This is a Drinking Water Plans and Specifications Review Checklist prepared by the Florida Department of Environmental Protection (FDEP) for Bay County's Water Treatment Plant (WTP) Resiliency Project. The project involves the installation of new filters and appurtenances for the existing water treatment plant located at 3400 Transmitter Road, Panama City, Florida. Specifically, the work includes construction of three (3) additional sand gravity type filters at the facility. The contract submission deadline is 2:00 pm on Thursday, June 4, 2026, with public opening of submissions to follow immediately. The project completion time is specified as 432 days. The checklist confirms that all required permits, including environmental permits and Army Corps of Engineers permits, have been received, though the selected contractor will be responsible for providing any remaining permits. All work is contained within the existing county-owned site.

This project represents the final phase of an already-approved loan agreement and is funded through grant sources. The FDEP review confirms that the design documents contain no ineligible items, are consistent with planning documentation recommendations, and include the most current FDEP Supplementary Conditions. The contract specifications clearly define formal advertising and bid opening procedures, bid evaluation methods including additives and deducts, "or equal" clauses for equipment and materials, bond requirements for bidding and performance, and procedures for issuing changes to bidding and contract documents. The checklist was approved on April 17, 2026, by Project Manager Timothy L. Owens and Program Administrator Eric V. Meyers, with an effective date of December 2025.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DRINKING WATER PLANS & SPECIFICATIONS REVIEW CHECKLIST

Project Sponsor:

Contract Title:

Brief summary of contract work:

Project Number:

Contract #:

Have plans & specifications been previously accepted? If “Yes” list contract Yes No title and effective date of acceptance below.

Title: Date:

The basis for this checklist is Rule 62-552.700, F.A.C. The questions below are used to verify that the plans and specifications prepared for competitive bidding meet program requirements.

1. Is the project sponsor requesting construction funding at the next priority list meeting? Explain.

Yes No Comments:

2. Is the work described consistent with the planning documentation recommendations?

Yes No If "No" describe the inconsistency and how it was resolved:

3. Do the design documents include any ineligible items? Yes No N/A

If "Yes," briefly describe and list the ineligible items:

4. Has the ineligible work been noted as ineligible in the database? Yes N/A

5. Is the work described consistent with environmental mitigation as recommended in the Department's environmental information document? Yes Mitigation is not an issue

6. During the administrative review, has anything come to the reviewer's attention to indicate the documents are too incomplete to competitively bid the contract work or procure equipment/materials as appropriate? Yes No

7. Do the contract specifications include the requirements of the most current FDEP Supplementary Conditions, as appropriate? Yes No If No, Please explain:

8a. Has the construction permit been received? If No, then provide an explanation.

Form Revised 1-19-24 by GCA

8b. Has the Site Certification been received? If No, then provide an explanation. Yes No

a. Formal advertising and bid opening procedures? Yes

b. Method of bid evaluation; including bid item additives, deducts and contract award? Yes

c. Comprehensive (or individual) "or equal" c1 lause(s) for equipment and materials? Yes days.

Yes No

10. Are the following clearly specified?

9. The completion time for the contract is

DRINKING WATER PLANS & SPECIFICATIONS REVIEW CHECKLIST

No

Yes

11. Will the project sponsor use a pre-qualified list in acquiring goods and services? Yes

If “Yes,” is the pre-qualified list current and does it include enough qualified sources to ensure maximum open and free competition? Yes N/A

12. Are bonds (or equivalent) required for bids and contract performance and payment of suppliers, subcontractors and workmen? Yes

13. Are the procedures for issuing changes to the bidding and contract documents clearly stated?

14. Has the contract information been entered into the database? Yes

15. Is the acceptance letter included with this checklist? Yes

ACCEPTANCE:

Project Manager

Effective Date Program

Administrator

Form Revised 1-19-24 by GCA

Project Sponsor: Bay County
Project Number: DW0302J
Contract Title: Water Treatment Plant Resiliency Project
Contract: 1
Check Box1: Yes
Check Box2: Off
Check Box5: Yes
Check Box6: Off
Check Box7: Yes
Check Box8: Off
Check Box9: Off
Check Box10: Yes
Check Box11: Off
Check Box12: Off
Check Box13: Yes
Check Box14: Yes
Check Box15: Off
Check Box16: Off
Check Box17: Yes
Check Box18: Yes
Check Box19: Off
Title: Water Treatment Plant Resiliency Project
Comment on Authorization to Incur Construction Costs: This is an already approved loan agreement, this is the final project associated with the grant
Description of Inconsistancy:
Comment on Supplementary Conditions:
Competion time for contract: 432
Date_es_:signer:date: 04/17/2026
Ineligible items:
P:
E:
2026-04-17T10:38:38-0400
Timothy L. Owens
2026-04-17T11:36:48-0400
Eric V. Meyers
Check Box25: Off
Check Box26: Yes
Check Box27: Off
Check Box28: Yes
Check Box29: Yes
Check Box35: Yes
Check Box36: Yes
Check Box38: Yes
Date1_es_:signer:date: 12/2025
Check Box20: Yes
Check Box21: Off
Text2: Environmental permit and ACOE permit has been received, the contractor once selected will have to provide any remaining permits
Text3: All work is contained within the existing county owned site.
Check Box4: Off
Check Box22: Yes
Check Box23: Yes
Check Box24: Yes
Check Box30: Yes
Text31: Installation of new filters and appurtenances for existing water treatment plant