Clarification Regarding Scaffolding for Repair 12 Sep 2023.pdf

PDF 93 KB Posted

Attached to
Z1DA--656-19-314, Repair/Replace Roof Systems 2019 36C263-23-AP-4135
Solicitation number
36C26323B0003
Issued by

About this file

This document provides clarification regarding scaffolding requirements for a roof repair and replacement project at the St. Cloud VA Health Care System. The general contractor shall install a scaffolding system to provide access for contractors and VA staff during debris removal and to protect existing structures. Plywood debris ramps must remain in place at all times in non-working areas. Ramps may also be installed under roof overhangs as needed. The contractor is responsible for repairing any impacts to existing conditions from scaffold installation, such as tuckpointing at connection points. All lumber used must be noncombustible. The related federal contract opportunity is solicitation number 36C26323B0003 for roof system repairs and replacements in 2019 at the St. Cloud VA facility under Department of Veterans Affairs contract 36C263-23-AP-4135.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Clarification Regarding Scaffolding for Repair/Replace Roof Systems 2019, St

Cloud VA Health Care System.

Project: 656-19-314

The following information is provided to clarify the intent the St Cloud VA Health Care System use of scaffolding:

The scaffolding system as designed general intent is to provide access for contractors and VA staff, for debris management, and for existing condition protection. The general contractor shall comply with general intent of scaffold design in the contract while coordinating the demo and installation of facia, ice shields, water shields, etc. The plywood or similar debris ramps shall be installed at all times in areas not being immediately being worked on. Debris ramp may be installed under the facia/roof overhang to accommodate contractor work and sequencing.

Any impact to existing conditions shall be repaired by the contractor. Examples may include tuckpointing at scaffolding connection points or other means/methods impacts.

Any lumber used shall be noncombustible.