This is a specification document for the 26-35 Water Treatment Plant (WTP) Resiliency Project Additional Filters, a procurement by Bay County Board of County Commissioners for Bay County Utility Services in Panama City, Florida. The project involves construction of three (3) additional sand gravity-type filters at the Water Treatment Plant located at 3400 Transmitter Road, Panama City, Florida. The scope of work includes construction of new Filters 12, 13, and 14 adjacent to existing Filters 9-11, installation of Transfer Pump No. 5 in Transfer Pump Station No. 2, filter underdrains, filter media, filter piping, filter control valves and gates, filter piping headers, yard piping modifications, electrical and SCADA system improvements, sitework, and related appurtenances. Electronic or sealed paper submissions are due by 2:00 p.m. on Thursday, June 4, 2026, with public opening immediately following the deadline. The contract includes substantial coordination requirements with ongoing plant operations, with construction sequencing constraints specified to maintain continuous facility operation and limit service interruptions to maximum 72-hour periods for critical tie-ins and equipment connections.
The specifications require comprehensive contractor responsibility for all labor, materials, equipment, and incidentals to deliver complete operational systems including electrical distribution, raceway and cable systems, wiring devices, interior and exterior lighting, motors, HVAC systems, fire suppression equipment, and instrumentation and controls. All electrical equipment and materials must comply with NFPA 70 (National Electrical Code) 2020 edition with Florida amendments, undergo acceptance testing, and receive manufacturer certification and training. The contractor must obtain all necessary permits and licenses, provide temporary facilities including power and utilities, maintain erosion and sediment controls, perform testing and commissioning of all systems, and provide detailed operations and maintenance documentation. The project requires adherence to strict environmental and safety standards, including NSF/ANSI 61 certification for all materials in contact with potable water, and compliance with OSHA and Florida regulations. The contract terms specify a one-year warranty period from Substantial Completion with contractor responsibility for all defects due to faulty design, improper assembly, or defective materials, and contractor must maintain all temporary facilities throughout construction with costs included in the contract price.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXHIBIT 2
BARGE DESIGN SOLUTIONS SPECIFICATIONS
VOLUME 1 & 2
26-35 Water Treatment Plant (WTP) Resiliency Project Additional Filters Page 47 of 1045
Water Treatment Plant Resiliency Project
Additional Filters
BAY COUNTY NO. 24-06
FOR
BAY COUNTY UTILITY SERVICES (BCUS)
BAY COUNTY, FLORIDA
Volume I of II
FILE: 3723715
DATE: December 2025
120 Richard Jackson Boulevard Suite 200A Panama City, FL 32407 850.299.8121
EB#: 6045
26-35 Water Treatment Plant (WTP) Resiliency Project Additional Filters Page 48 of 1045
26-35 Water Treatment Plant (WTP) Resiliency Project Additional Filters Page 49 of 1045
Section 00 01 10 Table of Contents
12/23/25 37237-15
SPECIFICATIONS
Section Title
Volume I of II
Division 01 - General Requirements
01 11 00 Summary of Work 01 22 00 Measurement and Payment 01 25 00 Substitution Procedures 01 31 19 Project Meetings 01 32 16 Construction Schedules 01 32 33 Construction Videos and Photographs 01 33 00 Submittal Procedures 01 35 00 Unique Requirements 01 41 00 Regulatory Requirements 01 42 00 Codes and Standards 01 43 33 Manufacturer Services 01 45 29 Testing Laboratory Services 01 50 00 Temporary Facilities and Controls 01 56 00 Temporary Barriers and Enclosures 01 57 23 Temporary Stormwater Pollution Control 01 61 00 Common Product Requirements 01 65 00 Product Delivery Requirements 01 66 00 Product Storage and Handling Requirements 01 71 23.13 Construction Layout 01 73 29 Cutting and Patching 01 74 00 Cleaning and Waste Management 01 75 16 Startup Procedures 01 78 23 Operation and Maintenance Data 01 78 36 Warranties 01 78 39 Record Documents 01 78 43 Spare Parts
Division 03 – Concrete
03 01 00 Concrete Surface Repair Systems 03 11 00 Concrete Framework 03 15 00 Concrete Accessories 03 20 00 Concrete Reinforcement 03 30 00 Case-in-Place Concrete 03 60 00 Grout 03 64 00 Concrete Repair Crack Injection
Division 05 – Metals
05 12 00 Structural Steel 05 50 00 Metal Fabrications 05 51 00 Metal Stairs
26-35 Water Treatment Plant (WTP) Resiliency Project Additional Filters Page 50 of 1045
00 01 10 - 2
12/23/25 37237-15
05 52 13 Pipe and Tube Railings 05 53 00 Metal Gratings
Division 07 – Thermal and Moisture Protection
07 14 16 Cold Fluid-Applied Waterproofing 07 92 00 Joint Sealants
Division 08 – Openings
08 11 13 Hollow Metal Doors and Frames 08 51 13 Aluminum Windows 08 91 19 Fixed Louvers
Division 09 – Finishes
09 90 15 Paint
Division 10 – Specialties
10 44 16 Fire Extinguishers
Division 13 – Special Construction
13 34 19 Metal Building Systems
Division 23 – Heating, Ventilating, and Air Conditioning (HVAC)
23 05 00 Common Work Results for HVAC 23 05 53 Identification for HVAC Piping and Equipment 23 05 93 Testing, Adjusting, and Balancing for HVAC 23 34 00 HVAC Fans 23 82 39.19 Wall and Ceiling Unit Heaters
Volume II of II
Division 26 – Electrical
26 05 00 Common Work Results for Electrical 26 05 05 Demolition and Modifications for Electrical 26 05 19 Low Voltage Conductors and Cables 26 05 26 Grounding and Bonding for Electrical Systems 26 05 33 Raceway and Boxes 26 05 43 Underground Ducts and Raceways for Electrical Systems 26 05 53 Identification for Electrical Systems 26 05 73 Electrical System Analysis 26 08 80 Commissioning of Electrical Systems 26 22 13 Low Voltage Distribution Transformers 26 24 16 Panelboards
26-35 Water Treatment Plant (WTP) Resiliency Project Additional Filters Page 51 of 1045
00 01 10 - 3
12/23/25 37237-15
26 27 26 Wiring Devices – Power and Distribution 26 29 23 Variable-Frequency Motor Controllers 26 50 00 Lighting 26 50 00 Appendix A – Lighting Fixtures
Division 27 – Communication
27 13 23 Fiber Optic Cabling and Connectors 27 13 23A Fiber Allocation Table
Division 31 – Earthwork
31 20 00 Earth Moving 31 23 33 Trenching and Backfilling 31 66 15 Helical Pulldown Micropile Foundations
Division 33 – Utilities
33 01 10.58 Disinfection of Water Utility Piping Systems 33 05 05.31 Hydrostatic Testing 33 05 63 Concrete Vaults and Chambers 33 23 33C Florida Trench Safety Act Compliance 33 40 00 Storm Drainage Utilities
Division 40 – Process Integration
40 05 06 Couplings, Adapters, and Specials for Process Piping 40 05 07 Hangers and Supports for Process Piping 40 05 09 Wall Pipes, Floor Pipes, and Pipe Sleeves 40 05 19 Ductile Iron Process Piping 40 05 23 Stainless Stell Process Piping 40 05 31.13 Polyvinyl Chloride Process Piping 40 05 51 Common Requirements for Process Valves 40 05 51.1 Valve Schedule 40 05 57 Actuators for Process Valves and Gates 40 05 59 Hydraulic Gates 40 05 63 Ball Valves 40 05 64 Butterfly Valves 40 05 65 Valves for Pump Control and Check Service 40 05 78 Air Valves for Water and Wastewater Service 40 05 81 Hydrants and Hose Bibbs for Process Service 40 05 93 Common Motor Requirements for Process Equipment 40 05 97 Identification for Process Equipment 40 23 00 Water and Wastewater Process Piping 40 61 00 Common Work Results – Instrumentation and Controls for Process Systems 40 61 93 IO List 40 61 96 Process Control Descriptions 40 63 00 SCADA System Hardware and Software 40 67 00 Control Panels and Hardware 40 70 00 Instrument Index
26-35 Water Treatment Plant (WTP) Resiliency Project Additional Filters Page 52 of 1045
00 01 10 - 4
12/23/25 37237-15
40 71 00 Instrumentation and Controls – Flow Measurement 40 72 00 Instrumentation and Controls – Level Measurement 40 73 00 Instrumentation and Controls – Pressure Measurement 40 75 00 Instrumentation and Controls – Analytical Devices 40 80 00 Commissioning of Process Control Systems
Division 43 – Process Gas and Liquid Handling, Purification and Storage Equipment
43 24 13.10 Vertical Turbine Pumps (product lubricated) 43 25 13 Submersible Centrifugal Pumps (Sump Pump)
Division 46 – Water and Wastewater Equipment
46 61 23 Gravity Filtration Equipment
26-35 Water Treatment Plant (WTP) Resiliency Project Additional Filters Page 53 of 1045
26-35 Water Treatment Plant (WTP) Resiliency Project Additional Filters Page 54 of 1045
26-35 Water Treatment Plant (WTP) Resiliency Project Additional Filters Page 55 of 1045
26-35 Water Treatment Plant (WTP) Resiliency Project Additional Filters Page 56 of 1045
26-35 Water Treatment Plant (WTP) Resiliency Project Additional Filters Page 57 of 1045
26-35 Water Treatment Plant (WTP) Resiliency Project Additional Filters Page 58 of 1045
26-35 Water Treatment Plant (WTP) Resiliency Project Additional Filters Page 59 of 1045
26-35 Water Treatment Plant (WTP) Resiliency Project Additional Filters Page 60 of 1045
26-35 Water Treatment Plant (WTP) Resiliency Project Additional Filters Page 61 of 1045
Section 01 11 00
Summary of Work
12/19/24 37237-15
Part 1 General
1.1 Section Includes
A. Work by Contractor.
B. Owner-Furnished Items
C. Contractor Use of Site and Premises
D. Owner Occupancy
E. Quantities
1.2 Work by Contractor
A. The work to be performed under this Contract shall consist of furnishing all labor, materials, tools, equipment and incidentals and performing all work required to construct complete in place and ready to operate the improvements shown in the
Contract Documents.
B. The major components for the Project consist of the construction of new Filters 12, 13, and 14 adjacent to Filters 9-11 and the installation of a new Transfer Pump No. 5 in Transfer Pump Station No. 2. The new Filter Building includes the filter underdrains, filter media, filter piping, filter control valves and gates, filter piping headers, and appurtenances. The project also includes modifications to the WTP yard piping, electrical and SCADA system improvements for the new facilities, sitework, and all appurtenances shown on the drawings.
C. Project Location
1. The equipment and materials to be furnished will be installed at the Bay County
Water Treatment Plant at the locations shown on the Drawings.
1.3 Owner Furnished Items
A. Not Applicable
1.4 Contractor Use of Site and Premises
A. See Section 01 35 00.
26-35 Water Treatment Plant (WTP) Resiliency Project Additional Filters Page 62 of 1045
01 11 00 - 2
Summary of Work
1.5 Partial Owner Occupancy
A. The Owner will occupy existing facilities to which these improvements are being made and will continue operation during the period of construction.
B. There shall not be any interruption in service. The Contractor is responsible for fines assessed due to his activities.
C. Whenever, in the opinion of the Engineer, any section or portion of the work or any structure is in suitable condition, it may be put into use upon the written order of the
Engineer and such usage will not be held in any way as an acceptance of said work or structure, or any part thereof, or as a waiver of any of the provisions of these
Specifications and the Contract. Pending final completion and acceptance of the
Work, all necessary repairs and replacements, due to defective materials or workmanship or operations of the Contractor, for any section of the work so put into use shall be performed by the Contractor at Contractor's own expense.
1.6 Quantities
A. The Owner reserves the right to alter the quantities of work to be performed or to extend or shorten the improvements at any time when and as found necessary, and the Contractor shall perform the work as altered, increased or decreased. Payment for such increased or decreased quantity will be made in accordance with the
Instructions to Bidders. No allowance will be made for any change in anticipated profits nor shall such changes be considered as waiving or invalidating any conditions or provisions of the Contract and Bond.
Part 2 Products
(NOT USED)
Part 3 Execution
(NOT USED)
END OF SECTION
26-35 Water Treatment Plant (WTP) Resiliency Project Additional Filters Page 63 of 1045
Section 01 22 00 Measurement and Payment
12/23/25 37237-15
1.1 Scope
A. The Bid lists each item of the Project for which payment will be made. No payment will be made for any items other than those listed in the Bid.
B. Required items of work and incidentals necessary for the satisfactory completion of the work which are not specifically listed in the Bid, and which are not specified in this section to be measured or to be included in one of the items listed in the Bid, shall be considered as incidental to the work. All costs thereof, including Contractor's overhead costs and profit, shall be considered as included in the lump sum or unit prices bid for the various Bid items. The Contractor shall prepare the Bid accordingly.
C. Work includes furnishing all plant, labor, equipment, tools and materials, which are not furnished by the Owner and performing all operations required to complete the work satisfactorily, in place, as specified and as indicated on the Drawings.
1.2 Descriptions
A. Measurement of an item of work will be by the unit indicated in the Bid.
B. Final payment quantities shall be determined from the record drawings. The record drawing lengths, dimensions, quantities, etc. shall be determined by a survey after the completion of all required work. The precision of final payment quantities shall match the precision shown for that item in the Bid.
C. Payment will include all necessary and incidental related work not specified to be included in any other item of work listed in the Bid.
D. Unless otherwise stated in individual sections of the Specifications or in the Bid, no separate payment will be made for any item of work, materials, parts, equipment, supplies or related items required to perform and complete the work. The costs for all such items required shall be included in the price bid for item of which it is a part.
E. Payment will be made by extending unit prices multiplied by quantities provided and then summing the extended prices to reflect actual work. Such price and payment shall constitute full compensation to the Contractor for furnishing all plant, labor, equipment, tools and materials not furnished by the Owner and for performing all operations required to provide to the Owner the entire Project, complete in place, as specified and as indicated on the Drawings.
1.3 Cash Allowances
A. General
1. The Contractor shall include in the Bid Total all allowances stated in the Contract
Documents. These allowances shall cover the net cost of the services provided
26-35 Water Treatment Plant (WTP) Resiliency Project Additional Filters Page 64 of 1045
01 22 00 - 2
12/23/25 37237-15 by a firm selected by the Contractor. The Contractor's handling costs, labor, overhead, profit and other expenses contemplated for the original allowance shall be included in the items to which they pertain and not in allowances.
2. No payment will be made for nonproductive time on the part of personnel due to the Contractor's failure to properly coordinate activities with the work schedule or the Contractor's problems with maintaining equipment in good working condition.
3. No payment shall be provided for services which fail to verify required results.
B. Should the net cost be more or less than the specified amount of the allowance, the
Contract will be adjusted accordingly by change order. The amount of change order will not recognize any changes in handling costs at the site, labor, overhead, profit and other expenses caused by the adjustment to the allowance.
C. Documentation
1. Submit copies of the invoices with each periodic payment request from the firm providing the services.
D. Schedule of Cash Allowances
1. Soils and Concrete Testing: Allow the amount provided in the Bid for the services of a geotechnical engineering firm and testing laboratory to verify soils conditions including trench excavation and backfill and similar issues and for the testing of concrete cylinders for poured in place concrete.
2. Construction Verification Surveying
a. Allow the amount provided in the Bid for construction surveying by an independent surveying firm, selected by the Owner, to perform horizontal and vertical alignment checks at the discretion of the Engineer.
b. This allowance is solely for the use of the Engineer for verification of the Contractor's reference points, centerlines and work performed. The presence of this cash allowance in no way relieves the Contractor of the responsibility of installing reference points, centerlines, temporary bench marks or verifying that the work has been performed accurately.
3. Owner’s Contingency: Allow the amount provided in the Bid for the Owner’s
Contingency for use of unexpected matters deemed necessary and approved by the Owner. Such allowance may be used to compensate Contractor monies that otherwise may be due Contractor in lieu of execution of a Change Order.
26-35 Water Treatment Plant (WTP) Resiliency Project Additional Filters Page 65 of 1045
01 22 00 - 3
1.4 Erosion and Sedimentation Control
A. General
1. No separate payment shall be made for temporary and/or permanent erosion and sedimentation controls. All temporary and/or permanent erosion and sedimentation control costs shall be included in the unit price bid for the item to which it pertains.
2. No payment will be made for any portion of the Project for which temporary erosion and sedimentation controls are not properly maintained.
1.5 Earthwork
A. Site Preparation
1. No separate payment will be made for site preparation work.
B. Earth Excavation
1. No separate payment will be made for earth excavation. The cost of such work and all costs incidental thereto shall be included in the price bid for the item to which the work pertains.
2. No separate payment will be made for providing sheeting, bracing and timbering.
C. Foundation Excavation
1. Costs for undercutting, foundation preparation, and removal and replacement of unsuitable material, where shown on the Drawings or specified, shall be included in the lump sum bid.
2. Payment for removal and replacement of unsuitable material which is ordered by the Engineer which is not shown on the Drawings or specified shall be made at the unit price bid for:
a. Replacement with Crushed Stone
b. Replacement with Suitable Earth Material
3. No separate payment will be made for concrete backfill of trenches beneath structures. The cost of this work and all costs incidental thereto shall be included in the price bid for the item to which the work pertains.
4. Additional costs of corrective work, made necessary by unauthorized excavation of earth or rock, shall be borne by the Contractor.
D. Dewatering: No separate payment will be made for dewatering required to accomplish the work.
26-35 Water Treatment Plant (WTP) Resiliency Project Additional Filters Page 66 of 1045
01 22 00 - 4
12/23/25 37237-15
E. Backfilling: No separate payment will be made for backfilling or excavation, hauling and placement of borrow material. The cost of all such work and all costs incidental thereto shall be included in the unit price bid for the item to which the work pertains.
1.6 Trench Excavation and Backfill
A. No separate or additional payment shall be made for any special or unique method, means, techniques or equipment necessary for the Contractor's compliance with these Specifications, regulatory requirements, permits, laws or regulations which govern this Project.
B. Trench Excavation: No separate payment shall be made for trench excavation.
C. Sheeting, Bracing and Shoring: No separate payment will be made for providing sheeting, bracing and shoring.
D. Dewatering Excavations: All costs of equipment, labor and materials required for dewatering shall be included in the price bid for the item to which it pertains.
E. Trench Foundation and Stabilization
1. No payment for trench stabilization shall be authorized until after the trench has been dewatered. If the pipe is installed in an inadequately prepared trench bottom, the Engineer shall notify the Contractor in writing of the deficiency and will not authorize payment for that length of pipe which was improperly installed.
2. Payment for trench stabilization shall be made on the basis of the amount authorized and the unit price bid for Removal of Unsuitable Material and Replacement with Crushed Stone. Payment shall include all costs for the removal and disposal of the unsuitable material and replacement with crushed stone. No additional payment will be made for material required for specified bedding.
1.7 Site Utilities
A. Solid sleeves and fittings necessary for connections to existing site utilities, even if not shown on the Drawings, are considered incidental to the Project and will not be paid for separately. Additionally, no payment will be made for fittings provided due to the Contractor's sequence of construction, layout problems, tie-ins or repairs.
1.8 Additional Work
A. Additional work or increase in the quantities of certain classes of work over those included in the lump sum for Item 1 of the Bid, when ordered by the Engineer, shall be measured and paid for in accordance with the following Paragraphs. Measurement of the quantities of additional work shall be made by the Engineer.
B. The unit prices bid shall be applicable to any single occurrence of additional work ordered by the Engineer, which do not exceed the quantity in the Bid. Should a single occurrence exceed the quantity in the Bid, the Contractor and the Owner shall both have the right to negotiate a new unit price which is more representative of the larger quantity
26-35 Water Treatment Plant (WTP) Resiliency Project Additional Filters Page 67 of 1045
01 22 00 - 5 of work being ordered by the Engineer for that single occurrence. The aforementioned shall not relieve the Owner of its right to require the Contractor to provide additional work at the unit prices bid, nor shall it limit the number of times the additional work can be ordered at the unit prices bid, as long as each single occurrence does not exceed the quantity in the Bid.
C. The unit prices bid under Additional Work if Ordered by the Engineer shall include all material costs, labor costs, overhead costs, schedule impact costs, incidental costs, and profit.
Part 2 Products
26-35 Water Treatment Plant (WTP) Resiliency Project Additional Filters Page 68 of 1045
Section 01 25 00 Substitution Procedures
This section outlines the restrictions and requirements for substitutions, product and manufacturer options, and construction method options.
1.2 Definitions
A. For the purposes of these Contract Documents, a “substitute item” shall be defined as one of the following:
1. A product or manufacturer offered as a replacement to a specified product or manufacturer.
2. A product or manufacturer offered in addition to a specified product or manufacturer.
B. For the purposes of these Contract Documents, a “substitute construction method” shall be defined as one of the following:
1. A mean, method, technique, sequence or procedure of construction offered as a replacement for a specified mean, method, technique, sequence or procedure of construction.
2. A mean, method, technique, sequence or procedure of construction offered in addition to a specified mean, method, technique, sequence or procedure of construction.
1.3 General
A. An item or construction method, which is offered where no specific product, manufacturer, mean, method, technique, sequence or procedure of construction is specified or shown on the Drawings, shall not be considered a substitute and shall be at the option of the Contractor, subject to the provisions in the Contract Documents for that item or construction method.
B. For products specified only by a referenced standard, the Contractor may select any product by any manufacturer, which meets the requirements of the Specifications, unless indicated otherwise in the Contract Documents.
C. If the manufacturer is named on the Drawings or in the Specifications as an acceptable manufacturer, products of that manufacturer meeting all requirements of the Specifications and Drawings are acceptable.
D. Whenever the Engineer's design is based on a specific product of a particular manufacturer, that manufacturer will be shown on the Drawings and/or listed first in the list of approved manufacturers in the Specifications. Any Bidder intending to furnish products of other than the first listed manufacturer, or furnish substitute items, shall:
26-35 Water Treatment Plant (WTP) Resiliency Project Additional Filters Page 69 of 1045
01 25 00 - 2
1. Verify that the item being furnished will fit in the space allowed, perform the same functions and have the same capabilities as the item specified,
2. Include in its Bid the cost of all accessory items which may be required by the other listed substitute product,
3. Include the cost of any architectural, structural, mechanical, piping, electrical or other modifications required, and
4. Include the cost of required additional work by the Engineer, if any, to accommodate the item.
1.4 Approvals
Approval, of a substitution as an acceptable manufacturer, of the Engineer is dependent on determination that the product offered is essentially equal in function, performance, quality of manufacture, ease of maintenance, reliability, service life and other criteria to that on which the design is based; and will require no major modifications to structures, electrical systems, control systems or piping systems.
1.5 Substitutions and Options
A. After Notice to Proceed
1. Substitute items will be considered only if the term “equal to” precedes the names of acceptable manufacturers in the Specification.
2. Where items are specified by referenced standard or specified as indicated in
Article 1.3, Paragraph B above, such items shall be submitted to the Engineer for review.
3. The Contractor shall submit shop drawings on the substitute item for the
Engineer's review in accordance with Section 01 33 00.
4. No substitutions will be considered for the manufacturers listed in the Bid.
B. Prior to Opening of Bids
1. No consideration or approvals will be made for products specified by a referenced standard, or specified as indicated in Article 1.3, Paragraph B, above. Such consideration may occur only after the Notice to Proceed.
2. No consideration or approvals will be made for products being offered where the term “equal to” precedes the name of an approved product. Such substitution consideration may occur only after the Notice to Proceed.
3. If the term “or equal” follows the names of acceptable manufacturers, then other manufacturers desiring approval as an acceptable manufacturer may submit the product information to the Engineer for approval during the bidding phase, as
26-35 Water Treatment Plant (WTP) Resiliency Project Additional Filters Page 70 of 1045
01 25 00 - 3 indicated below. With the exception of where the phrase “no substitutions” is associated with a list of manufacturers, where a list of acceptable manufacturers is not preceded by the phrase “equal to”, the list of acceptable manufacturers shall be considered as having the phrase “or equal” following the list, and the list being subject to the “or equal” provisions of this section.
4. The manufacturer shall include the following items in its “or equal” submittal:
a. Descriptive literature including information on materials used, minimum design standards, standard design features, manufacturing processes and facilities, and similar information which will indicate experience and expertise in the manufacture of the product being evaluated.
b. Performance specifications applicable to the manufacturer's standard design which indicates the level of performance to be expected from the product.
c. A complete set of submittal drawings of similar products which have been completed and placed into operation.
d. A list of existing installations of products similar in type and size, information required to satisfy specified experience requirements, or a copy of the bond to be submitted in lieu of experience.
e. Evidence of technical ability of the manufacturer to design and manufacture products meeting Project requirements.
f. Evidence submitted shall include, as a minimum, descriptions of engineering and manufacturing staff capabilities.
g. A copy of the manufacturer's most recent annual business report. Include a statement comparing the present net worth of the manufacturer in comparison to the total value of all products proposed to be furnished. Net worth must exceed the total value of all products proposed.
h. A complete description of field service capabilities, including the location of field service facilities which would serve the proposed facility and the number and qualifications of personnel working from that location.
i. A complete list of all requirements of the Drawings and Specifications with which the manufacturer cannot conform, including reasons why alternate features are considered equivalent.
j. If descriptive literature or drawings illustrate standard products with design features or materials not in compliance with Project requirements then these exceptions must be specifically listed. Failure to do so will indicate intent by the manufacturer to modify design features and alter materials to meet Project requirements.
k. Where additional information is submitted to supplement the submittal, all changes to the list of exceptions shall be specifically noted.
26-35 Water Treatment Plant (WTP) Resiliency Project Additional Filters Page 71 of 1045
01 25 00 - 4
l. All other information necessary to fully evaluate the product for consideration.
5. This “or equal” submittal shall reach the Engineer no later than 15 days prior to the
Bid date. Submittals which do not include a complete list of exceptions to Project requirements, or the statement “No exceptions to the Specifications will be taken”, will automatically be rejected by the Engineer. Manufacturers will be advised of approval or rejection in writing no later than 10 days prior to the Bid date. Rejected submittals may be supplemented with additional information and resubmitted no later than five days prior to the Bid date. Manufacturers making supplementary submittals will be advised of approval or rejection in writing no later than two days prior to the Bid date.
6. Bids based on products which have not received the approval of the Engineer may be determined non-responsive by the Owner and rejected.
Part 2 Products
(NOT USED)
Part 3 Execution
(NOT USED)
26-35 Water Treatment Plant (WTP) Resiliency Project Additional Filters Page 72 of 1045
Section 01 31 19 Project Meetings
A. Work under this Section includes all scheduling and administering of pre-construction and progress meetings as herein specified and necessary for the proper and complete performance of this work.
B. Scheduling and Administration by Engineer:
1. Prepare agenda.
2. Make physical arrangements for the meetings.
3. Preside at meetings.
4. Record minutes and include significant proceedings and decisions.
5. Distribute copies of the minutes to participants.
1.2 Preconstruction Conference
A. The Engineer shall schedule the preconstruction conference prior to the issuance of the Notice to Proceed.
B. Representatives of the following parties are to be in attendance at the meeting:
1. Owner.
2. Engineer.
3. Contractor and superintendent.
4. Major subcontractors.
5. Representatives of governmental or regulatory agencies when appropriate.
C. The agenda for the preconstruction conference shall consist of the following as a minimum:
1. Distribute and discuss a list of major subcontractors and a tentative construction schedule.
2. Critical work sequencing.
3. Designation of responsible personnel and emergency telephone numbers.
4. Processing of field decisions and change orders.
26-35 Water Treatment Plant (WTP) Resiliency Project Additional Filters Page 73 of 1045
01 31 19 - 2
5. Adequacy of distribution of Contract Documents.
6. Schedule and submittal of shop drawings, product data and samples.
7. Pay request format, submittal cutoff date, pay date and retainage.
8. Procedures for maintaining record documents.
9. Use of premises, including office and storage areas and Owner's requirements.
10. Major equipment deliveries and priorities.
11. Safety and first aid procedures.
12. Security procedures.
13. Housekeeping procedures.
14. Work hours.
1.3 Project Coordination Meetings
A. Attend regular monthly meetings as directed by the Engineer.
B. Hold called meetings as the progress of the work dictates.
C. The meetings shall be held at the location indicated by the Engineer.
D. Representatives of the following parties are to be in attendance at the meetings:
1. Engineer.
2. Contractor and superintendent.
3. Major subcontractors as pertinent to the agenda.
4. Owner's representative as appropriate.
5. Representatives of governmental or other regulatory agencies as appropriate.
E. The minimum agenda for progress meetings shall consist of the following:
1. Review and approve minutes of previous meetings.
2. Review work progress since last meeting.
3. Note field observations, problems, and decisions.
26-35 Water Treatment Plant (WTP) Resiliency Project Additional Filters Page 74 of 1045
01 31 19 - 3
4. Identify problems which impede planned progress.
5. Review off-site fabrication problems.
6. Review Contractor's corrective measures and procedures to regain plan schedule.
7. Review Contractor's revision to the construction schedule as outlined in the
Supplementary Conditions.
8. Review submittal schedule; expedite as required to maintain schedule.
9. Maintenance of quality and work standards.
10. Review changes proposed by Owner for their effect on the construction schedule and completion date.
11. Complete other current business.
(NOT USED)
26-35 Water Treatment Plant (WTP) Resiliency Project Additional Filters Page 75 of 1045
26-35 Water Treatment Plant (WTP) Resiliency Project Additional Filters Page 76 of 1045
Section 01 32 16
Construction Schedules
1.1 Scope
A. Preparing, furnishing, distributing, and periodic updating of the construction schedules as specified herein.
B. The purpose of the schedule is to demonstrate that the Contractor can complete the overall Project within the Contract Time and meet all required interim milestones.
1.2 Submittals
A. Overall Project Schedule (OPS)
1. Submit the schedule within 10 days after date of the Notice to Proceed.
2. The Engineer will review the schedule and return it within 10 days after receipt.
3. If required, resubmit within 10 days after receipt of a returned copy.
B. Near Term Schedule (NTS)
1. Submit the first Near Term Schedule within 10 days of the Notice to Proceed.
2. The Engineer will review the schedule and return it within 10 days after receipt.
C. Submit an update of the OPS and NTS with each progress payment request.
D. Submit the number of copies required by the Contractor, plus four copies to be retained by the Engineer.
1.3 Approval
A. Approval of the Contractor's detailed construction program and revisions thereto shall in no way relieve the Contractor of any of Contractor's duties and obligations under the Contract. Approval is limited to the format of the schedule and does not in any way indicate approval of, or concurrence with, the Contractor's means, methods and ability to carry out the work.
1.4 Overall Project Schedule (OPS)
A. The Contractor shall submit to the Owner for approval a detailed Overall Project Schedule of the Contractor's proposed operations for the duration of the Project.
The OPS shall be in the form of a Gantt/bar chart.
26-35 Water Treatment Plant (WTP) Resiliency Project Additional Filters Page 77 of 1045
01 32 16 - 2
B. Gantt/Bar Chart Schedule
1. Each activity with a duration of five or more days shall be identified by a separate bar. Activities with a duration of more than 20 days shall be sub divided into separate activities.
2. The schedule shall include activities for shop drawing preparation and review, fabrication, delivery, and installation of major or critical path materials and equipment items.
3. The schedule shall show the proposed start and completion date for each activity. A separate listing of activity start and stop dates and working day requirements shall be provided unless the information is shown in text form on the Gantt/bar chart.
4. The schedule shall identify the Notice to Proceed date, the Contract Completion date, major milestone dates, and a critical path.
5. The schedule shall be printed on a maximum 11 x 17-inch size paper. If the OPS needs to be shown on multiple sheets, a simplified, one page, summary bar chart showing the entire Project shall be provided.
6. The schedule shall have a horizontal time scale based on calendar days and shall identify the Monday of each week.
7. The schedule shall show the precedence relationship for each activity.
1.5 Near Term Schedule (NTS)
A. The Contractor shall develop and refine a detailed Near Term Schedule showing the day to day activities with committed completion dates which must be performed during the upcoming 30-day period. The detailed schedule shall represent the Contractor's best approach to the Work which must be accomplished to maintain progress consistent with the Overall Project Schedule.
B. The Near Term Schedule shall be in the form of Gantt/bar chart and shall include a written narrative description of all activities to be performed and describe corrective action to be taken for items that are behind schedule.
1.6 Updating
A. Show all changes occurring since previous submission of the updated schedule.
B. Indicate progress of each activity and show actual completion dates.
C. The Contractor shall be prepared to provide a narrative report at the Project Progress Meetings. The report shall include the following:
1. A description of the overall Project status and comparison to the OPS.
26-35 Water Treatment Plant (WTP) Resiliency Project Additional Filters Page 78 of 1045
01 32 16 - 3
2. Identify activities which are behind schedule and describe corrective action to be taken.
3. A description of changes or revisions to the Project and their effect on the
OPS.
4. A description of the Near Term Schedule of the activities to be completed during the next 30 days. The report shall include a description of all activities requiring participation by the Engineer and/or Owner.
Part 2 Products
(NOT USED)
Part 3 Execution
(NOT USED)
26-35 Water Treatment Plant (WTP) Resiliency Project Additional Filters Page 79 of 1045
26-35 Water Treatment Plant (WTP) Resiliency Project Additional Filters Page 80 of 1045
Section 01 32 33 Construction Videos and Photographs
A. The Contractor shall furnish all equipment and labor materials required to provide the
Owner with digital construction videos and photographs of the Project.
B. Photo and video files shall become the property of the Owner and none of the videos or photographs shall be published without express permission of the Owner.
1.2 Pre and Post Construction Videos and Photographs
A. Prior to the beginning of any work, the Contractor shall take videos and photographs of the work area to record existing conditions.
B. Following completion of the work, another set of videos and photographs shall be made showing the same areas and features as in the pre-construction videos and photographs.
C. All conditions which might later be subject to disagreement shall be shown in sufficient detail to provide a basis for decisions.
1.3 File Format, Media, and Submittals
A. Photographs shall be in “jpg” format.
B. Videos shall be in a format viewable by Microsoft Windows Media Player or Apple
QuickTime Player. Audio narration is desirable.
C. Files shall be named such that what is being viewed is self-evident.
D. Files shall be submitted on a flash drive, compact disk (CD) or a digital video disk (DVD).
If submitted on DVD, disk shall be recorded in “Minus R” format.
E. The pre-construction videos and photographs shall be submitted to the Engineer within
25 calendar days after the date of receipt by the Contractor of Notice to Proceed.
Post-construction videos and photographs shall be provided prior to final acceptance of the Project.
26-35 Water Treatment Plant (WTP) Resiliency Project Additional Filters Page 81 of 1045
01 32 33 - 2
Construction Videos and Photographs
12/19/24 37237-15
Part 3 Execution
(NOT USED)
26-35 Water Treatment Plant (WTP) Resiliency Project Additional Filters Page 82 of 1045
Section 01 33 00 Submittal Procedures
A. The work under this Section includes submittal to the Engineer of shop drawings, product data and samples required by the various Sections of these Specifications.
B. Submittal Contents: The submittal contents required are specified in each Section.
C. Definitions: Submittals are categorized as follows:
1. Shop Drawings
a. Shop drawings shall include technical data, drawings, diagrams, procedure and methodology, performance curves, schedules, templates, patterns, test reports, calculations, instructions, measurements and similar information as applicable to the specific item for which the shop drawing is prepared.
b. Provide newly-prepared information with graphic information at accurate scale (except as otherwise indicated) with name or preparer (firm name) indicated. The Contract Drawings shall not be reproduced by any method for use as or in lieu of detail shop drawings. Show dimensions and note dimensions that are based on field measurement. Identify materials and products in the work shown. Indicate compliance with standards and special coordination requirements. Do not allow shop drawings to be used in connection with the Work without appropriate final “Action” markings by the Engineer.
c. Drawings shall be presented in a clear and thorough manner. Details shall be identified by reference to sheet and detail, Specification Section, schedule or room numbers shown on the Contract Drawings.
d. Minimum assembly drawings sheet size shall be 11 x 17-inches.
e. Minimum detail sheet size shall be 8-1/2 x 11-inches.
f. Minimum Scale :
i. Assembly Drawings Sheet, Scale: 1-inch = 30 feet.
ii. Detail Sheet, Scale: 1/4-inch = 1 foot.
2. Product Data
a. Product data includes standard published information on materials, products and systems, not specially prepared for this Project, other than the designation of selections from among available choices printed therein.
26-35 Water Treatment Plant (WTP) Resiliency Project Additional Filters Page 83 of 1045
01 33 00 - 2
12/19/24 37237-15
b. Collect required data into one submittal for each unit of work or system, and mark each copy to show which choices and options are applicable to the Project. Include manufacturer's standard published recommendations for application and use, compliance with standards, application of labels and seals, notation of field measurements which have been checked and special coordination requirements.
3. Samples
a. Samples include both fabricated and un-fabricated physical examples of materials, products and units of work, both as complete units and as smaller portions of units of work, either for limited visual inspection or, where indicated, for more detailed testing and analysis.
b. Provide units identical with final condition of proposed materials or products for the work. Include “range” samples, not less than three units, where unavoidable variations must be expected, and describe or identify variations between units of each set. Provide full set of optional samples where the Engineer's selection is required. Prepare samples to match the Engineer's sample where indicated. Include information with each sample to show generic description, source or product name and manufacturer, limitations and compliance with standards. Samples are submitted for review and confirmation of color, pattern, texture and “kind” by the Engineer. Engineer will note “test” samples, except as otherwise indicated, for other requirements, which are the exclusive responsibility of the Contractor.
4. Miscellaneous submittals related directly to the work (non-administrative) include warranties, maintenance agreements, workmanship bonds, project photographs, survey data and reports, physical work records, statements of applicability, quality testing and certifying reports, copies of industry standards, record drawings, field measurement data, operating and maintenance materials, overrun stock, security/protection/safety keys and similar information, devices and materials applicable to the work but not processed as shop drawings, product data or samples.
1.2 Specific Category Requirements
A. General: Except as otherwise indicated in the individual work sections, comply with general requirements specified herein for each indicated category of submittal.
Submittals shall contain:
1. The date of submittal and the dates of any previous submittals.
2. The Project title.
3. Unless indicated otherwise by the Engineer’s submittal management software, provide numerical submittal numbers, starting with 1.0, 2.0, etc. Revisions to be numbered 1.1, 1.2, etc.
26-35 Water Treatment Plant (WTP) Resiliency Project Additional Filters Page 84 of 1045
01 33 00 - 3
4. The Names of:
a. Contractor
b. Supplier
c. Manufacturer
5. Identification of the product, with the Specification Section number, permanent equipment tag numbers and applicable Drawing No.
6. Field dimensions, clearly identified as such.
7. Relation to adjacent or critical features of the work or materials.
8. Applicable standards, such as ASTM .
9. Notification to the Engineer in writing, at time of submissions, of any deviations on the submittals from requirements of the Contract Documents.
10. Identification of revisions on resubmittals.
11. Contractor's stamp, initialed or signed or affirmatively indicated on submittal, certifying to review of submittal, verification of products, field measurements and field construction criteria and coordination of the information within the submittal with requirements of the work and of Contract Documents.
12. Submittals showing more than the particular item under consideration shall have all but the pertinent description of the item for which review is requested crossed out.
1.3 Routing of Submittals
A. Submittals and routine correspondence shall be routed as follows:
1. Supplier to Contractor (through representative if applicable)
2. Contractor to Engineer
3. Engineer to Contractor and Owner
4. Contractor to Supplier
2.1 Shop Drawings
A. Unless otherwise specifically directed by the Engineer, make all shop drawings accurately to a scale sufficiently large to show all pertinent features of the item and its method of connection to the work.
26-35 Water Treatment Plant (WTP) Resiliency Project Additional Filters Page 85 of 1045
01 33 00 - 4
B. Submit all shop assembly drawings, as a digital image, pdf format, scanned at the original scale.
C. Submit all shop drawings as a digital image, pdf format, scanned at the original scale.
2.2 Manufacturer's Literature
A. Where content of submitted literature from manufacturers includes data not pertinent to this submittal, clearly indicate which portion of the contents is being submitted for the Engineer's review.
2.3 Samples
A. Samples shall illustrate materials, equipment or workmanship and established standards by which completed work is judged.
B. Unless otherwise specifically directed by the Engineer, all samples shall be of the precise article proposed to be furnished.
C. Submit all samples in the quantity which is required to be returned plus one sample which will be retained by the Engineer.
2.4 Colors
A. Unless the precise color and pattern is specifically described in the Contract
Documents, wherever a choice of color or pattern is available in a specified product, submit accurate color charts and pattern charts to the Engineer for review and selection.
B. Unless all available colors and patterns have identical costs and identical wearing capabilities, and are identically suited to the installation, completely describe the relative costs and capabilities of each.
3.1 Contractor's Coordination of Submittals
A. Prior to submittal for the Engineer's review, the Contractor shall use all means necessary to fully coordinate all material, including the following procedures:
1. Determine and verify all field dimensions and conditions, catalog numbers and similar data.
2. Coordinate as required with all trades and all public agencies involved.
3. Submit a written statement of review and compliance with the requirements of all applicable technical Specifications as well as the requirements of this Section.
26-35 Water Treatment Plant (WTP) Resiliency Project Additional Filters Page 86 of 1045
01 33 00 - 5
4. Clearly indicate in a letter or memorandum on the manufacturer's or fabricator's letterhead, all deviations from the Contract Documents.
B. Each and every shop drawing and data sheet submittal shall bear the Contractor's stamp showing that they have been so checked. Shop drawings submitted to the Engineer without the Contractor's stamp will be returned to the Contractor for conformance with this requirement.
C. The Owner may back charge the Contractor for costs associated with having to review a particular shop drawing, product data or sample more than two times to receive a “No Exceptions Taken” mark.
D. Grouping of Submittals
1. Unless otherwise specifically permitted by the Engineer, make all submittals in groups containing all associated items.
2. No review will be given to partial submittals of shop drawings for items which interconnect and/or are interdependent. It is the Contractor's responsibility to assemble the shop drawings for all such interconnecting and/or interdependent items, check them and then make one submittal to the Engineer along with Contractor's comments as to compliance, non-compliance or features requiring special attention.
E. Schedule of Submittals
1. Within 30 days of Contract award and prior to any shop drawing submittal, the Contractor shall submit a schedule showing the estimated date of submittal and the desired approval date for each shop drawing anticipated. A reasonable period shall be scheduled for review and comments. Time lost due to unacceptable submittals shall be the Contractor's responsibility and some time allowance for resubmittal shall be provided. The schedule shall provide for submittal of items which relate to one another to be submitted concurrently.
3.2 Timing of Submittals
A. Make all submittals far enough in advance of scheduled dates for installation to provide all required time for reviews, for securing necessary approvals, for possible revision and resubmittal, and for placing orders and securing delivery.
B. In scheduling, allow sufficient time for the Engineer's review following the receipt of the submittal.
3.3 Reviewed Shop Drawings
A. Engineer Review
1. Allow a minimum of 30 days for the Engineer's initial processing of each submittal requiring review and response, except allow longer periods where processing must be delayed for coordination with subsequent submittals. The
26-35 Water Treatment Plant (WTP) Resiliency Project Additional Filters Page 87 of 1045
01 33 00 - 6
12/19/24 37237-15
Engineer will advise the Contractor promptly when it is determined that a submittal being processed must be delayed for coordination. Allow a minimum of two weeks for reprocessing each submittal. Advise the Engineer on each submittal as to whether processing time is critical to progress of the work, and therefore the work would be expedited if processing time could be foreshortened.
2. Acceptable submittals without any comments will be marked “No Exceptions
Taken”.
3. Submittals containing comments for clarification will be marked “Exceptions
Noted”.
4. Submittals marked “Revise and Resubmit” must be revised to reflect required changes and the initial review procedure repeated.
5. The “Rejected” notation is used to indicate products which are not acceptable.
Upon return of a submittal so marked, the Contractor shall repeat the initial review procedure utilizing acceptable products.
B. No work or products shall be installed without a drawing or submittal bearing the “No
Exceptions Taken” notation. The Contractor shall maintain at the job site a complete set of shop drawings bearing the Engineer's stamp.
C. Substitutions: In the event the Contractor obtains the Engineer's approval for the use of products other than those which are listed first in the Contract Documents, the Contractor shall, at the Contractor's own expense and using methods approved by the Engineer, make any changes to structures, piping and electrical work that may be necessary to accommodate these products.
D. Use of the “No Exceptions…
This is the start of the file's text. The full file is on GovTribe.