This solicitation is for roof repair and replacement services at multiple buildings on the Saint Cloud VA Health Care System campus in Minnesota. The solicitation seeks bids to remove existing roof systems and install new pre-finished metal roofing, fully adhered EPDM, and ballasted roof systems. Bids are due by July 15, 2023, with an anticipated award date of August 15, 2023. The period of performance is 120 days. The solicitation is designated as a Veterans First Contracting Program set-aside for Service-Disabled Veteran-Owned Small Businesses. The estimated value is $1.5 million. The contracting agency is the Department of Veterans Affairs Veterans Health Administration VISN 23.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LOCATION MAP
PROJECT LOCATIONS
HIGHLIGHTED WITH SOLID FILL
ST CLOUD VA HEALTH CARE SYSTEM
4801 VETERANS DRIVE
ST CLOUD, MN 56303
NORTH
VICINITY MAP
PROJECT VICINITY
NORTH
ABBREVIATIONS
PROJ(D)
PLBG
PLYWD
PREFIN
RAD(R)
RESIL
REINF
REQ'D
SECT
SHWR
SPECS
REFRIG
GALVANIZEDGALVBMRK BENCHMARK
CONCRETE
MASONRY UNIT
CEILINGCLG
CLR
CMU
COL
CLO
CLEAR/CLEARANCE
COLUMN
CLOSET
CAB
CJ
CC
CB
BW
CL
BOC
BRZ
BRK
BO
BRG
BUR
BTM
BS
BUILT-UP ROOF
CENTER TO CENTER
CHALKBOARD
BOTTOM OF WALL
CENTER LINE
CONTROL JOINT/
CONSTRUCTION JOINT
CABINET
BACK OF CURB
BOTH SIDES
BOTTOM OF
BRONZE
BRICK
BEARING
BOTTOM
FOUNDATION
FLOOR DRAIN
FIRE EXTINGUISHER
FIRE
EXTINGUISHER
CABINET
FE
FEC
FDN
FD
EAST
EACH
EQUIPMENT
EXPOSED
EACH WAY
EXISTING
ELECTRICAL
EXTERIOR INSULATION
FINISH SYSTEM
ELEVATION/ELEVATOR
EXPANSION JOINT
EXISTING GRADE
ELECTRICAL CONTRACTOR
EXTERIOR
ETHYLENE PROPYLENE
DIENE TERPOLYMER
ELEV
EQUIP
EW
EPDM
EXP
EXIST
EXT
E
EA
EC
EG
EIFS
EJ
ELEC
INSULATION
INTERIOR
INSIDE DIAMETER
INSUL
IN(")
INT
ID
INCH
GRAB BAR
GENERAL CONTRACTOR
GYPSUM
GLASS/GLAZING
HOLLOW METAL
HIGH PRESSURE
DECORATIVE LAMINATE
HORIZONTAL
HARDWARE
HARDWOOD
HOSE BIB
HOT WATER
HEATING, VENTILATING
& AIR CONDITIONING
HDWR
HM
HORZ
HT
HPDL
HVAC
HW
HEIGHT
GB
GL
GRD
GYP
GC
HDWD
HB
GRADE
PART
PLAS
OVHD
PARTITION
PLASTER
OVERHEAD
SRT
SS
SQ
MISCELANEOUS
MASONRY OPENING
NOT IN CONTRACT
NOT APPLICABLE
OUTSIDE DIAMETER
NUMBERNO(#)
NTS
OC
OA
NOM
OFF
OPNG
OD
ON CENTER
OVERALL
NOMINAL
NOT TO SCALE
OFFICE
OPENING
MISC
N
MO
MULL
MTL
NIC
NA
NORTH
MULLION
METAL
SHT
SF
SB
SND
SIM
S
RM
ROW
RO
SAT
SAN
ARCHITECT/
ARCHITECTURAL
AB ANCHOR BOLT
APPROX
BLDG
BD
ARCH
BM
BLK
ADJ
AFF
AC
ACCU
ALUM
ANOD
ALT
APPROXIMATE
BLOCK/BLOCKING
AT
BOARD
BEAM
BUILDING
AIR COOLED
CONDENSING UNIT
ABOVE FINISHED FLOOR
ADJUSTABLE
ALTERNATE
ANODIZED
ACOUSTICAL
ALUMINUM
A/C AIR CONDITIONING
PLUS OR MINUS
CONSTRUCTIONCONST
COURSE
CERAMIC TILE
CONTINUOUS
CARPET
CORRIDOR
DIAMETER
DOOR
DOWN
DITTO
DIMENSION
DOUBLE
DRINKING FOUNTAIN
DETAIL
DRAWING
DOWNSPOUT
DIA
DR
DS
DN
DO
DIM
DTL
DWG
CRS
CT
CONT
CORR
CPT
DBL
DF
CONFERENCE
CONCRETE
CONF
CONC
FINISHFIN
FLUORESENT
FLOW LINE
FOLDING
FIELD VERIFY
FURNACE
FOOTING
FIRE RETARDANT
FOOT SCRAPER
FIBERGLASS
REINFORCED PLASTIC
FV
FT(')
FURR
FURN
FTG
G
GA
FOOT
FURRING
GAS
GUAGE
FRP
FLR
FLDG
FL
FRT
FS
FLUOR
FLOOR
FINISH GRADE
FINISH FLOOR
FG
FF
JOISTJST
LOW VOLUMN CHANGE
MASONRYMAS
MANUF
MATL
MAX
MECH
MEMB
MH
MIN
MIRR
MANUFACTURER
MATERIAL
MECHANICAL
MEMBRANE
MAXIMUM
MINIMUM
MANHOLE
MIRROR
LDR
LF
LAV
LAM
LVC
LOCN
LINEAL FEET
LADDER
LAVATORY
LAMINATE
LOCATION
REF
R
RAG
RD
PT
PR
QT
PTD
JT
JAN JANITOR
JOINT
PL
UNDER CABINET LIGHTREQUIRED
PHYSICAL THERAPY
RESPIRATORY THERAPY
SURGICAL INTENSIVE CARE UNIT
STUDDED RUBBER TILE
STAINLESS STEEL
SQUARE
SPECIFICATIONS
YD
SUSPENDED
ACOUSTICAL TILE
SIMILAR
SANITARY NAPKIN
DISPENSER
SECTION
SHOWER
SHEET
SQUARE FEET
SPLASH BLOCK
RESILIENT
SOUTH
SANITARY
RIGHT OF WAY
ROUGH OPENING
ROOM
WD
WNDW
WH
WNSCT
WC
WT
WWF
WP
VCT
VWC
VEST
VERT
W
W/
W/O
YARD
WATERPROOFING
/WATERPROOF
WELDED WIRE FABRIC
WATER HEATER
WATER CLOSET
WINDOW
WOOD
WAINSCOT
WEIGHT
VINYL COMPOSITION TILE
VINYL WALL COVERING
VERTICAL
VESTIBULE
WEST
WITH
WITH OUT
RT
SICU
CENTRAL STERILE
LONG TERM CARE
INTENSIVE CARE UNIT
OCCUPATIONAL THERAPY
MAGNETIC RESONANCE IMAGING
POST ANESTHETIC CARE UNIT
MEDICAL INTENSIVE CARE UNIT
LABOR-DELIVERY-RECOVERY-POST PARTUM
OPERATING ROOM
FOR MEDICAL
FACILITIES ONLY
EMERGENCY ROOM
COMPUTED TOMOGRAPHY
STORPLUMBING
PROJECT/(PROJECTED)
REFER/REFERENCE
ROOF DRAIN
RADIUS
RETURN AIR GRILLE
REINFORCING
REFRIGERATOR
RISER
PRESSURE TREATED
PAINTED
QUARRY TILE
PLYWOOD
PREFINISHED
PAIR
TLT
TV
TW
TOC
TPH
TO
TYP
UCL
T&B
T
SUSP
STRUCT
TEL
TB
T&G
PLATE/PLASTIC/
PROPERTY LINE STL
STD
STORAGE
TOILET PAPER HOLDER
TOP OF CURB
TOILET
TELEVISION
TOP OF
TYPICAL
TOP OF WALL
TONGUE & GROOVE
TOP & BOTTOM
STRUCTURE/STRUCTURAL
TREAD
TELEPHONE
TACKBOARD
SUSPENDED
ICU
OR
LDRP
MRI
MICU
LTC
PT
PACU
OT
CS
CT
ER
STEEL
STANDARD
CUT STONE
STEEL
PLYWOOD
FINISH WOOD
CONT WD FRAMING
WOOD BLOCKING
MATERIAL SYMBOLS
LVC FILL
GRANULAR FILL
CONCRETE MASONRY
FACE BRICK
CONCRETE
EARTH
EXISTING CONSTRUCTION
ASPHALT
GLASS
RIGID OR TAPERED
INSULATION, EIFS
BATT INSULATION
GYPSUM BOARD
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT OF RECORD
A/E:
STAMPCONSULTANTS
321 4 5 6 7 8 9 10 o n e e ig h th in c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s in c h o n e f o o t o n e h a lf in c h o n e f o o t th re e q u a rt e rs in c h o n e f o o t o n e in c h o n e f o o t o n e a n d o n e h a lf in c h e s o n e f o o t th re e in c h e s o n e f o o t
FINAL CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
REPAIR ROOF SYSTEMS
SAINT CLOUD, MN
MULTIPLE
APRIL 28, 2020
VA# 656-19-314
STONE GROUP ARCHITECTS, INC.
1001 TWELVE OAKS CENTER DRIVE,
SUITE 1025
WAYZATA, MN 55391
952.476.5850
C
S G
A R e v it L o c a l\
-1
-3
S t C lo u d
R e p a ir R o o f S y s te m s R je s s e b D
Q
Y .r v t
/2
/2
:4
:5
A
M
GI001
COVER SHEET
JESSE KLANKOWSKI
REPAIR ROOF SYSTEMS
FINAL CONSTRUCTION DOCUMENTS
APRIL 28, 2020
4801 VETERANS DRIVE, ST CLOUD MN 56303
VA# 656-19-314
BUILDING 1, 2, 30, 37, 48, 50, 51, 69, 95 & 100
ST CLOUD VA HEALTH CARE SYSTEM
SHEET LIST
GI001 COVER SHEET
GI002 SITE & STAGING PLAN
GI003 SITE SAFETY PLAN - BUILDING 1
GI004 SITE SAFETY PLAN - BUILDING 2
GI005 SITE SAFETY PLAN - BUILDING 48
GI006 SITE SAFETY PLAN - BUILDING 50
GI007 SITE SAFETY PLAN - BUILDING 51
GI008 SITE SAFETY PLAN - BUILDINGS 30, 37, 69 & 95
GI009 SITE SAFETY PLAN - BUILDING 100, SECTIONS & DETAILS
AD101 ROOF DEMOLITION PLAN - BUILDING 1
AD102 ROOF DEMOLITION PLAN - BUILDING 2
AD103 ROOF DEMOLITION PLAN - BUILDING 48
AD104 ROOF DEMOLITION PLAN - BUILDING 50
AD105 ROOF DEMOLITION PLAN - BUILDING 51
AD106 ROOF DEMOLITION PLAN - BUILDING 95
AD107 ROOF DEMOLITION PLAN - BUILDINGS 30, 37, 69 & 100
AE101 ROOF PLAN - BUILDING 1
AE102 ROOF PLAN - BUILDING 2
AE103 ROOF PLAN - BUILDING 48
AE104 ROOF PLAN - BUILDING 50
AE105 ROOF PLAN - BUILDING 51
AE106 ROOF PLAN & SECTIONS - BUILDING 95
AE107 ROOF PLAN - BUILDINGS 30, 37, 69 & 100
AE201 TYPICAL SECTIONS & DETAILS
AE202 DETAILS
AE203 DETAILS
AE204 EXISTING CONDITIONS IMAGES
Revision# Description Date:
Jesse Bell Snapshot
CCC
D
BLDG
BLDG 37 BLDG 69
BLDG 30
BLDG 48
BLDG
BLDG
BLDG 95
BLDG
BLDG
BLDG 1
ANNEX
GI009
GI008
GI005
GI006
GI007
GI008
GI003
GI004
CONTRACTOR WILL BE ALLOWED A 40'X40'X7'H
FENCED IN STAGING AND PARKING AREA PLUS
SPACE FOR ONE SEMI TRAILER
'-0
40'-0"
ALL VEHICLES, EQUIPMENT & MATERIALS
TO BE KEPT INSIDE FENCED AREA
CONTRACTOR TO PROVIDE AND
MAINTAIN PORTAL POTTY SYSTEM
CONTRACTOR TO PROVIDE POWER SOURCE, I.E. GENERATOR,
AS REQUIRED FOR ALL STORAGE & WORK AREAS
CONTRACTOR PARKING &
STAGING AREA
DESIGNATED CONTRACTOR
ROADWAY FOR POWERED
VEHICLES/EQUIPMENT -
ACCESS FOR ALL BUILDINGS
DESIGNATED CONTRACTOR
ROADWAY FOR POWERED
VEHICLES/EQUIPMENT- ACCESS
FOR BUILDINGS 30, 37, 69, 48, 95 & 100
DESIGNATED CONTRACTOR
ROADWAY FOR POWERED
VEHICLES/EQUIPMENT- ACCESS
FOR BUILDINGS 1, 2, 50 & 51
DESIGNATED CONTRACTOR
ROADWAY FOR POWERED
VEHICLES/EQUIPMENT- ACCESS
FOR BUILDING 2
DESIGNATED CONTRACTOR
ROADWAY FOR POWERED
VEHICLES/EQUIPMENT- ACCESS
FOR BUILDING 1 EAST
DESIGNATED CONTRACTOR
ROADWAY FOR POWERED
VEHICLES/EQUIPMENT- ACCESS
FOR BUILDING 1 ENTRY CANOPY
DESIGNATED CONTRACTOR
ROADWAY FOR POWERED
VEHICLES/EQUIPMENT- ACCESS
FOR BUILDING 1 WEST
DESIGNATED CONTRACTOR
ROADWAY FOR POWERED
VEHICLES/EQUIPMENT- ACCESS
FOR BUILDING 51
DESIGNATED CONTRACTOR
ROADWAY FOR POWERED
VEHICLES/EQUIPMENT- ACCESS
FOR BUILDING 50
DESIGNATED CONTRACTOR
ROADWAY FOR POWERED
VEHICLES/EQUIPMENT- ACCESS
FOR BUILDING 95
DESIGNATED CONTRACTOR
ROADWAY FOR POWERED
VEHICLES/EQUIPMENT- ACCESS
FOR BUILDINGS 30, 37, 69, 48 & 100
DESIGNATED CONTRACTOR
ROADWAY FOR POWERED
VEHICLES/EQUIPMENT- ACCESS
FOR BUILDING 100
DESIGNATED CONTRACTOR
ROADWAY FOR POWERED
VEHICLES/EQUIPMENT- ACCESS
FOR BUILDINGS 30, 37 & 69
DESIGNATED CONTRACTOR
ROADWAY FOR POWERED
VEHICLES/EQUIPMENT- ACCESS
FOR BUILDING 48
DIVERSION RIDGE REQUIRED
WHERE GRADE EXCEEDS 2%
EXISTING PAVED ROADWAY
FILTER FABRIC FOR STABILIZATION
2% OR GREATER
SEDIMENT BARRIER (STRAW
BALE TYPE SHOWN)
DIVERSION RIDGE REQUIRED
WHERE GRADE EXCEEDS 2%
NOTE: USE SANDBAGS, STRAW
BALES OR OTHER APPROVED
METHODS TO CHANNELIZE RUNOFF
TO BASIN AS REQUIRED.
2"-3" COURSE
AGGREGATE MIN.
6" THICK.
E X
IS
T
IN
G
P A
V E
D
R O
A D
W A
Y
50'-0" MIN.
20' R
20' R
SPILLWAY
FLO
W
FLO
W
SUPPLY WATER
TO WASH WHEELS
NOTE:
1. THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION THAT WILL PREVENT TRACKING OR FLOWING
OF SEDIMENT ONTO PAVED ROADWAYS. THIS MAY REQUIRE TOP DRESSING, REPAIR AND /OR
CLEANOUT OF ANY MEASURES USED TO TRAP SEDIMENT.
2. WHEN NECESARY, WHEELS SHALL BE CLEANED PRIOR TO ENTRANCE ONTO PAVED ROADWAYS.
3. LAYDOWN AREA & ACCESS ROAD TO BE RESTORED BACK TO ORIGINAL CONDITION ONCE
CONSTRUCTION IS COMPLETE. REMOVE ALL CRUSHED STONE AND GRAVEL, GRADE AS REQUIRED
TO RETURN AREA TO ORIGINAL CONDITION, RESTORE WALKING PATH AND RESEED DISTURBED
AREA WITH GRASS TO MATCH EXISTING.
SECTION A
A A
SITE & STAGING PLAN NOTES:
1. GC TO COORDINATE FINAL LAYDOWN AREA SIZE AND LOCATION WITH COR.
2. TREE/LANDSCAPE REMOVAL IN LAYDOWN AREA IS NOT PERMITTED.
3. LAYDOWN AREA TO BE FULLY GRAVELED TO PREVENT VEHICLE TRACKING OF MUD & DIRT.
4. ACCESS ROAD FROM PAVED ROAD TO LAYDOWN AREA TO BE CRUSHED STONE TO PREVENT VEHICLE TRACKING
OF MUD & DIRT. SEE DETAIL ON GI002.
5. LAYDOWN AREA TO BE COMPLETELY SCREENED WITH PRIVACY SLAT FENCE TO A MIN HEIGHT OF 6'-0".
6. (1) 40' CONEX BOX IS ALLOWED IN LAYDOWN AREA.
7. LAYDOWN AREA & ACCESS ROAD TO BE RESTORED BACK TO ORIGINAL CONDITION ONCE CONSTRUCTION IS COMPLETE. REMOVE ALL CRUSHED STONE AND GRAVEL, GRADE AS REQUIRED TO RETURN AREA TO ORIGINAL
CONDITION, RESEED DISTURBED AREA WITH GRASS TO MATCH EXISTING.
8. SUGGESTED PARKING AREAS SHOWN FOR REFERENCE ONLY, FINAL PARKING COORDINATION TO BE DETERMINED
BY COR AND DISCUSSED AT PRE-CONSTRUCTION MEETING.
9. GC TO COORDINATE FINAL JOB SITE TRAILER & GC PARKING LOCATIONS WITH COR.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT / ENGINEER A/E Seal:
321 4 5 6 7 8 9 10 o n e e ig h th in c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s in c h o n e f o o t o n e h a lf in c h o n e f o o t th re e q u a rt e rs in c h o n e f o o t o n e in c h o n e f o o t o n e a n d o n e h a lf in c h e s o n e f o o t th re e in c h e s o n e f o o t
STONE GROUP ARCHITECTS, INC.
1001 TWELVE OAKS CENTER DRIVE, SUITE 1025
WAYZATA, MN 55391
952-476-5850
P.O.C.: JESSE KLANKOWSKI
C
S G
A R e v it L o c a l\
-1
-3
S t C lo u d
R e p a ir R o o f S y s te m s R je s s e b D
Q
Y .r v t
/2
/2
:4
:0
A
M
GI002
SITE & STAGING PLAN REPAIR ROOF SYSTEMS
SAINT CLOUD, MN
MULTIPLE
APRIL 28, 2020 Checker Author
FINAL CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
VA #656-19-314
NORTH
1" = 80'-0"
SITE & STAGING PLAN
1" = 2'-0"
LAYDOWN AREA ACCESS ROAD
Revision# Description Date:
CCC
SAFETY PLAN NOTES:
1. ALL EXITS & ENTRIES MUST BE KEPT USABLE DURING CONSTRUCTION, CONSTRUCTION TUNNELS ARE TO BE CONSTRUCTED AT THESE LOCATIONS AND EXTEND AWAY FROM THE BUILDING TO THE CONSTRUCTION BOUNDARY
FENCING.
2. ALL MECHANICAL EQUIPMENT AND LANDSCAPING IS TO BE PROTECTED FROM FALLING DEBRIS AND DUST.
PROTECTION COULD INCLUDE BUT IS NOT LIMITED TO TEMPORARY FRAMED STRUCTURES AND ROOF NETS.
CONTRACTOR IS RESPONSIBLE FOR CREATING AND SUBMITTING TO COR FOR APPROVAL THE FINAL SITE SAFETY
PLAN PRIOR TO ANY DEMOLITION WORK.
3. CONTRACTOR IS RESPONSIBLE FOR PROTECTING THE BUILDING AND IT'S DAILY OPERATIONS FROM WATER INTRUSION. PRIOR TO BEGINNING EACH PHASE, CONTRACTOR IS TO COORDINATE WITH COR THE AMOUNT OF DEMOLITION ALLOWED AT THAT TIME BASED ON LOCAL WEATHER REPORTS AND THE ESTIMATED TIME TO COMPLETE WORK WITHIN THAT PHASE. COVERAGE WITH WATER PROOF FABRICS OF EXPOSED ROOF AREAS DUE TO DEMOLITION SHALL BE COORDINATED DAILY WITH COR. SEE SPEC. SECTION 07 01 50.19 PREPARATION FOR RE-
ROOFING.
4. CONTRACTOR MAY BE ASKED FREQUENTLY TO MOVE THEIR DEBRIS VEHICLES IN ORDER TO ACCOMMODATE THE
DAILY OPERATIONS OF THE FACILITY.
5. DUMPSTERS MUST ALWAYS BE COVERED WITH CANVAS OR SIMILAR COVER AND REMAIN INSIDE A FENCED AREA.
6. ALL TOOLS, EQUIPMENT AND MATERIALS USED DAILY SHALL BE RETURNED TO THE STAGING AREA AT THE END OF
THE WORK SHIFT AND BE SECURED IN A GANG BOX OR SECURED STORAGE DEVICE WITHIN THE STAGING AREA.
7. EQUIPMENT ENGINES SHALL NOT BE LEFT ON IDOL TO AVOID EXHAUST FUMES FROM ENTERING THE BUILDINGS AND
SURROUNDING AREAS.
8. A SCRUBBER KIT SHALL BE USED ON ALL POWER EQUIPMENT.
9. CONTRACTOR IS ALLOW FOUR WEEKS TO COMPLETE A BUILDING AND WILL NOT BE ALLOWED TO BEGIN WORK ON
ANOTHER BUILDING UNTIL THE CURRENT ONE IS COMPLETED. IF THE CONTRACTOR HAS TWO CREWS ON SITE THEY
MAY WORK, AT THE COR'S DISCRESSION, ON TWO BUILDINGS SIMULTANEOUSLY.
10. AT THE COMPLETION OF WORK AT ROOFS WITH ATTICS BELOW, THE CONTRACTOR IS TO CLEAN THE ATTIC AND
REPAIR ANY DAMAGE DONE DURING THE REROOF.
11. AT THE COMPLETION OF WORK AT EACH ROOF SECTION, ALL DEBRIS MUST BE REMOVED FROM THE SITE, SCAFFOLDING, CONSTRUCTION BARRIERS/FENCING AND OVERHEAD PROTECTION REMOVED. ANY LANDSCAPE REPAIRS/REGRADING AND RESEEDING TO BE COMPLETED BEFORE BEGINNING WORK ON NEW ROOF AREA.
NOT IN CONTRACT (N.I.C.)
SCOPE OF WORK
BAMBOO GROUND PROTECTION MAT
BLDG
OVERHEAD PROTECTION @
MECHANICAL UNITS, TYP.
CRUSHED ROCK
GRASS
SCAFFOLDING
CONSTRUCTION FENCING
CONCRETE DRIVE
PROTECT EXHAUST DUCTS @
EXTERIOR WALL FROM DAMAGE
GRASS
OVERHEAD PROTECTION @
MECHANICAL UNIT, TYP.
LOWER LEVEL EXIT
OVERHEAD PROTECTION FOR
LOWER LEVEL EXITS
SCAFFOLDING W/OVERHEAD
PROTECTION @ WALKWAYS, TYP.
OVERHEAD PROTECTION
@ WALKWAYS, TYP.
CRUSHED ROCK
CONSTRUCTION FENCING
BLDG 1 ANNEX
SCAFFOLDING
CONSTRUCTION FENCING
SCAFFOLDING
CONSTRUCTION FENCING
TEMPORARY BUS STOP (REQUIRED ONLY
DURING FRONT ENTRY/CANOPY WORK)
CONSTRUCTION FENCING OVERHEAD PROTECTION
TO TEMPORARY BUS STOP
SIDEWALK
SIDEWALK
SIDEWALK
SIDEWALKSIDEWALK
GI009
GI009
D U
M P
S T
E R
SCAFFOLDING W/OVERHEAD
PROTECTION
WORK AT FRONT ENTRY/CANOPY TO
COMMENCE ON A THURSDAY NIGHT
AT 5PM AND MUST BE COMPLETED
BY 6AM THE FOLLOWING MONDAY.
FRONT ENTRY TO BUILDING 1 MUST
REMAIN OPEN AT ALL TIMES DURING
THIS CONSTRUCTION PERIOD.
CONTRACTOR TO USE DUMP TRUCK OR PICKUP
TRUCK FOR WASTE REMOVEL AT FRONT ENTRY
/CANOPY IN LIEU OF DUMPSTER
AMBULANCE
GARAGE
SCAFFOLDING
CONSTRUCTION FENCING
A M
B U
LA
N
C E
D R
IV
E
, K E
E P
C
LE
A R
O F
O B
S T
R U
C T
IO
N
S A
T A
LL
T
IM
E
S
CONSTRUCTION FENCING
BAMBOO GROUND PROTECTION MAT TO BE
PROVIDED AT ALL NONHARD SURFACE VEHICLE
TRAFFIC AREAS AND DUMPSTER LOCATIONS
NO MOTORIZED CONSTUCTION TRAFFIC IN THIS AREA
ASPHALT DRIVEWAY
BAMBOO GROUND PROTECTION MAT TO BE
PROVIDED AT ALL NONHARD SURFACE VEHICLE
TRAFFIC AREAS AND DUMPSTER LOCATIONS
BAMBOO GROUND PROTECTION MAT TO BE
PROVIDED AT ALL NONHARD SURFACE VEHICLE
TRAFFIC AREAS AND DUMPSTER LOCATIONS
CONTRACTOR TO USE DUMP TRUCK OR
PICKUP TRUCK FOR WASTE REMOVEL
ON WEST SIDE IN LIEU OF DUMPSTER
PUBLIC USE OF SIDEWALKS TO BE
MAINTAINED DURING CONSTRUCTION
PUBLIC USE OF SIDEWALKS TO BE MAINTAINED
AT ALL TIMES DURING CONSTRUCTION
EXISTING CHAIN
LINK FENCE
MAINTAIN ACCESS TO SIAMESE FIRE CONNECTION
AND VISIBILITY TO SIGNAGE AT ALL TIMES
PROTECT WALL MOUNTED MECH.
UNIT FROM DAMAGE
CONTRACTOR TO USE DUMP TRUCK OR
PICKUP TRUCK FOR WASTE REMOVEL
ON EAST SIDE IN LIEU OF DUMPSTER
WORK IN THIS AREA TO BE COORDINATED
WITH CONSTRUCTION ADDITION PROJECT
BUSES TO USE
WEST LOT FOR
TURNAROUND
STOP
42'-0"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT / ENGINEER A/E Seal:
321 4 5 6 7 8 9 10 o n e e ig h th in c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s in c h o n e f o o t o n e h a lf in c h o n e f o o t th re e q u a rt e rs in c h o n e f o o t o n e in c h o n e f o o t o n e a n d o n e h a lf in c h e s o n e f o o t th re e in c h e s o n e f o o t
STONE GROUP ARCHITECTS, INC.
1001 TWELVE OAKS CENTER DRIVE, SUITE 1025
WAYZATA, MN 55391
952-476-5850
P.O.C.: JESSE KLANKOWSKI
C
S G
A R e v it L o c a l\
-1
-3
S t C lo u d
R e p a ir R o o f S y s te m s R je s s e b D
Q
Y .r v t
/2
/2
:4
:0
A
M
GI003
SITE SAFETY PLAN - BUILDING 1 REPAIR ROOF SYSTEMS
SAINT CLOUD, MN
MULTIPLE
APRIL 28, 2020 Checker Author
FINAL CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
VA #656-19-314
1" = 20'-0"
SAFETY PLAN - BUILDING 1
NORTH
Revision# Description Date:
1. ALL EXITS & ENTRIES MUST BE KEPT USABLE DURING CONSTRUCTION, CONSTRUCTION TUNNELS ARE TO BE CONSTRUCTED AT THESE LOCATIONS AND EXTEND AWAY FROM THE BUILDING TO THE CONSTRUCTION BOUNDARY
FENCING.
2. ALL MECHANICAL EQUIPMENT AND LANDSCAPING IS TO BE PROTECTED FROM FALLING DEBRIS AND DUST.
PROTECTION COULD INCLUDE BUT IS NOT LIMITED TO TEMPORARY FRAMED STRUCTURES AND ROOF NETS.
CONTRACTOR IS RESPONSIBLE FOR CREATING AND SUBMITTING TO COR FOR APPROVAL THE FINAL SITE SAFETY
PLAN PRIOR TO ANY DEMOLITION WORK.
3. CONTRACTOR IS RESPONSIBLE FOR PROTECTING THE BUILDING AND IT'S DAILY OPERATIONS FROM WATER INTRUSION. PRIOR TO BEGINNING EACH PHASE, CONTRACTOR IS TO COORDINATE WITH COR THE AMOUNT OF DEMOLITION ALLOWED AT THAT TIME BASED ON LOCAL WEATHER REPORTS AND THE ESTIMATED TIME TO COMPLETE WORK WITHIN THAT PHASE. COVERAGE WITH WATER PROOF FABRICS OF EXPOSED ROOF AREAS DUE TO DEMOLITION SHALL BE COORDINATED DAILY WITH COR. SEE SPEC. SECTION 07 01 50.19 PREPARATION FOR RE-
ROOFING.
4. CONTRACTOR MAY BE ASKED FREQUENTLY TO MOVE THEIR DEBRIS VEHICLES IN ORDER TO ACCOMMODATE THE
DAILY OPERATIONS OF THE FACILITY.
5. DUMPSTERS MUST ALWAYS BE COVERED WITH CANVAS OR SIMILAR COVER AND REMAIN INSIDE A FENCED AREA.
6. ALL TOOLS, EQUIPMENT AND MATERIALS USED DAILY SHALL BE RETURNED TO THE STAGING AREA AT THE END OF
THE WORK SHIFT AND BE SECURED IN A GANG BOX OR SECURED STORAGE DEVICE WITHIN THE STAGING AREA.
7. EQUIPMENT ENGINES SHALL NOT BE LEFT ON IDOL TO AVOID EXHAUST FUMES FROM ENTERING THE BUILDINGS AND
SURROUNDING AREAS.
8. A SCRUBBER KIT SHALL BE USED ON ALL POWER EQUIPMENT.
9. CONTRACTOR IS ALLOW FOUR WEEKS TO COMPLETE A BUILDING AND WILL NOT BE ALLOWED TO BEGIN WORK ON
ANOTHER BUILDING UNTIL THE CURRENT ONE IS COMPLETED. IF THE CONTRACTOR HAS TWO CREWS ON SITE THEY
MAY WORK, AT THE COR'S DISCRESSION, ON TWO BUILDINGS SIMULTANEOUSLY.
10. AT THE COMPLETION OF WORK AT ROOFS WITH ATTICS BELOW, THE CONTRACTOR IS TO CLEAN THE ATTIC AND
REPAIR ANY DAMAGE DONE DURING THE REROOF.
11. AT THE COMPLETION OF WORK AT EACH ROOF SECTION, ALL DEBRIS MUST BE REMOVED FROM THE SITE, SCAFFOLDING, CONSTRUCTION BARRIERS/FENCING AND OVERHEAD PROTECTION REMOVED. ANY LANDSCAPE REPAIRS/REGRADING AND RESEEDING TO BE COMPLETED BEFORE BEGINNING WORK ON NEW ROOF AREA.
NOT IN CONTRACT (N.I.C.)
SCOPE OF WORK
BAMBOO GROUND PROTECTION MAT
BLDG
SCAFFOLDING
CONSTRUCTION FENCING
OVERHEAD PROTECTION
@ WALKWAYS, TYP.
SCAFFOLDING
CONSTRUCTION FENCING
SIDEWALK
S
ID
E W
A
LK
SIDEWALK
SID
EW
ALK
C O
N C
R E
T E
D R
IV
E
W A
Y
ASPHALT DRIVEWAY
GI009
D U
M P
S T
E R
A M
B U
LA
N
C E
D R
IV
E
, K E
E P
C
LE
A R
O F
O B
S T
R U
C T
IO
N
S A
T A
LL
T
IM
E
S
DUM
PSTER
BAMBOO GROUND PROTECTION MAT TO BE
PROVIDED AT ALL NONHARD SURFACE VEHICLE
TRAFFIC AREAS AND DUMPSTER LOCATIONS
OVERHEAD PROTECTION @ EXIT DOORS
COORDINATE CLOSING OF
TWO PARKING SPOTS W/COR
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT / ENGINEER A/E Seal:
321 4 5 6 7 8 9 10 o n e e ig h th in c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s in c h o n e f o o t o n e h a lf in c h o n e f o o t th re e q u a rt e rs in c h o n e f o o t o n e in c h o n e f o o t o n e a n d o n e h a lf in c h e s o n e f o o t th re e in c h e s o n e f o o t
STONE GROUP ARCHITECTS, INC.
1001 TWELVE OAKS CENTER DRIVE, SUITE 1025
WAYZATA, MN 55391
952-476-5850
P.O.C.: JESSE KLANKOWSKI
C
S G
A R e v it L o c a l\
-1
-3
S t C lo u d
R e p a ir R o o f S y s te m s R je s s e b D
Q
Y .r v t
/2
/2
:4
:0
A
M
GI004
SITE SAFETY PLAN - BUILDING 2 REPAIR ROOF SYSTEMS
SAINT CLOUD, MN
MULTIPLE
APRIL 28, 2020 Checker Author
FINAL CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
VA #656-19-314
1" = 20'-0"
SAFETY PLAN - BUILDING 2
NORTH
Revision# Description Date:
CONSTRUCTED AT THESE LOCATIONS AND EXTEND AWAY FROM THE BUILDING TO THE CONSTRUCTION BOUNDARY
FENCING.
2. ALL MECHANICAL EQUIPMENT AND LANDSCAPING IS TO BE PROTECTED FROM FALLING DEBRIS AND DUST.
PROTECTION COULD INCLUDE BUT IS NOT LIMITED TO TEMPORARY FRAMED STRUCTURES AND ROOF NETS.
CONTRACTOR IS RESPONSIBLE FOR CREATING AND SUBMITTING TO COR FOR APPROVAL THE FINAL SITE SAFETY
PLAN PRIOR TO ANY DEMOLITION WORK.
3. CONTRACTOR IS RESPONSIBLE FOR PROTECTING THE BUILDING AND IT'S DAILY OPERATIONS FROM WATER INTRUSION. PRIOR TO BEGINNING EACH PHASE, CONTRACTOR IS TO COORDINATE WITH COR THE AMOUNT OF DEMOLITION ALLOWED AT THAT TIME BASED ON LOCAL WEATHER REPORTS AND THE ESTIMATED TIME TO COMPLETE WORK WITHIN THAT PHASE. COVERAGE WITH WATER PROOF FABRICS OF EXPOSED ROOF AREAS DUE TO DEMOLITION SHALL BE COORDINATED DAILY WITH COR. SEE SPEC. SECTION 07 01 50.19 PREPARATION FOR RE-
ROOFING.
4. CONTRACTOR MAY BE ASKED FREQUENTLY TO MOVE THEIR DEBRIS VEHICLES IN ORDER TO ACCOMMODATE THE
DAILY OPERATIONS OF THE FACILITY.
5. DUMPSTERS MUST ALWAYS BE COVERED WITH CANVAS OR SIMILAR COVER AND REMAIN INSIDE A FENCED AREA.
6. ALL TOOLS, EQUIPMENT AND MATERIALS USED DAILY SHALL BE RETURNED TO THE STAGING AREA AT THE END OF
THE WORK SHIFT AND BE SECURED IN A GANG BOX OR SECURED STORAGE DEVICE WITHIN THE STAGING AREA.
7. EQUIPMENT ENGINES SHALL NOT BE LEFT ON IDOL TO AVOID EXHAUST FUMES FROM ENTERING THE BUILDINGS AND
SURROUNDING AREAS.
8. A SCRUBBER KIT SHALL BE USED ON ALL POWER EQUIPMENT.
9. CONTRACTOR IS ALLOW FOUR WEEKS TO COMPLETE A BUILDING AND WILL NOT BE ALLOWED TO BEGIN WORK ON
ANOTHER BUILDING UNTIL THE CURRENT ONE IS COMPLETED. IF THE CONTRACTOR HAS TWO CREWS ON SITE THEY
MAY WORK, AT THE COR'S DISCRESSION, ON TWO BUILDINGS SIMULTANEOUSLY.
10. AT THE COMPLETION OF WORK AT ROOFS WITH ATTICS BELOW, THE CONTRACTOR IS TO CLEAN THE ATTIC AND
REPAIR ANY DAMAGE DONE DURING THE REROOF.
11. AT THE COMPLETION OF WORK AT EACH ROOF SECTION, ALL DEBRIS MUST BE REMOVED FROM THE SITE, SCAFFOLDING, CONSTRUCTION BARRIERS/FENCING AND OVERHEAD PROTECTION REMOVED. ANY LANDSCAPE REPAIRS/REGRADING AND RESEEDING TO BE COMPLETED BEFORE BEGINNING WORK ON NEW ROOF AREA.
NOT IN CONTRACT (N.I.C.)
SCOPE OF WORK
BAMBOO GROUND PROTECTION MAT
BLDG 48
SIDEWALK
OVERHEAD PROTECTION @
MECHANICAL UNIT, TYP.
CONSTRUCTION FENCING
SCAFFOLDING W/OVERHEAD PROTECTION
@ WALKWAYS, TYP.
OVERHEAD PROTECTION
@ WALKWAYS, TYP.
SCAFFOLDING
CONSTRUCTION FENCING
SCAFFOLDING
CONSTRUCTION FENCING
OVERHEAD PROTECTION
@ WALKWAYS, TYP.
AS
PH
AL
T
DRIV
E
ASPHALT DRIVE
GRASS
SCAFFOLDING W/OVERHEAD PROTECTION
@ WALKWAYS, TYP.
OVERHEAD PROTECTION
@ WALKWAYS, TYP.
PROTECT ROOF BELOW WORK AREA
PROTECT ROOF BELOW WORK AREA
GI009
GI009 SCAFFOLDING W/OVERHEAD PROTECTION @ WALKWAYS, TYP.
D U
M P
S T
E R
ROCK AREA MUST BE RESTORED TO
ORIGINAL CONDITION AT COMPLETION
OF WORK, RESTORATION MAY
REQUIRE REPLACEMENT OF ALL ROCK
BAMBOO GROUND PROTECTION MAT TO BE
PROVIDED AT ALL NONHARD SURFACE VEHICLE
TRAFFIC AREAS AND DUMPSTER LOCATIONS
MAINTAIN ACCESS TO SIAMESE FIRE CONNECTION
AND VISIBILITY TO SIGNAGE AT ALL TIMES
PROTECT EXISTING CHAIN LINK FENCING
OVERHEAD PROTECTION @
LOWER LEVEL EXIT
EXISTING CHAIN LINK FENCE
EXISTING SATELITE DISH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT / ENGINEER A/E Seal:
321 4 5 6 7 8 9 10 o n e e ig h th in c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s in c h o n e f o o t o n e h a lf in c h o n e f o o t th re e q u a rt e rs in c h o n e f o o t o n e in c h o n e f o o t o n e a n d o n e h a lf in c h e s o n e f o o t th re e in c h e s o n e f o o t
STONE GROUP ARCHITECTS, INC.
1001 TWELVE OAKS CENTER DRIVE, SUITE 1025
WAYZATA, MN 55391
952-476-5850
P.O.C.: JESSE KLANKOWSKI
C
S G
A R e v it L o c a l\
-1
-3
S t C lo u d
R e p a ir R o o f S y s te m s R je s s e b D
Q
Y .r v t
/2
/2
:4
:0
A
M
GI005
SITE SAFETY PLAN - BUILDING 48 REPAIR ROOF SYSTEMS
SAINT CLOUD, MN
MULTIPLE
APRIL 28, 2020 Checker Author
FINAL CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
VA #656-19-314
NORTH
1" = 20'-0"
SAFETY PLAN - BUILDING 48
Revision# Description Date:
CONSTRUCTED AT THESE LOCATIONS AND EXTEND AWAY FROM THE BUILDING TO THE CONSTRUCTION BOUNDARY
FENCING.
2. ALL MECHANICAL EQUIPMENT AND LANDSCAPING IS TO BE PROTECTED FROM FALLING DEBRIS AND DUST.
PROTECTION COULD INCLUDE BUT IS NOT LIMITED TO TEMPORARY FRAMED STRUCTURES AND ROOF NETS.
CONTRACTOR IS RESPONSIBLE FOR CREATING AND SUBMITTING TO COR FOR APPROVAL THE FINAL SITE SAFETY
PLAN PRIOR TO ANY DEMOLITION WORK.
3. CONTRACTOR IS RESPONSIBLE FOR PROTECTING THE BUILDING AND IT'S DAILY OPERATIONS FROM WATER INTRUSION. PRIOR TO BEGINNING EACH PHASE, CONTRACTOR IS TO COORDINATE WITH COR THE AMOUNT OF DEMOLITION ALLOWED AT THAT TIME BASED ON LOCAL WEATHER REPORTS AND THE ESTIMATED TIME TO COMPLETE WORK WITHIN THAT PHASE. COVERAGE WITH WATER PROOF FABRICS OF EXPOSED ROOF AREAS DUE TO DEMOLITION SHALL BE COORDINATED DAILY WITH COR. SEE SPEC. SECTION 07 01 50.19 PREPARATION FOR RE-
ROOFING.
4. CONTRACTOR MAY BE ASKED FREQUENTLY TO MOVE THEIR DEBRIS VEHICLES IN ORDER TO ACCOMMODATE THE
DAILY OPERATIONS OF THE FACILITY.
5. DUMPSTERS MUST ALWAYS BE COVERED WITH CANVAS OR SIMILAR COVER AND REMAIN INSIDE A FENCED AREA.
6. ALL TOOLS, EQUIPMENT AND MATERIALS USED DAILY SHALL BE RETURNED TO THE STAGING AREA AT THE END OF
THE WORK SHIFT AND BE SECURED IN A GANG BOX OR SECURED STORAGE DEVICE WITHIN THE STAGING AREA.
7. EQUIPMENT ENGINES SHALL NOT BE LEFT ON IDOL TO AVOID EXHAUST FUMES FROM ENTERING THE BUILDINGS AND
SURROUNDING AREAS.
8. A SCRUBBER KIT SHALL BE USED ON ALL POWER EQUIPMENT.
9. CONTRACTOR IS ALLOW FOUR WEEKS TO COMPLETE A BUILDING AND WILL NOT BE ALLOWED TO BEGIN WORK ON
ANOTHER BUILDING UNTIL THE CURRENT ONE IS COMPLETED. IF THE CONTRACTOR HAS TWO CREWS ON SITE THEY
MAY WORK, AT THE COR'S DISCRESSION, ON TWO BUILDINGS SIMULTANEOUSLY.
10. AT THE COMPLETION OF WORK AT ROOFS WITH ATTICS BELOW, THE CONTRACTOR IS TO CLEAN THE ATTIC AND
REPAIR ANY DAMAGE DONE DURING THE REROOF.
11. AT THE COMPLETION OF WORK AT EACH ROOF SECTION, ALL DEBRIS MUST BE REMOVED FROM THE SITE, SCAFFOLDING, CONSTRUCTION BARRIERS/FENCING AND OVERHEAD PROTECTION REMOVED. ANY LANDSCAPE REPAIRS/REGRADING AND RESEEDING TO BE COMPLETED BEFORE BEGINNING WORK ON NEW ROOF AREA.
NOT IN CONTRACT (N.I.C.)
SCOPE OF WORK
BAMBOO GROUND PROTECTION MAT
BLDG
CONSTRUCTION FENCING
OVERHEAD PROTECTION
@ WALKWAYS, TYP.
SCAFFOLDING
OVERHEAD PROTECTION @
MECHANICAL UNITS, TYP.
CONSTRUCTION FENCING
SCAFFOLDING
SCAFFOLDING
GI009
CRUSHED ROCK
GRASS
CRUSHED ROCK
CRUSHED ROCK
GRASS
PUBLIC USE OF SIDEWALKS MUST BE MAINTAINED DURING CONSTRUCTION
DUMPSTER
BAMBOO GROUND PROTECTION MAT TO BE
PROVIDED AT ALL NONHARD SURFACE VEHICLE
TRAFFIC AREAS AND DUMPSTER LOCATIONS
ASPHALT PARKING LOT
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT / ENGINEER A/E Seal:
321 4 5 6 7 8 9 10 o n e e ig h th in c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s in c h o n e f o o t o n e h a lf in c h o n e f o o t th re e q u a rt e rs in c h o n e f o o t o n e in c h o n e f o o t o n e a n d o n e h a lf in c h e s o n e f o o t th re e in c h e s o n e f o o t
STONE GROUP ARCHITECTS, INC.
1001 TWELVE OAKS CENTER DRIVE, SUITE 1025
WAYZATA, MN 55391
952-476-5850
P.O.C.: JESSE KLANKOWSKI
C
S G
A R e v it L o c a l\
-1
-3
S t C lo u d
R e p a ir R o o f S y s te m s R je s s e b D
Q
Y .r v t
/2
/2
:4
:0
A
M
GI006
SITE SAFETY PLAN - BUILDING 50 REPAIR ROOF SYSTEMS
SAINT CLOUD, MN
MULTIPLE
APRIL 28, 2020 Checker Author
FINAL CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
VA #656-19-314
NORTH
1" = 20'-0"
SAFETY PLAN - BUILDING 50
Revision# Description Date:
CONSTRUCTED AT THESE LOCATIONS AND EXTEND AWAY FROM THE BUILDING TO THE CONSTRUCTION BOUNDARY
FENCING.
2. ALL MECHANICAL EQUIPMENT AND LANDSCAPING IS TO BE PROTECTED FROM FALLING DEBRIS AND DUST.
PROTECTION COULD INCLUDE BUT IS NOT LIMITED TO TEMPORARY FRAMED STRUCTURES AND ROOF NETS.
CONTRACTOR IS RESPONSIBLE FOR CREATING AND SUBMITTING TO COR FOR APPROVAL THE FINAL SITE SAFETY
PLAN PRIOR TO ANY DEMOLITION WORK.
3. CONTRACTOR IS RESPONSIBLE FOR PROTECTING THE BUILDING AND IT'S DAILY OPERATIONS FROM WATER INTRUSION. PRIOR TO BEGINNING EACH PHASE, CONTRACTOR IS TO COORDINATE WITH COR THE AMOUNT OF DEMOLITION ALLOWED AT THAT TIME BASED ON LOCAL WEATHER REPORTS AND THE ESTIMATED TIME TO COMPLETE WORK WITHIN THAT PHASE. COVERAGE WITH WATER PROOF FABRICS OF EXPOSED ROOF AREAS DUE TO DEMOLITION SHALL BE COORDINATED DAILY WITH COR. SEE SPEC. SECTION 07 01 50.19 PREPARATION FOR RE-
ROOFING.
4. CONTRACTOR MAY BE ASKED FREQUENTLY TO MOVE THEIR DEBRIS VEHICLES IN ORDER TO ACCOMMODATE THE
DAILY OPERATIONS OF THE FACILITY.
5. DUMPSTERS MUST ALWAYS BE COVERED WITH CANVAS OR SIMILAR COVER AND REMAIN INSIDE A FENCED AREA.
6. ALL TOOLS, EQUIPMENT AND MATERIALS USED DAILY SHALL BE RETURNED TO THE STAGING AREA AT THE END OF
THE WORK SHIFT AND BE SECURED IN A GANG BOX OR SECURED STORAGE DEVICE WITHIN THE STAGING AREA.
7. EQUIPMENT ENGINES SHALL NOT BE LEFT ON IDOL TO AVOID EXHAUST FUMES FROM ENTERING THE BUILDINGS AND
SURROUNDING AREAS.
8. A SCRUBBER KIT SHALL BE USED ON ALL POWER EQUIPMENT.
9. CONTRACTOR IS ALLOW FOUR WEEKS TO COMPLETE A BUILDING AND WILL NOT BE ALLOWED TO BEGIN WORK ON
ANOTHER BUILDING UNTIL THE CURRENT ONE IS COMPLETED. IF THE CONTRACTOR HAS TWO CREWS ON SITE THEY
MAY WORK, AT THE COR'S DISCRESSION, ON TWO BUILDINGS SIMULTANEOUSLY.
10. AT THE COMPLETION OF WORK AT ROOFS WITH ATTICS BELOW, THE CONTRACTOR IS TO CLEAN THE ATTIC AND
REPAIR ANY DAMAGE DONE DURING THE REROOF.
11. AT THE COMPLETION OF WORK AT EACH ROOF SECTION, ALL DEBRIS MUST BE REMOVED FROM THE SITE, SCAFFOLDING, CONSTRUCTION BARRIERS/FENCING AND OVERHEAD PROTECTION REMOVED. ANY LANDSCAPE REPAIRS/REGRADING AND RESEEDING TO BE COMPLETED BEFORE BEGINNING WORK ON NEW ROOF AREA.
NOT IN CONTRACT (N.I.C.)
SCOPE OF WORK
BAMBOO GROUND PROTECTION MAT
BLDG
CONSTRUCTION FENCING
OVERHEAD PROTECTION
@ WALKWAYS, TYP.
SCAFFOLDING
OVERHEAD PROTECTION @
PLANTER BOXES, TYP.
OVERHEAD PROTECTION @
MECHANICAL UNITS, TYP.
OVERHEAD PROTECTION @
BIRD CAGE
OVERHEAD PROTECTION
@ ROOF BELOW, TYP.
OVERHEAD PROTECTION
@ ROOF BELOW, TYP.
OVERHEAD PROTECTION
@ WALKWAYS, TYP.
PROTECT ROOF & AWNING BELOW WORK AREA
OVERHEAD PROTECTION
@ WALKWAYS, TYP.
CONSTRUCTION FENCING
CONSTRUCTION FENCING
SCAFFOLDING
OVERHEAD PROTECTION
@ WALKWAYS, TYP.
SCAFFOLDING 2
GI009
MAINTAIN OPEN PATHWAY FOR
BUILDING EXITING
DUMPSTER
PUBLIC USE OF SIDEWALKS MUST BE
MAINTAINED DURING CONSTRUCTION
BAMBOO GROUND PROTECTION MAT TO BE PROVIDED AT ALL NONHARD
SURFACE VEHICLE TRAFFIC AREAS AND DUMPSTER LOCATIONS
PUBLIC USE OF RAMP MUST BE
MAINTAINED DURING CONSTRUCTION
ASPHALT PARKING LOT
ASPHALT DRIVE, M
AINTAIN
ACCESS FOR DELIVERIES
NO HEAVY EQUIPMENT SHALL BE
USED FOR MOVING DEBRIS FROM
SOUTH SIDE TO DUMPSTER
EXISTING POLE MOUNTED SIGNAGE
OVERHEAD PROTECTION @ DOORS
MAINTAIN ACCESS TO LOW
PRESSURE OXYGEN INLET PANEL
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT / ENGINEER A/E Seal:
321 4 5 6 7 8 9 10 o n e e ig h th in c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s in c h o n e f o o t o n e h a lf in c h o n e f o o t th re e q u a rt e rs in c h o n e f o o t o n e in c h o n e f o o t o n e a n d o n e h a lf in c h e s o n e f o o t th re e in c h e s o n e f o o t
STONE GROUP ARCHITECTS, INC.
1001 TWELVE OAKS CENTER DRIVE, SUITE 1025
WAYZATA, MN 55391
952-476-5850
P.O.C.: JESSE KLANKOWSKI
C
S G
A R e v it L o c a l\
-1
-3
S t C lo u d
R e p a ir R o o f S y s te m s R je s s e b D
Q
Y .r v t
/2
/2
:4
:0
A
M
GI007
SITE SAFETY PLAN - BUILDING 51 REPAIR ROOF SYSTEMS
SAINT CLOUD, MN
MULTIPLE
APRIL 28, 2020 Checker Author
FINAL CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
VA #656-19-314
NORTH
1" = 20'-0"
SAFETY PLAN - BUILDING 51
Revision# Description Date:
CONSTRUCTED AT THESE LOCATIONS AND EXTEND AWAY FROM THE BUILDING TO THE CONSTRUCTION BOUNDARY
FENCING.
2. ALL MECHANICAL EQUIPMENT AND LANDSCAPING IS TO BE PROTECTED FROM FALLING DEBRIS AND DUST.
PROTECTION COULD INCLUDE BUT IS NOT LIMITED TO TEMPORARY FRAMED STRUCTURES AND ROOF NETS.
CONTRACTOR IS RESPONSIBLE FOR CREATING AND SUBMITTING TO COR FOR APPROVAL THE FINAL SITE SAFETY
PLAN PRIOR TO ANY DEMOLITION WORK.
3. CONTRACTOR IS RESPONSIBLE FOR PROTECTING THE BUILDING AND IT'S DAILY OPERATIONS FROM WATER INTRUSION. PRIOR TO BEGINNING EACH PHASE, CONTRACTOR IS TO COORDINATE WITH COR THE AMOUNT OF DEMOLITION ALLOWED AT THAT TIME BASED ON LOCAL WEATHER REPORTS AND THE ESTIMATED TIME TO COMPLETE WORK WITHIN THAT PHASE. COVERAGE WITH WATER PROOF FABRICS OF EXPOSED ROOF AREAS DUE TO DEMOLITION SHALL BE COORDINATED DAILY WITH COR. SEE SPEC. SECTION 07 01 50.19 PREPARATION FOR RE-
ROOFING.
4. CONTRACTOR MAY BE ASKED FREQUENTLY TO MOVE THEIR DEBRIS VEHICLES IN ORDER TO ACCOMMODATE THE
DAILY OPERATIONS OF THE FACILITY.
5. DUMPSTERS MUST ALWAYS BE COVERED WITH CANVAS OR SIMILAR COVER AND REMAIN INSIDE A FENCED AREA.
6. ALL TOOLS, EQUIPMENT AND MATERIALS USED DAILY SHALL BE RETURNED TO THE STAGING AREA AT THE END OF
THE WORK SHIFT AND BE SECURED IN A GANG BOX OR SECURED STORAGE DEVICE WITHIN THE STAGING AREA.
7. EQUIPMENT ENGINES SHALL NOT BE LEFT ON IDOL TO AVOID EXHAUST FUMES FROM ENTERING THE BUILDINGS AND
SURROUNDING AREAS.
8. A SCRUBBER KIT SHALL BE USED ON ALL POWER EQUIPMENT.
9. CONTRACTOR IS ALLOW FOUR WEEKS TO COMPLETE A BUILDING AND WILL NOT BE ALLOWED TO BEGIN WORK ON
ANOTHER BUILDING UNTIL THE CURRENT ONE IS COMPLETED. IF THE CONTRACTOR HAS TWO CREWS ON SITE THEY
MAY WORK, AT THE COR'S DISCRESSION, ON TWO BUILDINGS SIMULTANEOUSLY.
10. AT THE COMPLETION OF WORK AT ROOFS WITH ATTICS BELOW, THE CONTRACTOR IS TO CLEAN THE ATTIC AND
REPAIR ANY DAMAGE DONE DURING THE REROOF.
11. AT THE COMPLETION OF WORK AT EACH ROOF SECTION, ALL DEBRIS MUST BE REMOVED FROM THE SITE, SCAFFOLDING, CONSTRUCTION BARRIERS/FENCING AND OVERHEAD PROTECTION REMOVED. ANY LANDSCAPE REPAIRS/REGRADING AND RESEEDING TO BE COMPLETED BEFORE BEGINNING WORK ON NEW ROOF AREA.
NOT IN CONTRACT (N.I.C.)
SCOPE OF WORK
BAMBOO GROUND PROTECTION MAT
B L
D G
BLDG 37
B L
D G
CONSTRUCTION FENCING
COORDINATE NUMBER OF PARKING
STALL CLOSURES WITH COR.
MAXIMUM (5) DAY CLOSURE FOR STALLS, TYP.
CONSTRUCTION FENCING
OVERHEAD PROTECTION @
OVERHEAD DOORS, MAINTAIN
DOOR ACCESS @ AT ALL TIMES
ASPHALT DRIVEWAY ASPHALT DRIVEWAY
ASPHALT PARKING LOT
ASPHALT PARKING LOT
ASPHALT PARKING LOT
GRASS
CONSTRUCTION FENCING
SCAFFOLDING
WATER TOWER
DESIGNATE (4) TEMPORARY HANDICAP
PARKING STALLS, COORDINATE TEMP.
SIGNAGE WITH VA
WORK ON BUILDING 30, 37 & 69 IS NOT TO BE DONE
SIMULTANEOUSLY. COORDINATE SEQUENCING OF WORK
AND NUMBER OF PARKING STALLS TO BE CLOSED DURING
THE WORK FOR EACH BUILDING WITH THE COR. (5) DAY
MAXIMUM CLOSURE FOR PARKING STALLS, TYP.
COORDINATE NUMBER OF PARKING
STALL CLOSURES WITH COR.
MAXIMUM (5) DAY CLOSURE FOR STALLS, TYP.
CONSTRUCTION FENCING
CONSTRUCTION FENCING
SCAFFOLDING
COORDINATE NUMBER OF PARKING
STALL CLOSURES WITH COR.
MAXIMUM (5) DAY CLOSURE FOR STALLS, TYP.
D U
M P
S T
E R
DUMPSTER DUMPSTER
OVERHEAD PROTECTION @
DOOR, MAINTAIN
DOOR ACCESS @ AT ALL TIMES
OVERHEAD PROTECTION @
DOOR, MAINTAIN DOOR ACCESS
@ ALL TIMES
OVERHEAD PROTECTION @
OVERHEAD DOORS, MAINTAIN
DOOR ACCESS @ AT ALL TIMES
BLDG
CONSTRUCTION FENCING
SCAFFOLDING
CONSTRUCTION FENCING
SCAFFOLDING
CONSTRUCTION FENCING
SCAFFOLDING
ASPHALT DRIVE
GRASS
CRUSHED ROCK
D U
M P
S T
E R
MAINTAIN OPEN PATHWAY
FOR BUILDING EXITING
SCAFFOLDING W/OVERHEAD
PROTECTION @ WALKWAYS, TYP.
CRUSHED ROCK
BAMBOO GROUND PROTECTION MAT TO BE
PROVIDED AT ALL NONHARD SURFACE VEHICLE
TRAFFIC AREAS AND DUMPSTER LOCATIONS
OVERHEAD PROTECTION
@ ACCESS DOORS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT / ENGINEER A/E Seal:
321 4 5 6 7 8 9 10 o n e e ig h th in c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s in c h o n e f o o t o n e h a lf in c h o n e f o o t th re e q u a rt e rs in c h o n e f o o t o n e in c h o n e f o o t o n e a n d o n e h a lf in c h e s o n e f o o t th re e in c h e s o n e f o o t
STONE GROUP ARCHITECTS, INC.
1001 TWELVE OAKS CENTER DRIVE, SUITE 1025
WAYZATA, MN 55391
952-476-5850
P.O.C.: JESSE KLANKOWSKI
C
S G
A R e v it L o c a l\
-1
-3
S t C lo u d
R e p a ir R o o f S y s te m s R je s s e b D
Q
Y .r v t
/2
/2
:4
:1
A
M
GI008
SITE SAFETY PLAN - BUILDINGS
30, 37, 69 & 95
REPAIR ROOF SYSTEMS
SAINT CLOUD, MN
MULTIPLE
APRIL 28, 2020 Checker Author
FINAL CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
VA #656-19-314
1" = 20'-0"
SAFETY PLAN - BUILDING 30, 37 & 69
NORTH
1" = 20'-0"
SAFETY PLAN - BUILDING 95
NORTH
Revision# Description Date:
CONSTRUCTED AT THESE LOCATIONS AND EXTEND AWAY FROM THE BUILDING TO THE CONSTRUCTION BOUNDARY
FENCING.
2. ALL MECHANICAL EQUIPMENT AND LANDSCAPING IS TO BE PROTECTED FROM FALLING DEBRIS AND DUST.
PROTECTION COULD INCLUDE BUT IS NOT LIMITED TO TEMPORARY FRAMED STRUCTURES AND ROOF NETS.
CONTRACTOR IS RESPONSIBLE FOR CREATING AND SUBMITTING TO COR FOR APPROVAL THE FINAL SITE SAFETY
PLAN PRIOR TO ANY DEMOLITION WORK.
3. CONTRACTOR IS RESPONSIBLE FOR PROTECTING THE BUILDING AND IT'S DAILY OPERATIONS FROM WATER INTRUSION. PRIOR TO BEGINNING EACH PHASE, CONTRACTOR IS TO COORDINATE WITH COR THE AMOUNT OF DEMOLITION ALLOWED AT THAT TIME BASED ON LOCAL WEATHER REPORTS AND THE ESTIMATED TIME TO COMPLETE WORK WITHIN THAT PHASE. COVERAGE WITH WATER PROOF FABRICS OF EXPOSED ROOF AREAS DUE TO DEMOLITION SHALL BE COORDINATED DAILY WITH COR. SEE SPEC. SECTION 07 01 50.19 PREPARATION FOR RE-
ROOFING.
4. CONTRACTOR MAY BE ASKED FREQUENTLY TO MOVE THEIR DEBRIS VEHICLES IN ORDER TO ACCOMMODATE THE
DAILY OPERATIONS OF THE FACILITY.
5. DUMPSTERS MUST ALWAYS BE COVERED WITH CANVAS OR SIMILAR COVER AND REMAIN INSIDE A FENCED AREA.
6. ALL TOOLS, EQUIPMENT AND MATERIALS USED DAILY SHALL BE RETURNED TO THE STAGING AREA AT THE END OF
THE WORK SHIFT AND BE SECURED IN A GANG BOX OR SECURED STORAGE DEVICE WITHIN THE STAGING AREA.
7. EQUIPMENT ENGINES SHALL NOT BE LEFT ON IDOL TO AVOID EXHAUST FUMES FROM ENTERING THE BUILDINGS AND
SURROUNDING AREAS.
8. A SCRUBBER KIT SHALL BE USED ON ALL POWER EQUIPMENT.
9. CONTRACTOR IS ALLOW FOUR WEEKS TO COMPLETE A BUILDING AND WILL NOT BE ALLOWED TO BEGIN WORK ON
ANOTHER BUILDING UNTIL THE CURRENT ONE IS COMPLETED. IF THE CONTRACTOR HAS TWO CREWS ON SITE THEY
MAY WORK, AT THE COR'S DISCRESSION, ON TWO BUILDINGS SIMULTANEOUSLY.
10. AT THE COMPLETION OF WORK AT ROOFS WITH ATTICS BELOW, THE CONTRACTOR IS TO CLEAN THE ATTIC AND
REPAIR ANY DAMAGE DONE DURING THE REROOF.
11. AT THE COMPLETION OF WORK AT EACH ROOF SECTION, ALL DEBRIS MUST BE REMOVED FROM THE SITE, SCAFFOLDING, CONSTRUCTION BARRIERS/FENCING AND OVERHEAD PROTECTION REMOVED. ANY LANDSCAPE REPAIRS/REGRADING AND RESEEDING TO BE COMPLETED BEFORE BEGINNING WORK ON NEW ROOF AREA.
NOT IN CONTRACT (N.I.C.)
SCOPE OF WORK
BAMBOO GROUND PROTECTION MAT
BLDG
ASPHALT DRIVEWAY
ASPHALT PARKING LOT
GRAVEL
CONSTRUCTION FENCING
SCAFFOLDING
GRASSGRASS
CONCRETE APRON
GRASS
OVERHEAD PROTECTION
@ SERVICE DOOR &
OVERHEAD DOORS
CONSTRUCTION FENCING
SCAFFOLDING
GI009
OVERHEAD DOOR ACCESS
MUST BE MAINTAINED
OVERHEAD DOOR ACCESS
MUST BE MAINTAINED
D U
M P
S T
E R
BAMBOO GROUND PROTECTION MAT
TO BE PROVIDED AT ALL NONHARD
SURFACE VEHICLE TRAFFIC AREAS AND
DUMPSTER LOCATIONS
CONSTRUCTION FENCING - 7FT TALL MIN.
E X
T E
N D
S C
A F
F O
LD
A
M
IN
. 6 '-0
A
B O
V E
R O
O F
E D
G E
S C
A F
F O
LD
H
E
IG
H T
V A
R
IE
S B
Y B
U
IL
D
IN
G
INWARD SIDE SCAFFOLD PROTECTION
-2"x6" FRAMING ATTACHED TO SCAFFOLD
AT 3'-0" VERTICAL INCREMENTS
-FIRE RATED KNITTED MESH
CONSTRUCTION DEBRIS NETTING
FIRMLY ATTACHED TO FRAMING
-REPAIR ALL DAMAGE DAILY
GRADE CONDITIONS VARY
SEE SITE SAFETY PLANS
6'-0"
SLOPED DEBRIS PROTECTION
-3/4" PLYWOOD
-2"x8" JOISTS ATTACHED TO BUILDING
-DEBRIS NETTING ATTACHED TO
UNDERSIDE OF JOISTS
WORK LEVEL DECK
-FULL WIDTH ALUMINUM SCAFFOLD
PLANK
SCAFFOLD BRACING TO MASONRY
-2"x6" FRAMING ATTACHED AT MASONRY
JOINTS
-SCAFFOLD WALL ANCHORING
ATTACHED TO FRAMING AT EACH
VERTICAL SECTION
OUTWARD SIDE SCAFFOLD PROTECTION
-2"x6" FRAMING ATTACHED TO SCAFFOLD
AT 3'-0" VERTICAL INCREMENTS
-FIRE RATED KNITTED MESH
CONSTRUCTION DEBRIS NETTING
FIRMLY ATTACHED TO FRAMING
-REPAIR ALL DAMAGE DAILY
OUTWARD SIDE SCAFFOLD PROTECTION
EXTENDS OVER TOP OF SCAFFOLD
CONSTRUCTION FENCING - 7FT TALL MIN.
GRADE CONDITIONS VARY
SEE SITE SAFETY PLANS
E X
T E
N D
S C
A F
F O
LD
A
M
IN
. 6 '-0
A
B O
V E
R O
O F
E D
G E
S C
A F
F O
LD
H
E
IG
H T
V A
R
IE
S B
Y B
U
IL
D
IG
6'-0"
INWARD SIDE SCAFFOLD PROTECTION
-2"x6" FRAMING ATTACHED TO SCAFFOLD
AT 3'-0" VERTICAL INCREMENTS
-FIRE RATED KNITTED MESH
CONSTRUCTION DEBRIS NETTING
FIRMLY ATTACHED TO FRAMING
-REPAIR ALL DAMAGE DAILY
SLOPED DEBRIS PROTECTION
-3/4" PLYWOOD
-2"x8" JOISTS ATTACHED TO BUILDING
-DEBRIS NETTING ATTACHED TO
UNDERSIDE OF JOISTS
WORK LEVEL DECK
-FULL WIDTH ALUMINUM SCAFFOLD
PLANK
SCAFFOLD BRACING TO MASONRY
-2"x6" FRAMING ATTACHED AT MASONRY
JOINTS
-SCAFFOLD WALL ANCHORING
ATTACHED TO FRAMING AT EACH
VERTICAL SECTION
OUTWARD SIDE SCAFFOLD PROTECTION
-2"x6" FRAMING ATTACHED TO SCAFFOLD
AT 3'-0" VERTICAL INCREMENTS
-FIRE RATED KNITTED MESH
CONSTRUCTION DEBRIS NETTING
FIRMLY ATTACHED TO FRAMING
-REPAIR ALL DAMAGE DAILY
OUTWARD SIDE SCAFFOLD PROTECTION
EXTENDS OVER TOP OF SCAFFOLD
SCAFFOLD DEBRIS SCREEN -
OUTWARD SIDE OF SCAFFOLD
GRADE CONDITIONS VARY
SEE SITE SAFETY PLANS
STEEL SCAFFOLD STRUCTURE
ACROSS PATHWAY
STEEL DECKING SPANNING
LENGTH OF PATHWAY
M
IN
. 7 '-0
U
N D
E R
N E
A T
H
MIN. 6' WIDE @ 4' HIGH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT / ENGINEER A/E Seal:
321 4 5 6 7 8 9 10 o n e e ig h th in c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s in c h o n e f o o t o n e h a lf in c h o n e f o o t th re e q u a rt e rs in c h o n e f o o t o n e in c h o n e f o o t o n e a n d o n e h a lf in c h e s o n e f o o t th re e in c h e s o n e f o o t
STONE GROUP ARCHITECTS, INC.
1001 TWELVE OAKS CENTER DRIVE, SUITE 1025
WAYZATA, MN 55391
952-476-5850
P.O.C.: JESSE KLANKOWSKI
C
S G
A R e v it L o c a l\
-1
-3
S t C lo u d
R e p a ir R o o f S y s te m s R je s s e b D
Q
Y .r v t
/2
/2
:4
:1
A
M
GI009
SITE SAFETY PLAN - BUILDING
100, SECTIONS & DETAILS
REPAIR ROOF SYSTEMS
SAINT CLOUD, MN
MULTIPLE
APRIL 28, 2020 Checker Author
FINAL CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
VA #656-19-314
1" = 20'-0"
SAFETY PLAN - BUILDING 100
NORTH
1/2" = 1'-0"
SECTION - SCAFFOLD AT FLAT ROOF
1/2" = 1'-0"
SECTION - SCAFFOLD AT PITCHED ROOF
1/2" = 1'-0"
DETAIL @ OVERHEAD
PROTECTION-PEOPLE
Revision# Description Date:
3 3
14 14
EXISTING ROOF TO REMAIN
E X
IS
T
IN
G
R O
O F
T O
R E
M A
IN
EXISTING ROOF TO REMAIN
EXISTING ROOF TO REMAIN
E X
IS
T
IN
G
R O
O F
T O
R E
M A
IN
EXISTING ROOF TO REMAIN
E X
IS
T
IN
G
R O
O F
T O
R E
M A
IN
E X
IS
T
IN
G
R O
O F
T O
R E
M A
IN
E X
IS
T
IN
G
R O
O F
T O
R E
M A
IN
EXISTING ROOF TO REMAIN
EXISTING ROOF TO REMAIN
E X
IS
T
IN
G
R O
O F
T O
R E
M A
IN
E X
IS
T
IN
G
R O
F
T
R
E M
A
IN CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS PRIOR TO WORK BEGINNING.
THE CONTRACTOR IS RESPONSIBLE FOR INFORMING THE ARCHITECT OF ANY
CONDITIONS THAT DIFFER FROM THE INFORMATION INDICATED IN THE DRAWINGS.
A.
GENERAL DEMOLITION NOTES:
PROTECT ALL EXISTING BUILDING COMPONENTS WHICH ARE TO REMAIN. REPAIR ANY
DAMAGED AREAS AS REQUIRED TO RETURN THEM TO THEIR ORIGINAL CONDITION.
B.
VERIFY EXTENT OF DEMOLITION WORK WITH INFORMATION SHOWN IN THE
DRAWINGS AND WORK THAT IS NOT SHOWN AND MAY BE REQUIRED TO COMPLETE
THE INTENDED WORK.
C.
ALL WORK SHALL COMPLY WITH REQUIRED LOCAL CODES. CONTRACTOR IS
RESPONSIBLE FOR OBTAINING REQUIRED PERMITS AND INSPECTIONS FOR ALL
WORK ASSOCIATED WITH THIS CONTRACT.
D.
CONTRACTOR SHALL REPAIR ALL DISTURBED AREAS AS REQUIRED TO MATCH
SURROUNDING EXISTING FINISHES NOT DISTURBED.
E.
F.
G.
H.
I.
J.
IN EXISTING AREAS, RENOVATION AND DEMOLITION WORK SHALL BE ACCOMPLISHED
WITH MINIMAL DISRUPTION TO OPERATIONS. IF REQUIRED, THE OWNER RESERVES THE
RIGHT TO TEMPORARILY STOP WORK OF SPECIFIC CONSTRUCTION OPERATIONS
SHOULD THE OWNER IDENTIFY AN EMERGENCY OR DANGER EXISTS TO THE WELFARE
OF THE OCCUPANTS ON ACCOUNT OF SUCH WORK OR OPERATIONS.
CONTRACTOR SHALL REMOVE AND DISPOSE OF ALL MATERIAL IN A LEGAL MANNER
NOT SCHEDULED FOR REUSE UNDER THIS PROJECT.
CONTRACTOR IS RESPONSIBLE FOR ENSURING ALL DUMPSTERS ARE MIN. 30 FEET
AWAY FROM COMBUSTIBLES, REF. NFPA 241 & DIVISION 1 OF THE VA
SPECIFICATION.
CONTRACTOR CAN INSTALL ENCLOSED CHUTES THAT LEAD DIRECTLY TO THE
DUMPSTER. CONTRACTOR IS NOT ALLOWED TO THROW DEBRIS FROM THE ROOF
TO THE GROUND.
MESH SHALL BE ATTACHED TO BOTH SIDES OF SCAFFOLDING TO PREVENT
MATERIALS/DEBRIS FROM BLOWING AWAY.
NOT IN CONTRACT (N.I.C.)
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT / ENGINEER A/E Seal:
321 4 5 6 7 8 9 10 o n e e ig h th in c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s in c h o n e f o o t o n e h a lf in c h o n e f o o t th re e q u a rt e rs in c h o n e f o o t o n e in c h o n e f o o t o n e a n d o n e h a lf in c h e s o n e f o o t th re e in c h e s o n e f o o t
STONE GROUP ARCHITECTS, INC.
1001 TWELVE OAKS CENTER DRIVE, SUITE 1025
WAYZATA, MN 55391
952-476-5850
P.O.C.: JESSE KLANKOWSKI
C
S G
A R e v it L o c a l\
-1
-3
S t C lo u d
R e p a ir R o o f S y s te m s R je s s e b D
Q
Y .r v t
/2
/2
:4
:2
A
M
AD101
ROOF DEMOLITION PLAN -
BUILDING 1
REPAIR ROOF SYSTEMS
SAINT CLOUD, MN
MULTIPLE
APRIL 28, 2020 Checker Author
FINAL CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
VA #656-19-314
NORTH
1/8" = 1'-0"
ROOF DEMOLITION PLAN - BUILDING 1
DEMO SCHEDULE - ROOF PLAN
1 REMOVE EXISTING ROOF SYSTEM IN IT'S ENTIRETY TO EXISTING SUBSTRATE.
2 REMOVE EXISTING GUTTER.
3 REMOVE EXISTING SCUPPER.
4 REMOVE EXISTING DOWNSPOUT.
5 REMOVE EXISTING GRAVEL STOP.
6 REMOVE EXISTING FASCIA.
7 REMOVE EXISTING FASCIA AND SOFFIT
8 REMOVE EXISTING FLASHING.
9 REMOVE EXISTING STEP FLASHING.
10 REMOVE EXISTING VALLEY FLASHING.
11 REMOVE EXISTING FLASHING, TERMINATION BAR AND CAULK
12 REMOVE EXISTING ASPHALT SHINGLES AND UNDERLAYMENT IN AREAS SHOWN TO ALLOW PROPER
INSTALLATION/TIE-IN WITH NEW EPDM MEMBRANE.
13 REMOVE EXISTING PIPE COVER, DRAWBAND AND FLASHING AT PIPE PENETRATION
14 REMOVE EXISTING FLASHING AND TURBINE ATTIC VENT.
15 REMOVE EXISTING ROOF VENT.
16 REMOVE ROOF MEMBRANE FROM EQUIPMENT CURB
17 TEMPORARILY RELOCATE COOLING UNIT, POWER POLE & JUNCTION BOX TO BLDG 95 FLAT ROOF, EXTEND POWER AND LINES AS NEEDED TO KEEP UNIT OPERATIONAL.
18 REMOVE ROOF MEMBRANE AND KNEE WALL, INFILL ROOF SHEATHING W/LIKE CONSTRUCTION
19 SALVAGE EXISTING METAL PANEL FOR RE-INSTALLATION AFTER PROPER LAPPING OF WEATHER
BARRIER, ICE & WATER WITH NEW STEP OR CONTINUOUS FLASHING
1/8" = 1'-0"
ROOF DEMOLITION PLAN - BUILDING 1
ANNEX
Revision# Description Date:
8 8
9 9
6 6
14 14
E X
IS
T
IN
G
R O
O F
T O
R E
M A
IN
E X
IS
T
IN
G
R O
O F
T O
R E
M A
IN
E X
IS
T
IN
G
R O
O F
T O
R E
M A
IN
CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS PRIOR TO WORK BEGINNING.
THE CONTRACTOR IS RESPONSIBLE FOR INFORMING THE ARCHITECT OF ANY
CONDITIONS THAT DIFFER FROM THE INFORMATION INDICATED IN THE DRAWINGS.
A.
GENERAL DEMOLITION NOTES:
PROTECT ALL EXISTING BUILDING COMPONENTS WHICH ARE TO REMAIN. REPAIR ANY
DAMAGED AREAS AS REQUIRED TO RETURN THEM TO THEIR ORIGINAL CONDITION.
B.
VERIFY EXTENT OF DEMOLITION WORK WITH INFORMATION SHOWN IN THE
DRAWINGS AND WORK THAT IS NOT SHOWN AND MAY BE REQUIRED TO COMPLETE
THE INTENDED WORK.
C.
ALL WORK SHALL COMPLY WITH REQUIRED LOCAL CODES. CONTRACTOR IS
RESPONSIBLE FOR OBTAINING REQUIRED PERMITS AND INSPECTIONS FOR ALL
WORK ASSOCIATED WITH THIS CONTRACT.
D.
CONTRACTOR SHALL REPAIR ALL DISTURBED AREAS AS REQUIRED TO MATCH
SURROUNDING EXISTING FINISHES NOT DISTURBED.
E.
F.
G.
H.
I.
J.
IN EXISTING AREAS, RENOVATION AND DEMOLITION WORK SHALL BE ACCOMPLISHED
WITH MINIMAL DISRUPTION TO OPERATIONS. IF REQUIRED, THE OWNER RESERVES THE
RIGHT TO TEMPORARILY STOP WORK OF SPECIFIC CONSTRUCTION OPERATIONS
SHOULD THE OWNER IDENTIFY AN EMERGENCY OR DANGER EXISTS TO THE WELFARE
OF THE OCCUPANTS ON ACCOUNT OF SUCH WORK OR OPERATIONS.
CONTRACTOR SHALL REMOVE AND DISPOSE OF ALL MATERIAL IN A LEGAL MANNER
NOT SCHEDULED FOR REUSE UNDER THIS PROJECT.
CONTRACTOR IS RESPONSIBLE FOR ENSURING ALL DUMPSTERS ARE MIN. 30 FEET
AWAY FROM COMBUSTIBLES, REF. NFPA 241 & DIVISION 1 OF THE VA
SPECIFICATION.
CONTRACTOR CAN INSTALL ENCLOSED CHUTES THAT LEAD DIRECTLY TO THE
DUMPSTER. CONTRACTOR IS NOT ALLOWED TO THROW DEBRIS FROM THE ROOF
TO THE GROUND.
MESH SHALL BE ATTACHED TO BOTH SIDES OF SCAFFOLDING TO PREVENT
MATERIALS/DEBRIS FROM BLOWING AWAY.
NOT IN CONTRACT (N.I.C.)
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT / ENGINEER A/E Seal:
321 4 5 6 7 8 9 10 o n e e ig h th in c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s in c h o n e f o o t o n e h a lf in c h o n e f o o t th re e q u a rt e rs in c h o n e f o o t o n e in c h o n e f o o t o n e a n d o n e h a lf in c h e s o n e f o o t th re e in c h e s o n e f o o t
STONE GROUP ARCHITECTS, INC.
1001 TWELVE OAKS CENTER DRIVE, SUITE 1025
WAYZATA, MN 55391
952-476-5850
P.O.C.: JESSE KLANKOWSKI
C
S G
A R e v it L o c a l\
-1
-3
S t C lo u d
R e p a ir R o o f S y s te m s R je s s e b D
Q
Y .r v t
/2
/2
:4
:3
A
M
AD102
ROOF DEMOLITION PLAN -
BUILDING 2
REPAIR ROOF SYSTEMS
SAINT CLOUD, MN
MULTIPLE
APRIL 28, 2020 Checker Author
FINAL CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
VA #656-19-314
NORTH
1/8" = 1'-0"
ROOF DEMOLITION PLAN - BUILDING 2
DEMO SCHEDULE - ROOF PLAN
1 REMOVE EXISTING ROOF SYSTEM IN IT'S ENTIRETY TO EXISTING SUBSTRATE.
2 REMOVE EXISTING GUTTER.
3 REMOVE EXISTING SCUPPER.
4 REMOVE EXISTING DOWNSPOUT.
5 REMOVE EXISTING GRAVEL STOP.
6 REMOVE EXISTING FASCIA.
7 REMOVE EXISTING FASCIA AND SOFFIT
8 REMOVE EXISTING FLASHING.
9 REMOVE EXISTING STEP FLASHING.
10 REMOVE…