Final Grade and Site Finalization Group A- 8.24.2026.xlsx
XLSX spreadsheet 23 KB Posted
- Solicitation number
- 300000151629138
- Issued by
- Michigan
About this file
This is a price sheet for Final Grade and Site Finalization Services submitted by Doe Demolition, Inc. for District 3 in Michigan. The document outlines demolition and site finalization work at five residential properties: 19183 Lumpkin, 8435 Siebert, 10157 Woodlawn, 8291 Mt Olivet, and 8273 Mt Olivet. The scope of work includes sidewalk flag removal and replacement, backfill, grading, and site finalization activities. The contractor must limit flag replacement to damaged sidewalk sections only, with maximum replacement limits specified per property (ranging from 6 to 9 flags). All pricing must be submitted as a lump sum bid for each cost category: price per flag for removal and replacement, total sidewalk cost, backfill and grade, site finalization, and total costs.
Doe Demolition, Inc., located at 1234 Fifth Street in the 48226 zip code, submitted this proposal with points of contact Jane D. Doe (President) and John D. Doe (Vice President). All pricing must be inclusive of administrative costs, operational costs including mobilization and transportation, overhead, and profit. The price sheet indicates zero dollar amounts across all line items, suggesting this is a blank template awaiting pricing submission or a template showing bidders' cost structure requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SCOPEO~1.PDF | ||
| RFQNOT~1.DOC | DOC document | |
| RFQ Planned Residential Backfill.pdf | ||
| Backfill Signature Page.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
District 3
| Price Sheet- Final Grade and Site Finalization Services | |||||||
| District 3 | |||||||
| Organization Name: | Doe Demolition, Inc. | ||||||
| Business Address: | 1234 Fifth Street, 48226 | ||||||
| Point(s)-of-Contact: | Jane D. Doe, President | John D. Doe, Vice President | |||||
| E-mail Address(es): | jane.doe@doedemolition.com | john.doe@doedemolition.com | |||||
| Phone #(s): | 313.313.3113 | 313.313.3131 | |||||
| 500j000000JYKAL | |||||||
| 500j0000002Oxkp | Property Address | Number of Forms/Flags * | Price per Flag for Removal and Replacement | Total Sidewalk Cost | Backfill & Grade | Site Finalization | Total Costs ₄ |
| 500j000000Bl9T6 | 19183 Lumpkin | 9 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 8435 Siebert | 7 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 10157 Woodlawn | 6 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 8291 Mt Olivet | 7 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 8273 Mt Olivet | 7 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
Note:
- Submit a lump sum bid in the highlighted category above.
- All pricing must be inclusive of all administrative costs, operational costs (i.e. mobilization and transportation), any other related costs, overhead, and profit.
* Number of flags replaced must not exceed this amount. Please only replace sidewalk flags that were damaged during the demolition, backfill and site finalization activities.
File details come from the government source that posted it. Updated .