Waste Water Treatment Plant Site Visit Questions and Answers
Q.1-During the site visit, we did not see a sludge digestion process, as such, how is the Class B Sludge requirements being met for Land Application of the biosolids?
ANS: We don’t have a Class B. The Class III Plant located at AFRL does not process sludge.
The contractor is required to take off base and dispose of. See 1.6 of the PWS.
Q.2-Can we get copies of the past 3 years of Annual Land Application Reports?
ANS: Please clarify. There is none from the Govt. This is to be done by the contractor.
Q.3- We understand you anticipate awarding the contract on 9/25 and expect contractor to start on October 1. Given the expedited procurement timeline will it be possible to for new contractor to provide a 30-day transition plan starting October 1, 2019?
ANS: No, time does not permit.
Q.4- Please provide a listing of all required laboratory tests for the Main Base WWTP and AFRL WWTP for daily, weekly, monthly, quarterly, semi-annual and annual basis.
ANS: See current Board Order.
Q.5- Please confirm that coliform testing is required daily for the WWTP effluent.
ANS: See current Board Order.
Q.6- Please provide a list of all testing requirements under Title 22 for the Main Base WWTP.
ANS: See current Board Order.
Q.7- If the sludge profile test comes back hazardous, is the contractor responsible for the cost of the hazardous sludge disposal?
ANS: No. The Government is responsible if they created.
Q.8- Please provide a listing of the monthly testing requirements for bio-solids.
ANS: See attached previous report.
Q.9- Please confirm that the contractor is responsible for the disposal cost of grit and screenings.
ANS: Confirmed. See PWS, paragraph 1.6.
Q.10- Please confirm that at minimum of a level 3 state certified operator must be physically present to operate the wastewater facility.
ANS: Confirmed. See PWS, paragraph 4.1.3. Operators shall possess a valid Grade III, IV or V WWTP California State Water Resources Control Board Certificate of Competence.
Q.11- Is the contractor required to have a California Wastewater Contract Operator Certification prior to start date?
FA9301-19-R-A013 Site Visit Questions and Answers Attachment 14 September 9, 2019
ANS: Yes, see PWS, paragraph 4.0.
FA9301-19-R-A013 Site Visit Questions and Answers Attachment 14