Development_Services_Scope_and_Plan_(FINAL).pdf

PDF 191 KB Posted

Attached to
City of Kingman City Complex Remodel Project
Solicitation number
2025-IFB-010
Issued by
Mohave County, Arizona

About this file

The document is a Scope of Work for a Development Services Remodel project, detailing comprehensive office renovation specifications for a specific location. The scope includes installing 48 linear feet of 74-inch tall cubicle walls, constructing four new offices (A, B, C, and D) with specific dimensional requirements, removing and replacing approximately 1,750 square feet of carpet, installing new electrical outlets and Cat6 cabling, modifying HVAC systems, and performing comprehensive interior finishes including wall base molding, door trim, and painting. The project involves significant reconfiguration of the existing space, with specific requirements for wall construction, door installations, and matching existing finishes.

The scope specifies detailed technical requirements for each aspect of the renovation, including precise HVAC modifications for different areas, using specific manufacturers like Hart & Cooley for registers and grills. Electrical work includes pulling Cat6 cabling approximately 60 feet through open trussing to the IT server room, and all furniture will be supplied by others. The document notes that all constructed walls must match existing finishes, and all doors must be commercial-rated to meet programmed occupancy and applicable codes. No specific pricing, funding sources, or contract terms are outlined in this technical scope of work document.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Development Services Remodel Scope

1. Install Cubicle walls. Cubicle walls shall be a minimum of 74 inches tall. Approximately 48 LF of panels is needed. Interion Deluxe Free-Standing Office Partitions or approved equal (to be submitted for approval).

2. Construct two new enclosed offices, A & B, as depicted on the floor plan. Doors shall be 3-0.

Finishes to match existing.

3. Construct a wall splitting the break room to create office C as depicted on the floor plan.

4. Remove the existing door/Frame in the southwest corner of office C and replace it with drywall to match the current wall finish.

5. Make 3-foot entry openings for office D.

6. Install electrical outlets for workstations as depicted on the plan. Electrical may utilize existing outlets to accommodate the new layout.

7. Install boxes and Cat6 cabling for workstations as depicted on the floor plan. Home runs for each location will be required. Cat6 must be pulled approximately 60 feet through open trussing to the IT server room. The area can be accessed through tee bar panels.

8. Lighting and light switches installed in new offices as depicted on the floor plan.

9. Remove and replace approximately 1,750 SQFT of carpet. The color and type shall be:

Cornerstone Color #: 106180 Style: 1467302500.

10. Install wall base molding and door trim for newly constructed walls. 750 LF- Tarkett 440288081 Moon Rock 4.5 Inch wall base

11. Paint all interior walls. The paint sheen shall be satin. Paint color and type shall be submitted for approval.

12. HVAC

Common Area

• Remove 2 existing t-bar supplies.

• Remove 1 existing RA grill.

• Add 2 8x8 t-bar registers.

Office A

• Add 2 t-bar registers.

• Add 1 10x10 bar transfer grill.

Development Services Remodel Scope

Office B

• Add 1 t-bar register.

• Add 1 10x10 bar transfer grill.

Office C

• No HVAC Changes

Office D

• Remove 1 existing register.

• Keep existing RA grills.

• Add 1 8x8x6 hard lid register in each area

T-Bar Registers – Hart & Cooley 1200 with duct size RA Transfer Grills – Hart & Cooley FDR grill size Hard Lid – Hart & Cooley 304

Notes:

All Furniture supplied by others.

All Constructed walls shall match existing finishes.

All doors shall be commercial-rated to suit programmed occupancy and applicable codes.

739.7 Ft²

A

B

75.3 Ft²

173.8 Ft²

201.3 Ft²

N

EW

W

ALL IN

PLACE

D

O O

R TO

BE REM

O

VED

C

73.3 Ft²

D

78.5 Ft²

277.3 Ft²

4.2 Ft²

6 CAT

6 CAT

6 CAT

6 CAT

6 CAT

6 CAT

6 CAT

6 CAT

6 CAT

6 CAT

6 CAT

6 CAT

6 CAT

Cubicals

Constructed Hard Walls

Existing Walls

Electrical

Development Services Remodel

*Desk size 5x5 by Others *Furniture Provided

35'1"

8'7" 8'7"

8'4"

8'

4'3"

10'9"

7'

11'7" 8'4"

8'3"

12'7"

16'

5'6"

8'

21'1"

8'

15'

11'7"

7'6"

3'10" 10'2"

7'11"7'5"

9'11"

9'11"

16'

5'

Development_Scope(FINAL).pdf
Development_Plan(FINAL)

File details come from the government source that posted it. Updated .