Final Woodcock Creek at Grimm Road Bridge Bid Tabs Summary_5-16-2023.xlsx
XLSX spreadsheet 107 KB Posted
- Solicitation number
- S-10000-00006578
- Issued by
- Oregon
About this file
Bid Tabs Summary for Woodcock Creek at Grimm Road Bridge Replacement
This document is a bid analysis summary prepared by a local government entity for the Woodcock Creek at Grimm Road Bridge Replacement project, with bids opened on May 11, 2023. The project involves the complete replacement of a bridge structure, including removal of the existing bridge, construction of a pre-fabricated replacement structure, site preparation, erosion control, temporary traffic management, and restoration of streambed features. The scope encompasses 46 line items ranging from workplace harassment prevention plans and mobilization through bridge fabrication, guardrail installation, and channel restoration work. Three contractors submitted bids: Bent LLC (Conway, Oregon), Conway Construction Co. (Vancouver, Washington), and Farline Bridge, Inc. (Stayton, Oregon). The engineer's estimate for the project was $918,670, with contingency and fees bringing the total construction phase cost to approximately $1,429,137.68.
Bent LLC emerged as the apparent low bidder at $1,350,519, representing a 47.01 percent increase over the engineer's estimate. Conway Construction Co. bid $1,451,670, and Farline Bridge, Inc. submitted the highest bid of $1,516,997. Significant price variations among bidders appeared in several categories, most notably the pre-fabricated bridge component (ranging from $400,000 to $861,445), structure excavation (varying from $4,000 to $67,563), and streambed materials such as sediment and cobbles. The bid tab summary identifies the highest and lowest unit prices for each line item across the three bidders, with color-coded highlighting indicating extremes. The engineer's estimate consistently fell between the low and high bids across most items, though substantial deviations occurred in specialized work such as shoring and cofferdam installation and specific erosion control measures.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID ANALYSIS
| Woodcock Creek at Grimm Road Bridge Replacement | |||||||||||||||||
| Bid Opening May 11, 2023 | |||||||||||||||||
| Bent LLC | Conway Construction Co. | Farline Bridge, Inc. | |||||||||||||||
| Item # | Spec | ||||||||||||||||
| Sec | Description | Unit | Quantity | Unit Price | Total Price | Unit Price | Total Price | Unit Price | Total Price | High in Red Print | Low in Blue Print | ||||||
| 1 | 00180 | WORK PLACE HARASSMENT PREVENTION PLAN | LS | 1 | $ 500.00 | $ 500.00 | $ 100.00 | $ 100.00 | $ 10,000.00 | $ 10,000.00 | $ 10,000.00 | $ 100.00 | |||||
| 2 | 00196 | EXTRA WORK | FA | 1 | $ 50,000.00 | $ 50,000.00 | $ 50,000.00 | $ 50,000.00 | $ 50,000.00 | $ 50,000.00 | $ 50,000.00 | $ 50,000.00 | |||||
| 3 | 00210 | MOBILIZATION | LS | 1 | $ 135,000.00 | $ 135,000.00 | $ 145,000.00 | $ 145,000.00 | $ 151,000.00 | $ 151,000.00 | $ 151,000.00 | $ 135,000.00 | |||||
| 4 | 00221 | TEMPORARY PROTECTION AND DIRECTION OF TRAFFIC, COMPLETE | LS | 1 | $ 8,500.00 | $ 8,500.00 | $ 15,000.00 | $ 15,000.00 | $ 50,000.00 | $ 50,000.00 | $ 50,000.00 | $ 8,500.00 | |||||
| 5 | 00222 | PORTABLE CHANGEABLE MESSAGE SIGNS | EACH | 2 | $ 6,500.00 | $ 13,000.00 | $ 10,000.00 | $ 20,000.00 | $ 6,000.00 | $ 12,000.00 | $ 20,000.00 | $ 12,000.00 | |||||
| 6 | 00231 | CONSTRUCT AND REMOVE TEMPORARY ACCESS ROAD | LS | 1 | $ 5,500.00 | $ 5,500.00 | $ 15,000.00 | $ 15,000.00 | $ 20,085.00 | $ 20,085.00 | $ 20,085.00 | $ 5,500.00 | |||||
| 7 | 00245 | TEMPORARY WATER MANAGEMENT FACILITY | LS | 1 | $ 55,000.00 | $ 55,000.00 | $ 50,000.00 | $ 50,000.00 | $ 50,000.00 | $ 50,000.00 | $ 55,000.00 | $ 50,000.00 | |||||
| 8 | 00280 | EROSION CONTROL | LS | 1 | $ 4,000.00 | $ 4,000.00 | $ 1,000.00 | $ 1,000.00 | $ 15,000.00 | $ 15,000.00 | $ 15,000.00 | $ 1,000.00 | |||||
| 9 | 00280 | MATTING, TYPE D | SQYD | 300 | $ 9.00 | $ 2,700.00 | $ 8.00 | $ 2,400.00 | $ 6.00 | $ 1,800.00 | $ 2,700.00 | $ 1,800.00 | |||||
| 10 | 00280 | SEDIMENT BARRIER, TYPE 8 | FOOT | 1,300 | $ 7.25 | $ 9,425.00 | $ 8.00 | $ 10,400.00 | $ 5.50 | $ 7,150.00 | $ 10,400.00 | $ 7,150.00 | |||||
| 11 | 00280 | CONCRETE WASHOUT FACILITY | EACH | 1 | $ 500.00 | $ 500.00 | $ 1,000.00 | $ 1,000.00 | $ 4,200.00 | $ 4,200.00 | $ 4,200.00 | $ 500.00 | |||||
| 12 | 00280 | CONSTRUCTION ENTRANCE, TYPE 1 | EACH | 1 | $ 1,250.00 | $ 1,250.00 | $ 3,500.00 | $ 3,500.00 | $ 2,500.00 | $ 2,500.00 | $ 3,500.00 | $ 1,250.00 | |||||
| 13 | 00280 | CHECK DAM, TYPE 3 | EACH | 4 | $ 60.00 | $ 240.00 | $ 250.00 | $ 1,000.00 | $ 105.00 | $ 420.00 | $ 1,000.00 | $ 240.00 | |||||
| 14 | 00280 | POLLUTION CONTROL PLAN | LS | 1 | $ 500.00 | $ 500.00 | $ 100.00 | $ 100.00 | $ 500.00 | $ 500.00 | $ 500.00 | $ 100.00 | |||||
| 15 | 00290 | WORK CONTAINMENT PLAN | LS | 1 | $ 500.00 | $ 500.00 | $ 100.00 | $ 100.00 | $ 5,000.00 | $ 5,000.00 | $ 5,000.00 | $ 100.00 | |||||
| 16 | 00290 | TURBIDITY MONITORING | LS | 1 | $ 2,500.00 | $ 2,500.00 | $ 1,000.00 | $ 1,000.00 | $ 5,000.00 | $ 5,000.00 | $ 5,000.00 | $ 1,000.00 | |||||
| 17 | 00305 | CONSTRUCTION SURVEY WORK | LS | 1 | $ 15,000.00 | $ 15,000.00 | $ 10,000.00 | $ 10,000.00 | $ 18,000.00 | $ 18,000.00 | $ 18,000.00 | $ 10,000.00 | |||||
| 18 | 00310 | REMOVAL OF SURFACINGS | SQYD | 325 | $ 35.00 | $ 11,375.00 | $ 10.00 | $ 3,250.00 | $ 39.00 | $ 12,675.00 | $ 12,675.00 | $ 3,250.00 | |||||
| 19 | 00310 | REMOVAL OF GUARDRAIL | FOOT | 310 | $ 10.00 | $ 3,100.00 | $ 5.00 | $ 1,550.00 | $ 12.25 | $ 3,797.50 | $ 3,797.50 | $ 1,550.00 | |||||
| 20 | 00320 | CLEARING AND GRUBBING | LS | 1 | $ 18,500.00 | $ 18,500.00 | $ 10,000.00 | $ 10,000.00 | $ 54,500.00 | $ 54,500.00 | $ 54,500.00 | $ 10,000.00 | |||||
| 21 | 00330 | GENERAL EXCAVATION | CY | 350 | $ 80.00 | $ 28,000.00 | $ 35.00 | $ 12,250.00 | $ 54.25 | $ 18,987.50 | $ 28,000.00 | $ 12,250.00 | |||||
| 22 | 00331 | 18 INCH SUBGRADE STABILIZATION | SQYD | 60 | $ 60.00 | $ 3,600.00 | $ 60.00 | $ 3,600.00 | $ 75.00 | $ 4,500.00 | $ 4,500.00 | $ 3,600.00 | |||||
| 23 | 00350 | SUBGRADE GEOTEXTILE | SQYD | 350 | $ 3.00 | $ 1,050.00 | $ 1.50 | $ 525.00 | $ 5.00 | $ 1,750.00 | $ 1,750.00 | $ 525.00 | |||||
| 24 | 00490 | CONNECT NEW STRUCTURE TO EXISTING STORM LINE | EACH | 1 | $ 3,500.00 | $ 3,500.00 | $ 350.00 | $ 350.00 | $ 6,600.00 | $ 6,600.00 | $ 6,600.00 | $ 350.00 | |||||
| 25 | 00501 | BRIDGE REMOVAL WORK | LS | 1 | $ 125,350.00 | $ 125,350.00 | $ 50,000.00 | $ 50,000.00 | $ 75,000.00 | $ 75,000.00 | $ 125,350.00 | $ 50,000.00 | |||||
| 26 | 00510 | STRUCTURE EXCAVATION | CY | 100 | $ 75.00 | $ 7,500.00 | $ 40.00 | $ 4,000.00 | $ 675.63 | $ 67,563.00 | $ 67,563.00 | $ 4,000.00 | |||||
| 27 | 00510 | SHORING, CRIBBING, AND COFFERDAMS | LS | 1 | $ 1.00 | $ 1.00 | $ 100.00 | $ 100.00 | $ 25,000.00 | $ 25,000.00 | $ 25,000.00 | $ 1.00 | |||||
| 28 | 00565 | PRE-FABRICATED BRIDGE | LS | 1 | $ 660,450.00 | $ 660,450.00 | $ 861,445.00 | $ 861,445.00 | $ 665,000.00 | $ 665,000.00 | $ 861,445.00 | $ 660,450.00 | |||||
| 29 | 00640 | AGGREGATE BASE | TON | 160 | $ 135.00 | $ 21,600.00 | $ 45.00 | $ 7,200.00 | $ 123.00 | $ 19,680.00 | $ 21,600.00 | $ 7,200.00 | |||||
| 30 | 00744 | LEVEL 2, 1/2 INCH DENSE ACP MIXTURE | TON | 130.0 | $ 175.00 | $ 22,750.00 | $ 180.00 | $ 23,400.00 | $ 175.00 | $ 22,750.00 | $ 23,400.00 | $ 22,750.00 | |||||
| 31 | 00810 | GUARDRAIL, TYPE 2A | FOOT | 170 | $ 40.00 | $ 6,800.00 | $ 40.00 | $ 6,800.00 | $ 40.00 | $ 6,800.00 | $ 6,800.00 | $ 6,800.00 | |||||
| 32 | 00810 | GUARDRAIL, TYPE 4 | FOOT | 88 | $ 1.00 | $ 88.00 | $ 100.00 | $ 8,800.00 | $ 115.00 | $ 10,120.00 | $ 10,120.00 | $ 88.00 | |||||
| 33 | Deleted Bid Item | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||
| 34 | Deleted Bid Item | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||
| 35 | 00810 | GUARDRAIL TRANSITION | EACH | 4 | $ 3,000.00 | $ 12,000.00 | $ 4,100.00 | $ 16,400.00 | $ 3,000.00 | $ 12,000.00 | $ 16,400.00 | $ 12,000.00 | |||||
| 36 | 00810 | MIDWEST GUARDRAIL TERMINALS, NON-FLARED | EACH | 4 | $ 4,100.00 | $ 16,400.00 | $ 3,800.00 | $ 15,200.00 | $ 4,100.00 | $ 16,400.00 | $ 16,400.00 | $ 15,200.00 | |||||
| 37 | 00860 | LONGITUDINAL PAVEMENT MARKINGS, PAINT | FOOT | 140 | $ 9.00 | $ 1,260.00 | $ 12.50 | $ 1,750.00 | $ 5.00 | $ 700.00 | $ 1,750.00 | $ 700.00 | |||||
| 38 | 01012 | WATER QUALITY BIOFILTRATION SWALE | LS | 1 | $ 15,000.00 | $ 15,000.00 | $ 35,000.00 | $ 35,000.00 | $ 21,589.00 | $ 21,589.00 | $ 35,000.00 | $ 15,000.00 | |||||
| 39 | 01030 | SEEDING MOBILIZATION | EACH | 2 | $ 1,000.00 | $ 2,000.00 | $ 1,500.00 | $ 3,000.00 | $ 350.00 | $ 700.00 | $ 3,000.00 | $ 700.00 | |||||
| 40 | 01030 | PERMANENT SEEDING, WATER QUALITY MIX | ACRE | 0 | $ 37,000.00 | $ 1,110.00 | $ 25,000.00 | $ 750.00 | $ 40,000.00 | $ 1,200.00 | $ 1,200.00 | $ 750.00 | |||||
| 41 | 01030 | PERMANENT SEEDING, EROSION CONTROL MIX | ACRE | 0 | $ 18,000.00 | $ 1,080.00 | $ 25,000.00 | $ 1,500.00 | $ 50,000.00 | $ 3,000.00 | $ 3,000.00 | $ 1,080.00 | |||||
| 42 | 01040 | IMPORTED TOP SOIL, 12-INCH SECTION | CY | 40 | $ 91.00 | $ 3,640.00 | $ 75.00 | $ 3,000.00 | $ 70.00 | $ 2,800.00 | $ 3,640.00 | $ 2,800.00 | |||||
| 43 | 01091 | BOULDERS | EACH | 42 | $ 225.00 | $ 9,450.00 | $ 100.00 | $ 4,200.00 | $ 415.00 | $ 17,430.00 | $ 17,430.00 | $ 4,200.00 | |||||
| 44 | 01091 | STREAMBED SEDIMENT | TON | 60 | $ 300.00 | $ 18,000.00 | $ 140.00 | $ 8,400.00 | $ 180.00 | $ 10,800.00 | $ 18,000.00 | $ 8,400.00 | |||||
| 45 | 01091 | STREAMBED COBBLES, 6 INCH TO 10 INCH | TON | 60 | $ 390.00 | $ 23,400.00 | $ 60.00 | $ 3,600.00 | $ 250.00 | $ 15,000.00 | $ 23,400.00 | $ 3,600.00 | |||||
| 46 | 01091 | CHANNEL MARGIN JAMS, COMPLETE | EACH | 4 | $ 7,350.00 | $ 29,400.00 | $ 10,000.00 | $ 40,000.00 | $ 4,500.00 | $ 18,000.00 | $ 40,000.00 | $ 18,000.00 | |||||
| $ 1,350,519.00 | $ 1,451,670.00 | $ 1,516,997.00 | $ 1,516,997.00 | $ 1,350,519.00 | |||||||||||||
| Bent, LLC | Conway Construction Co. | Farline Bridge, Inc. | |||||||||||||||
| 36750 Richardson Gap Road | 6620 NW Whitney Road, Suite 100 | 1445 Miller Drive | |||||||||||||||
| Scio, OR 97374 | Vancouver, WA 98665 | Stayton, OR 97383 |
Bid List
| Woodcock Creek at Grimm Road Bridge Replacement | |||||||||||
| Apparent Low Bidder | |||||||||||
| Bent Llc | |||||||||||
| Estimate | Bent Llc | ||||||||||
| Item # | Spec | ||||||||||
| Sec | Description | Unit | Quantity | Unit Price | Total Price | Unit Price | Total Price | ||||
| 1 | 00180 | WORK PLACE HARASSMENT PREVENTION PLAN | LS | 1 | $ 2,000.00 | $ 2,000.00 | $ 500.00 | $500.00 | |||
| 2 | 00196 | EXTRA WORK | FA | 1 | $ 50,000.00 | $ 50,000.00 | $ 50,000.00 | $50,000.00 | |||
| 3 | 00210 | MOBILIZATION | LS | 1 | $ 71,000.00 | $ 71,000.00 | $ 135,000.00 | $135,000.00 | |||
| 4 | 00221 | TEMPORARY PROTECTION AND DIRECTION OF TRAFFIC, COMPLETE | LS | 1 | $ 15,000.00 | $ 15,000.00 | $ 8,500.00 | $8,500.00 | |||
| 5 | 00222 | PORTABLE CHANGEABLE MESSAGE SIGNS | EACH | 2 | $ 4,000.00 | $ 8,000.00 | $ 6,500.00 | $13,000.00 | |||
| 6 | 00231 | CONSTRUCT AND REMOVE TEMPORARY ACCESS ROAD | LS | 1 | $ 4,000.00 | $ 4,000.00 | $ 5,500.00 | $5,500.00 | |||
| 7 | 00245 | TEMPORARY WATER MANAGEMENT FACILITY | LS | 1 | $ 25,000.00 | $ 25,000.00 | $ 55,000.00 | $55,000.00 | |||
| 8 | 00280 | EROSION CONTROL | LS | 1 | $ 10,000.00 | $ 10,000.00 | $ 4,000.00 | $4,000.00 | |||
| 9 | 00280 | MATTING, TYPE D | SQYD | 300 | $ 5.00 | $ 1,500.00 | $ 9.00 | $2,700.00 | |||
| 10 | 00280 | SEDIMENT BARRIER, TYPE 8 | FOOT | 1,300 | $ 4.00 | $ 5,200.00 | $ 7.25 | $9,425.00 | |||
| 11 | 00280 | CONCRETE WASHOUT FACILITY | EACH | 1 | $ 1,000.00 | $ 1,000.00 | $ 500.00 | $500.00 | |||
| 12 | 00280 | CONSTRUCTION ENTRANCE, TYPE 1 | EACH | 1 | $ 2,000.00 | $ 2,000.00 | $ 1,250.00 | $1,250.00 | |||
| 13 | 00280 | CHECK DAM, TYPE 3 | EACH | 4 | $ 750.00 | $ 3,000.00 | $ 60.00 | $240.00 | |||
| 14 | 00280 | POLLUTION CONTROL PLAN | LS | 1 | $ 1,000.00 | $ 1,000.00 | $ 500.00 | $500.00 | |||
| 15 | 00290 | WORK CONTAINMENT PLAN | LS | 1 | $ 20,000.00 | $ 20,000.00 | $ 500.00 | $500.00 | |||
| 16 | 00290 | TURBIDITY MONITORING | LS | 1 | $ 5,000.00 | $ 5,000.00 | $ 2,500.00 | $2,500.00 | |||
| 17 | 00305 | CONSTRUCTION SURVEY WORK | LS | 1 | $ 15,000.00 | $ 15,000.00 | $ 15,000.00 | $15,000.00 | |||
| 18 | 00310 | REMOVAL OF SURFACINGS | SQYD | 325 | $ 20.00 | $ 6,500.00 | $ 35.00 | $11,375.00 | |||
| 19 | 00310 | REMOVAL OF GUARDRAIL | FOOT | 310 | $ 10.00 | $ 3,100.00 | $ 10.00 | $3,100.00 | |||
| 20 | 00320 | CLEARING AND GRUBBING | LS | 1 | $ 4,000.00 | $ 4,000.00 | $ 18,500.00 | $18,500.00 | |||
| 21 | 00330 | GENERAL EXCAVATION | CY | 350 | $ 40.00 | $ 14,000.00 | $ 80.00 | $28,000.00 | |||
| 22 | 00331 | 18 INCH SUBGRADE STABILIZATION | SQYD | 60 | $ 80.00 | $ 4,800.00 | $ 60.00 | $3,600.00 | |||
| 23 | 00350 | SUBGRADE GEOTEXTILE | SQYD | 350 | $ 5.00 | $ 1,750.00 | $ 3.00 | $1,050.00 | |||
| 24 | 00490 | CONNECT NEW STRUCTURE TO EXISTING STORM LINE | EACH | 1 | $ 5,000.00 | $ 5,000.00 | $ 3,500.00 | $3,500.00 | |||
| 25 | 00501 | BRIDGE REMOVAL WORK | LS | 1 | $ 60.00 | $ 52,500.00 | $ 125,350.00 | $125,350.00 | |||
| 26 | 00510 | STRUCTURE EXCAVATION | CY | 100 | $ 80.00 | $ 8,000.00 | $ 75.00 | $7,500.00 | |||
| 27 | 00510 | SHORING, CRIBBING, AND COFFERDAMS | LS | 1 | $ 500.00 | $ 20,000.00 | $ 1.00 | $1.00 | |||
| 28 | 00565 | PRE-FABRICATED BRIDGE | LS | 1 | $ 400,000.00 | $ 400,000.00 | $ 660,450.00 | $660,450.00 | |||
| 29 | 00640 | AGGREGATE BASE | TON | 160 | $ 70.00 | $ 11,200.00 | $ 135.00 | $21,600.00 | |||
| 30 | 00744 | LEVEL 2, 1/2 INCH DENSE ACP MIXTURE | TON | 130.0 | $ 130.00 | $ 16,900.00 | $ 175.00 | $22,750.00 | |||
| 31 | 00810 | GUARDRAIL, TYPE 2A | FOOT | 170 | $ 35.00 | $ 5,950.00 | $ 40.00 | $6,800.00 | |||
| 32 | 00810 | GUARDRAIL, TYPE 4 | FOOT | 88 | $ 70.00 | $ 6,160.00 | $ 1.00 | $88.00 | |||
| 33 | Deleted Bid Item | $ - 0 | $0.00 | ||||||||
| 34 | Deleted Bid Item | $ - 0 | $0.00 | ||||||||
| 35 | 00810 | GUARDRAIL TRANSITION | EACH | 4 | $ 4,000.00 | $ 16,000.00 | $ 3,000.00 | $12,000.00 | |||
| 36 | 00810 | MIDWEST GUARDRAIL TERMINALS, NON-FLARED | EACH | 4 | $ 4,500.00 | $ 18,000.00 | $ 4,100.00 | $16,400.00 | |||
| 37 | 00860 | LONGITUDINAL PAVEMENT MARKINGS, PAINT | FOOT | 140 | $ 20.00 | $ 2,800.00 | $ 9.00 | $1,260.00 | |||
| 38 | 01012 | WATER QUALITY BIOFILTRATION SWALE | LS | 1 | $ 25,000.00 | $ 25,000.00 | $ 15,000.00 | $15,000.00 | |||
| 39 | 01030 | SEEDING MOBILIZATION | EACH | 2 | $ 750.00 | $ 1,500.00 | $ 1,000.00 | $2,000.00 | |||
| 40 | 01030 | PERMANENT SEEDING, WATER QUALITY MIX | ACRE | 0 | $ 15,000.00 | $ 450.00 | $ 37,000.00 | $1,110.00 | |||
| 41 | 01030 | PERMANENT SEEDING, EROSION CONTROL MIX | ACRE | 0 | $ 15,000.00 | $ 900.00 | $ 18,000.00 | $1,080.00 | |||
| 42 | 01040 | IMPORTED TOP SOIL, 12-INCH SECTION | CY | 40 | $ 80.00 | $ 2,960.00 | $ 91.00 | $3,640.00 | |||
| 43 | 01091 | BOULDERS | EACH | 42 | $ 250.00 | $ 10,500.00 | $ 225.00 | $9,450.00 | |||
| 44 | 01091 | STREAMBED SEDIMENT | TON | 60 | $ 50.00 | $ 3,000.00 | $ 300.00 | $18,000.00 | |||
| 45 | 01091 | STREAMBED COBBLES, 6 INCH TO 10 INCH | TON | 60 | $ 50.00 | $ 3,000.00 | $ 390.00 | $23,400.00 | |||
| 46 | 01091 | CHANNEL MARGIN JAMS, COMPLETE | EACH | 4 | $ 9,000.00 | $ 36,000.00 | $ 7,350.00 | $29,400.00 | |||
| $ 918,670.00 | $1,350,519.00 | ||||||||||
| Estimate | Bent Llc |
| Contingency at 3.5% | $ 47,268.17 |
| Boli Fee | $ 1,350.52 |
| County Eng. | $ 30,000.00 |
| Consultant Eng. | $ - 0 |
| Anticipated Items: | |
| Fuel Escalation | $ - 0 |
Total Construction Phase $ 1,429,137.68
Programmed Phase
Additional Funding Needed
Compare to Estimate
| Woodcock Creek At Grimm Road Bridge Replacement | ||||||||||||||
| Bent Llc | Estimate | |||||||||||||
| Item # | Spec | |||||||||||||
| Sec | Description | Unit | Quantity | Unit Price | Total Price | Unit Price | Total Price | Maximum | Minimum | |||||
| 1 | 00180 | WORK PLACE HARASSMENT PREVENTION PLAN | LS | 1 | $ 500.00 | $500.00 | $ 2,000.00 | $ 2,000.00 | $ 2,000.00 | $ 500.00 | ||||
| 2 | 00196 | EXTRA WORK | FA | 1 | $ 50,000.00 | $50,000.00 | $ 50,000.00 | $ 50,000.00 | $ 50,000.00 | $ 50,000.00 | ||||
| 3 | 00210 | MOBILIZATION | LS | 1 | $ 135,000.00 | $135,000.00 | $ 71,000.00 | $ 71,000.00 | $ 135,000.00 | $ 71,000.00 | ||||
| 4 | 00221 | TEMPORARY PROTECTION AND DIRECTION OF TRAFFIC, COMPLETE | LS | 1 | $ 8,500.00 | $8,500.00 | $ 15,000.00 | $ 15,000.00 | $ 15,000.00 | $ 8,500.00 | ||||
| 5 | 00222 | PORTABLE CHANGEABLE MESSAGE SIGNS | EACH | 2 | $ 6,500.00 | $13,000.00 | $ 4,000.00 | $ 8,000.00 | $ 13,000.00 | $ 8,000.00 | ||||
| 6 | 00231 | CONSTRUCT AND REMOVE TEMPORARY ACCESS ROAD | LS | 1 | $ 5,500.00 | $5,500.00 | $ 4,000.00 | $ 4,000.00 | $ 5,500.00 | $ 4,000.00 | ||||
| 7 | 00245 | TEMPORARY WATER MANAGEMENT FACILITY | LS | 1 | $ 55,000.00 | $55,000.00 | $ 25,000.00 | $ 25,000.00 | $ 55,000.00 | $ 25,000.00 | ||||
| 8 | 00280 | EROSION CONTROL | LS | 1 | $ 4,000.00 | $4,000.00 | $ 10,000.00 | $ 10,000.00 | $ 10,000.00 | $ 4,000.00 | ||||
| 9 | 00280 | MATTING, TYPE D | SQYD | 300 | $ 9.00 | $2,700.00 | $ 5.00 | $ 1,500.00 | $ 2,700.00 | $ 1,500.00 | ||||
| 10 | 00280 | SEDIMENT BARRIER, TYPE 8 | FOOT | 1,300 | $ 7.25 | $9,425.00 | $ 4.00 | $ 5,200.00 | $ 9,425.00 | $ 5,200.00 | ||||
| 11 | 00280 | CONCRETE WASHOUT FACILITY | EACH | 1 | $ 500.00 | $500.00 | $ 1,000.00 | $ 1,000.00 | $ 1,000.00 | $ 500.00 | ||||
| 12 | 00280 | CONSTRUCTION ENTRANCE, TYPE 1 | EACH | 1 | $ 1,250.00 | $1,250.00 | $ 2,000.00 | $ 2,000.00 | $ 2,000.00 | $ 1,250.00 | ||||
| 13 | 00280 | CHECK DAM, TYPE 3 | EACH | 4 | $ 60.00 | $240.00 | $ 750.00 | $ 3,000.00 | $ 3,000.00 | $ 240.00 | ||||
| 14 | 00280 | POLLUTION CONTROL PLAN | LS | 1 | $ 500.00 | $500.00 | $ 1,000.00 | $ 1,000.00 | $ 1,000.00 | $ 500.00 | ||||
| 15 | 00290 | WORK CONTAINMENT PLAN | LS | 1 | $ 500.00 | $500.00 | $ 20,000.00 | $ 20,000.00 | $ 20,000.00 | $ 500.00 | ||||
| 16 | 00290 | TURBIDITY MONITORING | LS | 1 | $ 2,500.00 | $2,500.00 | $ 5,000.00 | $ 5,000.00 | $ 5,000.00 | $ 2,500.00 | ||||
| 17 | 00305 | CONSTRUCTION SURVEY WORK | LS | 1 | $ 15,000.00 | $15,000.00 | $ 15,000.00 | $ 15,000.00 | $ 15,000.00 | $ 15,000.00 | ||||
| 18 | 00310 | REMOVAL OF SURFACINGS | SQYD | 325 | $ 35.00 | $11,375.00 | $ 20.00 | $ 6,500.00 | $ 11,375.00 | $ 6,500.00 | ||||
| 19 | 00310 | REMOVAL OF GUARDRAIL | FOOT | 310 | $ 10.00 | $3,100.00 | $ 10.00 | $ 3,100.00 | $ 3,100.00 | $ 3,100.00 | ||||
| 20 | 00320 | CLEARING AND GRUBBING | LS | 1 | $ 18,500.00 | $18,500.00 | $ 4,000.00 | $ 4,000.00 | $ 18,500.00 | $ 4,000.00 | ||||
| 21 | 00330 | GENERAL EXCAVATION | CY | 350 | $ 80.00 | $28,000.00 | $ 40.00 | $ 14,000.00 | $ 28,000.00 | $ 14,000.00 | ||||
| 22 | 00331 | 18 INCH SUBGRADE STABILIZATION | SQYD | 60 | $ 60.00 | $3,600.00 | $ 80.00 | $ 4,800.00 | $ 4,800.00 | $ 3,600.00 | ||||
| 23 | 00350 | SUBGRADE GEOTEXTILE | SQYD | 350 | $ 3.00 | $1,050.00 | $ 5.00 | $ 1,750.00 | $ 1,750.00 | $ 1,050.00 | ||||
| 24 | 00490 | CONNECT NEW STRUCTURE TO EXISTING STORM LINE | EACH | 1 | $ 3,500.00 | $3,500.00 | $ 5,000.00 | $ 5,000.00 | $ 5,000.00 | $ 3,500.00 | ||||
| 25 | 00501 | BRIDGE REMOVAL WORK | LS | 1 | $ 125,350.00 | $125,350.00 | $ 60.00 | $ 52,500.00 | $ 125,350.00 | $ 52,500.00 | ||||
| 26 | 00510 | STRUCTURE EXCAVATION | CY | 100 | $ 75.00 | $7,500.00 | $ 80.00 | $ 8,000.00 | $ 8,000.00 | $ 7,500.00 | ||||
| 27 | 00510 | SHORING, CRIBBING, AND COFFERDAMS | LS | 1 | $ 1.00 | $1.00 | $ 500.00 | $ 20,000.00 | $ 20,000.00 | $ 1.00 | ||||
| 28 | 00565 | PRE-FABRICATED BRIDGE | LS | 1 | $ 660,450.00 | $660,450.00 | $ 400,000.00 | $ 400,000.00 | $ 660,450.00 | $ 400,000.00 | ||||
| 29 | 00640 | AGGREGATE BASE | TON | 160 | $ 135.00 | $21,600.00 | $ 70.00 | $ 11,200.00 | $ 21,600.00 | $ 11,200.00 | ||||
| 30 | 00744 | LEVEL 2, 1/2 INCH DENSE ACP MIXTURE | TON | 130.0 | $ 175.00 | $22,750.00 | $ 130.00 | $ 16,900.00 | $ 22,750.00 | $ 16,900.00 | ||||
| 31 | 00810 | GUARDRAIL, TYPE 2A | FOOT | 170 | $ 40.00 | $6,800.00 | $ 35.00 | $ 5,950.00 | $ 6,800.00 | $ 5,950.00 | ||||
| 32 | 00810 | GUARDRAIL, TYPE 4 | FOOT | 88 | $ 1.00 | $88.00 | $ 70.00 | $ 6,160.00 | $ 6,160.00 | $ 88.00 | ||||
| 33 | Deleted Bid Item | $ - 0 | $0.00 | $ - 0 | $ - 0 | |||||||||
| 34 | Deleted Bid Item | $ - 0 | $0.00 | $ - 0 | $ - 0 | |||||||||
| 35 | 00810 | GUARDRAIL TRANSITION | EACH | 4 | $ 3,000.00 | $12,000.00 | $ 4,000.00 | $ 16,000.00 | $ 16,000.00 | $ 12,000.00 | ||||
| 36 | 00810 | MIDWEST GUARDRAIL TERMINALS, NON-FLARED | EACH | 4 | $ 4,100.00 | $16,400.00 | $ 4,500.00 | $ 18,000.00 | $ 18,000.00 | $ 16,400.00 | ||||
| 37 | 00860 | LONGITUDINAL PAVEMENT MARKINGS, PAINT | FOOT | 140 | $ 9.00 | $1,260.00 | $ 20.00 | $ 2,800.00 | $ 2,800.00 | $ 1,260.00 | ||||
| 38 | 01012 | WATER QUALITY BIOFILTRATION SWALE | LS | 1 | $ 15,000.00 | $15,000.00 | $ 25,000.00 | $ 25,000.00 | $ 25,000.00 | $ 15,000.00 | ||||
| 39 | 01030 | SEEDING MOBILIZATION | EACH | 2 | $ 1,000.00 | $2,000.00 | $ 750.00 | $ 1,500.00 | $ 2,000.00 | $ 1,500.00 | ||||
| 40 | 01030 | PERMANENT SEEDING, WATER QUALITY MIX | ACRE | 0 | $ 37,000.00 | $1,110.00 | $ 15,000.00 | $ 450.00 | $ 1,110.00 | $ 450.00 | ||||
| 41 | 01030 | PERMANENT SEEDING, EROSION CONTROL MIX | ACRE | 0 | $ 18,000.00 | $1,080.00 | $ 15,000.00 | $ 900.00 | $ 1,080.00 | $ 900.00 | ||||
| 42 | 01040 | IMPORTED TOP SOIL, 12-INCH SECTION | CY | 40 | $ 91.00 | $3,640.00 | $ 80.00 | $ 2,960.00 | $ 3,640.00 | $ 2,960.00 | ||||
| 43 | 01091 | BOULDERS | EACH | 42 | $ 225.00 | $9,450.00 | $ 250.00 | $ 10,500.00 | $ 10,500.00 | $ 9,450.00 | ||||
| 44 | 01091 | STREAMBED SEDIMENT | TON | 60 | $ 300.00 | $18,000.00 | $ 50.00 | $ 3,000.00 | $ 18,000.00 | $ 3,000.00 | ||||
| 45 | 01091 | STREAMBED COBBLES, 6 INCH TO 10 INCH | TON | 60 | $ 390.00 | $23,400.00 | $ 50.00 | $ 3,000.00 | $ 23,400.00 | $ 3,000.00 | ||||
| 46 | 01091 | CHANNEL MARGIN JAMS, COMPLETE | EACH | 4 | $ 7,350.00 | $29,400.00 | $ 9,000.00 | $ 36,000.00 | $ 36,000.00 | $ 29,400.00 | ||||
| $1,350,519.00 | $ 918,670.00 | $ 1,350,519.00 | $ 918,670.00 | |||||||||||
| Bent Llc | Estimate |
Difference 47.01%
3 lowest Bid Analysis
| Woodcock Creek At Grimm Road Bridge Replacement | |||||||||||||||||
| Bid Opening May 11, 2023 | |||||||||||||||||
| Engineers Estimate | Bent, LLC | % OVR/UND. | % OVR/UND. | ITEM % OF | Conway Construction | Farline Bridge, Inc. | |||||||||||
| Item # | Spec | ||||||||||||||||
| Sec | Description | Unit | Quantity | Unit Price | Total Price | Unit Price | Total Price | Low Bidder | |||||||||
| to Engr. Estimate | 3 Lowest Bidders | ||||||||||||||||
| Average | Lowest Bid | ||||||||||||||||
| to Total Bid | Unit Price | Total Price | Unit Price | Total Price | |||||||||||||
| 1 | 00180 | WORK PLACE HARASSMENT PREVENTION PLAN | LS | 1 | $ 2,000.00 | $ 2,000.00 | $ 500.00 | $ 500.00 | -75.00% | -606.67% | 0.04% | $ 100.00 | $ 100.00 | $ 10,000.00 | $ 10,000.00 | ||
| 2 | 00196 | EXTRA WORK | FA | 1 | $ 50,000.00 | $ 50,000.00 | $ 50,000.00 | $ 50,000.00 | 0.00% | 0.00% | 3.70% | $ 50,000.00 | $ 50,000.00 | $ 50,000.00 | $ 50,000.00 | ||
| 3 | 00210 | MOBILIZATION | LS | 1 | $ 71,000.00 | $ 71,000.00 | $ 135,000.00 | $ 135,000.00 | 90.14% | -6.42% | 10.00% | $ 145,000.00 | $ 145,000.00 | $ 151,000.00 | $ 151,000.00 | ||
| 4 | 00221 | TEMPORARY PROTECTION AND DIRECTION OF TRAFFIC, COMPLETE | LS | 1 | $ 15,000.00 | $ 15,000.00 | $ 8,500.00 | $ 8,500.00 | -43.33% | -188.24% | 0.63% | $ 15,000.00 | $ 15,000.00 | $ 50,000.00 | $ 50,000.00 | ||
| 5 | 00222 | PORTABLE CHANGEABLE MESSAGE SIGNS | EACH | 2 | $ 4,000.00 | $ 8,000.00 | $ 6,500.00 | $ 13,000.00 | 62.50% | -15.38% | 0.96% | $ 10,000.00 | $ 20,000.00 | $ 6,000.00 | $ 12,000.00 | ||
| 6 | 00231 | CONSTRUCT AND REMOVE TEMPORARY ACCESS ROAD | LS | 1 | $ 4,000.00 | $ 4,000.00 | $ 5,500.00 | $ 5,500.00 | 37.50% | -145.97% | 0.41% | $ 15,000.00 | $ 15,000.00 | $ 20,085.00 | $ 20,085.00 | ||
| 7 | 00245 | TEMPORARY WATER MANAGEMENT FACILITY | LS | 1 | $ 25,000.00 | $ 25,000.00 | $ 55,000.00 | $ 55,000.00 | 120.00% | 6.06% | 4.07% | $ 50,000.00 | $ 50,000.00 | $ 50,000.00 | $ 50,000.00 | ||
| 8 | 00280 | EROSION CONTROL | LS | 1 | $ 10,000.00 | $ 10,000.00 | $ 4,000.00 | $ 4,000.00 | -60.00% | -66.67% | 0.30% | $ 1,000.00 | $ 1,000.00 | $ 15,000.00 | $ 15,000.00 | ||
| 9 | 00280 | MATTING, TYPE D | SQYD | 300 | $ 5.00 | $ 1,500.00 | $ 9.00 | $ 2,700.00 | 80.00% | 14.81% | 0.20% | $ 8.00 | $ 2,400.00 | $ 6.00 | $ 1,800.00 | ||
| 10 | 00280 | SEDIMENT BARRIER, TYPE 8 | FOOT | 1,300 | $ 4.00 | $ 5,200.00 | $ 7.25 | $ 9,425.00 | 81.25% | 4.60% | 0.70% | $ 8.00 | $ 10,400.00 | $ 5.50 | $ 7,150.00 | ||
| 11 | 00280 | CONCRETE WASHOUT FACILITY | EACH | 1 | $ 1,000.00 | $ 1,000.00 | $ 500.00 | $ 500.00 | -50.00% | -280.00% | 0.04% | $ 1,000.00 | $ 1,000.00 | $ 4,200.00 | $ 4,200.00 | ||
| 12 | 00280 | CONSTRUCTION ENTRANCE, TYPE 1 | EACH | 1 | $ 2,000.00 | $ 2,000.00 | $ 1,250.00 | $ 1,250.00 | -37.50% | -93.33% | 0.09% | $ 3,500.00 | $ 3,500.00 | $ 2,500.00 | $ 2,500.00 | ||
| 13 | 00280 | CHECK DAM, TYPE 3 | EACH | 4 | $ 750.00 | $ 3,000.00 | $ 60.00 | $ 240.00 | -92.00% | -130.56% | 0.02% | $ 250.00 | $ 1,000.00 | $ 105.00 | $ 420.00 | ||
| 14 | 00280 | POLLUTION CONTROL PLAN | LS | 1 | $ 1,000.00 | $ 1,000.00 | $ 500.00 | $ 500.00 | -50.00% | 26.67% | 0.04% | $ 100.00 | $ 100.00 | $ 500.00 | $ 500.00 | ||
| 15 | 00290 | WORK CONTAINMENT PLAN | LS | 1 | $ 20,000.00 | $ 20,000.00 | $ 500.00 | $ 500.00 | -97.50% | -273.33% | 0.04% | $ 100.00 | $ 100.00 | $ 5,000.00 | $ 5,000.00 | ||
| 16 | 00290 | TURBIDITY MONITORING | LS | 1 | $ 5,000.00 | $ 5,000.00 | $ 2,500.00 | $ 2,500.00 | -50.00% | -13.33% | 0.19% | $ 1,000.00 | $ 1,000.00 | $ 5,000.00 | $ 5,000.00 | ||
| 17 | 00305 | CONSTRUCTION SURVEY WORK | LS | 1 | $ 15,000.00 | $ 15,000.00 | $ 15,000.00 | $ 15,000.00 | 0.00% | 4.44% | 1.11% | $ 10,000.00 | $ 10,000.00 | $ 18,000.00 | $ 18,000.00 | ||
| 18 | 00310 | REMOVAL OF SURFACINGS | SQYD | 325 | $ 20.00 | $ 6,500.00 | $ 35.00 | $ 11,375.00 | 75.00% | 20.00% | 0.84% | $ 10.00 | $ 3,250.00 | $ 39.00 | $ 12,675.00 | ||
| 19 | 00310 | REMOVAL OF GUARDRAIL | FOOT | 310 | $ 10.00 | $ 3,100.00 | $ 10.00 | $ 3,100.00 | 0.00% | 9.17% | 0.23% | $ 5.00 | $ 1,550.00 | $ 12.25 | $ 3,797.50 | ||
| 20 | 00320 | CLEARING AND GRUBBING | LS | 1 | $ 4,000.00 | $ 4,000.00 | $ 18,500.00 | $ 18,500.00 | 362.50% | -49.55% | 1.37% | $ 10,000.00 | $ 10,000.00 | $ 54,500.00 | $ 54,500.00 | ||
| 21 | 00330 | GENERAL EXCAVATION | CY | 350 | $ 40.00 | $ 14,000.00 | $ 80.00 | $ 28,000.00 | 100.00% | 29.48% | 2.07% | $ 35.00 | $ 12,250.00 | $ 54.25 | $ 18,987.50 | ||
| 22 | 00331 | 18 INCH SUBGRADE STABILIZATION | SQYD | 60 | $ 80.00 | $ 4,800.00 | $ 60.00 | $ 3,600.00 | -25.00% | -8.33% | 0.27% | $ 60.00 | $ 3,600.00 | $ 75.00 | $ 4,500.00 | ||
| 23 | 00350 | SUBGRADE GEOTEXTILE | SQYD | 350 | $ 5.00 | $ 1,750.00 | $ 3.00 | $ 1,050.00 | -40.00% | -5.56% | 0.08% | $ 1.50 | $ 525.00 | $ 5.00 | $ 1,750.00 | ||
| 24 | 00490 | CONNECT NEW STRUCTURE TO EXISTING STORM LINE | EACH | 1 | $ 5,000.00 | $ 5,000.00 | $ 3,500.00 | $ 3,500.00 | -30.00% | 0.48% | 0.26% | $ 350.00 | $ 350.00 | $ 6,600.00 | $ 6,600.00 | ||
| 25 | 00501 | BRIDGE REMOVAL WORK | LS | 1 | $ 60.00 | $ 52,500.00 | $ 125,350.00 | $ 125,350.00 | 138.76% | 33.43% | 9.28% | $ 50,000.00 | $ 50,000.00 | $ 75,000.00 | $ 75,000.00 | ||
| 26 | 00510 | STRUCTURE EXCAVATION | CY | 100 | $ 80.00 | $ 8,000.00 | $ 75.00 | $ 7,500.00 | -6.25% | -251.39% | 0.56% | $ 40.00 | $ 4,000.00 | $ 675.63 | $ 67,563.00 | ||
| 27 | 00510 | SHORING, CRIBBING, AND COFFERDAMS | LS | 1 | $ 500.00 | $ 20,000.00 | $ 1.00 | $ 1.00 | -100.00% | -836600.00% | 0.00% | $ 100.00 | $ 100.00 | $ 25,000.00 | $ 25,000.00 | ||
| 28 | 00565 | PRE-FABRICATED BRIDGE | LS | 1 | $ 400,000.00 | $ 400,000.00 | $ 660,450.00 | $ 660,450.00 | 65.11% | -10.37% | 48.90% | $ 861,445.00 | $ 861,445.00 | $ 665,000.00 | $ 665,000.00 | ||
| 29 | 00640 | AGGREGATE BASE | TON | 160 | $ 70.00 | $ 11,200.00 | $ 135.00 | $ 21,600.00 | 92.86% | 25.19% | 1.60% | $ 45.00 | $ 7,200.00 | $ 123.00 | $ 19,680.00 | ||
| 30 | 00744 | LEVEL 2, 1/2 INCH DENSE ACP MIXTURE | TON | 130.0 | $ 130.00 | $ 16,900.00 | $ 175.00 | $ 22,750.00 | 34.62% | -0.95% | 1.68% | $ 180.00 | $ 23,400.00 | $ 175.00 | $ 22,750.00 | ||
| 31 | 00810 | GUARDRAIL, TYPE 2A | FOOT | 170 | $ 35.00 | $ 5,950.00 | $ 40.00 | $ 6,800.00 | 14.29% | 0.00% | 0.50% | $ 40.00 | $ 6,800.00 | $ 40.00 | $ 6,800.00 | ||
| 32 | 00810 | GUARDRAIL, TYPE 4 | FOOT | 88 | $ 70.00 | $ 6,160.00 | $ 1.00 | $ 88.00 | -98.57% | -7100.00% | 0.01% | $ 100.00 | $ 8,800.00 | $ 115.00 | $ 10,120.00 | ||
| 33 | Deleted Bid Item | $ - 0 | $ - 0 | ERROR:#DIV/0! | ERROR:#DIV/0! | 0.00% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| 34 | Deleted Bid Item | $ - 0 | $ - 0 | ERROR:#DIV/0! | ERROR:#DIV/0! | 0.00% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| 35 | 00810 | GUARDRAIL TRANSITION | EACH | 4 | $ 4,000.00 | $ 16,000.00 | $ 3,000.00 | $ 12,000.00 | -25.00% | -12.22% | 0.89% | $ 4,100.00 | $ 16,400.00 | $ 3,000.00 | $ 12,000.00 | ||
| 36 | 00810 | MIDWEST GUARDRAIL TERMINALS, NON-FLARED | EACH | 4 | $ 4,500.00 | $ 18,000.00 | $ 4,100.00 | $ 16,400.00 | -8.89% | 2.44% | 1.21% | $ 3,800.00 | $ 15,200.00 | $ 4,100.00 | $ 16,400.00 | ||
| 37 | 00860 | LONGITUDINAL PAVEMENT MARKINGS, PAINT | FOOT | 140 | $ 20.00 | $ 2,800.00 | $ 9.00 | $ 1,260.00 | -55.00% | 1.85% | 0.09% | $ 12.50 | $ 1,750.00 | $ 5.00 | $ 700.00 | ||
| 38 | 01012 | WATER QUALITY BIOFILTRATION SWALE | LS | 1 | $ 25,000.00 | $ 25,000.00 | $ 15,000.00 | $ 15,000.00 | -40.00% | -59.09% | 1.11% | $ 35,000.00 | $ 35,000.00 | $ 21,589.00 | $ 21,589.00 | ||
| 39 | 01030 | SEEDING MOBILIZATION | EACH | 2 | $ 750.00 | $ 1,500.00 | $ 1,000.00 | $ 2,000.00 | 33.33% | 5.00% | 0.15% | $ 1,500.00 | $ 3,000.00 | $ 350.00 | $ 700.00 | ||
| 40 | 01030 | PERMANENT SEEDING, WATER QUALITY MIX | ACRE | 0 | $ 15,000.00 | $ 450.00 | $ 37,000.00 | $ 1,110.00 | 146.67% | 8.11% | 0.08% | $ 25,000.00 | $ 750.00 | $ 40,000.00 | $ 1,200.00 | ||
| 41 | 01030 | PERMANENT SEEDING, EROSION CONTROL MIX | ACRE | 0 | $ 15,000.00 | $ 900.00 | $ 18,000.00 | $ 1,080.00 | 20.00% | -72.22% | 0.08% | $ 25,000.00 | $ 1,500.00 | $ 50,000.00 | $ 3,000.00 | ||
| 42 | 01040 | IMPORTED TOP SOIL, 12-INCH SECTION | CY | 40 | $ 80.00 | $ 2,960.00 | $ 91.00 | $ 3,640.00 | 22.97% | 13.55% | 0.27% | $ 75.00 | $ 3,000.00 | $ 70.00 | $ 2,800.00 | ||
| 43 | 01091 | BOULDERS | EACH | 42 | $ 250.00 | $ 10,500.00 | $ 225.00 | $ 9,450.00 | -10.00% | -9.63% | 0.70% | $ 100.00 | $ 4,200.00 | $ 415.00 | $ 17,430.00 | ||
| 44 | 01091 | STREAMBED SEDIMENT | TON | 60 | $ 50.00 | $ 3,000.00 | $ 300.00 | $ 18,000.00 | 500.00% | 31.11% | 1.33% | $ 140.00 | $ 8,400.00 | $ 180.00 | $ 10,800.00 | ||
| 45 | 01091 | STREAMBED COBBLES, 6 INCH TO 10 INCH | TON | 60 | $ 50.00 | $ 3,000.00 | $ 390.00 | $ 23,400.00 | 680.00% | 40.17% | 1.73% | $ 60.00 | $ 3,600.00 | $ 250.00 | $ 15,000.00 | ||
| 46 | 01091 | CHANNEL MARGIN JAMS, COMPLETE | EACH | 4 | $ 9,000.00 | $ 36,000.00 | $ 7,350.00 | $ 29,400.00 | -18.33% | 0.91% | 2.18% | $ 10,000.00 | $ 40,000.00 | $ 4,500.00 | $ 18,000.00 | ||
| Estimate | $ 918,670.00 | Bent, LLC | $ 1,350,519.00 | Conway Construction | $ 1,451,670.00 | Farline Bridge, Inc. | $ 1,516,997.00 | ||||||||||
| Indicates Low Bid Contractor |