This is an architectural drawing depicting the 2nd Floor Secure Perimeter and RF Shielding Plan for a facility. The document shows two detailed floor plans (views A1 and H1) illustrating the layout and shielding requirements for a secure area containing hardware-in-loop cockpits, ante bays, staging areas, and supporting spaces.
The plans specify comprehensive RF (radiofrequency) shielding requirements throughout the secure perimeter, including copper lining to be provided above ceilings in ante bays and integrated into RF panels per manufacturer specifications. Key shielding elements include shielded sliding doors with scheduled references, 1-meter horizontal extensions of shielding at full perimeter locations, and continuous enclosure at level 2 with roof deck termination above the secure area. The document identifies wall/door test point areas (indicated in green), ceiling/floor test point areas (indicated in red), and directional indicators for test points. Notable spaces include rooms numbered 201-214 with specific functions such as freight elevator, staging, toilet simulation, corridors, ante bays, and secure areas. Special notes indicate no RF panel shielding on the east wall of ante bays with windows, and references to detailed specifications on drawing A-516 for ante bays 214. The shielding legend provides a comprehensive key for interpreting the various RF shielding components throughout the facility design.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UP
ELEC
HARDWARE-IN-LOOP
COCKPITS
HARDWARE-IN-LOOP
COCKPITS
ELEC
AN
TE
B
AY
S
AN
TE
B
AY
S
FREIGHT ELEV
STAGING
TOILE
ELEV
OPEN
BELOW
NO RF PANEL
SHIELDING ON EAST
WALL OF ANTE BAYS.
WINDOW IN WALL
WITHOUT SHIELDING
1 METER HORIZONTAL
EXTENSION. FULL PERIMETER.
1 METER HORIZONTAL
EXTENSION. FULL PERIMETER.
A13 A-514
E13 A-514 H17
A-514
. 1 G9 A-514 A-514
COPPER LINING TO BE
PROVIDED ABOVE CEILING
OF ENCLOSURE IN ANTE
BAYS AND RETURN INTO
RF PANELS AS PER
MANUFACTUER. REFER
TO DETAILING
NO RF PANEL
SHIELDING ON EAST
WALL OF ANTE BAYS.
WINDOW IN WALL
WITHOUT SHIELDING
COPPER LINING TO BE
PROVIDED ABOVE CEILING
OF ENCLOSURE IN ANTE
BAYS AND RETURN INTO
RF PANELS AS PER
MANUFACTUER. REFER
TO DETAILING
STAIRS #
E5
A-514
STAIR #1
1 METER HORIZONTAL
EXTENSION. FULL
PERIMETER.
SHIELDED SLIDING DOOR.
REFER TO SCHEDULE.
SHIELDED SLIDING DOOR.
REFER TO SCHEDULE.
1 METER HORIZONTAL
EXTENSION. FULL
PERIMETER.
TOILET SIM
204 A5
A-515 A9
203 CORRIDOR A-514
A5 A-516
A9 A-516
NOTE: REFERENCE
DETAILS ON A-516 FOR
ANTE BAYS 214
RF SHIELDED 11 GA
COPPER LINING RF
SHIELDING
COPPER LINING RF
SHIELDING AT
FLOOR - INCLUSIVE
BELOW RAISED
ACCESS FLOORING - 1
METER MINIMUM.
RF SHIELDED 11 GA
AT FLOOR
COPPER LINING RF
SHIELDING AT ROOF -
1 METER MINIMUM
RF SHIELDED 11 GA
BELOW ROOF
SECURED AREA
PERIMETER
ICD/ICS 705 w/ RF
SHIELDING
SECURED AREA
PERIMETER
ICD/ICS 705 WALL TYPE A
1 METER HORIZONTAL
EXTENSION. FULL PERIMETER.
1 METER HORIZONTAL
EXTENSION. FULL PERIMETER
ROOF DEC. ABOVE
SECURE AREA TO
TERMINATE FOR
CONTINUOUS
ENCLOSURE AT
LEVEL 2
ROOF DEC. ABOVE
SECURE AREA TO
TERMINATE FOR
CONTINUOUS
ENCLOSURE AT
LEVEL 2
D17 A-514
A17 A-514 L17
A-514
A17 A-514
SIM.
L9 A-514
COPPER LINING TO BE
PROVIDED ABOVE CEILING
OF ENCLOSURE IN ANTE
BAYS AND RETURN INTO
RF PANELS AS PER
MANUFACTUER. REFER
TO DETAILING
COPPER LINING TO BE
PROVIDED ABOVE CEILING
OF ENCLOSURE IN ANTE
BAYS AND RETURN INTO
RF PANELS AS PER
MANUFACTUER. REFER
TO DETAILING
E5 A-514
E9 A-514
E9 A-516
A5 A-516
A9 A-516
C
A B
D
US Army &orSs of Engineers ®
SHEET ID
N
3 5 7 9 11 13 15 17
L
G
E
C
A
DA
TE
DE
SC
RI
PT
IO
N
M
AR
K
2 4 6 10 12 14 16 1 19
SHIELDING LEGEND
P
M
K
H
F
D
B
KEY PLAN
AS-BUILT A120S
2N D
FL
O
O R
SE
C
U R
E
PE
R
IM
ET
ER
/S H
IE
LD
IN
G
PL
AN
S
C O
N
TR
AC
T
NO
W
2P L2
0C
SO
LI
C
IT
AT
IO
N
NO
W
2P
L2 0R
IS
SU
E
DA
TE
SE
PT
EM
BE
R
, 2
SU
BM
IT
TE
D
BY
PPC
H
EC
KE
D
BY
W F
D R
AW
N
BY
ALD
ES
IG
N
ED
BY
ES SI
ZE
AN
SI
D
TH
E
KO
R
TE
C
O M
PA
NY
U
S H
IG
H
W
AY
H
IG
H
LA
N
D ,I
L
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
RS
LO
S
AN
G
EL
ES
DI
ST
RI
CT
W
IL
SH
IR
E
BL
VD
,S
U
IT
E
0, LO
S
AN
G
EL
ES
C
AL
IF
O
R N
IA
R
EC
O R
D D
R
AW
IN
G
S
AS
-B U
IL
T
-2
ED
W
AR
D
S
AI
R
FO
R C
E
BA
SE
CA
LI
FO
RN
IA
-O
IN
T
SI
M U
LA
TI
O N
EN
VI
R O
N M
EN
T
FA
CI
LI
TY
3/64" = 1'-0"A1 2ND FLOOR SECURE PERIMETER / SHIELDING PLAN
PLAN NORTH
3/64" = 1'-0"H1 2ND FLOOR ROOF SECURE PERIMETER / SHIELDING PLAN
AS-B8ILT RECORD DRAWING
THIS RECORD DRAWINGS HAS BEEN
PREPARED, IN PART, BASED UPON
INFORMATION FURNISHED BY OTHERS.
WHILE THIS INFORMATION IS BELIEVED TO BE
RELIABLE, THE ARCHITECT/ENGINEER
ASSUMES NO RESPONSIBILITY FOR THE
ACCURACY OFTHIS RECORD DRAWING OR
RECORD SPECIFICATIONS OR FOR ANY
ERRORS OR OMISSIONS THAT MAY HAVE
BEEN INCORPORATED INTO IT AS A RESULT OF
INCORRECT INFORMATION PROVIDED TO THE
ARCHITECT/ENGINEER. THOSE RELYING ON
THIS RECORD DOCUMENT ARE ADVISED TO
OBTAIN INDEPENDENT VERIFICATION OF ITS
ACCURACY.
Indicates wall / door test point area
Indicates ceiling /floor test point area
Indicates direction of test points
File details come from the government source that posted it. Updated .