Finalized SOL 69727621Q000018 vendor price sheet for GEN RUDDER FY-21 DD.xlsx

XLSX spreadsheet 40 KB Posted

Attached to
TS GENERAL RUDDER FY21 REFURBUSH/REPAIR DRY DOCK
Solicitation number
69727621Q000018
Issued by

About this file

This federal solicitation requests quotations for drydock repair and maintenance services for the T.S. General Rudder school ship. The solicitation includes requirements for general services, drydock work items, repair items, supplemental labor and materials, drydock and wet berth day rates, and optional items. Quotes are due by August 17, 2021 and award will be made to the technically acceptable offeror providing the lowest price. A site visit will be held on July 26, 2021 to allow potential offerors to understand work requirements. The period of performance is scheduled from September 10, 2021 to October 31, 2021. The soliciting agency is the U.S. Department of Transportation Maritime Administration. This is a small business set-aside with a NAICS code of 336611 and size standard of 1,250 employees.

View the file

Other files

File Type Posted
AMENDMENT 0004.pdf PDF
AMEN 0003 JULY 26 2021.pdf PDF
AMENDMENT 7-23-21 to RESCHEDULE SITE VISIT.pdf PDF
Sea Valves 5987287_D.pdf PDF
Capacity Plan 5987330_-.pdf PDF
1355-S93-1-1 Rev D General Rudder Fire Safety Plan_124781319.pdf PDF
QUESTIONS -ANSWERS 7 14 2021 AMENT 1.pdf PDF
T9200-AD-EOS-010_0_0.pdf PDF
Copy of April 2016 RRF Coatings Guidelines.xls XLS spreadsheet
Ref 18 - DWG 801-0000036 - Guidance Docking Plan_.pdf PDF
Trim Stability 8 Jun 93.pdf PDF
Ref 14 - DWG 114-0000023C Skeg - Copy.PDF PDF
Revised Quick Ref. Tank Arrangement April 2014.pdf PDF
Ref 19 - 801-0000155_MAIN DECK - HOLD -(2of4).pdf PDF
Ref 17 - DWG 633-0000120B Cathodic Protection Schedule.pdf PDF
Ref 29 - DWG 171 0000033 Rev. C Mast .PDF PDF
Ref 22 - DWG 1355-S62-1-1_Electrical One Line Diagram_RevB_80484164.pdf PDF
Ref 24 - DWG 835-5988704 Inboard Profile.pdf PDF
69727621Q000018 GEN RUDDER FY21 DRY DOCK.pdf PDF
Ref 19 - 801-0000155_FCSLE - UPPER DECKS -(3of4).pdf PDF
Ref 25 - DWG 835-5988706 Outboard Profile.pdf PDF
Ref 9 - 53711-243-0000225_SHAFTING ASSY -(3 of 3).pdf PDF
Ref 20 - DWG 801 5988703 General Arrangement Above Main Deck.pdf PDF
Ref 12 - 243_0000228 Propulsion System Shafting Alignment Procedure.pdf PDF
Ref 13-DWG_506-5987287 Aux Seawater System - Sea Valves.pdf PDF
Ref 19 - 801-0000155_COMPT - ACCESS INBOARD PROFILE-INNER BOTTOM -(1of4).pdf PDF
Ref 10 - DWG_243-0000224 SHAFTING DETAILS -(1 OF 2).pdf PDF
Ref 9 - 53711-243-0000225_SHAFTING ASSY -(1 of 3).pdf PDF
Ref 26 - DWG 111-0000007 Scantling Profile.pdf PDF
Ref 16 - DWG_562-0000030_D Rudder - Rudder Trunk.PDF PDF
Ref 19 - 801-0000155_COMPT - ACCESS BRIDGE DECK - AUXILIARY VIEWS -(4of4).pdf PDF
Ref 9 - 53711-243-0000225_SHAFTING ASSY -(2 of 3).pdf PDF
Ref 15 - DWG 561-0000222F Steering Gear Arrg. - Copy.PDF PDF
RTD Minco S325-637263.pdf PDF
Ref 18 - DWG 801-0000036 - Guidance Docking Plan .pdf PDF
Ref 28 - DWG 0000208_PL Ventilation.pdf PDF
Ref 11 - DWG_243-0000224 SHAFTING DETAILS -(2 OF 2).pdf PDF
Ref 27-DWG 101-0000008 Scantling Profile_C.pdf PDF
Ref 21 - DWG 801-5988702 General Arrangement Main Deck - Below .pdf PDF
Ref 19 - DWG 801-0000155 Inboard Profile Inner Bottom.pdf PDF
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bids

TS GENERAL RUDDER

US GOVERNMENT ESTIMATE OF DRY DOCK EXPENCES

SPRING 2019

ITEM # TITLE/DESCRIPTION Vendor Pricing

SECTION 100 – GENERAL SERVICES REQUIREMENT
101OFFICE AND ADMINISTRATIVE SERVICES$ -
102SHORE POWER SERVICES$ -
103WHARFAGE AND LINEHANDLERS$ -
104POTABLE WATER$ -
105BILGES AND DRAIN WELLS$ -
106GARBAGE AND TRASH REMOVAL$ -
107PROTECTIVE FLOOR COVERING$ -
108SECURITY/WATCHMAN$ -
109GAS FREE INSPECTIONS AND CERTIFICATES$ -
110FIRE PROTECTION$ -
111PORTABLE TOILETS/TEMPORARY FACILITIES$ -
112COOLING WATER$ -
113TEMPORARY LIGHTING$ -
114CRANE SERVICE$ -
115STAGING REQUIREMENT$ -
116OFF LOAD OF LIQUIDS AND STORAGE$ -
SUB TOTAL SECTION - 100$ -
SECTION 200 - DRYDOCK WORK ITEMS
201DRYDOCKING AND UNDOCKING OF THE VESSEL$ -
202DOCK TRIALS$ -
203HULL PREPARATION AND COATING$ -
204RENEW ZINC ANODES$ -
205ANTI BIOFOULING SYSTEM MAINTENANCE$ -
206RUDDER AND STERN FRAME EXAMINATION$ -
207PROPELLER INSPECTION, MAINTENANCE AND REPAIRS (ABS)$ -
208PROPELLER SHAFT WEAR DOWN READINGS$ -
209TANK CLEANING AND INSPECTIONS$ -
210SEA VALVES: INSPECTION AND REPAIR, (ABS & USCG)$ -
211ANCHOR CHAIN AND CHAIN LOCKER INSPECTION$ -
212BOW THRUSTER EXAMINATION AND MAINTENANCE (ABS)$ -
213ULTRASONIC/AUDIO HULL GAUGING$ -
214WASTER PIECE: EXAMINATION$ -
215SWITCHBOARD METER CALIBRATION$ -
216SWITCHBOARD CLEANING$ -
217PRESSURE VESSEL INSPECTIONS$ -
218MAIN PROPULSION MOTORS MAINTENANCE ABSTRACT$ -
219GENERATOR MAINTENANCE$ -
220ELECTRIC MOTOR MAINTENANCE$ -
221THRUST BEARING(S) INSPECTION/RENEWAL$ -
222PROPELLER SHAFT BEARING LUBE OIL TANK AND DELIVERY SYSTEM - INSPECTION/CLEAN AND RENEWAL$ -
223AFT MAST BALST AND COAT$ -
224FORWARD MAST BLAST AND COAT$ -
SUB TOTAL SECTION - 200$ -
SECTION 300 - REPAIR ITEMS
301TOP END OVERHAUL #1 MAIN GENERATOR$ -
302REPLACE GALLEY/MESS’/PASSAGE WAY DOORS TO A-60 FIRE RATED DOORs$ -
303FABRIACTE AND INSTALL GRAB RAILS ON ALL CONTROL ROOM AND SSDG ROOM ELECTRICAL PANELSUNOBSTRUCTED ACTIVATION$ -
304REPLOCATE SSDG ROOM REMOTE FUEL CUT OFF’S TO A LOCATION THAT ALLOWS UNOBSTRUCTED ACTIVATION$ -
305REMOVE – PREP AND INSTALL ELETRICAL MATTING (ECR) IN SSDG CONTROL ROOMSLE$ -
306OPTIONAL – BLAST AND COAT FANTAIL DECKING AND RENEW GRATING$ -
SUB TOTAL SECTION - 300$ -
SECTION 400 - SUPPLEMENTAL ITEMS
401SUPPLEMENTAL WORK: MANHOURS LABOR - Contractor shall not exceed 1000 man hours. Contractor shall specify fully burdened hourly rate X 1000 in cell C62$ -
402SUPPLEMENTAL WORK: MATERIAL - Government provided total NTE $50,000.00$ 50,000
SUB TOTAL SECTION - 400$ 50,000
SECTION 403 - DRYDOCK AND WET BERTH DAYS - CONTRACTOR SHALL SPECIFY A PER DAY RATE FOR USE IF REQUIRED
403Haul rate per day$
403Drydock Lay day per day rate$
403Wet Dock Lay Day per day rate$
Rates not included in total for section 400
SECTION 500 - OPTIONAL ITEMS
502PORT AND STBD TAIL SHAFT REMOVAL AND INSPECTION$ -
503PROVIDE ACCESS, THEN REMOVE EXISTING A/C MOTORS & COMPRESSORS AND INSTALL NEW A/C UNITS$ -
$ -
Contract Optional Itmes: SUB TOTAL SECTION - 500$ -
Contract Base Items: TOTAL SECTIONS 100 - 200 - 300 - 400$ 50,000
Total Contract Base Items$ 50,000