Waste Water Treatment Plant Site Visit Questions and Answers

Q.1-During the site visit, we did not see a sludge digestion process, as such, how is the Class B Sludge requirements being met for Land Application of the biosolids?

ANS: We don’t have a Class B. The Class III Plant located at AFRL does not process sludge.

The contractor is required to take off base and dispose of. See 1.6 of the PWS.

Q.2-Can we get copies of the past 3 years of Annual Land Application Reports?

ANS: Please clarify. There is none from the Govt. This is to be done by the contractor.

Q.3- We understand you anticipate awarding the contract on 9/25 and expect contractor to start on October 1. Given the expedited procurement timeline will it be possible to for new contractor to provide a 30-day transition plan starting October 1, 2019?

ANS: No, time does not permit.

Q.4- Please provide a listing of all required laboratory tests for the Main Base WWTP and AFRL WWTP for daily, weekly, monthly, quarterly, semi-annual and annual basis.

ANS: See current Board Order.

Q.5- Please confirm that coliform testing is required daily for the WWTP effluent.

ANS: See current Board Order.

Q.6- Please provide a list of all testing requirements under Title 22 for the Main Base WWTP.

ANS: See current Board Order.

Q.7- If the sludge profile test comes back hazardous, is the contractor responsible for the cost of the hazardous sludge disposal?

ANS: No. The Government is responsible if they created.

Q.8- Please provide a listing of the monthly testing requirements for bio-solids.

ANS: See attached previous report.

Q.9- Please confirm that the contractor is responsible for the disposal cost of grit and screenings.

ANS: Confirmed. See PWS, paragraph 1.6.

Q.10- Please confirm that at minimum of a level 3 state certified operator must be physically present to operate the wastewater facility.

ANS: Confirmed. See PWS, paragraph 4.1.3. Operators shall possess a valid Grade III, IV or V WWTP California State Water Resources Control Board Certificate of Competence.

Q.11- Is the contractor required to have a California Wastewater Contract Operator Certification prior to start date?

FA9301-19-R-A013 Site Visit Questions and Answers Attachment 14 September 9, 2019

ANS: Yes, see PWS, paragraph 4.0.