T9200-AD-EOS-010_0_0.pdf
PDF 17 MB Posted
- Attached to
- TS GENERAL RUDDER FY21 REFURBUSH/REPAIR DRY DOCK
- Solicitation number
- 69727621Q000018
About this file
This solicitation requests quotations for refurbishment and repair work on the T.S. General Rudder school ship. The U.S. Department of Transportation Maritime Administration is seeking a firm fixed price contract to complete drydocking and repairs between September 10, 2021 and October 31, 2021. Quotes are due by August 17, 2021 and award will occur on or around September 9, 2021. A site visit will be held on July 26, 2021 for interested vendors to inspect the vessel. This is a small business set-aside solicitation under NAICS code 336611 with a size standard of 1,250 employees. The solicitation includes attachments covering requirements, provisions, clauses and evaluation criteria.
View the file
Other files
Show all 40
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ENGINEER'S OPERATING MANUAL
T-AGOS
Ocean Surveillance Ship
Prepared by
TACOMA BOATBUILDING COMPANY
I Ii
.'-1
FOREWARD
The purpose of the Engineer's Operating Manual (EOM) is to provide a description of the operating procedures for the ship's machinery plants. The EOM also presents the basic system information for the Heating, Ventilating and Air Condition
System, Electrical System and Piping System for the T -AGOS Ocean Surveillance
Ship.
TIle equipment and systems described herein are supplemented by arrangement plans and flow diagrams to facilitate comprehension of the overall machinery plant. Included are a listing of indicators, alarms, controls and remotely operated valves appearing at the Main Control Station Console (MCSC).
Additional information concerning installation, operation, safety precautions, maintenance procedures and adjustments for the various machinery components can be found in their respective technical manuals.
For related information and background source material used in developing this manual, refer to Chapter 32.
Also, a listing of chapters, figures, tables and abbrevations is located on pages xxii through xxviii.
53-15/04 3/7/85
CHAPTER
NO.
53-15/04 3/7/85
TABLE OF CONTENTS
TITLE/PARAGRAPH NO. PAGE
LIST OF CHAPTERS, • . • • • . •• • • . • • • • . • • . • • . • . • • • • •• . • • . • . • xxii
LIST OF FIGURES· •• . • • • • . •. . • • . • . . • . • • • • . . . . • • . • . • • • . • . • xxiv
LIST OF TABLES·· . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . xxv
LIST OF ABBREVA TIONS" .. • .. .. • .. .. . .. • .. .. . .. . .. .. .. .. xxvii
GENERAL INFORM A TION .••.•..••••.••.••••...•.••.•.•..• I-I
1.1. General· . • . • • . • . . . . . • . • . . . . . • . • . . • . . • . . . • . • • . • . • • . • I-I
1.2. Ship's Characteristics································ I-I
1.3. Description of Machinery Plant······················· 1-2
1.4. Main Generator Room Machinery" . . . . . • . . • • • . • • . • . • . . 1-3
1.5. Main Control Station Machinery' . • . • . . . . • . . • • • . . . . • . • . 1-17
1.6. Propulsion Motor Room Machinery •.•••..•.••.•..•.••• 1-18
1.7. Sewage Machinery Room Machinery··················· 1-34
1.8. Air Conditioning Machinery Room Machinery··········· 1-37
1.9. Bow Thruster Motor Room Machinery·················· 1-40
1.10. Emergency Switchboard and Generator Room
Machinery ........••.....•..................•.•.•.. 1-42
1.11. Steering Gear Room Machinery······················· 1-45
1.12. Machinery Arrangement •.•......•..•.•..•.•..•.••... 1-46
MAIN GENERA TOR DIESEL ENGINES AND GENERA TORS 2-1
2.1. General' •..••..•• , . . . • . . . . • . . • . . . • . . . . • . • . . • . . . • . • . 2-1
2.2. Main Generator Engines······························ 2-1
2.2.1. Engine Cooling Systems •..••..•....•.•.••... 2-2
2.2.2. Engine Seawater Cooling •••••••••••••••••••• 2_2
2.2.3. Engine Lubrication.......................... 2-2
2.2.4. Engine Pre-Lubrication······················ 2-3
2.2 . .5. Engine Fuel System" . . . • • . • • . • . . • . • • . • • • . • . 2-3
2.2.6. Cranking of the Main Generator Engines .•.•... 2-3
2.2.7. Main Generator Engine Control' ..•.•..•..•.•. 2-4
CHAPTER
NO.
(Cont'd)
53-15/04 3/7/85
2.2.8.
2.2.9.
TABLE OF CONTENTS (Cont'd)
TITLE/PARAGRAPH NO.
Starting the Main Generator Engines •.•..•...•
Stopping the .\lain Generator Engines" •••....•
2.2. 10. Emergency Stopping of the \lain Generator
PAGE
2-5
2-6
Engines' • • • • • . • • • • • . • • . . . • . . . . • . • • . . • . . . • . . 2-6
2.2.11. Instrumentation and Monitoring Devices········ 2-7
2.3. \lain Generators· . • . . • • . • • • • • . . • • • • • • • . . . . • • • • . • • . • • 2-8
2.4.
2.3.1.
2.3.2.
2.3.3.
2.3.4.
2.3.5.
2.3.6.
2.3.7.
2.3.8.
2.3.9.
2.3.10.
General· ...•••••••••..•.•••••.•..•.••.••••.
Generator Cooling ...••.••.•...•.••.•.••.•..
Heating' •••.••.••••••••...•.••.••.•....••.•
Instrumentation and Monitoring' .••••.•......•
Preparation for Starting the Generator Engines .
Starting the \lain Generator Engines' .•.••.•...
Putting the Generators On-Line'" ..• , .•.••.••
Removing the Generators from Service ......•.
Stopping the Engines (600V Switchboard)
Emergency Stopping of the Engines' .•..•.•..••
Alarms and Causes •.••.••..••...••.••••..••.•••••••.
2.4.1.
2.4.2.
Main Generator Engines' ••.••...••••••.•.••..
Main Generators' ....•.•••.•.•..••••.••.••..
2-8
2-8
2-8
2-8
2-9
2-10
2-11
2-14
2-16
2-17
2-18
2-18
2-20
BOW THRUSTER ...•...•••••.•........•.••....••.•..•..•. 3-1
3. I. Gener al . • . • . . • . . • . . • • . • • . . • . . . . • • • • . • • . . . • • . . • • • • . • 3-1
3.2. Cooling' . . . • • • • • . • • . . . . . • • . • • . . . • . . • • . • • • • • . . • • • . • • 3-1
3.2.1. Drive Motor .... •· .. ··•·••·• .. •··· .. • .... ·· 3-1
3.2.2. Heat Exchanger •.••....••.••...........••.• 3-1
3.3. Heating' . • • . . • . . . • • • . • • . • . . • . . • • • • • . • . . • • • • . . . . • . . • 3-2
3.4. Lubrication' • . • • . • . . • • . • • . • • . • • . • . . • • . • . . . . • • . • . • • . 3-2
3.5. Control' . . • • . • • . • • . . . . • • . • . • • • . . . . . . . • . • . . . . • • • . • . . 3-3
3.6. Pre-Operational Procedure'" ••.••....•••••... .•.••.• 3-3
3.7. Bow Thruster Operation· .•••••.•..••••• : •.••.••.•.•..
3.7.1. Normal Operation, Remote •••....••.••
3.7 .2. Emergency Operation, 600V Switchboard······· ii
3-6
3-5
3-6
CHAPTER
NO.
(Cont'd)
53-15/04 3/7/85
3.8.
3.9.
3.10.
3.11.
TABLE OF CONTENTS (Cont'd)
TITLE/PARAGRAPH NO.
Securing from Bow Thruster Operation·
Instrumentation and Monitoring Devices·
Operating Parameters
Alarms and Causes·
PAGE
3-6
3-7
3-8
3-9
PROPULSION MOTORS· .................................. . 4-1
4.1. General············································ 4-1
4.2. Bearings··········································· 4-1
4.2.1. Motor Shaft································ 4-1
4.2.2. Bearing Temperature Relay·················· 4-2
4.2.3. Resistance Temperature Detector············ 4-2
4.2.4. Bearing Wear ..... ......................... 4-2
4.3. Lubrication·
4.3. I. After Pedestal Bear ing ......... :
4.3.2. Sump Tank·································
4-3
4-3
4-3
4.3.3. Lube Oil Pumps···························· 4-4
4.3.4. Lube Oil Strainers·························· 4-4
4.3.5. Lube Oil Cooler ............................ 4-4
4.3.6. Head Tanks ................................ 4-4
4.3.7. Forward Pedestal Bearing···················· 4-5
4.4. Ventilation and Cooling· . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-5
4.4. I. Centrifugal Fan ............................ 4-5
4.4.2 .. Temperature Regulating Valve··············· 4-6
II. II. 3. Seawater Cooling Pump ...•....•.•••.••••.•• 4-6
4.5. Heating· . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-7
4.6. Barring Irons······································· 4-8
4.7. Detection and Speed Generators······················ 4-8
4.8. Propulsion Motor C02 System···· ... ... .............. 4-9
4.9. Instrumentation and Monitoring······················· 4-10 iii
CHAPTER
NO.
(Cont'd)
53-15/04 3/7/&5
TABLE OF CONTENTS (Cont'd)
TITLE/PARAGRAPH NO.
4.10. Operating Parameters·······························
4.11. Preoperational Procedures
PAGE
4-11
4-12
4.11.1. Lubrication.. • . • • .. . . . • • . • .. • • . . . . • . . • . • .. . 4-12
4.11.2. Cooling Water .. •·•· .. ••·· .. ···•• .. •·• .. ···• 4-14
4.11.3. Emergency Seawater Cooling ................ • 4-15
4.12. Operating the Propulsion Motors ....••••..•.....•..••. 4-15
4.13. Extended Operation on One Non-Running
Propulsion \~otor . . . . • • • • • . . • • . . • • . • . • • . • • • • • . • . . • . • • 4-16
4.14. Securing the Propulsion Motor························ 4-16
4.15. Emergency Stopping of the Propulsion Motors····· ....•• 4-17
4.16. Alarms and Causes •••••. . . . . . . • • • . • • • • • . • . . . . . • • . • • • 4-19
PROPELLERS, SHAFTING AND SHAFT BEARINGS .•.......••
5.1. General .. ••·••·•·
5.2. Propellers······· .•••••.•...•....•..•••••••........•
5.3. Propeller Shafts .••.•••••.••.....•..•.••.•••••
5-1
5-1
5-1
5-1
5.4. Shaft Brakes •••••••••.•..•..•..•..••••.••.•..•..•.• 5-2
5.4. A. Shaft Revolution Counter . . . • • . • . • • • . . . . . . . . . • • • • • • • 5-2
5.5. Propeller Shaft Bearings and Seals····················· 5-2
5.6. Lubrication' • . • . • • . . . . . • . . • • . • • • • • • • . . . . . . . . . • • . • • • 5-3
5.6.1.
5.6.2.
5.6.3.
5.6.1t.
Sump Tank·································
Rotar y Gear Pump' ....••••.••.•....••..••••
Basket Strainer .•.•.•.•••.....•.••....•.•••
Head Tank·································
5-3
5-1t
5-1t
5-1t
5.7. Emergency Lubrication" .•..•.•. .••...... .••...•..•• 5-5
5.&. Instrumentation and Monitoring Devices' . • • • • • . • . . • • . • • 5-6
5.9 Operating Parameters ..•••••••..•..••••.•..••.••.... 5-7
5.10 Alarms and Causes ..•.••.••.••.......•••...••••.•... 5-&
5.11. Pre-Underway Operational Procedure' . . . . • • • • . . • . • • • • • 5-9
5.12. Securing of Propeller Shafts and Systems (In Port) .•.•. .• 5-11
5.13. Stopping and Locking of Propeller Shaft(s) ..•.•..•••• , •• 5-12 iv
CHAPTER
NO.
53-15/04 3/7/85
TABLE OF CONTENTS (Cont'd)
TITLE/PARAGRAPH NO. PAGE
PROPULSION DRIVE SYSTEM· ......•••........••.••••••.•• 6-1
6.1. Gener al . . • . • • . • • . • . . • • • . • . . • . • • • • • . . • . . • . . • • • • . . . . • 6-1
6.2. Heating and Lighting················ .••.•.••. .•.••.• 6-1
6.3. Ventilation························· .•.••••••••••..• 6-1
6.4. Overload Protection· • . . • . . . . . • . • • . • • . • • . • • . • • . • • • • • • 6-2
6.5. Assignment of Propulsion Motor SCR Power
Converters· . . • . • • • • • . . • . • • . . • . . . . • • . . . . . . . . . . . . . • • . 6-2
6.6. Instrumentation and Monitoring ..•..•..••.••....•.••. 6-4
6.7. Operating Parameters ....••..••.•.••..••.........•.. 6-5
6.8. Pre-Start Up Checks ..•..••...........••....•..•.••. 6-5
6.8.1. Propulsion Motor Power Converters··········· 6-5
6.8.2. &:>w Thruster Power Converter ......•.•.••. 6-7
6.9. Placing Propulsion SCR Power Converters in
Operation· • . . • • . . . . . . . • . . . . • • • • • . . • • • . • • • . • • • • . • • . • 6-7
6.9.1.
6.9.2.
6.9.3.
6.9.4.
Port SCR Power Converter
Star board SCR Power Converter· ...........••
&:>w Thruster SCR Power Converter·· .......•.
Abnormal Assignment of SCR Power Converters· .......•••••.••...•••.••••.••.•.
6-7
6-8
6-8
6-8
6.10. Securing SCR Power Converters ••.••..............••. 6-10
6.10.1.
6.10.2.
6.10.3.
6.10.4.
6.10.5.
Port and Starboard SCR Power Converters No Longer Required·· .•.....•.••.•••••••.••.
Securing Port SCR Power Converter ..•..•••..
Securing Starboard SCR Power Converter······
Securing &:>w Thruster Power Converter •...•.•
Emergency Securing of SCR Power Converters .
6-10
6-11
6-11
6-12
6-12
6.11 Alarms and Causes •.... .•.•..•..•....... ....•. .•.••• 6-13 v
NO.
53-15/04 3/7/85
TABLE OF CONTENTS (Cont'd)
TITLE/PARAGRAPH "'0. PAGE
PROPULSION AND BOW THRUSTER CONTROL STATIONS···· 7-1
7.1. General············································ 7-1
7.2. Remote/Local Emergency Switch .•.•••.••..••••..•.•• 7-1
7.3. Control Station Select Switch (on MCSC) .••.••.••.••... 7-2
7.4. Bow Thruster Select Switch (on MCSC)················· 7-3
7.5. Throttles·········································· 7-4
7.5.1.
7.5.2.
7.5.3.
"Stick" Type Throttle .........•.••.••.••.•••
Rheostat Type Throttle· ..•...••••.•••••••..•
Power Source ••.•...••.••.••.•..••..•.••.•.
7-4
7-4
7-4
7.6. Engine Order Telegraph··········· .••.•.....•..•••••• 7-5
7.7.
7.8.
7.6.1. Purpose············· .••........•.••.••••... 7-5
7.6.2.
7.6.3.
Indicating Pointers··························
Wrong Direction Alarm·· .........•.••.••••..
7.6.4. Power Source .•..•.•...........•.•••••.•..•
Pre-Operation· ••••••••.•.••...••.•.•.•......•••.•.•
7-5
7-5
7-6
7-6
7.7.1. 600V Switchboard···· ... .... ...•••.••••••... 7-6
7.7.2. M CSC ......•.••••••••.••..•.......••.••.•.
Shifting Propulsion Control Stations .....•..••.•.••.•..
7.8.1. Local Emergency to MCSC···················
7.8.2. M C SC to Local Emer gency •......••.•..••••.•
7.8.3. MCSC to PH (or WH) •.•••••.•......•..•.•.••
7.8.4. PH (or WH) to MCSC ...••..•.•....••..••••.
7-6
7-7
7-7
7-7
7-8
7-8
7.8.5. PH to WH .•..•..•.••.•...•.••.••.••.•..... 7-9
7.8.6. WH to PH •.•.•••.••........•••••.•••.....• 7-10
7.8.7. MCSC Overrides and Takes Control··········· 7-10
7.9. Shifting Bow Thruster Control Stations················· 7-11
7.9.1. Local EmergencytoMCSC··················· 7-11
7.9.2. MCSC to PH (or WH) ..••.....••••....•...••. 7-11
7.9.3. PH (or WH) to MCSC •••..•.••...•••••••••.. 7-12
vi
CHAPTER
NO.
(Cont'd)
53-15/04 3/7/85
7.9.4.
7.9.5.
TABLE OF CONTENTS (Cont'd)
TITLE/PARAGRAPH NO.
PHtoWH··································
W H to PH
PAGE
7-12
7-12
7.10. Alarms and Causes·································· 7-13
EMERGENCY DIESEL GENERATOR SET ................... . 8-1
8.1. General············································ 8-1
8.2. Emergency Diesel Engine ............................ 8-2
8.2.!'
8.2.2.
8.2.3.
8.2.4.
8.2.5.
8.2.6 .
Gener al
Engine Cooling System
Jacket Water Heater··
Lubrication ..........................•
Fuel System
Cranking of the Emergency Diesel Engine·
8.2.7. Exhaust Valve/Actuator .......•
8.2.8. Instrumentation and Monitoring·
8.3. Emergency Generator
8.3.1. General·
8.3.2.
8.3.3.
Generator Cooling
Strip Heaters
8-2
8-2
8-3
8-3
8-4
8-4
8-5
8-5
8-7
8-7
8-7
8-7
8.4. Emergency Diesel Generator Operation ..•............. 8-7
8.4.1. Automatic Operation························ 8-8
8.4.2. Manual Operation··························· 8-8
8.4.3. Stopping the Generator Set .................. 8-9
8.5. Operating Procedures································ 8-10
8.5.1. Normal Operation .......................... 8-10
8.5.2. Manual Operation··························· 8-11
8.5.3. Unloading and Stopping· . . . . . . . . . . . . . . . . . . . . . 8-12
8.6. "vIaintenance and Servicing········· .................. 8-13
8.7. Testing············································ 8-14
8.8. Alarms and Causes .................................. 8-15 vii
CHAPTER
NO.
53-15/04 3/7/85
T ABLE OF CONTENTS (Cont'd)
TITLE/PARAGRAPH NO. PAGE --
MONITORING AND ALARM SYSTEMS· ••.••••••.•••...•••••• 9- I
9.1. General·· .•. .•.••••••.••.•. ....•...••••. .•••••..... 9-1
9.2.
9.3.
9.4.
9.1.1.
9.1.2.
9.1.3.
Pur pose· •.••••••••...•....••..•.•••.•••••••
Alarm Display and Demand Display ..•.•.•.•••
Alar m System •.•.••..•............••.•••••
9.1.4. Alarm Condition····························
Alarm Display·········· .•......•....•••.•..••••••..
Power Sources·· ..••..•.•••.••••........•..•.••.••.•
9.3.1.
9.3.2.
9.3.3.
MCSC Power Source ..•......•.••.••..•... -:-.
MCSC Internal Power Supply········· .•..•.••
Power Within the MCSC from Other External Sources· •.••.••.••.••.....•.....•..•.••.•..
Operation of the MCSC ....••••.•.•••.......••.••.•.•
9.4.1. Placing the .'vICC in Operation· .•.••.••.•.•...
9.4.2. Securing the MCSC ..••..••.•...••
9.4.3. Shifting Back to the Main Power Source .•••...
9-1
9-1
9-2
9-2
9-3
9-12
9-12
9-12
9-14
9-14
9-14
9-15
9-15
9.5. Maintenance and Troubleshooting ...•...••..••••.•.... 9-15
9.6. Current Failure Alarm······························· 9-16
9.7. Trouble and Assistance Alarm Panels·················· 9-16
9.7 .1.
9.7.2.
Gener al .....•.••..•......••.•..•...•••••.•.•
Power Sour ce •••••••••••••..•..•
9-16
9-17
9.8. Fire/Smoke J)etection and Alarm System··············· 9-17
9.8.1.
9.8.2.
9.8.3.
Detection and Alarm Panel •••..•..•
Fire Detectors •..•.••.••.•••.••••..••.•.•..
Power Source and Power Supply ......•.••.•..
9-17
9-18
9-20
9.8.4. Operation··············· .••.•.••.•.. ... .•.. 9-20
9.9. Tank Level Indicator and Alarm System .•.......•..•.•• 9-21
9.9.1. Fuel Oil Storage Tanks······················ 9-21
9.9.2.
9.9.3.
Fuel Oil Service Tanks ..••.......•••••.•.••.
Power Source •.••.••.•••.••.••.•.•.•.•.•••• viii
9-21
9-22
CHAPTER
NO.
(Cont'd)
53-15/04 3/7/85
TABLE OF CONTENTS (Cont'd)
TITLE/PARAGRAPH NO.
9.9.4. Operation'
9.10. High Bilge Protection·
9.10.1. Float Swi tch
PAGE --
9-22
9-22
9-22
9.10.2. Power Source·· . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-23
9.11. Watertight Door Status Indicator···· ...... ............ 9-23
9.11.1. General···································· 9-23
9.11. 2. Power Source··· . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-24
9.12. 'vIiscellaneous High Level Alarms·· ......... ........... 9-24
9.12.1. Power Source·· . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9- 25
FUEL OIL FILL, TRANSFER AND SERVICE SySTEMS········· 10-1
10.1. General············································ 10-1
10.2. Operation····································· .. ···
10.2.!. Fuel System, Initial Conditions .. ··· .. · .. ·····
10.2.2. Fuel Transfer to the Ship'" ........ ,
10.2.3. Fuel Transfer from Storage Tanks to
10-1
10-1
10-2
Service Tanks······························ 10-4
10.2.4. Fuel Delivery from Service Tanks to
i)iesel Generators .......................... 10-7
10.2.5. Stripping Fuel from the Service Tanks········· 10-7
10.2.6. Fuel Transfer from Service Tanks to
Storage Tanks······························ 10-8
10.2.7. Fuel Transfer from Storage Tank
to Storage Tank .......................... 10-9
10.2.8. Fuel Transfer to Another Ship or Shore
Facility'" ............ ...... ...... ......... 10-10 ix
CI-IAPTER
NO.
II
53-15/04 3/7/85
TABLE OF CONTENTS (Cont'd)
TITLE/PARAGRAPH NO. PAGE --
LUBE OIL FILL, TRANSFER
AND SERVICE SYSTEMS .••••.•..•.....••.•.••••••••.•••• 11-1
11.1. General············································ 11-1
11.1.1. Purpose· • . • • .. • . • . . • • . • • . • . . . . . . . . • . . • . • • . • 11-1
11.1. 2. Main Propulsion Motors· • . . • . . . . . . . . . . • . . . . . • 11-1
11.1.3. Main Diesel Generators······················ 11-1
11.1.4. Stern Tubes •......•.••..••••.......••.....• 11-2
11.1. 5. Bow Thruster Motor· . . . . • • . • . . . . . . . . . . . . . . • . 11- 2
11.1.6. Emergency Diesel Generator················· 11-2
11.1.7. Tanks and Capacities························ 11-2
11.1.8. Lube Oil Purifier··························· 11-2
11.2. Operation·········································· 11-3
11.2.1. Initial Conditions··························· 11-3
11.2.2. Transferring Lube Oil to the Ship·············
11.2.3. Transferring Lube Oil from the Storage
Tanks to the Main Diesel Generator Sumps via the Lube Oil Purifier···· .••••.••••.
II. 2.4. Transferring Lube Oil from the Storage Tanks to the Main Diesel Generator
11-3
11-4
Sumps via the Transfer Pump············· .... 11-5
11.2.5. Purifying Lube Oil in Main Diesel
Generator Sumps •.••..•••••••••..•....•..•. 11-6
11.2.6. Main Propulsion Motor Lube Oil System········ 11-8
11. 2. 7. Stern Tube Lube Oil System . . • • • . . . . . . . . . . . • • 11-8
11.2.8. Bow Thruster Lube Oil System······ ...•..•.•• 11-8
11.2.9. Emergency Diesel Generator Lube Oil
System .••.••••.........••••.••••••••.•••.. 11-8 x
NO.
53-15/04 6-29-&4
TABLE OF CONTENTS (Cont'd)
TITLE/PARAGRAPH NO. PAGE --
DISTILLING PLANT······································· 12-1
I 2. I: Gener al . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-1
12.2. Power Source· . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-1
12.3. Feed/Ejector Pumps·· . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-2
12.4. Distillate/Fresh Water Pumps· . . . . . . . . . . . . . . . . . . . . . . . . 12-2
12.5. Salinometer········································ 12-2
12.6. No.1 Distilling Plant Operation······················· 12-3
I 2.6.1. Without the Tri m Heater .................... 12-3
12.6.2. Shutdown' . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-6
12.6.3. With the Trim Heater ....................... 12-7
12.6.4. Securing the Trim Heater'" . ................ 12-9
12.7. No.2 Distilling Plant Operation" ...... ......... ...... 12-9
12.7.1. Without the Trim Heater···················· 12-9
12.7.2. Shutdown' . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-13
12.7.3. With the Trim Heater ....................... 12-14
12.7.4. Securing the Trim Heater .................... 12-15
12. &. Troubleshooting······· . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-16
12.9. Alarms············································ 12-16
POT ABLE WATER ....................................... . 13-1
13.1. General············································ 13-1
13.2. Potable Water Pressure Sets···· . ..................... 13-1
13.2.1. General' . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . • 13-1
13.2.2. Power Source .............................. 13-2
, 13.3. Bro'l1ine Proportioning Feeder ........................ 13-2
13.3.1. General···································· 13-2
13.3.2. Power Source ......•....................... 13-2
13.3.3. Operation' . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . • 13-2 xi
CHAPTER
NO.
(Cont'd)
53-15/04 6-29-84
TABLE OF CONTENTS (Cont'd)
TITLE/PARAGRAPH NO.
13A. Recirculating Bromine Feeder •.••••••.......•..•••••• l3.4.1. General· .••••.•...•.•.........••.••••
PAGE
13-3
13-3
13.4.2. Power Source·············· . • . . . . . . . . . . • . • • . 13-3
13.4.3. Testing of Potable Water· . . • • • . • . . • • . . • • . . . . . 13-3
13.4.4. Operation of the Unit··········· .••.•. .•.•••• 13-4
13.5. Water Heaters
13.5.1. Gener al • . . . . . . • . . . . • . . • . . • . . • . . • • • . . . . . . . . . 13-4
13.5.2. Water Heater No. I •....••••••.........•.••• 13-4
13.5.3. Water Heater No.2.························ 13-6
13.5.4. Water Heater No.3···· ..•...•. . .••.•.••.•. . 13-8
13.5.5. Booster Heater •••.••.•.•.......••.••••.••.• 13-9
13.6. Potable Water Pressure Regulators······ .•..••.••..... 13-10
13.6.1. General···································· 13-10
13.6.2. Shore Water Pressure Regulator··············· 13-10
13.6.3. Booster Heater Pressure Water
Regulator ., . • . . . • . . . . . . • . • • . • • . • • . . . . . . . . . . 13-11
OIL Y WASTE, BILGE AND BALLAST SYSTEMS' ........•.•.•• 14-1
111.1. General·············· . . . . . . . • • . • • . • • . • . . • . . . . . . . . . . 14-1
14.1.1. Oily Waste System Description .•..••......... 14-1
14.1.2. Bilge System Description •••.............•.•. 14-2
14.1.3. Ballast System Description··················· 14-2
14.2. Oily Waste System Operation························· 14-3
14.2.1. Oily Waste System, Initial Conditions·········· 14-3
14.2.2. Oily Waste System, Normal Operation········· 14-3
14.2.3. Transfer of Oily Waste from Purifier Sludge
Tank to Oily Waste Tanks .••.••.•. ..•.•.•.. 14-4
14.2.4. Transfer of Oily Waste from Holding Tanks
to Shore Connections' . . . . . . • . • . . • . . • . . • . . . . . 14-4
14.2.5. Draining the Main Oiesel Generator
Sumps ..•......•..•.••..•.••........•••.••. 14-4 xii
CHAPTER
NO.
(Cont'd)
53-15/04 6-29-84
TABLE OF CONTENTS (Cont'd)
TITLE/PARAGRAPH NO.
14.3. Bilge System Operation· ..••••••.•••.•....••.•..•
14.3.1. Bilge System, Initial Conditions··· ..•••.•...•.
PAGE
14-5
14-5
14.3.2. Bilge System, Normal Operation •....•..•..••• 14-5
14.4. Ballast System Operation •••.•.••..••.••.••.••.••.••• 14-8
14.4.1. Ballast System, Initial Conditions .•••••.•••••• 14-8
14.4.2. Ballasting Ship···· ....•.. ... .. . .•. .•. ....••. 14-8
14.4.3. Deballasting Ship··························· 14-11
14.4.4. Emergency Deballasting of Anti-Roll
Tank •..... ...••...•..•.••..•.••.••..•.••.• 14-12
STABILIZA TION SYSTE\-I .....••..•.•...•••...•............ 15-1
15.1. General············································ 15-1
15.2. Description of the Anti-Roll Tank·····················
15.3. Operation of the Anti-Roll Tank .•••.•.•••••..•
15.3.1. Ballasting, Normal Operation ....•..•.••.•.••
15-1
15-2
15-2
15.3.2. Deballasting, Normal Operation· . • • • • . • . • • . • • 15-2
15.3.3. Deballasting, Emergency Operation· • . • • . . • • • . 15-2
COMPRESSED AIR SYSTEMS· .......•.•...•••.••.•.••.•.••. 16-1
16.1. General···········································.. 16-1
16.1.1. Diesel Starting Air System (DA) •••..•.•..••.. 16-1
16.1.2. Ship's Service Air System (ALP) .•..••...••.•• 16-1
16.1.3. SATCOM Waveguide Air System·············· 16-2
16.1.4. Air Compressor Electrical Operation·········· 16-2
16.2. Operation·········································· 16-3
16.2.1. Air System, Initial Conditions················ 16-3
16.2.2. Activating Diesel Starting Air System········· 16-3
16.2.3. Activating Ship's Service Air System·········· 16-4
xiii
CHAPTER
NO.
53-15/04 6-29-84
TABLE OF CONTENTS (Cont'd)
TITLE/PARAGRAPH NO. PAGE
HEATING, VENTILATION AND AIR CONDITIONING SYSTEM 19-1
19.1. General············································ 19-1
19. I. I. System Components . . . . . . . . . . . . . . . . . . . . . . . . . 19-1
19. I. 2. Purpose· . . . . . . . . . . . . . . . . . . . . . . . . . . . • . . . . . . . 19-1
19.2. Operation·········································· 19-1
SHIP SER VICE AIR CONDITIONING PLANT· .........•....... 20-1
20.1. General············································ 20-1
20.2. Chilled Water Air Conditioning Units·················· 20-1
20.2.1. General···································· 20-1
20.2.2. Power Source ......................•....... 20-1
20.2.3. Operation·································· 20-2
20.3. Self -Contained Units'
20.3.1. General·
20-2
20-2
20.3.2. Power Source .............................. 20-2
20.3.3. Operation' . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20-3
20.4. Ship's Store Refrigeration' . . . . . . . . . . . . . . . . . . . . . . . . . . . 20-3
20.4. I. General' . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20-3
20.4.2. Power Source .............................. 20-3
20.4.3. Operation' . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20-4
20.5. Refrigerator !Frozen Food Cabinet .................... 20-4
20.5. I. General' . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20-4
20.5.2. Power Source······························ 20-4
20.5.3. Operation·································· 20-4
20.6. Ice Machines····· ...... ......... ................... 20-5
20.6. I. General' . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20-5
20.6.2. Power Source .............................. 20-5
20.6.3. Operation' . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20-5 xv
CHP-.PTER
NO.
18.2.
53-15/04 6-29-84
TABLE OF CONTENTS (Cont'd)
TITLE/PP-.RAGRAPH NO. PP-.GE
PLUMBING DRP-.INS P-.ND SEW P-.GE TRANSFER SYSTEMS 17-1
17.1. General············································ 17-1
17.1.1. Purpose···· ................ ........... ..... 17-1
17.1.2. System Operation··························· 17-1
17.1.3. Seawater Flushing System ................... 17-2
17.1.~. Collection Holding and Transfer System (CHT)······························ 17-3
17.2. Operation·········································· 17-5
17.2.1.
17.2.2.
17.2.3.
17.2.4.
17.2.5.
Initial Conditions···························
M-Sea System Operation
Restricted Waters, In- Port System Operation' ..
Discharging Sewage via Shore Connection'
Activating Seawater Flushing System via Shore Connection···························
CHILLED W P-. TER AND ELECTRONIC COOLING W P-. TER
SYSTEMS' .................•
18.1. General············································
17-5
17-5
17-7
17-8
17-10
18-1
18-1
18.1.1. Purpose···································· 18-1
18.1.2. Chilled Water System······················· 18-1
18.1.3. Electronic Cooling Water System ............. 18-1
Operation' ...........•
18.2.1. Chilled Water System, Normal Operation
18.2.2. Adding Makeup Water to Chilled Water
18.2.3.
18.2.4.
18.2.5.
18.2.6.
System ......•
Electronic Cooling Water System, Normal Operation' ...•
Bypassing the Electronic Cooling Flowmeter .. .
Bypassing the SUR TASS Heat Exchanger'
Adding Makeup Water to Electronic Cooling Water System······························ xiv
1&-2
18-2
18-2
18-2
18-3
18-3
18-3
CHAPTER
NO.
(Cont'd)
53-15/04 6-29-84
TABLE OF CONTENTS (Cont'd)
TITLE/PARAGRAPH NO.
20.7. Refrigerator (6 CF) ••...••••••.•..•..•.....••.•..•.•
20.7.1. General·
PAGE
20-5
20-5
20.7.2. Power Source·· . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20-5
20.7.3. Operation.································· 20-6
20.8. Refrigerator (2.5 CF) .......... ,. ............... ..... 20-6
20.8.1. General···································· 20-6
20.8.2. Power Source··· . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20-6
20.8.3. Operation· . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20-7
AUXILIARY SEAWATER SySTEM··························· 21-1
21.1. General············································ 21-1
21.2. Main Sea Chests···································· 21-1
21.3. Seawater Service Pumps········
21.3.1. General'
21. 3. 2. Power Source
21.3.3. Operation of the ASW Pumps·················
21-1
21-1
21-2
21-3
21.4. Propulsion Motor Cooling Water' . . . . . . . . . . . . . . . . . . . . . . 21-3
21.4.1.
21.4.2.
21.4.3.
21.4.4.
Gener a1
Power Source
Operation of the Propulsion Motor Cooling Pump······························
Emergency Cooling Water
21-3
21-3
21-3
21-4
21.5. Bow Thruster Seawater Cooling Pump·················· 21-4
21.5.1. General···································· 21-4
21.5.2. Power Source······························ 21-5
21.5.3. Operation of the Bow Thruster Cooling
Water Pump ............................... 21-5
21.6. Distiller Feed/Ejector Pumps························· 21-5 xvi
CHAPTER
NO.
53-15104 6-29-84
TABLE OF CONTENTS (Cont'd)
TITLE/PARAGRAPH NO.
FIREMAIN SySTEMS····· ..•.••.•••.......•..•..••••.•••••
PAGE
22-1
22.!. General·································· .. ··•····•• 22-1
22.!.!. Purpose· • . • • . . • . • • . . . . . • . . . . . . . . . . . • . . • . . . . 22-1
22.1.2. System Components························· 22-1
22.2. Operation.·········· • • . . . . . . . . . . . . . . • . • • • • . . • • . • • . • 22-4
22.2.1. Placing the Firemain System in Standby
Condition ......•..••.••..•.••.••..•.••••.•• 22-4
22.2.2. Activating the Firemain System·············· 22-5
22.2.3. Use of the No.2 Pump for Propulsion Motor
Emergency Seawater Cooling Supply .••..•.•.• 22-6
FIREFIGHTING EQUIPMENT ...........•.•..•.••..•.•..... 23-1
23.!. General············································ 23-1
23.2. Fixed Halon 130 I Systems····························
23.2.l. Gener al •.•.......••....••.••.••.•..•..•.•..
23-1
23-1
23.2.2. Halon System No. I .....•.•......•....•..... 23-1
23.2.3. Halon System No.2· . . . . . . . • . . • . • • . • • . • . • • • • 23-3
23.2.4. Halon System No.3······ .•....•....... ..... 23-3
23.2.5. Halon System No.4· . . . . . • • . . . . . . • • . . • . . • . • . 23-4
23.2.6. Halon System No.5· • . • • . • . . • • . • • . . . • . . . . . . . 23-4
23.2.7. Halon System No.6· • . • . . • • . • • . • . • • . • • • • . • . • 23-5
23.2.8. Operation of Halon 1301 System·············· 23-5
23.3. Fixed C02 Systems· . . . . • • . . . . • . . . . . • . . . . . . • . . • . . • . • • 23-6
23.3.1. General· • . • . . . • . . • • . • . . • • . • . • . • • . • • . • • . • . • • 23-6
23.3.2. Port Fixed C02 System· . . . . . . . . . . . • • • • • • • . • . 23-7
23.3.3. Starboard Fixed C02 System················· 23-7
23.3.4. Operation of C02 System···················· 23-8
xvii
CHAPTER
NO.
(Cont'd)
53-15/04 6-29-84
TABLE OF CONTENTS (Cont'd)
TITLE/PARAGRAPH NO. PAGE
23.4. Portable Fire Extinguishers········.· •• · ••.••.•••• •••• 23-10
23.4.1. General····· .. ······;······················ 23-10
23.4.2. Dry Chemical Fire Extinguisher
(Class "A", "B" or "C" Fires) .••.••.••.••••.••.
23.4.3. Dry Chemical Fire Extinguisher
(Class "B" or "C" Fires) ......•.••......•
23.4.4. Rescue/Work Boat Fire Extinguisher ...••••.•
23-10
23-12
23-14
23.5. AFFF Extinguishing Agent (Class "B" Fires)············· 23-14
23.6. Other Equipment···································· 23-15
ELECTRICAL POWER DISTRIBUTION .•................••. 24-1
24.1. General···························· .. ··•···•·· .. •·· 24-1
24.2. 600V Power Distribution····························· 24-1
24.2.1. Main Generator Breakers" .•.•••.•.••. ..•..• 24-2
24.2.2. Tie Bus Circuit Breakers· .............. • .... • 24-4
24.2.3. Feeder Circuit Breakers (600V/450V
Transformers' ••.•••••....•...•............. 24-4
24.2.4. Propulsion Power Converter Circuit
Breakers. . • . . . . . • • . • • . • • . . . . . . . . . . . . . . . . . • • 24-5
24.3. Ship's Service Power Distribution' . • • . . . . • . . . . . • . • . • • • • 24-5
24.3.1. General···································· 24-5
24.3.2. 600V /450V Transformers .••.•.••..••......... 24-6
24.3.3. Circuit Breakers···························· 24-6
24.4. 400Hz Power Distribution" . . • . . . . . . . . . • . . . . . . . • . • • . • 24-8
24.4.1. General' • • . . . • • . • • . • • . • • . • • . . • . • • . • . . • . . • . • 24-8
24.4.2. 400HZ MG Set Power Source •.••••••.•.•.••.. 24-8
24.4.3. Space Heaters······························ 24-9
24.4.4. 400HZ Switchboard" • .. • .. • • . . . • • • . • • . • . • • . • 24-9
24.4.5. 400HZ MG Set Operation (Voltage Regulator Automatic)· .. · . ....•.• ..................... 24-10 xviii
CHAPTER
NO.
(Cont'd)
53-15/04 2-13-85
TABLE OF CONTENTS (Cont'd)
TITLE/PARAGRAPH NO. PAGE
24.4.6. 40HZ MG Set Operation (Voltage Regulator in Manual ........••.•..••.••.••.••.••.•..•. 24-13
24.4.7. Loss of 400HZ Power························ 24-17
24.4.8. Troubleshooting· . • . . • • . . • . • . . • • • • . . • • • • . . • . . 24-18
24.5. 60HZ Special Power for Electronic Equipment .•••..•.•. 24-18
24.5.1. General· •...•.•••.••.••..•.••.•...•.•..•..•
24.5.2. 60HZ MG Set Power Source .....••......•
24.5.3. Space Heaters··· ........•..••.•..•....•..••
24.5.4. 60HZ Electronic Switchboard·· ..•.......•..•.
24.5.5. 60HZ MG Set Operation (Voltage Regulator in Automatic) .•..•..•..•..•...•..•.....••.•
24.5.6. 60HZ MG Set Operation (Voltage Regulator in Manuall .....•.•.••.........•...•.••.•.•.
24.5.7. Loss of 60HZ Special Power ..••.•....••.•.••.
24.5.8. Troubleshooting·· .••.••••...•..............•
24-18
24-19
24-19
24-20
24-20
24-24
24-28
24-28
24.6. Emergency Power···· .... ....•.••. .•. .. .••.•.••.•... 24-28
INTERIOR COMMUNICATIONS SySTEM·········· .......... . 25-1
25.1. General············································ 25-1
25.1.1. Sound Powered Telephone System . • . • . • • . • . • • • 25-1
25.1. 2. Watch Call System· . . . . . . . . . . . . . . . . . • . . . . • . • 25-6
25.1.3. Public Address (PA) System·················· 25-8
25.1.4. General Alarm System • • . . . . • • . • . . . . . . . . . • . 25-8
HYDRAULIC SYSTEMS·· ..•.•........••••..•.......•.••.•. 26-1
26.1. General············································ 26-1
26.1.1. Purpose···································· 26-1
26.1.2. Steering Hydraulic System··················· 26-1
26.1.3. Anchor Windlass HydrauliC System············ 26-1
26.1.4. Array Hydraulic System •••.....••••....•.•.. 26-2
xix
CHAPTER
NO.
(Cont'd)
TABLE OF CONTENTS (Cont'd)
TITLE/PARAGRAPH NO. PAGE
26.2. Operation .••.••• ••·••··•·••··••·••·····•·········•• 26-2
26.2.1. Steering Hydraulic System, Normal
Operation· .......•••••.•••••.•.....•.••.•.. 26-2
26.2.2. Replenishing Steering System Hydraulic
Fluid .•.••••.••.••.••...••••.•..••••.••.•.• 26-3
26.2.3. Steering System, 'vIanual Operation············ 26-3
26.2.4. Anchor Windlass Hydraulic System
Operation· • . • • • . . • • • • . . • . • • • . • • . • • . • . • • . • • • 26-3
26.2.5. Replenishing Array System Hydraulic Fluid· .... 26-3
26.2.6. Removing Contaminated Hydraulic Fluid
from Ship·· . . . . . . . . • • . . . . . . . . . . . • . • . . . . . . . • 26-4
27 (DELETED)
53-15/04 6-29-84
OPERA TlNG MODE PROCEDURES ..••.•..•...•••..•
28.1. General·············· ...............••.••.••.•.••..
28.2. Propulsion Mode, at Anchor ..•••••.••.•..••.••.••••.•
28-1
28-1
28-1
28.3. Propulsion Mode, Warm-up··························· 28-1
28.4.
28.5.
28.3.1. Generator Engine Starting with a Dead
Bus (No Generators On-Line) .•.••.••.•.••••. 28-1
28.3.2.
28.3.3.
28.3.4.
Placing the First Generator On-Line··········
Syncronizing the Generator •.•..•.••....•..•.
Propulsion Motors, Shafting and Propulsion Control· ...............................••.•
Propulsion Mode, Underway ..•••••.••....•.••..•.•.••
Propulsion Mode, Steering·· ..••...••.......•••••.•.••
28.5.1. Gyro Mode·································
28-3
28-3
28-4
28-5
28-6
28-6
28.5.2. Hand Mode .............••.•.•••.•..•...... 28-6
28.5.3. Non-Follow-Up 'vIode •••..•.......••.•.•..••• 28-6
28.6. Propulsion Mode, Securing the Main Propulsion
Plant • • . . . . . . . . . . . . . . . . . . . • . • • . • • . • • . • . • . . • . • • • • • • • 28-7
28.7. Collision Avoidance System ........•..••••.••.•••..•• 28-8 xx
CHAPTER
NO.
53-15/04 6-29-84
TABLE OF CONTENTS (Cont'd)
TITLE/PARAGRAPH NO. PAGE
CASUALTY PROCEDURES/PROPULSION CASUALTIES· .••.•• 29-1
29.1. Main Generator Engines· • . . • • • • . . . . . • • . • . . . . . . . . . . • . . 29-1
29.3. Main Propulsion Motors· • . • . . . . . . . . . • • . . . • • . • • . • . • • • • 29-2
29.3. Propellers············ • . . . . . • • . • . • • • • • . • • • • • . • . . • . . • 29-2
DAMAGE CONTROL EQUIPMENT··· .••....••....•..•..•.•• 30-1
30.1. General············································ 30-1
TANK CAPACITIES, AIR ESCAPES, OVERFLOWS AND
SOUNDING TUBES· ......•..•••••.•.......•...•.••.•..•...
31.1. General············································
31.2. Tank Capacities •......•..•..••....••.•..........•..
RELATED INFORMATION AND BACKGROUND SOURCE
MATERIALS ..•...•..........••..•••••.•.••.••.•
31-1
31-1
31-1
32-1
32.1. General············································ 32-1 xxi
CHAPTER
NO.
53-15/05 3/7/85
LIST OF CHAPTERS
TITLE PAGE
GENERAL INFORMATION···················· .•••••••• 1-1
MAIN GENERATOR DIESEL ENGINES &. GENERATORS·· 2-1
BOW THRUSTER····································· 3-1
PROPULSION MOTORS ..•.••.•••••.••••••.•.••.•••.•. 4-1
PROPELLERS, SHAFTING AND SHAFT BEARINGS· ••••.• 5-1
PROPULSION DRIVE SYSTEM .••.•••...••..........•.. 6-1
PROPULSION AND BOW THRUSTER CONTROL
STATIONS········································· 7-1
EMERGENCY DIESEL GENERATOR SET . •.•.... ..•.••.• 8-1
MONITORING AND ALARM SYSTEMS ..••.•..••.••.•.•• 9-1
FUEL OIL FILL, TRANSFER AND SERVICE SySTEMS····· 10-1
LUBE OIL FILL, TRANSFER AND SERVICE SYSTE\1S····· 11-1
DISTILLING PLANTS .•.•••.•.••.••••••••.••.•.••.... 12-1
POTABLE WATER···································· 13-1
OIL Y WASTE, BILGE AND BALLAST SYSTEMS· .•.. ...•.• 14-1
STABILIZATION SySTEM······························ 15-1
COMPRESSED AIR SySTEMS·························· 16-1
PLUMBING DRAINS AND SEW AGE TRANSFER
SySTEMS·········································· 17-1
CHILLED WATER AND ELECTRONIC COOLING WATER
SySTEMS······ .•••.... .•.... ................. ..... 18-1
HEATING, VENTILATION AND AIR CONDITIONING
SYSTEM •.........•..........•.....•............... 19-1
SHIP SERVICE AIR CONDITIONING AND
REFRIGERATION··································· 20-1
SEAWATER SERVICE ••.. ••............•.....•....... 21-1
FIREMAIN SySTEMS·································· 22-1
FIR EFIG HTING EQUIPM ENT •...•.......•.•..•........ 23-1
ELECTRICAL POWER I)JSTRIBUTION • • • . • . . • • . • • • • • • 24-1
INTERIOR COMMUNICATIONS SySTEMS··············· 25-1
HYDRAULIC SYSTEMS .....................•.•••.••.• 26-1
ARRAY FLUID AND CATCHMENT (DELETED) ..•••..••. 27-1
xxii
LIST OF CHAPTERS (Cont'd)
CHAPTER
NO. TITLE
28 OPERA TING MODE PROCEDURES··············.······
29 CASUAL TY PROCEDURES/PROPULSION
CASUAL TIES····························· ..•.•••.•.
30 DAMAGE CONTROL EQUIPMENT·········· ...•••••.•..
31 TANK CAPACITIES, AIR ESCAPES, OVERFLOWS AND
SOUNDING TUBES· ..•....••.••••.••••••.•..••••..••
32 RELATED INFORMATION AND BACKGROUND SOURCE
53-15/05 1-21i-85
MATERIALS, .•..•..••.••••..•••••••.••.•..••.•••.••
x.xiii
PAGE
28-1
29-1
30-1
31-1
32-1
FIGURE
NO.
1- I
2-1
2-2
4-1
5-1
10-1
II-I
12-1
13-1
14-1
14-2
14-3
14-4
15-1
16-1
17 -I
18-1
19-1
20-1
21-1
22-1
23-1
23-2
23-3
24-1
24-2
24-3
24-4
24-5
24-6
26-1
31-1
53-15/05 3/7/85
LIST OF FIGURES
TITLE
Machinery Arrangement Plan (4 Sheets) •.•••....•.••.••••
Main Generator Seawater Cooling (I Sheet) •••.••.••••••••
Diesel Engine FW Cooling System (I Sheet) •.•••••.••..•
Propulsion Motor Lube Oil (I Sheet) .•.......•••••••••.•.
Propeller Shaft and Stern Tube Lubrication (I Sheet) ....••.
Fuel Oil Fill, Transfer and Service Systems (4 Sheets) ..••••
Lube Oil Filling, Transfer and Service Systems (2 Sheets) •••
Diesel Engine JW Cooling and Distiller Heating (I Sheet) ...
Potable Water System (4 Sheets) .•.•...••••••.•••..•.••.
Oily Waste System (I Sheet) ••••••....•.••.••.....••.•••
Bilge System (I Sheet) •...••..•.....•..••••..•..•..••.•
Ballast System (I Sheet) ...•.•..•••......••.•.•••.•••••
Oily Waste, Bilge and Ballast Systems (I Sheet) ...•••••••.
Passive Roll Stabilization System (I Sheet) .•.......••.••.
Compressed Air System (3 Sheets) .••••..•..•.•...••.••••
Plumbing Drains and Sewage Transfer (3 Sheets) .•.••••••••
Chilled Water and Electronic Cooling Water Systems (2 Sheets) ..•.••......•..•..••.••..•..•......••.••••
HVAC Syste'Tl (5 Sheets) •..••..•.••.••.••.....•.••.••.•
Ship Service Refrigeration (I Sheet) •••.••.••.••.•.••..••
Auxiliary Seawater Cooling (3 Sheets) •.••.••.•••...•.••..
Firemain System (3 Sheets) •.••.••.•.•••.••.•••••.•.••.•
Fire Protection Arrangement (2 Sheets) •.•••••••••••.••.•
Fixed Fire Extinguishing Systems (2 Sheets) .••.....•.••.••
Portable Fire Extinguishers (I Sheet) .•.•...•....••.••••.
Electric Plant - Ship Service and Propulsion (I Sheet) ••.••.
Ship Service 450V Power Distribution (I Sheet) •..•.••.••••
Emergency Power Distribution (I Sheet)··················
Lighting Power Distribution (I Sheet) .•••.••.••.••.••.•••
60 Hz (SpeciaI) Power Distribution (I Sheet) •.••.•.•••••••
400 Hz Power Distribution (J Sheet) .....••.•••••.••.••••
Hydraulic Systems (2 Sheets) .••.••.•••.••••.•..•.••••••
Air Escapes, Overflows and Sounding Tubes (4 Sheets) •.•••• xxiv
CHAPTER
NO.
I
II
TABLE
NO.
2-1
2-2
2-3
3-1
3-2
3-3
4-1
4-2
4-3
5-1
5-2
5-3
6-1
6-2
6-3
8-1
8-2
8-3
9-1
9-2
9-3
9-4
10-1
10-2
10-3
11-1
11-2
53-15/05 1-24-85
LIST OF TABLES
TITLE
PAGE
NO.
Main Engine Operating Parameters····· . .•..•..•••••••.• 2-7
'vIain Generator Operating Parameters· •.•••••.••....•...
Alarms and Causes' .•••••................•.••.•••.••••
Bow Thruster Gages and Mounting Devices .•..••.••.•••••
Bow Thruster Operating Parameters· •.•...•..•.••..•..••
High Temperature Alarm·······························
Propulsion \1otor Instrumentation and Monitoring'
Propulsion Motor Operating Parameters······· .••.••.•..•
Propulsion Motor Alarms and Causes' .•..•..........••.••
Shaft Bearing and Lube Oil Monitors···· .••.•.••
Shaft Bearing and Lube Oil Operating Parameters •.•.•.••.
Troubleshooting Alarms' ..•..•.••.•.•.•.•••.........•••
Propulsion Drive System \1eters and Monitors" .••.••..•.•
Propulsion Bow Thruster Motor Operating Parameters" •.••
Propulsion Drive System Alarms and Causes ••.••.••.••.•.
Engine Operating Conditions·········· .........•
Engine Operating Parameters'" .......••.•.••.•••••.•.•
Emergency Diesel Generator Alarms' •.••...••.••••••••••
Alarms and Display Address .••••..••••.•......•...••..•
Fire Detectors" ..•.••.............•..•..••.•.••.••.•.
Spaces Protected by Float Switches .••.••.•........••.••
Watertight Doors With Open/Close Indication ...••..••.•••
Fuel Tank Fill Valves and Remote Operators' .•.••.•••••..
Fuel Tank Suction Valves and Remote Operators .•.•
Fuel Tank Capacities, Sounding Tubes, Air Escapes and Overflows' •••..••.•.•••...•..••.•.••.••.•..•..•••••
Main Diesel Generator Lube Oil Fill and Supply Cutout Valves······ .. • .. ••·•·••·•··••····•··• .. •·•· .••.••.
Main Diesel Generator Lube Oil Suction and Return Cutout Valves' .••••..•.•..........••••.•••....•.••..• xxv
2-9
2-18
3-8
3-9
3-10
4-10
4-12
4-19
5-5
5-6
5-7
6-4
6-5
6-13
8-6
8-6
8-15
9-4
9-19
9-23
9-24
10-3
10-5
10-12
11-5
11-7
TABLE
NO.
111-1
111-2
22-1
25-1
25-2
25-3
25-11
25-5
25-6
30-1
31-1
31- 2
31-3
31-11
31-5
31-6
31-7
32-1
32-2
53-15/05 1-211-85
LIST OF TABLES (Cont'd)
TITLE
PAGE
NO.
Spaces Served By the Bilge System······················ 111-7
Ballast Tank Fill and Suction Valves .•.•..•...••••..•.••.
Fire Stations •.••...•••.••...•••.••.....•.••.....••••.
Sound Powered Operation Circuit, I JV .....•••.•...•.••.•
Sound Powered Engineer's Circuit, 2JV •••••..•..••.••
Sound Powered lvIission Circuit, 3JV ••.•..••....••••••.•.
Jack Box Circuit, X6J and Jack Boxes ..•.••......•..•.•.
Watch Call Room Units·· •..•.•...•..•.••.••......•••••
Public Address System Components and Locations ......••.
Damage Control Equipment .••.•••....•.••.••........••
Fuel Tanks ..••.•.......••..••........•.••.••.......••
Ballast Tanks·· .••....••....••..•..••..•.......••.••..
Lube Oil Tanks .........••.•...•.•.•...•...••••••
Potable Water Tanks ••.•••.••.•.•••••...•.•..•.....•.•
Oil y Waste Tank .•...••..•.....•........•..•....••.•..
Voids· ..••..••....••.••.•.•••.••.•..••.•..•..•.••.•..
'vIiscellaneous Tanks, Sumps, Trunks and Sea Chests· •
Referenced Technical Manuals·· ...•.••.•..•......•.•...
Referenced TBC Drawings ...•.•..••.••.•.....•••• xxvi
111-10
22-3
25-2
25-3
25-11
25-5
25-7
25-10
30-2
31- 2
31-3
31-11
31-11
31-5
31-5
31-6
32-2
32-3
LIST OF ABBREVIA nONS
• ABL Above Base Line
ABT Automatic Bus Transfer
ALP Air Low Pressure
ASW Auxiliary Seawater
BITE Built In Test Equipment
CG Cleaning Gear
CHT Collection Holding and Transfer System
COV Cutout Valve
CRT Cathode Ray Tube
DA Diesel Air
DCL Damage Control Locker
EDG Emergency Diesel Generator
EOM Engineer's Operating ,Manual
EOT Engine Order Telegraph
FW Fresh Water
• GEM Generator Engine ,Module
GPD Gall ons Per Day
HVAC Heating, Ventilation, Air Conditioning
HW Hot Water
JW Jacket Water
MCC Main Control Center
MCS Main Control Station
MCSC Main Control Station Console
MG Motor Generator
MOR Mission Operations Room
MSC Military Sealift Command
NFU Non-Follow- Up
OBA Oxygen Breathing Apparatus
PA Public Address
PH Pilothouse
PP\1 Parts Per Million
PSID Pounds per Square Inch Differential
• 53-15/05 xxvii 1-21>-85
PW
ROV
RTD
SATCOMM
SCR
SEM
SURTASS
TBC
TLI
T'vIIN
WH
53-15/05 3/7/85
LIST OF ABBREVIA nONS (Cont'd)
Potable Water
Remotely Operated Valve
Resistance Temperature Detector
Satellite Communications
Silicon Controlled Rectifier
Signal Electronics Module
Surveillance Towed Array Sensor
Tacoma Boatbuilding Co.
Tank Level Indicator
Technical Manual Index Number
Winch House xxviii
CHAPTER 1
GENERAL INFORMATION
1.1. GENERAL
T -AGOS I Class, Ocean Surveillance ships are designed for towing a special array known as the Surveillance Towed Array Sensor (SURTASS) •
. The ships are operated by the Military Sealift Command (MSC). The crew members are merchant marine personnel and the SUR TASS System is operated by civilian technicians.
1.2. SHIP'S CHARACTERISTICS
Length, Overall
Length, Waterline
Beam
Draft, Design Waterline
Displacement, Full Load
Displacement, Light Ship
Complement
Stores Capacity, Refrigerated
Stores Capaci ty, Dry
Fresh Water Capacity
Seawater Ballast Capacity
Diesel Oil Capacity
LO Capacity
Tonnage, United States
Tonnage, Panama Canal
Maximum Speed
Cruising Speed
Cruising Range
53-13/08 1-24-85
224' - 0"
2011' - 0"
113' - 0"
15' - I"
2250.3 Tons
111611.6 Tons
21 Officers and Crew, 9 others
1715 Cubic Feet
1550 Cubic Feet
5099 Gallons (10096)
145,704 Gallons (10096)
228,284 Gallons (9896)
10,252 Gallons
1471 • 8 Gross, 1000.0 Net
2336.3 Gross, 843.6 Net
I-I
12.5 Knots
11 Knots
3000 Nauti cal Miles
Optimum Towing Speed 3 Knots
Endurance (at 3 Knots) 90 Days
Propellers 2 Fixed Pitch
Bow Thruster 550 Horsepower
Machinery Plant Diesel Electric
Main Diesel Engines 3400 Horsepower
Main Motor Characteristics 750 VDC
Shaft 1600 Horsepower
Ship's Service Generators 4 - 600 KW, 600V
Ship's Emergency Generator I - 250 KW, 450V
1.3. DESCRIPTION OF MACHINERY PLANT
The machinery plant is equipped with an automatic Control and Monitoring
System including an Event Logger. Additionally, two remote Cathode Ray
Tube (CRT) Monitoring Stations are provided; one in the Pilothouse and one in the Chief Engineer's Stateroom. The Control System is fully automated with
Built In Test Equipment (BITE). Except for starting/stopping the main generators and vital auxiliaries, the machinery spaces are unattended.
The Main Propulsion Plant consists of four constant-speed (1200 RPM)
Caterpillar Marine Diesel Engines (ModeID398B), each driving a 600 KW brushless KATO Generator (Model 5R4274) designed for Silicon Controlled
Rectifier (SCR) operation. The generators may be operated singularly or in parallel in any combination. The main generators supply power to the propulsion motors via the SCR's. Each of the two counter-rotating propellers is driven by a water-cooled, oil lubricated, 800 HP reversible General
Electric, Model DL58X 170535 main motor. At full power, the propellers rotate at 185 RPM.
Ship's Service electrical power is normally supplied by the Main Propulsion
Generators through 500 KVA, 450V output transformers. The Ship's Service
Switchboards normally supply· power to the Emergency Switchboard. The
53-13/08 1-24-85
1-2
KA TO, 250 K W untermittent), 450V Emergency Generator is driven by a
Caterpillar 3408 engine.
The ship's Central Air Conditioning System consists of three Carrier 40 ton
Chilled Water Plants which serve the Main Control Station, SUR TASS electronic spaces and all messing, lounging, sanitary and berthing spaces.
Normally, two plants are operating with one in standby. The Radio Room, Pilothouse, SUR TASS Array/Winch Shop and the Ship/Winch Control House are cooled by individual air conditioning units.
1.4. MAIN GENERATOR ROOM MACHINERY
I. Main Generator Diesel Engines, 4 each
53-13/08 1-24-85
Manufacturer: Caterpillar
Model: D398B, Vl2
Bore:
Stroke:
RPM:
Rotation:
Tur bochar ged
Air started
Fuel Injection
Radiator Cooled
6.25 inch (i58.8mm)
8.00 inch (203.2mm)
CCW
Reference Location:
Fig. 1-1, Sheet 1 of 4, item No. 62
EOM Chapter No.2
1-3
2.
3.
53-13/08 6-1-84
Main Generators, 4 each
Manufacturer: KATO
Model: 600-6003611
RPM: 1200
Power: 600 VAC/3-Phase/60 Hz
Air cooled
Designed for Silicon Controlled Rectifier operation
Reference Location:
Fig. I-I, Sheet 1 of 4, Item No. 62
EOM Chapter No.2
Starting Air Com~ressors! 2 each
Com~ressor
Manufacturer:
Model:
RPM:
PSI:
Reciprocating
Two stage
Motor
Manufacturer:
HP:
RPM:
Power:
Pulley:
Mounting:
Kellog - American
B352A
225 (ON) to 250 (OFF)
Baldor
7.5
440V/3-Phase/60 Hz
6.6" w/3-Belts
Horizontal
Reference Location:
Fig. I-I, Sheet 1 of 4, Item No. 107
EOM Chapter No. 16
1-4
4 •
5.
53-13/08 6-1-84
Starting Air Receivers, 2 each
PSI: 275
20 Cubic Feet
Reference Location:
Fig. I-I, Sheet I of 4, Item No. 109
EOM Chapter No. 16
Fire and Ballast Pump, I each
Pump
Manufacturer: Aurora
Model: 361 A-AB, size 2x2-1/2x9
GPM: 175
PSI: 100
Centrifugal
Motor
Manufacturer: U.S. Electric Motor
HP: 20
RPM: 3,600
Power: 440V /3-Phase/60 Hz
Mounting: Horizontal
Reference Location:
Fig; I-I, Sheet I of 4, Item No. 42
EOM Chapter No. 22
1-5
6.
53-13/08 2-13-85
Oily Water Separator (Gravity-Coalescerl, I each
Sarex Model:…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .