazing, flooring, and roof drains.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

11"

CO

N

TRO

LS

TYP.

D .F.

D .F.

D .F.

D .F.

W .F.

D .F.

CO

N

CESSIO

N

H105

TICKETS/

CO

N

TRO

L H104

FAC. M

G

R.

O

FF.

H114

LO

CKERS #2

H124

TICKETS

H132

O

FFICIALS

RO

O

M #1

H128

M

ACH

RO

O M

H118

H O

SPITALITY RM

H117

VEN

D

ALCO

VE

H134

O

FFICIALS

RO

O

M #2

H127

PASSAG

E

H126

D

ATA

H133

LO

BBY

H102

STAIR

S1

CO

RRID

O R

H113

W O

M

EN

'S H120

M

EN

'S H116

ELEV.

E1

LO

CKER #1

H121

SH

O

W

ERS #1

H122

SH

O

W

ERS #2

H125

STAIR

S3

VESTIBU

LE

H135

STAIR

S4

VESTIBU

LE

H103

VEN

D

IN

G

H112

CO

RRID

O R

H113

VESTIBU

LE

H123

VESTIBU

LE

H130

CO

RRID

O R

H113

TRAIN

ER'S

RO

O

M H115

D

ATA

H107

JAN

ITO

R H111

ALCO

VE

H109

ALCO

VE

H129

VEST.

H101

U P

U P

U P

U P

FEC

11"

CO

N

TRO

LS

TYP.

D .F.

D .F.

D .F.

D .F.

W .F.

D .F.

CO

N

CESSIO

N

H105

TICKETS/

CO

N

TRO

L H104

FAC. M

G

R.

O

FF.

H114

LO

CKERS #2

H124

TICKETS

H132

O

FFICIALS

RO

O

M #1

H128

M

ACH

RO

O M

H118

H O

SPITALITY RM

H117

VEN

D

ALCO

VE

H134

O

FFICIALS

RO

O

M #2

H127

PASSAG

E

H126

D

ATA

H133

LO

BBY

H102

STAIR

S1

CO

RRID

O R

H113

W O

M

EN

'S H120

M

EN

'S H116

ELEV.

E1

LO

CKER #1

H121

SH

O

W

ERS #1

H122

SH

O

W

ERS #2

H125

STAIR

S3

VESTIBU

LE

H135

STAIR

S4

VESTIBU

LE

H103

VEN

D

IN

G

H112

CO

RRID

O R

H113

VESTIBU

LE

H123

VESTIBU

LE

H130

CO

RRID

O R

H113

TRAIN

ER'S

RO

O

M H115

D

ATA

H107

JAN

ITO

R H111

ALCO

VE

H109

ALCO

VE

H129

VEST.

H101

U P

U P

U P

U P

FEC

A.6

A.6

B.5

B.5

C.3

C.3

D

D

D.5

D.5

E

E

F

F

G

G

H

H

I

I

J

J

K

K

L

L

M

M

N

N

O

O

P

P

Q

Q

R.5

R.5

S.3

S.3

S.9

S.9

2.92.9

14' - 4" 20' - 0" 20' - 0" 26' - 8" 26' - 8" 20' - 0" 13' - 4" 20' - 0" 26' - 8" 26' - 8" 26' - 8" 20' - 0" 13' - 4" 20' - 0" 26' - 8" 13' - 4" 13' - 4" 13' - 4" 13' - 4" 14' - 4"

S

S

SEE ALUMINUM CURTAIN WALL

REPAIR SPECIFICATIONS,

DASHED LINE INDICATES SCOPE

SEE ALUMINUM CURTAIN WALL

REPAIR SPECIFICATIONS,

DASHED LINE INDICATES SCOPE

124"

4"

188"

124"

4"

H

7A

H

1A

H

4A

E1

H123A H123B H130A H131A

H110A

H105A H103A

H136EH136DH136CH136BH136A H136JH136IH136HH136GH136F

H131B H131C H131D H131E

H 131F

H114AH102F

H102E

H

2A H

2B

H

2C H

2D

H132A

H

8A

H

7A

H

1A

H116A H120A

1. CONTRACTOR IS TO FULLY FAMILIARIZE THEMSELVES WITH THE

GENERAL CONDITIONS POSTED ON THE CITY OF NEW HAVEN'S

PURCHASING DIVISION WEBSITE WHICH THOROUGHLY DEFINES

PROJECT PROCESS AND PERFORMANCE REQUIREMENTS.

2. DRAWINGS SHOW GENERAL LAYOUT OF EXISTING CONDITIONS.

DIMENSIONS ARE FOR REFERENCE ONLY. EXACT LOCATION, SIZE,

AND QUANTITY OF THESE ITEMS MAY DIFFER FROM THOSE

INDICATED ON PLANS.

3. IN THE EVENT OF A CONFLICT WITHIN THE CONTRACT

DOCUMENTS, THE MOST STRINGENT OBLIGATION OR DUTY AND

THE HIGHEST QUALITY OR GREATEST QUANTITY SHALL CONTROL.

4. PROTECT EXISTING CONSTRUCTION TO REMAIN INCLUDING, BUT

NOT LIMITED TO, STRUCTURE, CEILING GRID, WALLS, GLAZING,

FLOORING, AND ROOF DRAINS.

5. IN-HOUSE CITY STAFF WILL DISCONNECT UTILITIES AND

TEMPORARILY SHUT OFF AND DRAIN WATER FROM PLUMBING AND

SPRINKLER SYSTEM AS NECESSARY.

6. DAMAGE TO EXISTING CONSTRUCTION SHALL BE CORRECTED

SUCH THAT SURFACES TO BE REBUILT MATCH MATERIAL,

STRUCTURAL INTEGRITY, AND APPEARANCE OF THOSE THAT WERE

REMOVED.

7. COORDINATE THE EXACT LOCATION OF DUMPSTERS, CHUTES,

AND MATERIALS STORED AT GRADE (IF ANY) WITH THE CITY'S

REPRESENTATIVE IN THE FIELD PRIOR TO PLACEMENT.

8. CONTRACTOR IS RESPONSIBLE FOR ALL TEMPORARY PARTITIONS/

CONSTRUCTIONS IN ORDER TO ISOLATE WORK ZONES AND

MAINTAIN A WEATHER-TIGHT BUILDING.

9. ALL SPECIFICATIONS ARE BASIS OF DESIGN. REFER TO THE

GENERAL CONDITIONS "OR EQUAL" CLAUSE FOR CLARIFICATION.

10. PROVIDE MATERIALS AND ACCESSORIES AS REQUIRED TO

PROVIDE A COMPLETE INSTALLATION.

11. ACQUIRE MATERIALS FROM A SINGLE SOURCE AS MUCH AS

POSSIBLE FOR EASE OF MAINTENANCE AND WARRANTY.

12. FOLLOW MATERIAL MANUFACTURER'S RECOMMENDED

INSTALLATION PRACTICES.

13. CONTRACTOR MUST OBTAIN ANY/ALL NECESSARY PERMITS FOR

WORK. CONTRACTOR MUST SELECT “PAY AT COUNTER” SO THAT

THE BUILDING DEPARTMENT CAN WAIVE/ADJUST THE

MUNICIPALITY PERMIT FEE. THE CONTRACTOR WILL THEN RECEIVE

AN EMAIL FOR THE ADJUSTMENT AND BE ABLE TO LOG-IN TO PAY

JUST THE STATE PERMIT FEE.

GENERAL NOTES

SPORTS RUBBER FLOORING - COLOR 1

SPORTS RUBBER FLOORING - COLOR 2

STAIRWELL RUBBER FLOORING

VESTIBULE WALK OFF CARPET COLOR 1

PLAN LEGEND 25 FEET

CUSTOM LOGO

SPORTS RUBBER FLOORING - COLORS 3 +4

CUSTOM LOGO

WALK OFF CARPET COLORS 2 + 3

12 FEET

FE

E T

FE

E T

RUBBER WALL BASE

EXTERIOR STOREFRONT REPAIR

FLOORING PROJECT SCOPE

1. REMOVE ALL EXISTING FLOORING AND EXTRACT ADHESIVE

2. GRIND DOWN SLAB TO ACCOMMODATE THE EXTRA THICKNESS OF THE

FLOORING AT DOORS THAT SWING INTO THE HALLWAY TO MAINTAIN A

MINIMUM 1/4" UNDERCUT UNDER DOOR SWING AS INDICATED IN THE DOOR

SCHEDULE. THE EXISTING FLOORING IS APPROXIMATELY 1/8" OF AN INCH

THICK. PROVIDE 1:48 MAX SLOPE AT TRANSITION.

3. SHOT BLAST CONCRETE TO REQUIRED CSP BY MOISTURE MITIGATION

SYSTEM MANUFACTURER

4. INSTALL MOISTURE MITIGATION SYSTEM FOR 100% RH CONDITIONS AND

ALLOW TO CURE

5. ASSESS FLOORING AND REPORT BACK ON NEEDED THICKNESS FOR

UNDERLAYMENT.

6. INSTALL UNDERLAYMENT AS NECESSARY UP TO 1/8".

7. (SURFACE PREP MUST MEET MANUFACTURER'S REQUIREMENTS FOR

INSTALLING THE FLOOR)

8. MODIFY THRESHOLDS AS INDICATED ON THE DOOR SCHEDULE. SET NEW

THRESHOLDS IN A BED OF SEALANT.

9. INSTALL FLOORING PER MANUFACTURER'S RECOMMENDATIONS. PATTERN

CAN BE SLIGHTLY MODIFIED IN SHOP DRAWINGS TO BETTER MATCH SIZE OF

FLOORING MATERIAL.

FLOORING SPECIFICATIONS

* SEE GENERAL NOTES ON A1.1 AND PROJECT MANUAL FOR MORE DETAIL

ALUMINUM CURTAINWALL REPAIR PROJECT SCOPE

1. AFTER FLOORING AND ADHESIVE ARE REMOVED AND BEFORE NEW FLOOR IS

INTALLED PERFORM REPAIR WORK ON THE BOTTOM SILL PLATE OF THE

EXTERIOR CURTAINWALL SYSTEM AT THE FRONT AND THE BACK VESTIBULES

AND EXTERIOR STOREFRONT.

2. THE EXISTING SYSTEM IS EFCO WITH A BONE WHITE PAINT FINISH.

3. CAREFULLY REMOVE COVER CAP ON SILL PLATE.

4. THOROUGHLY REMOVE ALL EXISTING SEALANT AND CLEAN AND VACUUM

UNDER AND AROUND SILL.

5. REPAIR DETERIORATED ALUMINUM ON THE INTERIOR OF VESTIBULE WITH

BONDO AND APPLY TOUCH-UP PAINT TO THE BOTTOM SILL FOR THE ENTIRE

LENGTH OF THE VESTIBULE.

6. REPLACE EXISTING EXTERIOR SEALANT UNDER SYSTEM, USE A SHOULDER

CAULK BEAD WITH BACKER ROD, AND MAINTAIN OPEN AND CLEAR WEEPS

FOR PROPER DRAINAGE.

7. REINSTALL EXISTING EXTERIOR COVER CAP. REPLACE DAMAGED CAP AS

NECESSARY.

8. INSTALL A LOW-EXPANDING CLOSED CELL SPRAY FOAM UNDER SILL.

9. INSTALL SEALANT BELOW THE INTERIOR FACE OF SILL PLATE.

ALUMINUM CURTAIN WALL REPAIR SPECIFICATIONS

* SEE GENERAL NOTES ON A1.1 AND PROJECT MANUAL

TRANSITION STRIP TRANSITION STRIP

C

IT

Y O

F N

E W

H A

VE

N

D E

P A

R

TM

E N

T O

F E

N G

IN

E

E R

IN

G

TH

E

H O

N O

R A

B

LE

J U

S

TI

N M

. E

LI

C K

E R

, M A

Y O

R

G

IO

V A

N N

I Z

IN

N , P

.E

C

IT

Y E

N G

IN

E

E R

PROJECT NAME AND ADDRESS

DRAWN BY DESIGNED BY

DATE

PROJECT NUMBER

PROFESSIONAL SEAL

SHEET TITLE

SHEET NUMBER

PROJECT PHASE

NO. DESCRIPTION DATE

SCALE

1 2 3 4 5 6 7 8 9 10

A

B

C

D

E

F

G

As indicated

C

E n g in e e ri n g \C it y o f N e w

H a ve n

C

T \E n g in e e ri n g D e p a rt m e n t

D o c u m e n ts

\P ro je c ts

\2

-0

-0

F lo y d

L it tl e

F lo o ri n g

\D ra w in g s \F

L A

C F lo o ri n g _R

-C O

N H

-1

-H R

.r vt

5/27/2026

26-082-01

FLOYD LITTLE

ATHLETIC CENTER

FLOORING

480 SHERMAN

PARKWAY

MAK MAK

FLOORING PLAN AND NOTES

A1.1

BID DOCUMENTS

1/16" = 1'-0"

GROUND FLOOR PLAN

1 Addendum #1 6/11/26

0 8 16 32 1/16" = 1'-0"

MEZZANINE STAIRS

DOOR THRESHOLD SCHEDULE

TAG

APPROXIMATE

EXISTING

UNDERCUT COMMENTS

E1 0" BUTT FLOORING TO EXISTING ELEVATOR THRESHOLD

H102A - CHANGE THRESHOLD TO HALF SADDLE PEMKO 256A

H102B - CHANGE THRESHOLD TO HALF SADDLE PEMKO 256A

H102C - CHANGE THRESHOLD TO HALF SADDLE PEMKO 256A

H102D - CHANGE THRESHOLD TO HALF SADDLE PEMKO 256A

H102E - CHANGE THRESHOLD TO HALF SADDLE PEMKO 256A

H102F - CHANGE THRESHOLD TO HALF SADDLE PEMKO 256A

H103A 1/2" BUTT FLOORING TO EXISTING VCT

H105A 1/2" BUTT FLOORING TO EXISTING VCT

H107A - PROVIDE TRANSITION STRIP

H108A - PROVIDE TRANSITION STRIP

H110A 1/2" BUTT FLOORING TO EXISTING VCT

H111A - PROVIDE TRANSITION STRIP TO CONCRETE FLOOR

H114A 5/8" BUTT FLOORING TO EXISTING VCT

H116A - BUTT FLOORING TO EXISTING MARBLE THRESHOLD

H117A 5/8" PROVIDE TRANSITION STRIP

H120A - BUTT FLOORING TO EXISTING MARBLE THRESHOLD

H121A 3/4" BUTT FLOORING TO EXISTING MARBLE THRESHOLD

H123A 3/8" BUTT FLOORING TO EXISTING VCT

H123B 3/8" BUTT FLOORING TO EXISTING VCT

H124A 1/4" BUTT FLOORING TO EXISTING MARBLE THRESHOLD

H130A 3/8" BUTT FLOORING TO EXISTING VCT

H131A - CHANGE THRESHOLD TO HALF SADDLE PEMKO 256A

H131B - CHANGE THRESHOLD TO HALF SADDLE PEMKO 256A

H131C - CHANGE THRESHOLD TO HALF SADDLE PEMKO 256A

H131D - CHANGE THRESHOLD TO HALF SADDLE PEMKO 256A

H131E - CHANGE THRESHOLD TO HALF SADDLE PEMKO 256A

H131F - PROVIDE TRANSITION STRIP

H132A - PROVIDE TRANSITION STRIP

H136A 1/4" BUTT FLOORING TO EXISTING THRESHOLD

H136B 1/4" BUTT FLOORING TO EXISTING THRESHOLD

H136C 1/4" BUTT FLOORING TO EXISTING THRESHOLD

H136D 1/4" BUTT FLOORING TO EXISTING THRESHOLD

H136E 1/4" BUTT FLOORING TO EXISTING THRESHOLD

H136F 1/4" BUTT FLOORING TO EXISTING THRESHOLD

H136G 1/4" BUTT FLOORING TO EXISTING THRESHOLD

H136H 1/4" BUTT FLOORING TO EXISTING THRESHOLD

H136I 1/4" BUTT FLOORING TO EXISTING THRESHOLD

H136J 1/4" BUTT FLOORING TO EXISTING THRESHOLD

Sheets
A1.1 - FLOORING PLAN AND NOTES

File details come from the government source that posted it. Updated .