This document is a Tier II Sampling and Analysis Plan (SAP) for the Naval Weapons Industrial Reserve Plant (NWIRP) Bethpage Site 1 Soil Vapor Extraction Containment System (SVECS). The plan describes long-term environmental operation, maintenance, and monitoring activities for addressing volatile organic compound (VOC) contamination at a former industrial site in Bethpage, New York. The remediation system focuses on preventing offsite migration of contaminated soil vapors, with specific objectives including capturing soil vapor with trichloroethene (TCE) concentrations greater than 250 micrograms per cubic meter and other VOCs at higher concentrations.
The monitoring program includes monthly sampling of vapor process streams, quarterly soil vapor sampling from 18 soil vapor extraction wells, quarterly pressure readings from 18 soil vapor pressure monitors in residential areas, and annual winter soil vapor sampling from the off-site pressure monitors. The system targets nine VOCs of interest: TCE, PCE, 1,1,1-trichloroethane, and six other chlorinated compounds. The project is being conducted by KOMAN Government Solutions, LLC for the Naval Facilities Engineering Systems Command (NAVFAC) Mid-Atlantic, with oversight from New York State environmental agencies. The remediation will continue until monitoring data indicates that VOC migration has been sufficiently mitigated.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SAMPLING AND ANALYSIS PLAN
Operations, Maintenance, and Monitoring of the SVECS Site 1, Naval Weapons Industrial Reserve Plant
Bethpage, NY
Contract No. N40085-16-D-2288 Contract Task Order 4042
January 2023
Prepared for
Naval Facilities Engineering Systems Command Mid Atlantic
9324 Virginia Avenue Norfolk, VA 23511-3095
Prepared by
KOMAN Government Solutions, LLC 180 Gordon Drive, Suite 110
Exton, PA 19341
Tier II Sampling and Analysis Plan Title: Operation, Maintenance, and Monitoring Plan SAP Site Name/Project Name: NWIRP Bethpage Site 1 SVECS Version 1.0 Site Location: Bethpage, NY Revision Date: January 2023
Contract No N40085-16-D-2288 – 1 – KOMAN Government Solutions, LLC
Contract Task Order No. N4008517F4042 January 2023
Title and Approval Page (UFP-QAPP Manual Section 2.1 – Worksheet #1)
TIER II SAMPLING AND ANALYSIS PLAN
Operations, Maintenance, and Monitoring of the SVECS
Site 1, Naval Weapons Industrial Reserve Plant Bethpage, New York
January 2023 Prepared for:
Department of the Navy Naval Facilities Engineering Systems Command
Mid-Atlantic 9324 Virginia Ave
Norfolk, VA 23511-3095
Prepared by:
KOMAN Government Solutions, LLC
180 Gordon Drive, Suite 110 Exton, PA 19341
610-363-0601
Prepared under:
Contract Number N40085-16-D-2288 Task Order 4042
Review Signatures: Patrick Schauble KGS Program Manager/QAM
Date
Robert Gregory KGS Project Manager
Laurie Ekes KGS Project Chemist
Approval Signatures: Teresie Walker NAVFAC QAO/Chemist NAVFAC Atlantic
Date
30 January 2023
Robert Gregory Typewriter 30 January 2023
Robert Gregory Typewriter 30 January 2023
Tier�II�Sampling�and�Analysis�Plan� Title:�Operation,�Maintenance,�and�Monitoring�Plan�SAP� Site�Name/Project�Name:��NWIRP�Bethpage�Site�1�SVECS�� Version�1.0� Site�Location:��Bethpage,�NY� Revision�Date:�August�November�2022January�2023�
Contract�No�N40085-16-D-2288� –�1�–� KOMAN�Government�Solutions,�LLC�
Contract�Task�Order�No.�N4008517F4042� � August�November�2022January�2023�
Title�and�Approval�Page� � (UFP-QAPP�Manual�Section�2.1�–�Worksheet�#1)�
TIER�II�SAMPLING�AND�ANALYSIS�PLAN��
Operations,�Maintenance,�and�Monitoring�of�the�SVECS�
Site�1,�Naval�Weapons�Industrial�Reserve�Plant� Bethpage,�New�York�
January�2023August�November�2022�
Prepared�for:�
Department�of�the�Navy�� Naval�Facilities�Engineering�Systems�Command�
Mid-Atlantic� 9324�Virginia�Ave�
Norfolk,�VA�23511-3095�
Prepared�by:� KOMAN�Government�Solutions,�LLC�
180�Gordon�Drive,�Suite�110� Exton,�PA��19341� 610-363-0601�
Prepared�under:�
Contract�Number�N40085-16-D-2288� Task�Order�4042�
Review�Signatures:� Patrick�Schauble� KGS�Program�Manager/QAM�
Date�
� Robert�Gregory� KGS�Project�Manager�
Date�
� Laurie�Ekes� KGS�Project�Chemist��
Date�
Approval�Signatures:� Kenneth�BowersTeresie�Walker� NAVFAC�QAO/Chemist� NAVFAC�Mid-Atlantic�
Date�
WALKER.TERESIE.R.1
515870071
Digitally signed by
WALKER.TERESIE.R.1515870071
Date: 2023.01.30 11:40:23 -05'00'
Contract No N40085-16-D-2288 – 2 – KOMAN Government Solutions, LLC
Contract No N40085-16-D-2288 – 3 – KOMAN Government Solutions, LLC
EXECUTIVE SUMMARY
This Tier II Uniform Federal Policy (UFP) Sampling and Analysis Plan (SAP) describes sampling and monitoring activities which are performed as part of the Long-Term Environmental Operation, Maintenance, and Monitoring (OM&M) activities associated with the Soil Vapor Extraction Containment System (SVECS) at the Naval Weapons Industrial Reserve Plant (NWIRP), Installation Restoration (IR) Site 1 – Former Drum Marshalling Area in Bethpage, New York.
This UFP-SAP was prepared by KOMAN Government Solutions, LLC (KGS) on behalf of Naval Facilities Engineering Systems Command (NAVFAC) Mid-Atlantic under Contract Number N40085-16- D-2288, Task Order Number N4008517F4042. This UFP-SAP is required to update and consolidate sampling and analysis information provided in previously prepared documents, update current NAVFAC and prime contractor personnel information, update the analytical support laboratory, update the required analytical method, and include the addition of new vapor recovery wells.
NWIRP Bethpage is located in east central Nassau County, Long Island, New York, approximately 30 miles east of New York City. The Navy's property totaled approximately 109.5 acres and was formerly a Government-Owned Contractor-Operated (GOCO) facility that was operated by the Northrup Grumman Corporation (NG) until September 1998. NWIRP Bethpage is bordered on the north, west, and south by property owned, or formerly owned, by NG that covered approximately 605 acres, and, on the east, by a residential neighborhood.
Site 1 (Figures 1 and 2) lies within the fenced area of NWIRP Bethpage and is located east of Plant No.
3, west of 11th Street, and north of Plant 17 South.
Remedial Investigations conducted in the early 1990s identified volatile organic compound (VOC) contaminated soils and shallow groundwater at Site 1 that were contributing to a regional groundwater plume. To address this contamination, a Record of Decision (ROD) was prepared in 1995 that included in-situ treatment of VOCs, excavation and offsite disposal of soils contaminated with PCBs, and placement of a permeable cover to address other residual contaminants including cadmium, chromium, and VOCs.
Chlorinated solvents including trichloroethene (TCE), tetrachloroethene (PCE), and 1,1,1-trichloroethane (111TCA) were initially identified as the VOCs of interest in soil vapor at the site. Review of initial data by NAVFAC, the New York State Department of Environmental Conservation (NYSDEC), and the New York State Department of Health (NYDOH) indicated the need to monitor additional VOCs, consisting of 1,1-dichloroethane (11DCA), 1,1‐dichloroethene (11DCE), 1,2‐dichloroethane (12DCA), cis‐1,2‐ dichloroethene (C12DCE), trans‐1,2‐dichloroethene (T12DCE), and vinyl chloride and these constituents were added to the initial list of VOCs of interest, resulting in a total of nine. Concentrations of total VOCs greater than 1,000 micrograms per cubic meter (μg/m3) of soil vapor have been directly associated with Site 1 activities and historical environmental data, and based on preliminary screening, exceed guidelines established by NYDOH for subslab soil vapor concentrations. Of these chemicals, TCE is the primary VOC of concern. Addressing the detected concentrations of TCE in accordance with NYDOH guidance will address the other VOCs associated with the Site.
In response to the VOC impacts associated with the former activities at Site 1, the SVECS was established at the site. Implementation of the SVECS consists of soil vapor extraction, soil vapor pressure monitoring, and soil vapor treatment. Six soil vapor extraction well (SVEW) clusters, each consisting of an intermediate and deep well, were installed along the eastern boundary of the Site during calendar year 2009. In 2013, 18 soil vapor pressure monitors (SVPMs) were installed in off-site residential areas east and southeast of the SVEWs along 9th and 10th Streets and along Maple Avenue and Sycamore Avenue (Figure 3). The SVPMs are designed to monitor the effectiveness of the system in capturing and containing the contaminated soil vapors in the area east of Site 1. More recent monitoring data indicated the need for additional SVEWs within Site 1 and six additional deep SVEWs were installed
Contract No N40085-16-D-2288 – 4 – KOMAN Government Solutions, LLC during late 2021/early 2022 (Figure 3).
Each SVEW is piped below the ground to the Flow Monitoring Station (FMS), where flow, vacuum, and vapor quality can be monitored. The FMS consists of a Conex box located in the southeast corner of the Site. All the vapor lines collect into a single manifold within the FMS and from this location a single underground pipeline has been routed to the Treatment Building (Building 03-35) (Figure 3). The Treatment Building was established in an existing unoccupied building. The soil vapor treatment consists of moisture separation and off-gas treatment using vapor-phase granular activated carbon (VGAC) to remove the chlorinated VOCs.
The remedial objective for the SVECS is to prevent further off-site migration of VOC contaminated soil vapor and to the extent practical, capture contaminated soil vapor with a TCE concentration greater than 250 μg/m3, and PCE and 111TCA concentrations greater than 1000 μg/m3. A secondary objective of this project is to address soil vapor with a TCE concentration greater than 5 μg/m3.
The long-term monitoring (LTM) of the SVECS consists of the following work elements:
Monthly grab samples collected from the vapor phase treatment system influent and effluent, Quarterly soil vapor samples from the 18 SVEWs collected using Summa Canisters and analyzed for the nine VOCs of interest, Quarterly SVPM pressure readings in the off-site residential areas to the east and southeast of the Site, and
Annual (winter) soil vapor sampling from the 18 SVPMs using Summa canisters and the analysis of the nine VOCs of interest.
Operation of the SVECS will continue until the LTM data indicate that off-site migration of VOCs at levels greater than the guidelines established by NYDOH for subslab soil vapor concentrations has been mitigated, with the result that the soil vapor intrusion pathway has become incomplete. Consultation with NAVFAC and NYSDEC will precede any decision to terminate operation of the SVECS.
Contract No N40085-16-D-2288 – 5 – KOMAN Government Solutions, LLC
TABLE OF CONTENTS
Section Page No.
TITLE AND APPROVAL PAGE
LIST OF FIGURES
LIST OF APPENDICES
ACRONYMS AND ABBREVIATIONS
1.0 – PROJECT ORGANIZATIONAL CHART
2.0 – COMMUNICATION PATHWAYS
3.0 – PROJECT PLANNING SESSION PARTICIPANTS SHEET
4.0 – CONCEPTUAL SITE MODEL
5.0 – PROJECT QUALITY OBJECTIVES/SYSTEMATIC PLANNING PROCESS STATEMENTS ... 14
5.1 OVERALL PROJECT QUALITY OBJECTIVES
5.2 DATA USERS
5.3 DATA USES
5.4 DATA REQUIRED
5.5 PROJECT ACTION LIMITS
6.0 – SAMPLING AND ANALYTICAL STRATEGY
6.1 FIELD QUALITY CONTROL SAMPLES
7.0 – SAMPLING DESIGN AND RATIONALE
7.1 ON-SITE SAMPLING AND MONITORING FOR ROUTINE OPERATIONS
7.2 OFF-SITE SAMPLING AND MONITORING FOR ROUTINE OPERATIONS
8.0 – FIELD PROJECT IMPLEMENTATION (FIELD PROJECT INSTRUCTIONS)
8.1 FIELD PROJECT TASKS
Mobilization/Demobilization Site-Specific Health and Safety Training Field Decontamination Procedures Field Documentation Procedures
8.2 – FIELD SOPS REFERENCE TABLE
8.3 SAMPLE DETAILS TABLE
8.4 FIELD QUALITY CONTROL SAMPLE SUMMARY TABLE
8.5 REFERENCE LIMITS AND EVALUATION TABLES
8.6 ANALYTICAL SOP REFERENCE TABLE
9.0 – LABORATORY QC SAMPLE TABLES
10.0 – DATA VERIFICATION AND VALIDATION (STEPS I AND IIA/IIB) PROCESS TABLE
11.0 – REFERENCES
Contract No N40085-16-D-2288 – 6 – KOMAN Government Solutions, LLC
TABLE OF CONTENTS (continued)
LIST OF FIGURES
1-1 Site Location Map
1-2 Site 1 Area and Vicinity
1-3 Site Plan Existing Layout
LIST OF APPENDICES
A Laboratory DoD ELAP Accreditation and NYSDOH NELAC Certification Documents
B NYSDEC Air Permit Equivalent Documents
C Site-Specific Field Standard Operating Procedures
D Laboratory Analytical Standard Operating Procedure
Contract No N40085-16-D-2288 – 7 – KOMAN Government Solutions, LLC
ACRONYMS AND ABBREVIATIONS
11DCA 1,1-Dichloroethane
11DCE 1,1-Dichloroethene
111TCA 1,1,1-Trichloroethene
12DCE 1,2-Dichloroethene
124TCB 1,2,4-Trichlorobenzene
%R Percent Recovery
A Analytical
APP Accident Prevention Plan bgs Below Ground Surface
C12DCE Cis-1,2-Dichloroethene
CAS Chemical Abstract Service
CCV Continuing Calibration Value
COC Constituent of Concern
CoC Chain of Custody
DAR Division of Air Resources
DQI Data Quality Indicator
DoD Department of Defense
ELAP Environmental Laboratory Accreditation Program
FCS Flow Control Station
FTL Field Team Leader
FTMR Field Task Modification Request
GC/MS Gas Chromatograph/Mass Spectrometer gpm Gallons per Minute lb/hr Pounds per Hour
ICAL Internal Calibration
IDW Investigation Derived Waste
KGS KOMAN Government Solutions, LLC
LIMS Laboratory Information Management System
LOD Limit of Detection
LOQ Limit of Quantification µg /m3 Microgram per cubic meter
MPC Measurement Performance Criteria
MS/MSD Matrix Spike/Matrix Spike Duplicate
NAVFAC Naval Facilities Engineering Systems Command
Navy United States Department of the Navy
NCDOH Nassau County Department of Health
NELAC National Environmental Laboratory Accreditation Conference
NG Northrup Grumman Corporation
NWIRP Naval Weapons Industrial Reserve Plant
NYSDEC New York State Department of Environmental Conservation
Contract No N40085-16-D-2288 – 8 – KOMAN Government Solutions, LLC
NYSDOH New York State Department of Health
OM&M Operation, Maintenance & Monitoring
OSHA Occupational Safety and Health Administration
PAL Project Action Limit
PCE Tetrachloroethene
PE Performance Evaluation
PgM Program Manager
PM Project Manager ppbv Parts per Billion-Volume
PPE Personal Protection Equipment
PQOs Project Quality Objectives
PQL Practical Quantitation Limit
QA Quality Assurance
QAM Quality Assurance Manager
QAO Quality Assurance Office
QC Quality Control
QL Quantitation Limit
OSHA Occupational Safety and Health Administration
QSM Quality Systems Manual
RAB Restoration Advisory Board
ROD Record of Decision
RPD Relative Percent Difference
RPM Remedial Project Manager
RT Retention Time
S Sampling
SAP Sampling and Analysis Plan
SHM Safety and Health Manager
SIM Selective Ion Monitoring
SOP Standard Operating Procedure
SSHP Site Safety and Health Plan
SVECS Soil Vapor Extraction Containment System
SVEW Soil Vapor Extraction Well
SVPM Soil Vapor Pressure Monitor
T12DCE Trans-1,2-Dichloroethene
TCE Trichloroethene
UFP Uniform Federal Policy
USEPA United States Environmental Protection Agency
VGAC Vapor Phase Granular Activated Carbon
VOA Volatile Organic Analysis
VOC Volatile Organic Compounds
Contract No N40085-16-D-2288 – 9 – KOMAN Government Solutions, LLC
1.0 – PROJECT ORGANIZATIONAL CHART
(UFP-QAPP Manual Section 2.4.1 – Worksheet #5)
Lines of Authority Lines of Communication
SHM - Safety and Health Manager PgM – Program Manager KGS - KOMAN Government Solutions, LLC PM - Project Manager NAVFAC – Naval Facilities Engineering QAM - Quality Assurance Manager Systems Command QA – Quality Assurance NYSDEC – NY State Department of Environmental Conservation RPM - Remedial Project Manager
Laboratory Eurofins Air Toxics
Folsom, CA
John Rawlings
KGS
SHM
301-661-5629
Ericka Seiler
KGS
Field Team Leader 610-400-0617
Laurie Ekes
KGS
Project Chemist 508-367-7190
Robert Gregory
KGS
PM
610-400-0636
Patrick Schauble
KGS
PgM/QAM 610-400-0619
NYSDEC QA
Coordinator
Teresie Walker NAVFAC Chemist 757-322-46998288
Jason Pelton
NYSDEC PM
518-402-9478
Scott Sokolowski
NAVFAC RPM
760-672-3814
Randall Hoffmaster
KGS
Treatment Plant Operator 516-413-5099
Contract No N40085-16-D-2288 – 10 – KOMAN Government Solutions, LLC
2.0 – COMMUNICATION PATHWAYS
(UFP-QAPP Manual Section 2.4.2 – Worksheet #6) The communication pathways for the Sampling and Analysis Plan (SAP) are shown below.
Communication Drivers
Responsible Entity Name Phone Number Procedure
(Timing, Pathway To/From, etc.)
SAP Amendments Navy Remedial Project Manager (RPM)
Scott Sokolowski 760-672-3814 Immediately informs KGS Project Manager (PM).
Document via Field Task Modification Request (FTMR) form; complete within one week or less.
Changes in Schedule KGS PM Robert Gregory 610-400-0636 Informs Navy RPM via schedule impact letter as soon as impact is realized. Schedule revised within one week or less.
Unanticipated field conditions that would require a change in plan and result in FTMRs
KGS Plant Operator Randall Hoffmaster 513-413-5099 Plant Operator/FTL immediately informs PM; PM informs RPM; RPM issues scope change if warranted; scope change to be implemented before work is executed.
Document via FTMR form (within one week or less).
Quality Assurance Office (QAO) review of the FTMR may be required if it pertains to possible laboratory changes.
Complete within time frame as per agreement with Navy after authorization.
KGS PM Robert Gregory 610-400-0636
KGS Field Team Leader
(FTL)
Ericka Seiler 610-357-1346
Conditions adverse to quality or health and safety
KGS Plant Operator Randall Hoffmaster 513-413-5099 Responsible party immediately informs site workers, Navy RPM, and Project Team to stop work. Re-initiate work upon corrective action within one week or less (as possible).
KGS FTL Ericka Seiler 610-357-1346
KGS PM Robert Gregory 610-400-0636
KGS Quality Assurance Manager (QAM)
Patrick Schauble 610-400-0619
KGS Safety and Health Manager (SHM)
John Rawlings 301-661-5629
Navy RPM Scott Sokolowski 760-672-3814
Analytical data quality issues
Eurofins Air Toxics PM Brian Whitaker 916-605-3355 Immediately notify KGS Project Chemist. Notify data review staff and KGS PM if necessary. Notify Navy RPM and Chemist, if necessary. Resolve within one week or less.
KGS Project Chemist Laurie Ekes 508-367-7190
Navy Chemist Teresie Walker 757-322-4699
Contract No N40085-16-D-2288 – 11 – KOMAN Government Solutions, LLC
3.0 – PROJECT PLANNING SESSION PARTICIPANTS SHEET
(UFP-QAPP Manual Section 2.5.1 – Worksheet #9)
Project Name: Operation, Maintenance, and Monitoring of the Soil Vapor Extraction Containment System
Projected Date(s) of Sampling:
July 2022 – September 2023
Project Manager: Robert Gregory - KGS
Site Name: NWIRP Bethpage Site 1
Site Location: Bethpage, NY
Dates of Sessions: Letters/Emails/Telephone Conversations, 1995 - 2012
Scoping Session Purpose: Identify Sampling Plan Elements and Information
Name Title Affiliation Phone # E-Mail Address Project Role
Stavros Patselas
Former Project Manager
Tetra Tech EC 215-702-4099 Stavros.Patselas@tetratech.com
Former Contractor Point of Contact
David Brayack
Former Project Manager
Tetra Tech, Inc.
757-466-4909 David.Brayack@tetratech.com
Former Contractor Point of Contact
Lora Fly
Former Remedial Project Manager
NAVFAC
Mid-Atlantic
757-444-0781 Lora.Fly@navy.mil Former Navy Point of Contact
Steven Scharf
Project Engineer
NYSDEC 518-402-9620 Steven.Scharf@dec.ny.gov Project Engineer
Consensus Decisions:
Sampling plan elements and information were established via multiple conversations and other communications, as documented by Naval Facilities Engineering Systems Command (NAVFAC) and New York State Department of Environmental Conservation (NYSDEC) review and consensus approval of operational and sampling plans.
Project Planning Summary:
The remedial program for Site 1 contaminated soils and shallow groundwater was originally set forth in the 1995 Record of Decision. The operational and monitoring requirements for the Site 1 Soil Vapor Extraction Containment System (SVECS) were established by the Record of Decision, Operable Unit 4 Site 1 – Former Drum Marshalling Area, Naval Weapons Industrial Reserve Plant (NWIRP), Bethpage, New York, August 2018.
The current revision of the Sampling and Analysis Plan (SAP) is required to update the NAVFAC and prime contractor personnel information, update the analytical support laboratory, include the addition of new soil vapor recovery well locations, and to integrate previous sampling documents into a single volume in Uniform Federal Policy (UFP) format.
Contract No N40085-16-D-2288 – 12 – KOMAN Government Solutions, LLC
4.0 – CONCEPTUAL SITE MODEL
(UFP-QAPP Manual Section 2.5.2 – Worksheet #10)
Site 1, covering approximately 5.5 acres, is predominately an open, relatively flat and lightly vegetated area with a four-foot high windrow located along the eastern end of the site. At the northern end of the Site, the grade is mounded in the area of a former abandoned sanitary settling tank. Initially, the tank sidewalls used mounded soil as insulation. Later, the top of the tank was collapsed and the remnants were covered with soil. The southern portion of the site was covered in asphalt and gravel and used to store miscellaneous equipment and for vehicle parking. The Site was enclosed by a facility perimeter fence on the east and interior fencing on the north, west, and south.
NWIRP Bethpage is underlain by approximately 1,100 feet of unconsolidated sediments that overlie crystalline bedrock. The unconsolidated sediments consist of four distinct geologic units: the Upper Glacial Formation; Magothy Formation; Raritan Clay; and Lloyd Sand Formations. The Upper Glacial Formation consists primarily of coarse sands and gravels and is approximately 30 to 45 feet thick. The Upper Magothy Formation consists primarily of coarse sands to a depth of approximately 100 feet, below which finer sands, silts, and clay predominate. The 100- to 150-foot thick Raritan Clay Formation underlies the Magothy Formation at a depth of approximately 700 to 800 feet below ground surface (bgs).
The underlying Lloyd Sand Formation is approximately 300 feet thick.
Groundwater in the Magothy Formation is considered a sole source aquifer (NYSDEC Class GA) and is the primary source of potable water for Nassau County. Groundwater is encountered at a depth of approximately 50 feet bgs at the NWIRP Bethpage. In the past, as the result of groundwater extraction via deep production wells at the facility, and recharge, groundwater has been measured at depths from 40 to 60 feet bgs. Groundwater beneath the NWIRP flows in a general southerly direction toward the Atlantic Ocean and deeper. Across the facility the average horizontal hydraulic gradient and groundwater velocity of the unconfined aquifer are 5.3 feet per mile and 0.3 foot per day, respectively.
From the 1960s to the 1990s, there were 16 deep production wells in operation [seven on NWIRP Bethpage and nine on Northrup Grumman Corporation (NG) property]. The wells extracted water from the Magothy Formation, and each yielded approximately 1,200 gallons per minute (gpm). The production wells extracted groundwater from depths of approximately 280 to 500 feet bgs. All production wells on the NWIRP Bethpage and most of the production wells on the NG property have been decommissioned.
Extracted water was used primarily for non-contact single pass cooling for operations on the NWIRP Bethpage and NG properties, and water was discharged into nearby surface recharge basins. The influence from these production wells altered the local groundwater flow from southeast to southwest and west. The extraction from the production wells and near surface recharge resulted in vertical gradients across the NWIRP Bethpage and NG properties that would enhance the downward migration of constituents of concern (COCs).
Following decommissioning of the production wells, subsequent water level measurements have indicated that groundwater across Site 1 flows to the south-southeast and the water table elevation ranges from approximately 73 to 70 feet above mean sea level.
VOCs in soil represent the primary COCs at Site 1 with respect to operation of the SVECS. Carbon tetrachloride, chloroform, 1,1-dichloroethane (11DCA), 1,2-dichloroethane (12DCE), tetrachloroethene (PCE), 1,2,4-trichlorobenzene (124TCB), and trichloroethene (TCE) were initially identified in soil vapor at concentrations that, if they migrated to indoor air without sufficient attenuation, could adversely impact the indoor air. A residential neighborhood is located east of Site 1, and the SVECS is operating as a removal action designed to control VOC soil vapor migration into the off-property residential homes.
Quarterly pressure monitoring of offsite SVPMs and annual vapor sampling of the SVPMs provide data to verify control of potential offsite vapor migration.
Contract No N40085-16-D-2288 – 13 – KOMAN Government Solutions, LLC
The source of the VOCs is believed to be soils located at variable depths throughout Site 1. Review of initial soil vapor data generated by the sampling of soil vapor extraction wells (SVEWs) resulted in the current list of nine VOCs of interest, consisting of TCE, PCE, 1,1,1-trichloroethane (111TCA), 11DCA, 1,1-dichloroethene (11DCE), 1,2-dichloroethene (12DCE), cis-1,2-dichloroethene (C12DCE), trans-1,2-dichloroethene (T12DCE), and vinyl chloride.
Contract No N40085-16-D-2288 – 14 – KOMAN Government Solutions, LLC
5.0 – PROJECT QUALITY OBJECTIVES/SYSTEMATIC PLANNING PROCESS
STATEMENTS
(UFP-QAPP Manual Section 2.6.1 – Worksheet #11)
5.1 OVERALL PROJECT QUALITY OBJECTIVES
Operation of the SVECS to prevent further offsite migration of VOC contaminated soil vapor and, to the extent practical, capture contaminated soil vapor with a TCE concentration greater than 250 micrograms per cubic meter (μg/m3) and PCE and 111TCA concentrations greater than 1,000 μg/m3. A secondary objective of system operation is to address soil vapor with a TCE concentration greater than 5 μg/m3. Addressing the detected concentrations of TCE in accordance with NYDOH guidance will address the other VOCs of interest associated with the Site.
Monthly sampling and monitoring of the influent, effluent, and intermediate process streams within the SVECS for the purpose of evaluating the operation and performance of the process equipment for the treatment of captured vapor via vapor-phase granular activated carbon (VGAC) adsorption, and to monitor the capture of the contaminated soil vapor by the intermediate and deep SVEWs. Effluent concentrations for treated VOCs are required to meet air discharge limits established by NYSDEC (see Section 5.5).
Quarterly soil vapor sampling at nine SVEW clusters (each with an intermediate and a deep well) to evaluate potential reduction of vapor concentrations within Site 1.
Quarterly pressure monitoring of 18 off-site SVPMs to document maintenance of the onsite SVECS vacuum field and determine the effectiveness of the system in capturing and containing offsite soil vapor in the residential area east of Site 1.
Annual (winter) soil vapor sampling at 18 off-site SVPMs to document and assess VOC concentrations in off-site soils with respect to NYSDOH guidance for subslab soil vapor concentrations.
5.2 DATA USERS
KGS – Prime Contractor
NAVFAC – SVECS Owner
NYSDEC – Regulatory Oversight
NYSDOH – Regulatory Oversight
Nassau County Depart of Health (NCDOH) – Regulatory Oversight
City of Oyster Bay, NY – Local Government Oversight
NWIRP Bethpage Restoration Advisory Board (RAB) – Local Citizens Representatives Oversight
5.3 DATA USES
Performance monitoring of the treatment system components within the onsite SVECS and maintenance of the off-site vacuum field.
Confirmation of the acceptability of the onsite and offsite soil vapor emissions for discharge per NYSDOH and NYSDEC requirements.
Contract No N40085-16-D-2288 – 15 – KOMAN Government Solutions, LLC
Evaluate the need for continued operation of the onsite SVECS in accordance with NYSDOH and NYSDEC guidance.
5.4 DATA REQUIRED
On-site SVECS Process Stream Sampling and Monitoring during Routine Operations – During routine operations, vapor process streams (influent and effluent) will be sampled monthly (see Section 8.3 - Worksheet #18). Internal system performance parameters consisting of weekly flow rate, blower operation, pre-carbon temperature, and pre-blower pressure data will be monitored at the Treatment Building. In addition, the presence/absence of condensate in the system piping will be assessed.
The sampling and monitoring program will facilitate evaluation of the effectiveness of the system in capturing contaminated soil vapors from the SVEWs and the effectiveness of the VGAC-based treatment process. Sampling of the effluent will document the quality of the off-gas from the treatment system with respect to the nine VOCs of interest versus the NYSDEC Division of Air Resources (DAR) permit equivalent effluent limitations and monitoring.
On-site SVECS Vacuum Field Monitoring – Pressure readings will be collected on a quarterly basis from the 18 SVEWs to document and monitor the SVEC vacuum field within Site 1. Valve positions for each SVEW at the main manifold at the Flow Control Station (FCS) will be recorded.
Off-site Soil Vapor Pressure Monitoring – Quarterly pressure measurements will be recorded at each of the 18 SVPMs installed in the off-site residential area to document maintenance of the vacuum field and to facilitate assessment of the effectiveness of the SVECS in preventing migration of contaminated soil vapors in the off-site area east of Site 1.
Off-site Soil Vapor Sampling – Vapor samples will be collected from the 18 SVPMs annually (winter) to document and assess VOC concentrations in off-site soils with respect to NYDOH guidance for acceptable subslab soil vapor levels.
Section 8.3 - Worksheet #18 presents the SVEWs and SVPMs that will be sampled/monitored during the soil vapor sampling and monitoring program.
5.5 PROJECT ACTION LIMITS
Vapor samples from the on-site SVECS and offsite SVPMs will be analyzed for the list of nine VOCs of interest consisting of: 111TCA, 11DCA, 11DCE, 12DCE, C12DCE, T12DCE, PCE, TCE, and vinyl chloride. The samples will be analyzed by method TO-15 by Eurofins Air Toxics, Folsom, California (Eurofins-AT), which is certified by NYSDOH in accordance with the National Environmental Laboratory Accreditation Conference (NELAC) and accredited in accordance with the Department of Defense (DoD) Environmental Laboratory Accreditation Program (ELAP) (Appendix A).
The Project Action Limits (PALs) for air samples are shown below. The VOCs and associated action limits are based on the proposed revised air emissions discharge goals provided by the Navy contractor to NYSDEC on 21 November 2011, with concurrence subsequently received from NYSDEC on 31 October 2013.
Contract No N40085-16-D-2288 – 16 – KOMAN Government Solutions, LLC
(UFP-QAPP Manual Section 2.8.1 – Worksheet #15)
Matrix: Air
Analytical Group: Select VOCs
Analyte CAS Number Project Action
Limit1
(lb/hr)
Project Action Limit1
(μg/m3)
Project Action Limit
Reference
Project Quantitation Limit Goal3
(μg/m3)
1,1,1-Trichloroethane 71-55-6 225 >100,000
NYSDEC
Emission Discharge
Limit
4.8
1,1-Dichloroethane 75-34-3 NA 10002 NA2 3.6
1,1-Dichloroethene 75-35-4 NA 10002 NA2 3.5
1,2-Dichloroethane 107-06-2 NA 10002 NA2 3.6
Cis-1,2- Dichloroethene
156-59-2 NA 10002 NA2 3.1
Tetrachloroethene 127-18-4 0.04 22,000
NYSDEC
Emission Discharge
Limit
5.2
Trans-1,2- Dichloroethene
156-59-2 NA 10002 NA2 3.1
Trichloroethene 79-01-6 0.02 11,000
NYSDEC
Emission Discharge
Limit
4.2
Vinyl Chloride 75-01-4 NA 10002 NA2 1.9
1-The project action limits presented in lb/hr and μg/m3 correspond to the air emission discharge goals specified in the air emission documentation approved by NYSDEC 6 October 2011.
2-The 1,000 μg/m3 value represents a project objective for the maximum observed concentrations of individual VOCs, without specific NYSDEC discharge limitations, that would trigger reassessment of the ability of the SVECS to contain offsite migration.
3-The PQLGs are the LOQs that the laboratory can reasonably achieve for the required analyses.
lb/hr – pounds per hour CAS – Chemical Abstract Service
Contract No N40085-16-D-2288 – 17 – KOMAN Government Solutions, LLC
6.0 – SAMPLING AND ANALYTICAL STRATEGY
Samples will be analyzed by method TO-15 in strict accordance with the analytical test method and procedure established by the United States Environmental Protection Agency (USEPA) and NYSDEC Analytical Services Protocol. The analytical method will provide results with detection limits sufficiently below designated PALs and the methods will be accurate enough to quantify contamination at concentrations below action levels. Sample collection will utilize approved techniques that will ensure that the sample is representative of current environmental and operational conditions. Quality assurance and quality control (QA/QC) samples will be collected and analyzed for the purpose of assessing the quality of the sampling effort and of the analytical data. Vapor sample parameters have also been established as previously discussed. Vapor process and emission samples will continue to be collected.
No changes to the previously established sampling methods or the analytical laboratory were required in this UFP-SAP.
Contract No N40085-16-D-2288 – 18 – KOMAN Government Solutions, LLC
Contract Task Order No. 0005 January 2023
6.1 FIELD QUALITY CONTROL SAMPLES
(UFP-QAPP Manual Section 2.6.2 – Worksheet #12)
Quality Control (QC) Sample Analytical Group Frequency
Data Quality Indicators (DQIs) Measurement Performance Criteria
QC Sample Assesses Error for Sampling (S), Analytical (A), or both (S&A)
Measurement Performance Criteria Table – Field QC Samples - Air
Field Duplicate
VOCs
1 per 20 samples Precision (field) 50% RPD S&A
All samples All samples Sensitivity PQLs < project action limits listed on Worksheet #15
A
All samples All samples Data Completeness 95% overall S&A
RPD – relative percent difference PQL – practical quantitation limit, equivalent to PQLGs identified in WS#15, Section 5.5.
Contract No N40085-16-D-2288 – 19 – KOMAN Government Solutions, LLC
7.0 – SAMPLING DESIGN AND RATIONALE
(UFP-QAPP Manual Section 3.1.1 – Worksheet #17)
Sampling of influent and effluent process streams and on-site SVEWs and off-site SVPMs and monitoring of internal SVECS performance parameters will be conducted during routine operations.
7.1 ON-SITE SAMPLING AND MONITORING FOR ROUTINE OPERATIONS
On-site SVECS Process Stream Sampling and Monitoring during Routine Operations – During routine operations, vapor process streams (influent and effluent) will be sampled monthly (see Section 8.3 - Worksheet #18). Internal system performance parameters consisting of weekly flow rate, blower operation, pre-carbon temperature, and pre-blower pressure data will be measured at the Treatment Building. In addition, the presence/absence of condensate in the system piping will be assessed. Influent vapor quality and discharge of treated off-gas will be sampled for regulatory compliance purposes for the nine VOCs of interest specified by NYSDEC. All analytical parameters for regulatory compliance will be collected monthly and analyzed by Eurofins-AT, currently certified by NYSDEC and accredited in accordance with the DoD ELAP for these parameters (Appendix A).
This sampling and monitoring program will facilitate evaluation of the effectiveness of the system in capturing contaminated soil vapors from the SVEWs and the effectiveness of the VGAC-based treatment process. Sampling of the effluent will document the quality of the off-gas from the treatment system with respect to the nine VOCs of interest versus the NYSDEC DAR permit equivalent effluent limitations and monitoring (Appendix B).
On-site SVECS Vacuum Field Monitoring – Pressure readings will be collected on a quarterly basis from the 18 Site 1 SVEWs (see Section 8.3 - Worksheet #18) to document and monitor the SVECS vacuum field within Site 1. Valve positions for each SVEW at the main manifold of the FCS will be recorded.
On-site Soil Vapor Monitoring – Soil vapor samples will be collected on a quarterly basis from the 18 SVEWs installed within Site 1 (see Section 8.3 - Worksheet #18) to monitor the effectiveness of the system in capturing and containing the contaminated soil vapors within Site 1.
7.2 OFF-SITE SAMPLING AND MONITORING FOR ROUTINE OPERATIONS
Off-site Soil Vapor Pressure Monitoring – Quarterly pressure measurements will be recorded at each of the 18 SVPMs installed in the off-site residential area to the east of Site 1 to document maintenance of the vacuum field and to facilitate assessment of the effectiveness of the SVECS in preventing migration of contaminated soil vapors to off-site areas.
Off-site Soil Vapor Monitoring – Vapor samples will be collected from the 18 SVPMs annually (winter) to document and assess VOC concentrations in off-site soils with respect to NYSDOH guidance for subslab soil vapor levels.
Contract No N40085-16-D-2288 – 20 – KOMAN Government Solutions, LLC
8.0 – FIELD PROJECT IMPLEMENTATION (FIELD PROJECT INSTRUCTIONS)
Project implementation at the Site 1, Former Drum Marshalling Yard SVECS is comprised of the following:
Sampling and monitoring of influent, effluent, and intermediate and deep process streams within the onsite SVECS for the purpose of evaluating the operation and performance of the process equipment used for moisture separation and vapor-phase granular activated carbon adsorption during routine operations.
Sampling and monitoring of shallow, intermediate, and deep process streams within the offsite SVPMs for the purpose of determining the effectiveness of the onsite SVECS.
8.1 FIELD PROJECT TASKS
(UFP-QAPP Manual Section 2.8.1 – Worksheet #14)
The required field tasks and a brief description of these tasks are summarized below:
Mobilization/Demobilization
Site-Specific Health and Safety Training
SVECS Process Stream Sampling
Investigation-Derived Waste (IDW) Management
Field Decontamination Procedures
Field Documentation Procedures
Sample Custody and Shipment Tasks
Mobilization/Demobilization
Mobilization will consist of the delivery of all equipment, materials, and supplies to the site, complete assembly in satisfactory working order of all such equipment at the site, and satisfactory storage at the site of all such materials and supplies. The KGS PM or designee will coordinate with the Navy RPM to identify appropriate locations for the storage of equipment and supplies. Site-specific health and safety training for all field personnel and subcontractors will be provided as part of site mobilization.
Demobilization will consist of the prompt and timely removal of all equipment, materials, and supplies from the site following completion of the work. Demobilization includes the cleanup and removal of waste generated during the performance of the investigation.
Site-Specific Health and Safety Training
There are no specialized/non-routine project-specific training requirements or certifications needed by personnel to successfully complete the project or tasks. All field personnel will have appropriate training to conduct the field activities to which they are assigned. Each site worker will be required to have completed the Occupational Safety and Health Administration (OSHA) 40-hour course (and 8-hour annual refresher) in health and safety training. Safety requirements are addressed in greater detail in the site-specific Accident Prevention Plan (APP) and the Site-Specific Health and Safety Plan (SSHP).
SVECS Process Stream Sampling
The vapor samples from the onsite SVECS and offsite SVPMs will be analyzed for the nine VOCs of interest, consisting of 111TCA, 11DCA, 11DCE, 12DCE, C12DCE, T12DCE, PCE, TCE, and vinyl chloride by the subcontracted laboratory, Eurofins-AT. Standard Operating Procedures (SOP)-002 and SOP-003 (Appendix C) will be followed for the collection of these samples.
Contract No N40085-16-D-2288 – 21 – KOMAN Government Solutions, LLC
Investigation Derived Waste Sampling
IDW consisting of spent personal protective equipment (PPE) will be bagged and disposed as municipal waste in an appropriate facility waste container. No characterization sampling will be required to support the disposal of these items.
Field Decontamination Procedures
For this sampling and monitoring program, both disposable and non-disposable sampling equipment may be used. All non-disposable sampling equipment is designated to an individual sample port, so no decontamination process is needed.
Field Documentation Procedures
A summary of all field activities will be properly recorded in a bound logbook [with consecutively numbered pages that cannot be removed. Logbooks will be assigned to field personnel and will be stored in a secured area when not in use.
At a minimum, the following information will be recorded in the site logbook:
Name of the person to whom the logbook is assigned, Project name, Project start date, Names and responsibilities of on-site project personnel including subcontractor personnel, Arrival/departure of project personnel and any site visitors, Arrival/departure of equipment, Sampling activities and sample log sheet references, Description of subcontractor activities, Sample pick-up information, including chain-of-custody numbers, air bill numbers, carrier, time, and date, Health and safety issues, and
Description of photographs including date, time, photographer, roll and picture number, location, and compass direction of photograph.
All entries will be written in ink and no erasures will be made. If an incorrect entry is made, the person making the correction will strike a single line through the incorrect information, and initial and date the change. All documentation will be conducted in accordance with SOP-004 (Appendix C).
Sample Custody and Shipment Tasks
Sample Nomenclature
Sample locations and sampling frequency are presented in Worksheet #18. Sample nomenclature will follow SOP-004 (Appendix C).
Sample Collection Documentation
Documentation of field observations will be recorded in a field logbook and/or on field log sheets including sample collection logs. Bound field logbooks will be utilized for this project.
Sample Packaging and Shipping
Samples will be prepared for shipping and managed under strict chain of custody.
Contract No N40085-16-D-2288 – 22 – KOMAN Government Solutions, LLC
Sample Handling and Tracking System
Samples will be express shipped to the laboratory under chain of custody within 48 hours of being collected. Under no circumstances will sample holding times be exceeded.
Sample Custody
To ensure the integrity of a sample from collection through analysis, it is necessary to have an accurate written record that traces the possession and handling of the sample. This record, the chain of custody form, is designed to provide documentation of collection, preservation, packaging, handling, storage, and shipping of all samples collected. Proper chain of custody begins at the time of sample collection and links data obtained from analysis of the samples to the samples, themselves, and to the locations from which the samples were collected. A sample is under proper custody if:
The sample is in the physical possession of an authorized person, The sample is in view of an authorized person after being in his/her possession, The sample is placed in a secure area by an authorized person after being in his/her possession, and
The sample is in a secure area, restricted to authorized personnel only.
Chain of Custody (CoC) forms will be completed for all samples collected. The laboratories may provide multi-part forms to be used for chain of custody documentation. Each page of multi-part chain of custody forms shall be signed and dated by the person relinquishing sample custody and the recipient of a sample or portion of sample. The person releasing a sample or portion thereof and the person receiving the sample or sample portion will each retain a copy of the form each time a transfer occurs.
Field Sampling Custody Requirements
Field sample custody procedures (sample collections, packaging, and shipping to laboratory) will be conducted in accordance with SOP-005 (Appendix C). After collecting samples with the Summa cannisters, the Summa cannisters will be placed into a cardboard box and express shipped to the lab
Personnel collecting samples are responsible for the care and integrity of those sample until they are properly transferred or dispatched. Therefore, the number of people handling a sample will be kept to a minimum. When transferring samples, the individuals relinquishing and receiving them will sign, date, and note the time on the CoC form. This form documents the sample custody transfer from the sampler to the laboratory, often through another person or agency (common carrier).
Laboratory Custody
Laboratory sample custody procedures (e.g., receipt of samples, archiving, and disposal) will be used according to laboratory specific SOPs. Sample boxes are received and checked for damage. A receipt form will be filled out to note conditions and any discrepancies. The CoC form will be checked against the sample container labels for accuracy. Samples will be logged into the Laboratory Information Management System (LIMS) and given a unique log number which can be tracked through processing.
The Laboratory PM will notify the KGS PM verbally or via e-mail of any problems on the same day that an issue is identified.
Contract No N40085-16-D-2288 – 23 – KOMAN Government Solutions, LLC
8.2 – FIELD SOPS REFERENCE TABLE
(UFP-QAPP Manual Section 3.1.2 – Worksheet #21)
SOPs are presented in Appendix C.
SOP
Reference Number
Title/Author Revision Date or Version Number
Location of SOP
Any planned deviation for
Project Work?
Comments
001 Condensate (Aqueous) Sampling Rev 0 Appendix C No
002 Soil/Process Vapor Sampling Rev 0 Appendix C No
003 Field Documentation Rev 0 Appendix C No
004 Sample Nomenclature Rev 0 Appendix C No
005 Non-Radiological Sample Handling Rev 0 Appendix C No
Contract No N40085-16-D-2288 – 24 – KOMAN Government Solutions, LLC
8.3 SAMPLE DETAILS TABLE
(UFP-QAPP Manual Section 3.1.1 and 3.5.2.3 – Worksheets #18. 19, 20, and 30)
Onsite SVECS Samples
Sampling Location Sample Port
Matrix Analytical Group Number of
Samples / Event Sampling SOP
Reference2
Influent from SVE-101I Sample port in Flow Monitoring Station
Air Select VOCs1 1 002
Influent from SVE-101D Sample port in Flow Monitoring Station
Air Select VOCs1 1 002
Influent from SVE-102I Sample port in Flow Monitoring Station
Air Select VOCs1 1 002
Influent from SVE-102D Sample port in Flow Monitoring Station
Air Select VOCs1 1 002
Influent from SVE-103I Sample port in Flow Monitoring Station
Air Select VOCs1 1 002
Influent from SVE-103D Sample port in Flow Monitoring Station
Air Select VOCs1 1 002
Influent from SVE-104I Sample port in Flow Monitoring Station
Air Select VOCs1 1 002
Analytical Group Analytical and
Preparation Method Containers
(number, size, and type) Preservation Requirements
(chemical, temperature, light protected) Maximum Holding Time
(preparation / analysis)
Matrix: Air1
Select VOCs TO-15 One (1) – 6-liter Summa Canister None 30 days
1 Laboratory/Air: Eurofins-Air Toxics, 180 Blue Ravine Road, Folsom, CA 95630 Contact: Brian Whitaker, email: brian.whitaker@eurofinset.com, Phone: (916) 605-3355 Accreditations/certifications: DoD ELAP ADE-1451 (expires 4/27/2024) Sample Delivery Method: Express Shipment
Contract No N40085-16-D-2288 – 25 – KOMAN Government Solutions, LLC
Onsite SVECS Samples
Sampling Location Sample Port
Matrix Analytical Group Number of
Samples / Event Sampling SOP
Reference2
Influent from SVE-104D Sample port in Flow Monitoring Station
Air Select VOCs1 1 002
Influent from SVE-105I Sample port in Flow Monitoring Station
Air Select VOCs1 1 002
Influent from SVE-105D Sample port in Flow Monitoring Station
Air Select VOCs1 1 002
Influent from SVE-106I Sample port in Flow Monitoring Station
Air Select VOCs1 1 002
Influent from SVE-106D Sample port in Flow Monitoring Station
Air Select VOCs1 1 002
Influent from SVE-112D Sample port in Flow Monitoring Station
Air Select VOCs1 1 002
Influent from SVE-113D Sample port in Flow Monitoring Station
Air Select VOCs1 1 002
Influent from SVE-114D Sample port in Flow Monitoring Station
Air Select VOCs1 1 002
Influent from SVE-115D Sample port in Flow Monitoring Station
Air Select VOCs1 1 002
Influent from SVE-116D Sample port in Flow Monitoring Station
Air Select VOCs1 1 002
Influent from SVE-117D Sample port in Flow Monitoring Station
Air Select VOCs1 1 002
Influent to VAGC-1 BV-108 Air Select VOCs1 2 002
Effluent from VAGC-1 to Exhaust Stack BV-109 Air Select VOCs1 1 002
1 21-Day Results via method TO-15
2 SOP Reference – See Section 9.0.
Contract No N40085-16-D-2288 – 26 – KOMAN Government Solutions, LLC
Offsite SVPMs Samples
Sampling Location Sample Port
Matrix Analytical Group Number of
Samples / Event Sampling SOP
Reference2
BPS1-SVPM2001S NA Air Select VOCs1 1 002
BPS1-SVPM2001I NA Air Select VOCs1 1 002
BPS1-SVPM2001D NA Air Select VOCs1 1 002
BPS1-SVPM2002S NA Air Select VOCs1 1 002
BPS1-SVPM2002I NA Air Select VOCs1 1 002
BPS1-SVPM2002D NA Air Select VOCs1 1 002
BPS1-SVPM2003S NA Air Select VOCs1 1 002
BPS1-SVPM2003I NA Air Select VOCs1 1 002
BPS1-SVPM2003D NA Air Select VOCs1 1 002
BPS1-SVPM2004S NA Air Select VOCs1 1 002
BPS1-SVPM2004I NA Air Select VOCs1 1 002
BPS1-SVPM2004D NA Air Select VOCs1 1 002
BPS1-SVPM2006S NA Air Select VOCs1 1 002
BPS1-SVPM2006I NA Air Select VOCs1 1 002
BPS1-SVPM2006D NA Air Select VOCs1 1 002
BPS1-SVPM2007S NA Air Select VOCs1 1 002
BPS1-SVPM2007IR NA Air Select VOCs1 1 002
BPS1-SVPM2007D NA Air Select VOCs1 1 002
BPS1-DUP01 NA Air Select VOCs1 1 002
BPS1-DUP02 NA Air Select VOCs1 1 002
BPS1-FB2001 NA Air Select VOCs1 1 002
BPS1FB2002 NA Air Select VOCs1 1 002
1 21-Day Results via method TO-15
2 SOP Reference – See Section 8.6.
NA – Not applicable; sample collected from well head port.
Contract No N40085-16-D-2288 – 27 – KOMAN Government Solutions, LLC
8.4 FIELD QUALITY CONTROL SAMPLE SUMMARY TABLE
(UFP-QAPP Manual Section 3.1.1 Worksheet #20)
Field duplicate samples will be collected during air sampling from the influent and discharge of the VGAC adsorption unit. Field duplicates will be collected one per 20 samples per media. Field duplicates will be collected in the same manner for the same analyses as the primary sample for which it is a duplicate.
The vapor samples (Summa canisters) will be shipped in boxes to the laboratory as cooling is not required.
Matrix Analytical Group No. of
Sampling Locations1
No. of Field Duplicates
No. of
MS/MSD
No. of Field Blanks
No. of VOA Trip Blanks
No. of PE Samples
Total No. of Samples to
Lab
Onsite - Monthly Process Influent and Effluent Samples
Select VOCs 2 1 0 0 0 0 3
Onsite - Quarterly SVEWs
Select VOCs 18 1 0 0 0 0 19
Offsite - Quarterly SVPMs
Select VOCs 18 1 0 0 0 0 19
1- Samples will be collected at the same location for multiple rounds. The numbers presented in this table are for one round of process air sampling.
MS/MSD – Matrix Spike/Matrix Spike Duplicate VOA – Volatile organic analysis PE – Performance evaluation
Contract No N40085-16-D-2288 – 28 – KOMAN Government Solutions, LLC
8.5 REFERENCE LIMITS AND EVALUATION TABLES
(UFP-QAPP Manual Section 2.8.1 – Worksheet #15)
Matrix: Air
Analytical Group: Select VOCs
Analyte
CAS
Number
Project Action Limit
Project Action Limit
Project Quantitation Limit Goal
Achievable Laboratory Limits4
(lb/hr)1 (µg/m3)1 (µg/m3)3 LOD4 LOQ4
(µg/m3) (µg/m3)
1,1,1-Trichloroethane (TCA) 71-55-6 225 >100,000 4.8 2.4 4.8
1,1-Dichloroethane 75-34-3 NA 1,0002 3.6 1.8 3.6
1,1-Dichloroethene 75-35-4 NA 1,0002 3.5 1.7 3.5
1,2-Dichloroethane 107-06-2 NA 1,0002 3.6 1.8 3.6
Cis-1,2-Dich…