Final Drawings - 553-25-500.pdf
PDF 157 KB Posted
- Solicitation number
- 36C25025B0023
About this file
The document is a detailed floor plan drawing for a pharmacy renovation project at a Veterans Affairs (VA) facility. The drawing shows the lower level pharmacy area (LL101, LL101A, LL102, LL102A, LL102B) marked for construction, with specific zones including clean rooms, hazardous and non-hazardous buffer areas, controlled drug storage, and pharmacy cages. The drawing includes a comprehensive list of construction activities such as removing existing floor-mounted equipment, relocating supplies, installing new flooring, preparing floors, patching and painting walls, and conducting terminal cleaning. The proposed construction area covers multiple interconnected rooms totaling approximately 145 square feet, with a temporary construction barrier delineating the work zone.
The drawing is associated with VA Veterans Health Administration Solicitation Number 36C25025B0023, specifically for a "Z1DA--Lower Level Pharmacy Flooring Replacement IFB 553-25-500" project. The detailed drawing provides precise instructions for contractors, including specific removal and installation tasks, flooring preparation requirements, and notes about reinstalling equipment and conducting necessary site modifications. Drawing notes outline a step-by-step process for contractors, including removing existing wall-mounted items, preparing floors, installing new epoxy flooring, and conducting final cleaning and equipment repositioning.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25025B0023 0001.pdf | ||
| S04 - Pre-Bid Site Visit Agenda - 553-25-500.pdf | ||
| S04 Pre-Bid Attendance Log - 553-25-500.pdf | ||
| S02 Contractor EMR Certification Form - 553-25-500.docx | DOCX document | |
| Specifications - combined - 553-25-500.pdf | ||
| 36C25025B0023_1.docx | DOCX document | |
| S02 Wage Determination MI20250101 553-25-500.pdf | ||
| S02 RFI Form - 553-25-500.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OFFICE
LL182
OFFICE
LL183
OFFICE
LL184
CONTROLED
DRUGS
LL104
H.A.C.
LL103
NON-HAZARDOUS
BUFFER
AREA
LL101A
HAZARDOUS
BUFFER
AREA
LL102A
ANTE
LL102
CLEAN
ROOM
LL101
STORAGE
LL106
PHARMACY
LL109
PHARMACY
LL100
PHARMACY
LL100A
PHARMACY
CAGE
LL109A
AREA OF CONSTRUCTION
HAC
LL102B
LL101, LL101A, LL102, LL102A, LL102B
TEMPORARY CONSTRUCTION BARRIER
NO SCALE
145 S.F.
127 S.F.
43 S.F. 426 S.F.
26 S.F.
DRAWING NOTES:
TR
AN
SI
TI
O
N S
TR
IP
AutoCAD SHX Text
BENCH
AutoCAD SHX Text
HOOD
AutoCAD SHX Text
HOOD
AutoCAD SHX Text
HOOD
AutoCAD SHX Text
HOOD
AutoCAD SHX Text
1. REMOVE EXISTING FLOOR MOUNTED REMOVE EXISTING FLOOR MOUNTED ITEMS. TO BE REINSTALLED. 2. REMOVE EXISTING WALL MOUNTED REMOVE EXISTING WALL MOUNTED ITEMS. TO BE REINSTALLED. 3. REMOVE EXISTING HOODS AND STORE REMOVE EXISTING HOODS AND STORE AS DIRECTED BY COR. 4. REMOVE EXISTING FLOORING AND REMOVE EXISTING FLOORING AND INTEGRATED COVE BASE. 5. SCARIFY FLOOR AND PREP FLOOR SCARIFY FLOOR AND PREP FLOOR FOR NEW FLOORING PER MANUFACTURER'S SPECIFICATIONS. PROVIDE TRANSITION STRIPS AS REQUIRED. 6. INSTALL NEW FLOORING AND 4" HIGH INSTALL NEW FLOORING AND 4" HIGH INTEGRATED COVE BASE. 7. PATCH AND PAINT WALLS AND PATCH AND PAINT WALLS AND CEILINGS WITH EPOXY COATING. MATCH EXISTING. 8. CAULK DOOR FRAMES. CAULK DOOR FRAMES. 9. REINSTALL FLOOR AND WALL REINSTALL FLOOR AND WALL MOUNTED ITEMS. 10. REINSTALL HOODS AND RECERTIFY.REINSTALL HOODS AND RECERTIFY.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
RELOCATE SUPPLIES AND MOVABLE EQUIPMENT
AutoCAD SHX Text
GC
AutoCAD SHX Text
VA
AutoCAD SHX Text
RELOCATE PHONE AND COMPUTER
AutoCAD SHX Text
REMOVE WALL MOUNTED ITEMS
AutoCAD SHX Text
REMOVE FLOOR MOUNTED ITEMS
AutoCAD SHX Text
REMOVE IV HOODS AND STORE
AutoCAD SHX Text
INSTALL ICRA BARRIERS AND WALK OFF MATS
AutoCAD SHX Text
INSTALL NEGATIVE AIR MACHINE
AutoCAD SHX Text
REMOVE EXISTING FLOORING AND INTEGRATED COVE BASE
AutoCAD SHX Text
PREP FLOOR FOR NEW RESINOUS EPOXY FLOOR
AutoCAD SHX Text
INSTALL NEW FLOOR AND INTEGRATED COVE BASE
AutoCAD SHX Text
PATCH AND PAINT WALLS
AutoCAD SHX Text
REINSTALL WALL MOUNTED ITEMS
AutoCAD SHX Text
REINSTALL FLOOR MOUNTED ITEMS
AutoCAD SHX Text
ACTIVITY:
AutoCAD SHX Text
REINSTALL HOODS AND RECERTIFY
AutoCAD SHX Text
THOROUGH CLEANING
AutoCAD SHX Text
TERMINAL CLEANING
AutoCAD SHX Text
MOVE SUPPLIES AND EQUIPMENT BACK IN
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text NOTE: REMOVE EXISTING DOOR SILLS, TO BE REINSTALLED AFTER NEW FLOORING INSTALL. (TYP.)
| Sheets and Views |
| Model |
File details come from the government source that posted it. Updated .