The document is a Finance Remodel Scope for a Complex Finance Remodel project, detailing comprehensive renovation plans for two rooms (Room 1 and Room 2). The scope includes extensive structural and infrastructure modifications such as demolishing and constructing new walls, removing existing fixtures, installing new electrical and data systems, upgrading HVAC components, and performing interior finishes. Specific work includes moving and constructing walls with precise dimensional specifications, removing a ceiling fan, installing two dimmable LED lighting panels, adding an office door, running Cat6 cabling to the IT server room through approximately 60 feet of open web trussing, and replacing approximately 2,355 sq. ft. of carpet.

The project involves detailed specifications for finishes and materials, including Tarkett 4.5-inch Moon Rock wall base molding, Cornerstone carpet with color #106180 and style #1467302500, and interior walls to be painted with a satin sheen (paint color subject to approval). Additional notes specify that furniture will be supplied by others, constructed walls must match existing finishes, and all doors must be commercial-rated to meet programmed occupancy and applicable codes. The floor plan indicates the remodel will involve reconfiguring electrical, HVAC, and data connection layouts across the two rooms, with careful attention to routing and positioning of new infrastructure components.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Finance Remodel Scope

1. SOUTH WALL—ROOM 2: Demolition of the existing (6X9) wall and construction of a new

(12.9X9) wall. The new wall is to be moved 1' 11" (flush with the north side of the beam). The existing receptacle is to be rerouted to the new wall.

2. EAST WALL - ROOM 2: Demo false wall and counter (13.5x4.5). Replace with a new wall (9.8x9), wall to have cut out for door and frame. The existing receptacle is to be rerouted to the new wall.

3. EAST WALL - ROOM 1: Add wall (1.11x9').

4. Ceiling fan to be removed.

5. Remove old lighting and add 2 new dimmable LED 2x4 lighting panels.

6. Add HVAC return, A/C Ducting, and Flow control as required.

7. Add office door with frame.

8. Electrical, lighting, and light switches installed as depicted on the floor plan.

9. Add data connections as depicted on the floor plan. Home-run Cat6 cabling shall be run to the IT server room. The server room is on the first floor, and cabling must be run through approximately 60 feet of open web trussing. Trussing can be accessed through tee bar panels.

10. Pre-wire electronic access to Room 1. Cat6 cabling shall be run to the IT server room. The server room is on the first floor, and the cabling must be run through approximately 60 feet of open web trussing, which can be accessed through tee bar panels.

11. Install wall base molding and door trim for newly constructed walls. 73 LF- Tarkett 440288081 Moon Rock 4.5 Inch wall base

12. Remove and replace approximately 2,355 sq. ft of carpet. The color and type shall be:

Cornerstone Color #: 106180 Style: 1467302500.

13. Paint all interior walls. The paint sheen shall be satin. Paint color and type shall be submitted for approval.

Notes:

1. All Furniture supplied by others.

2. All Constructed walls shall match existing finishes.

3. All doors shall be commercial-rated to suit programmed occupancy and applicable codes.

ROOM 1

ROOM 26

CAT

HVAC

CAT

CAT

W N

E S

To Be Demoed

To Be Constructed

Complex Finance Remodel

Electrical

Existing Walls

HVAC

'9

11'3"6' 6'

1'11"

9'3"7'11"

Finance_Scope(FINAL).pdf
Finance_Plan(FINAL)