Fig 4 Weston.pdf
PDF 674 KB Posted
- Attached to
- Observation Well Pumping Project
- Solicitation number
- 300000250901761
- Issued by
- Missouri
About this file
This is a project description document for the Missouri Department of Natural Resources, Water Resources Center's Observation Well Pumping Project. The project involves performing well pumping activities and efficiency testing on 6 of the state's 150 groundwater observation wells. The work will include conducting pumping tests to determine each well's operational efficiency and analyzing results to assess whether more extensive rehabilitation efforts are necessary. Well and aquifer characteristics will be documented and recorded for comparison with future test results to track performance over time.
The document provides technical specifications and site-specific information relevant to the pumping operations, including well locations, geological data, and baseline performance metrics necessary for contractors to develop accurate proposals and project plans. Specific pricing terms, contract duration, bid due dates, and award timelines are not detailed in this particular file, which serves primarily as a technical reference document supporting the overall solicitation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| DNR 0000000011SL_SUPPLIER.pdf | ||
| Fig 7 Carrolton.pdf | ||
| Fig 6 Atherton.pdf | ||
| Fig 5 Independence.pdf | ||
| Fig 3 St Joseph.pdf | ||
| Fig 2 Forest City #7.pdf | ||
| Fig 1 Obs Well Locations.pdf | ||
| 780-3123-pump-test-record.pdf | ||
| IFB Observation Well Pumping Project 06042026.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .