Finalized SOL 69727621Q000018 vendor price sheet for GEN RUDDER FY-21 DD.xlsx
XLSX spreadsheet 40 KB Posted
- Attached to
- TS GENERAL RUDDER FY21 REFURBUSH/REPAIR DRY DOCK
- Solicitation number
- 69727621Q000018
About this file
This federal solicitation requests quotations for drydock repair and maintenance services for the T.S. General Rudder school ship. The solicitation includes requirements for general services, drydock work items, repair items, supplemental labor and materials, drydock and wet berth day rates, and optional items. Quotes are due by August 17, 2021 and award will be made to the technically acceptable offeror providing the lowest price. A site visit will be held on July 26, 2021 to allow potential offerors to understand work requirements. The period of performance is scheduled from September 10, 2021 to October 31, 2021. The soliciting agency is the U.S. Department of Transportation Maritime Administration. This is a small business set-aside with a NAICS code of 336611 and size standard of 1,250 employees.
View the file
Other files
Show all 40
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bids
TS GENERAL RUDDER
US GOVERNMENT ESTIMATE OF DRY DOCK EXPENCES
SPRING 2019
ITEM # TITLE/DESCRIPTION Vendor Pricing
| SECTION 100 – GENERAL SERVICES REQUIREMENT | ||
| 101 | OFFICE AND ADMINISTRATIVE SERVICES | $ - |
| 102 | SHORE POWER SERVICES | $ - |
| 103 | WHARFAGE AND LINEHANDLERS | $ - |
| 104 | POTABLE WATER | $ - |
| 105 | BILGES AND DRAIN WELLS | $ - |
| 106 | GARBAGE AND TRASH REMOVAL | $ - |
| 107 | PROTECTIVE FLOOR COVERING | $ - |
| 108 | SECURITY/WATCHMAN | $ - |
| 109 | GAS FREE INSPECTIONS AND CERTIFICATES | $ - |
| 110 | FIRE PROTECTION | $ - |
| 111 | PORTABLE TOILETS/TEMPORARY FACILITIES | $ - |
| 112 | COOLING WATER | $ - |
| 113 | TEMPORARY LIGHTING | $ - |
| 114 | CRANE SERVICE | $ - |
| 115 | STAGING REQUIREMENT | $ - |
| 116 | OFF LOAD OF LIQUIDS AND STORAGE | $ - |
| SUB TOTAL SECTION - 100 | $ - | |
| SECTION 200 - DRYDOCK WORK ITEMS | ||
| 201 | DRYDOCKING AND UNDOCKING OF THE VESSEL | $ - |
| 202 | DOCK TRIALS | $ - |
| 203 | HULL PREPARATION AND COATING | $ - |
| 204 | RENEW ZINC ANODES | $ - |
| 205 | ANTI BIOFOULING SYSTEM MAINTENANCE | $ - |
| 206 | RUDDER AND STERN FRAME EXAMINATION | $ - |
| 207 | PROPELLER INSPECTION, MAINTENANCE AND REPAIRS (ABS) | $ - |
| 208 | PROPELLER SHAFT WEAR DOWN READINGS | $ - |
| 209 | TANK CLEANING AND INSPECTIONS | $ - |
| 210 | SEA VALVES: INSPECTION AND REPAIR, (ABS & USCG) | $ - |
| 211 | ANCHOR CHAIN AND CHAIN LOCKER INSPECTION | $ - |
| 212 | BOW THRUSTER EXAMINATION AND MAINTENANCE (ABS) | $ - |
| 213 | ULTRASONIC/AUDIO HULL GAUGING | $ - |
| 214 | WASTER PIECE: EXAMINATION | $ - |
| 215 | SWITCHBOARD METER CALIBRATION | $ - |
| 216 | SWITCHBOARD CLEANING | $ - |
| 217 | PRESSURE VESSEL INSPECTIONS | $ - |
| 218 | MAIN PROPULSION MOTORS MAINTENANCE ABSTRACT | $ - |
| 219 | GENERATOR MAINTENANCE | $ - |
| 220 | ELECTRIC MOTOR MAINTENANCE | $ - |
| 221 | THRUST BEARING(S) INSPECTION/RENEWAL | $ - |
| 222 | PROPELLER SHAFT BEARING LUBE OIL TANK AND DELIVERY SYSTEM - INSPECTION/CLEAN AND RENEWAL | $ - |
| 223 | AFT MAST BALST AND COAT | $ - |
| 224 | FORWARD MAST BLAST AND COAT | $ - |
| SUB TOTAL SECTION - 200 | $ - | |
| SECTION 300 - REPAIR ITEMS | ||
| 301 | TOP END OVERHAUL #1 MAIN GENERATOR | $ - |
| 302 | REPLACE GALLEY/MESS’/PASSAGE WAY DOORS TO A-60 FIRE RATED DOORs | $ - |
| 303 | FABRIACTE AND INSTALL GRAB RAILS ON ALL CONTROL ROOM AND SSDG ROOM ELECTRICAL PANELSUNOBSTRUCTED ACTIVATION | $ - |
| 304 | REPLOCATE SSDG ROOM REMOTE FUEL CUT OFF’S TO A LOCATION THAT ALLOWS UNOBSTRUCTED ACTIVATION | $ - |
| 305 | REMOVE – PREP AND INSTALL ELETRICAL MATTING (ECR) IN SSDG CONTROL ROOMSLE | $ - |
| 306 | OPTIONAL – BLAST AND COAT FANTAIL DECKING AND RENEW GRATING | $ - |
| SUB TOTAL SECTION - 300 | $ - | |
| SECTION 400 - SUPPLEMENTAL ITEMS | ||
| 401 | SUPPLEMENTAL WORK: MANHOURS LABOR - Contractor shall not exceed 1000 man hours. Contractor shall specify fully burdened hourly rate X 1000 in cell C62 | $ - |
| 402 | SUPPLEMENTAL WORK: MATERIAL - Government provided total NTE $50,000.00 | $ 50,000 |
| SUB TOTAL SECTION - 400 | $ 50,000 | |
| SECTION 403 - DRYDOCK AND WET BERTH DAYS - CONTRACTOR SHALL SPECIFY A PER DAY RATE FOR USE IF REQUIRED | ||
| 403 | Haul rate per day | $ |
| 403 | Drydock Lay day per day rate | $ |
| 403 | Wet Dock Lay Day per day rate | $ |
| Rates not included in total for section 400 | ||
| SECTION 500 - OPTIONAL ITEMS | ||
| 502 | PORT AND STBD TAIL SHAFT REMOVAL AND INSPECTION | $ - |
| 503 | PROVIDE ACCESS, THEN REMOVE EXISTING A/C MOTORS & COMPRESSORS AND INSTALL NEW A/C UNITS | $ - |
| $ - |
| Contract Optional Itmes: SUB TOTAL SECTION - 500 | $ - | |
| Contract Base Items: TOTAL SECTIONS 100 - 200 - 300 - 400 | $ 50,000 | |
| Total Contract Base Items | $ 50,000 |