FA9301-15-R-0005 _Attachment_2 _Appendix_A_Asbestos_Specifications.pdf
PDF 1 MB Posted
- Attached to
- Demolition and Abatement IDIQ Federal contract opportunity
- Solicitation number
- FA9301-15-R-0005
About this file
Solicitation FA9301-15-R-0005 Attachment 2 Appendix A Asbestos Specifications
View the file
Other files for this federal contract opportunity
Show all 23
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Edwards Air Force Base, California
Asbestos Specification Section 02080
SECTION 02080 - Page 1
SECTION 02080
ASBESTOS SPECIFICATIONS
February 2015
PART 1 GENERAL
1.1 REFERENCES
The publications and documents listed below are the main rules and regulations that govern asbestos related work. They form a part of this specification and may be referenced in this document. The publications are referred to within the text by the basic designation only. Other unlisted applicable federal, state and local rules and regulations will also still apply, when applicable; the Contractor(s) are responsible for knowing all applicable rules and regulations.
AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI)
ANSI Z88.2 (1992) Respiratory Protection
ANSI Z9.2 (2001) Fundamentals Governing the Design and
Operation of Local Exhaust Ventilation Systems
ASTM INTERNATIONAL (ASTM)
ASTM E 1368 (2003) Visual Inspection of Asbestos
Abatement Projects
ASTM E 1494 (1992; R 2002) Encapsulants for Spray- or Trowel-Applied Friable Asbestos-Containing Building Materials
ASTM E 736 (2000) Cohesion/Adhesion of Sprayed Fire-
Resistive Materials Applied to Structural Members
U.S. ENVIRONMENTAL PROTECTION AGENCY (EPA)
EPA 560/5-85-024 (1985) Guidance for Controlling Asbestos-
Containing Materials in Buildings (Purple Book)
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
29 CFR 1926.103 Respiratory Protection
29 CFR 1926.1101 Asbestos
29 CFR 1926.200 Accident Prevention Signs and Tags
29 CFR 1926.51 Sanitation
29 CFR 1926.59 Hazard Communication
FA9301-15-R-0005, Attachment 2, Appendix A Asbestos Specifications Page 1 of 63
Asbestos Specification
SECTION 02080 - Page 2
40 CFR 262 Standards Applicable to Hazardous Waste
Generators
40 CFR 61-SUBPART A National Emission Standard for Hazardous Air Pollutants (NESHAP) General Provisions
40 CFR 61-SUBPART M NESHAP - National Emission Standard for
Asbestos
40 CFR 763 Asbestos; Asbestos Hazard Emergency Response Act (AHERA)
NOTE: Where a Federal OSHA standard is referenced herein, the same California OSHA standard is also applicable, or whichever is more stringent.
CALIFORNIA CODE OF REGULATIONS
Title 8, Div. 1, Ch. 4, Section 1529 Asbestos (Cal/OSHA)
Title 22, Division 4.5, Chapter 12, Standards Applicable to Hazardous
Waste Generators
UNITED STATES AIR FORCE / EDWARDS AIR FORCE BASE
Edwards Air Force Base Asbestos Management Plan (AFI 32-1052)
Edwards Air Force Base Asbestos Operating Plan
412 Test Wing Hazardous Waste Management Plan (AFI 32-7042)
1.2 DEFINITIONS
1.2.1 Asbestos Containing Material(s) (ACM)
Any material that contains greater than one percent asbestos.
1.2.2 Asbestos-Containing Construction Material (ACCM)
Cal/OSHA term used to describe construction materials that contain asbestos in amounts greater than one-tenth of one percent (0.1%) either alone or mixed with fibrous or non-fibrous materials. With the exception of waste issues, for the purposes of this contract the terms ACM and ACCM shall be interchangeable.
1.2.3 Amended Water
Water containing a wetting agent.
1.2.4 Area Sampling
Sampling of asbestos fiber concentrations in, around and/or adjacent to asbestos work areas, which approximates the concentrations of asbestos in the theoretical breathing zone but is not actually collected in the breathing zone of an employee.
1.2.5 Asbestos
FA9301-15-R-0005, Attachment 2, Appendix A Asbestos Specifications Page 2 of 63
Asbestos Specification
SECTION 02080 - Page 3
The term asbestos includes Chrysotile, Amosite, Crocidolite, Tremolite asbestos, Anthophyllite asbestos, and Actinolite asbestos and any of these minerals that has been chemically treated or altered.
1.2.6 Asbestos Control Area
That area where asbestos removal operations are performed which is isolated by physical boundaries which assist in the prevention of the uncontrolled release of asbestos dust, fibers, or debris (i.e. Regulated Area, Containment, etc.).
1.2.7 Asbestos Fibers
Those fibers having an aspect ratio of at least 3:1 and longer than 5 micrometers as determined by National Institute for Occupational Safety and Health (NIOSH) Method 7400.
1.2.8 Asbestos Permissible Exposure Limit
0.1 fibers per cubic centimeter (f/cc) of air as an 8-hour time weighted average and 1.0 f/cc as a 30 minute excursion limit measured in the breathing zone as defined by 29 CFR 1926.1101 (and/or Cal/OSHA) or other Federal legislation having legal jurisdiction for the protection of workers health.
1.2.9 Background Air Sample
The ambient airborne asbestos concentration in an uncontaminated area as measured immediately prior to any asbestos hazard abatement efforts.
1.2.10 Contractor
The Contractor is that individual, or entity under contract to Edwards Air Force Base (AFB) to perform the herein listed work. This may include sub-contractors to the Edwards AFB contractor(s) as well.
1.2.11 Competent Person
A person who is capable of identifying existing and predictable hazards in the surroundings or working conditions which are unsanitary, hazardous, or dangerous to employees, and who has authorization to take prompt corrective measures to eliminate them, one who is capable of identifying existing asbestos hazards in the workplace and selecting the appropriate control strategy for asbestos exposure, who has the authority to take prompt corrective measures to eliminate them: in addition, for Class I and Class II work who is specially trained in a training course which meets the criteria of EPA's Model Accreditation Plan (40 CFR part 763) for supervisor, or its equivalent and, for Class III and Class IV work, who is trained in a manner consistent with EPA requirements for training of local education agency maintenance and custodial staff as set forth at 40 CFR
763.92 (a)(2). Note: For operations involving more than 100 square feet of asbestos containing construction material as defined in subsection (r) of 8 CCR Section 1529. Asbestos, the competent person may fulfill the requirement contained in Section 341.9 to specify a certified supervisor for asbestos related work. Current California Training and Certification is required.
FA9301-15-R-0005, Attachment 2, Appendix A Asbestos Specifications Page 3 of 63
Asbestos Specification
SECTION 02080 - Page 4
1.2.12 Encapsulation
The abatement of an asbestos hazard through the appropriate use of chemical encapsulants.
1.2.13 Encapsulants
Specific materials in various forms used to chemically or physically entrap asbestos fibers in various configurations to prevent these fibers from becoming airborne. There are four types of encapsulants as follows which must comply with manufacturer and industry standard requirements.
a. Removal Encapsulant (can be used as a wetting agent)
b. Bridging Encapsulant (used to provide a tough, durable surface coating to asbestos containing material)
c. Penetrating Encapsulant (used to penetrate the asbestos containing material encapsulating all asbestos fibers and preventing fiber release due to routine mechanical damage)
d. Lock-Down Encapsulant (used to seal off or "lock-down" minute asbestos fibers left on surfaces from which asbestos containing material has been removed).
1.2.14 Friable Asbestos Material
Greater than one percent asbestos containing material, as determined using the method specified in appendix E, subpart E, 40 CFR part 763 section 1, Polarized Light Microscopy (PLM), that can be crumbled, pulverized, or reduced to powder by hand pressure when dry. Or an ACM that has been made friable by the forces acted upon it (i.e. weather, damage, demolition, etc.)
1.2.15 Glovebag Technique
Those asbestos removal and control techniques put forth in 29 CFR 1926.1101 Section (g) (and/or applicable Cal/OSHA section).
1.2.16 HEPA Filter Equipment
High efficiency particulate air (HEPA) filtered vacuum and/or exhaust ventilation equipment with a filter system capable of collecting and retaining asbestos fibers. Filters shall retain 99.97 percent of particles
0.3 microns or larger. All HEPA filtered equipment used on Edwards AFB (EAFB) is required to be challenge tested (DOP or equivalent) onsite and documented as tested and passing at least semi-annually or as requested by
EAFB.
1.2.17 Government Project Manager
That qualified person employed directly by the Government to monitor, sample, inspect the work or in some other way advise the Contracting Officer. The Government Project Manager or Project Manager (PM) can be an employee or support contractor of the Government.
FA9301-15-R-0005, Attachment 2, Appendix A Asbestos Specifications Page 4 of 63
Asbestos Specification
SECTION 02080 - Page 5
1.2.18 Negative Pressure Enclosure (NPE)
That engineering control technique described as a negative pressure enclosure in 29 CFR 1926.1101 (and/or applicable Cal/OSHA section).
1.2.19 Nonfriable Asbestos Material
Any material containing greater than one percent asbestos as determined by PLM, that, when dry, cannot be crumbled, pulverized, or reduced to a powder by hand pressure.
1.2.20 Personal Sampling
Air sampling which is performed in accordance with 29 CFR 1926.1101 (and/or applicable Cal/OSHA section), to determine asbestos fiber exposure levels within the breathing zone of employees.
1.2.21 Private Qualified Person (PQP)
That qualified person hired by the Contractor to perform the herein listed tasks. See Qualified Person for more information.
1.2.22 Qualified Person (QP)
An experienced Registered Architect, Professional Engineer, Certified Industrial Hygienist, Certified Asbestos Consultant or other qualified person who has successfully completed training and is therefore accredited under a legitimate State Model Accreditation Plan (California accreditation and certification is required) as described in 40 CFR 763 (and/or Cal/OSHA)as a Building Inspector, Contractor/Supervisor, Management Planner and Asbestos Project Designer; and if analyzing PCM air samples, has successfully completed the National Institute of Occupational Safety and Health (NIOSH) 582 course "Sampling and Evaluating Airborne Asbestos Dust" or equivalent and is proven proficient through the ACGIH PAT rounds (or equivalent). The QP must be qualified to perform visual inspections as indicated in ASTM E 1368. The QP shall be appropriately licensed in the State of California. The QP may be referred to herein as PQP or Project Monitor.
1.2.23 TEM
Refers to Transmission Electron Microscopy.
1.2.24 Time Weighted Average (TWA)
The TWA is an 8-hour time weighted average airborne concentration of asbestos fibers.
1.2.25 Wetting Agent
A chemical added to water to reduce the water's surface tension thereby increasing the water's ability to soak into the material to which it is applied.
1.2.26 Additional Definitions
a. ACGIH - American Conference of Governmental Industrial Hygienists
FA9301-15-R-0005, Attachment 2, Appendix A Asbestos Specifications Page 5 of 63
Asbestos Specification
SECTION 02080 - Page 6
b. AHERA - Asbestos Hazard Emergency Response Act
c. AIHA - American Industrial Hygiene Association
d. ANSI - American National Standards Institute
e. AOO – Asbestos Operations Office, Civil Engineering, 412 CEG/CENMP
f. ASTM - American Society for Testing and Materials
g. BEE – Bioenvironmental Engineering, 412 AMDS/SGPB
h. Cal/OSHA - California Division of Occupational Safety and Health
i. Certified Asbestos Consultant (CAC): An individual certified by the
State of California Division of Occupational Safety and Health as authorized by Section 7180 et seq. of Business and Professions Code.
j. Certified Asbestos Site Surveillance Technician (CSST): An individual certified by the State of California Division of Occupational Safety and Health as authorized by Section 7180 et seq. of Business and Professions Code.
k. Certified Industrial Hygienist (CIH) - An industrial hygienist certified in Comprehensive Practice by the American Board of Industrial Hygiene.
l. Challenge Testing – See DOP.
m. Competent Person - The Contractor’s employee who meets the requirements of and is responsible for the activities of the Competent Person as described in Title 8 CCR 1529. This includes but is not limited to an individual who has current AHERA Contractor/Supervisor accreditation and has the responsibility and authority to ensure that the Contractor’s employees comply with the contract documents and all relevant Cal/OSHA regulations.
n. Critical Barrier - Critical Barriers used to restrict water and air flow. Critical Barriers are the barriers placed over openings in the walls and ceilings of a work area in order to ensure that airborne fibers cannot escape the work area via these openings. The Contractor will construct impermeable barriers at all exits or openings, including doorways, duct chases, mechanical shafts, elevator shafts, floor openings, drains, and the like, so that all possible exit or entrance routes are effectively barricaded and sealed. Critical barriers are at least two layers of 6-mil thick poly.
o. Curtained Doorway, Z-Flapped - A device to allow ingress or egress from one room to another while permitting minimal air movement between spaces (such as the various rooms of the decontamination chamber).
Each Curtained Doorway will consist of three sheets of poly. The first barrier will be a sheet of poly covering the entire passage and taped to the ceiling, walls, and floor. This sheet will be slit vertically in order for the workers to pass through it. Another sheet of poly will cover the first sheet but be taped only to the ceiling (or top of the first barrier) and down one wall. The third sheet of poly will be
FA9301-15-R-0005, Attachment 2, Appendix A Asbestos Specifications Page 6 of 63
Asbestos Specification
SECTION 02080 - Page 7 placed on the opposite side of the slit poly from the second sheet.
The third sheet of poly will be attached in a similar manner as the second sheet except the wall attachment will be to the opposite wall.
Each barrier must be weighted at the bottom in order to ensure that it will lay flat against the slit sheet opening should the negative pressure system fail. Other designs are permissible, if approved by the Project Monitor.
p. Decontamination Enclosure System - (Also known as Decon or Waste
Transfer Decon) A series of connected rooms, typically clean room, shower room and equipment or dirty room, designed for the decontamination of workers and equipment that is separated from the work area and from each other by z-flapped curtained doorways. This unit shall be constructed with at least two layers of fireproof six-mil poly for the floors, walls, and ceiling. The floor of the dirty room shall consist of two layers of six-mil poly plus a third layer of poly, four-mil or thicker, to be used as a removable drop layer. Drop layer is to be removed as needed, but not less than daily. All decontamination enclosure systems used for worker entry and exit shall be equipped with a shower.
q. Demolition - The wrecking or taking out of any load-supporting structural member, casework, items or surfaces of a facility together with any related handling operations and disposal.
r. DOP – Dioctyl Phthalate particles which are normally used as an agent for challenge testing the efficiency of HEPA filters. DOP and/or Challenge Testing where referenced herein will also include approved equivalent methods.
s. Dust or Debris - Material visible to the Project Monitor. Dust and debris may be contaminated with asbestos, and may affect the asbestos work practices, containment or clearance air samples required on this project, whether contaminated with asbestos or not.
t. EM – Environmental Management, 412 CEG/CEVC
u. EPA - U.S. Environmental Protection Agency
v. Federal OSHA or OSHA - Federal Occupational Safety and Health
Administration.
w. Fixed object - A piece of equipment or furniture in the work area which cannot be removed, or will not be removed by EAFB's decision, from the work area.
x. Magnehelic Gauge - Instrument for measuring the static air-pressure differential across a barrier. Magnehelic® is a registered product name and is only used here-in as an example.
y. Manometer - See "Magnehelic gauge". This project requires at least one properly calibrated and fully functioning continuously recording manometer.
z. Project Monitoring – The Competent Person, 3rd Party Consultant, PQP, QP, etc. duties; some but not all expected duties are listed. The actions marked with an “*” are as requested by the Government:
FA9301-15-R-0005, Attachment 2, Appendix A Asbestos Specifications Page 7 of 63
Asbestos Specification
SECTION 02080 - Page 8
a. Visual inspection for the presence of visible emissions.
b. Air monitoring (area, personal, air quality, clearance, etc.)
performed in accordance with accepted methods.
c. Inspection of abatement contractor’s, and contractor’s employees, work practices for compliance to these and other specifications and applicable regulations.
d. Thorough project documentation.
e. *Collecting core samples of encapsulated or bridged materials.
f. *Collecting other bulk samples during and following abatement.
g. *Sampling substrata following abatement.
aa. NVLAP - National Voluntary Laboratory Accreditation Program.
bb. NESHAP - The National Emission Standards for Hazardous Air Pollutants
(40 CFR Part 61)
cc. NESHAP Notification- The regulatory notification required by local Air Quality Management District(s). All demolitions regardless of asbestos and all projects that disturb ACM of any quantity shall have a notification submitted by the abatement contractor, after review and approval by EAFB in accordance with the Edwards AFB Asbestos Management Plan. Courtesy Notification is required for all projects that are under the de minimis amount or are non-RACM; EAFB review and approval is still required.
dd. NIOSH - The National Institute for Occupational Safety and Health
ee. Outside Air - The air outside of containment.
ff. Owner and/or Owner Asbestos Representatives – Edwards Air Force Base Owner (Edwards AFB, EAFB, EAFB agent, etc), unless otherwise stated, the Base Commander’s AUTHORIZED REPRESENTATIVES, including the Base officers, employees, agents and Project Managers. Owner Asbestos Representatives are appropriately asbestos trainied Edwards AFB Civil Engineering Asbestos Operations Office (AOO), Bioenvironmental Engineering asbestos personnel and Environmental Management asbestos personnel.
gg. PCM - Phase contrast microscopy according to NIOSH Method 7400.
hh. Poly - Flame Retardant Polyethylene sheeting.
ii. Renovation - Altering in any way one or more facility components.
jj. Shower Room - A room between the clean room and the equipment room in the decontamination enclosure with hot and cold or warm running water controllable at the tap and suitably arranged for complete showering during decontamination and equipped with an overflow pan to contain water splashed, leaked or spilled out of the shower unit. Approved waste water filtration is required when applicable.
kk. Specification Amendment – Edwards AFB reserves the right to amend this asbestos specification at any time, on a project by project basis;
amendments could be more or less restrictive depending upon the situation. Only EAFB asbestos personnel in Civil Engineering, Bioenvironmental Engineering and Environmental Management can make
FA9301-15-R-0005, Attachment 2, Appendix A Asbestos Specifications Page 8 of 63
Asbestos Specification
SECTION 02080 - Page 9 amendments, which shall be approved by the government project manager.
ll. Visible Emissions - Any emissions, whether containing particulate asbestos material or not, that are visually detectable without the aid of instruments. This does not include condensed uncombined water vapor.
mm. Waste Load-out/Transfer System - A decontamination system utilized for transferring containerized waste from inside to outside of the work area. A series of three connected rooms used for the load-out of asbestos-containing materials that have been properly containerized.
The waste load-out chamber system shall normally consist of three connected chambers adjacent to the work area. Each chamber shall be constructed with at least two layers of six-mil thick poly for the floors, walls, and ceiling. The chamber located closest to the work area is known as the dirty chamber, and in addition to the two layers of six-mil thick poly on the floor, shall also have a third layer of poly, four-mil or thicker, to be used as a removable drop layer. The drop layer is to be removed as needed but at least daily. The chamber located closest to the outside the work area is known as the clean chamber. See Section 16 for proper use of waste Load-out/Transfer System.
nn. Waste Water – Edwards AFB may require a permit to dispose of or discharge waste water into or on to EAFB property. Prior to any discharge or disposal of water, contact EAFB (Environmental Management) for applicable requirements. Discharge/disposal of waste water off EAFB property may be regulated by federal, state and local laws.
oo. Wet Cleaning - The process of eliminating asbestos contamination and visible dust and debris from building surfaces and objects by using cloths, mops, or other utensils which have been dampened with water and afterwards thoroughly decontaminating them or disposing of them as asbestos contaminated waste.
pp. Work Area - Designated rooms, spaces, or areas of the project in which asbestos abatement actions are to be undertaken or which may become contaminated as a result of such abatement actions. A contained work area or temporary enclosure is a work area that is isolated from the rest of the facility by the use of critical barriers and cleaning barriers, a decontamination system, and additional means of signs and barriers to reduce access by unauthorized persons. A contained work area is a work area which has been sealed, protected with poly, and equipped with a decontamination enclosure system. The work area includes all decontamination chambers, waste transfer system and the abatement area. A non-contained work area is an isolated or controlled-access work area which has not had poly installed nor been equipped with a decontamination enclosure system.
1.3 REQUIREMENTS
1.3.1 Description of Work
The work covered by this section includes the handling and control of asbestos and asbestos containing materials (ACM), asbestos project monitoring, sampling, consulting, etc. and describes some of the resultant
FA9301-15-R-0005, Attachment 2, Appendix A Asbestos Specifications Page 9 of 63
Asbestos Specification procedures and equipment required to protect workers, the environment and occupants of the building or area, or both, from contact with airborne asbestos fibers. The work also includes the disposal of any asbestos containing materials generated by the work. More specific operational procedures shall be outlined in individual project documents (scope of work, proposals, etc.). Provide negative pressure enclosure techniques as outlined in this specification. All asbestos removal work shall be supervised by a competent person as specified herein. Contractors are responsible for complying with all applicable training, rules and regulations for other hazardous materials that may be encountered or used during asbestos projects, such materials include but are not limited to lead, mercury, treated wood, radioactive devices, silica, electronic waste (E-waste) and PCB’s.
Edwards AFB reserves the right to develop an asbestos specification amendment at any time, on a project by project basis or a specification section basis; amendments could be more or less restrictive dependent upon the situation. Only EAFB asbestos personnel in Civil Engineering (Asbestos Operations Office), Bioenvironmental Engineering and Environmental Management can make amendments to this specification, which shall then be approved by the Government Project Manager and or Contracting Officer.
1.3.2 Medical Requirements
Provide medical requirements including but not limited to medical surveillance and medical record keeping as listed in 29 CFR 1926.1101 (and/or Cal/OSHA).
1.3.2.1 Medical Examinations
Before exposure to airborne asbestos fibers, provide workers with a comprehensive medical examination as required by 29 CFR 1926.1101 or other pertinent State or local directives. This requirement must have been satisfied within the 12 months prior to the start of work on this contract.
The same medical examination shall be given on an annual basis to employees engaged in an occupation involving asbestos and within 30 calendar days before or after the termination of employment in such occupation.
Specifically identify x-ray films of asbestos workers to the consulting radiologist and mark medical record jackets with the word "ASBESTOS."
1.3.2.2 Medical Records
Maintain complete and accurate records of employees' medical examinations, medical records, and exposure data for a period of indefinite time after termination of employment and make records of the required medical examinations and exposure data available for inspection and copying to: The Assistant Secretary of Labor for Occupational Safety and Health (OSHA), or authorized representatives of them, and an employee's physician upon the request of the employee or former employee.
1.3.3 Employee Training
Submit certificates (training, state certification, medical approval, fit test, etc.) to Government Project Manager, prior to the start of work but after the main abatement submittal, signed by each employee indicating that the employee has received training in the proper handling of materials and wastes that contain asbestos in accordance with 40 CFR 763; understands the
SECTION 02080 - Page 10
FA9301-15-R-0005, Attachment 2, Appendix A Asbestos Specifications Page 10 of 63 health implications and risks involved, including the illnesses possible from exposure to airborne asbestos fibers; understands the use and limits of the respiratory equipment to be used; and understands the results of monitoring of airborne quantities of asbestos as related to health and respiratory equipment as indicated in 29 CFR 1926.1101 (and/or Cal/OSHA) on an initial and annual basis. Certificates shall be organized by individual worker, not grouped by type of certification. Post appropriate evidence of compliance with the training requirements of 40 CFR 763. Train all personnel involved in the asbestos control work in accordance with United States Environmental Protection Agency (USEPA) Asbestos Hazard Emergency Response Act (AHERA) training criteria or State training criteria whichever is more stringent. The Contractor shall document the training by providing:
dates of training, training entity, course outline, names of instructors, and qualifications of instructors upon request by the Contracting Officer.
Furnish each employee with respirator training and fit testing administered by the PQP as required by 29 CFR 1926.1101 (and/or Cal/OSHA). Fully cover engineering and other hazard control techniques and procedures. All asbestos related workers (worker, supervisor, consultants, designers, etc.)
shall have an applicable current State of California asbestos license. All submittals are subject to review and acceptance by EAFB asbestos personnel (Civil Engineering, Bioenvironmental Engineering and Environmental Management).
1.3.4 Permits, Licenses, and Notifications
Contractor is responsible for obtaining all necessary permits, licenses, profiles and notifications in conjunction with asbestos removal, encapsulation, hauling, waste and disposition, and furnish notification of such actions required by Federal, State, regional, and local authorities prior to the start of work. Notify the State's environmental protection agency and/or local air pollution control district/agency, as applicable, and the Government Project Manager in writing 10 working days prior to commencement of work in accordance with 40 CFR 61-SUBPART M and the Edwards AFB Asbestos Management Plan’s asbestos/demolition NESHAP Notification requirements. Submit copies of all Notifications to the Contracting Officer or their representative. All NESHAP notifications (demolition, renovation and courtesy) shall be submitted to Edwards AFB Environmental Management (EM) for review and approval. Notification submittal to EM shall be at least 5 work days prior to contractor submitting to the local Air Pollution Control District, as described above. Edwards AFB shall be listed as project/facility owner / generator for all notifications and waste profiles.
1.3.5 Environment, Safety and Health Compliance
In addition to detailed requirements of this specification, comply with those applicable laws, ordinances, criteria, rules, and regulations of Federal, State, regional, and local authorities regarding handling, storing, transporting, and disposing of asbestos waste materials. Comply with the applicable requirements of the current issue of 29 CFR 1926.1101 (and/or Cal/OSHA), 40 CFR 61-SUBPART A, 40 CFR 61-SUBPART M, 49 CFR Parts 100 to 185, 22 CCR Division 4.5 and the Edwards AFB Hazardous Waste Management Plan. Submit matters of interpretation of standards to the appropriate administrative agency for resolution before starting the work. Where the requirements of this specification, applicable laws, rules, criteria, ordinances, regulations, and referenced documents vary, the most stringent requirement as defined by the Government shall apply.
SECTION 02080 - Page 11
FA9301-15-R-0005, Attachment 2, Appendix A Asbestos Specifications Page 11 of 63
Asbestos Specification
SECTION 02080 - Page 12
1.3.6 Respiratory Protection Program
Establish and implement a respirator program as required by ANSI Z88.2, 29 CFR 1926.1101, and 29 CFR 1926.103 (and/or Cal/OSHA). Submit a written description of the program to the Contracting Officer, for review and acceptance by Edwards AFB asbestos personnel. Submit a written program manual or operating procedure including methods of compliance with regulatory statutes.
1.3.6.1 Respirator Program Records
Submit records of the respirator program as required by ANSI Z88.2, 29 CFR 1926.103, and 29 CFR 1926.1101 (and/or Cal/OSHA).
1.3.7 Asbestos Control Supervisor
The Contractor shall be represented on site by a supervisor, trained using the model Contractor accreditation plan as indicated in the Federal statutes for all portions of the herein listed work. California training, certification and licensing is required.
1.3.8 Hazard Communication
Adhere to all parts of 29 CFR 1926.59 (and/or Cal/OSHA) and provide the Contracting Officer with a copy of the Material Safety Data Sheets (MSDS) for all materials brought to the site. Materials and associated MSDS’s are subject to review and approval in accordance with applicable rules and regulations.
1.3.9 Asbestos Abatement Plan (Work Plan)
Submit for each project a site specific and detailed work plan for removal and/or demolition of materials containing asbestos; multiple plans may be required if there are multiple buildings with different materials and/or procedures encountered.
The plan, not to be combined with other abatement plans (lead, demo, etc.)
shall be prepared, signed, and sealed by the PQP.
Provide a Table of Contents (TOC) for each abatement submittal; The TOC shall follow the sequence of requirements in the Specification.
Such plan in accordance with requirements listed herein shall include but not be limited to; a physical description of work area and/or building; a description of each material to be removed and approximate quantities; a schedule and procedures for turning off and sealing ventilation systems and openings; personnel hygiene procedures; materials and equipment necessary for asbestos removal/encapsulation; remediation and encapsulation work procedures; the precise personal protective equipment to be used including, but not limited to, respiratory protection, type of whole-body protection;
the location of asbestos control areas including decontamination and change areas; interface of trades involved in the construction; sequencing of asbestos related work; waste collection/storage/disposal plan; locations of local exhaust equipment; air monitoring plan; PQP inspections.
The plan shall also include emergency response plans or contact information;
applicable safety precautions, procedures and materials such as (but not limited to) lockout / tag-out, FOD prevention and fall protection.
FA9301-15-R-0005, Attachment 2, Appendix A Asbestos Specifications Page 12 of 63
Asbestos Specification Section 02080
SECTION 02080 - Page 13
The work plan shall list all project associated contractors and government contacts, along with contact information.
In accordance with the Edwards AFB Asbestos Management Plan, the Asbestos Abatement Plan must be approved, as applicable, by Government Project Manager, Bioenvironmental Engineering and Environmental Management in writing prior to starting any asbestos work. The Contractor, Asbestos Control Supervisor, and PQP shall meet with the Contracting Officer or their representative prior to beginning work, to discuss in detail the Asbestos Abatement Plan, including work procedures and safety precautions. Once approved by the Contracting Officer, the plan will be enforced as if an addition to the specification.
The contractor may request a change to the specification on a project by project basis. All requests and reasoning/justification shall be in writing and submitted through the Contracting Officer to EAFB asbestos personnel (Civil Engineering Asbestos Operations Office, Environmental Management, and when applicable Bioenvironmental Engineering) who then must approve of any changes in writing; requests may or may not be approved.
1.3.10 Testing Laboratory
Submit the name, address, and telephone number of each testing laboratory and/or individual selected for the sampling, analysis, and reporting of airborne concentrations of asbestos fibers along with evidence that each laboratory selected holds the appropriate State license, accreditations and/or permits and certification that each PCM laboratory is American Industrial Hygiene Association (AIHA) accredited and that persons counting the samples have been judged proficient by current inclusion on the AIHA Asbestos Analysis Registry (AAR) and current successful participation of the laboratory in the Proficiency Analytical Testing (PAT) Program (or equivalent). Where analysis to determine asbestos content in bulk materials or transmission electron microscopy is required, submit evidence that the laboratory is accredited by the National Institute of Science and Technology (NIST) under National Voluntary Laboratory Accreditation Program (NVLAP) for asbestos analysis. The testing laboratory firm shall be independent of the asbestos contractor and shall have no employee or employer relationship which could constitute a conflict of interest.
1.3.11 Landfill Approval
Prior to planning for disposal, submit written request of the landfill intended for asbestos disposal; all hazardous waste landfills (hazardous and non-hazardous) must be on the Defense Reutilization Marketing Office (DRMO) and Edwards AFB list of approved disposal facilities, as well as being U.S.
Environmental Protection Agency (EPA) and California Department of Toxic Substance Control (DTSC) approved.
1.3.12 Medical Certification
Provide a written certification for each worker and supervisor, signed by a licensed physician indicating that the worker and supervisor has met or exceeded all of the medical prerequisites listed herein and in 29 CFR
1926.1101 and 29 CFR 1926.103 as prescribed by law. Submit certificates prior to the start of work but after the main abatement submittal.
1.4 SUBMITTALS
Government approval is required for submittals with a "G" designation;
FA9301-15-R-0005, Attachment 2, Appendix A Asbestos Specifications Page 13 of 63
Asbestos Specification Section 02080
SECTION 02080 - Page 14 submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Most submittals may be required for every project; Edwards AFB will make determination as contract
FA9301-15-R-0005, Attachment 2, Appendix A Asbestos Specifications Page 14 of 63
Asbestos Specification
SECTION 02080 - Page 15 progresses. The following shall be submitted in accordance with contract requirements and/or as directed:
SD-03 Product Data: Closeout submittal to Government Project Manager.
Local exhaust equipment; G
Vacuums; G
Respirators; G
Pressure differential automatic recording instrument; G
Amended water; G
Glovebags; G
Encapsulants; G
SD-06 Project Plans, Documentation, Records and Test Reports: Submit all to Government Project Manager prior to work; as individual project closeout submittals; and/or as requested by Edwards AFB Representative.
ALL MUST BE READILY AVAILABLE ON THE JOB-SITE for Edwards AFB review.
Asbestos Abatement Plan; G
NESHAP Notifications; G
Rental equipment; G
Testing laboratory/individual; G
Daily project documentation/notes by PQP and Competent Person; G
Air sampling results; G
Pressure differential recordings for local exhaust system; G
Asbestos disposal quantity report; G
Waste shipment records; G
Waste Delivery tickets; G
Material Safety Data Sheets (MSDS) for all materials proposed for transport to the project site; G
Encapsulation test patches; G
Clearance sampling; G (Bioenvironmental Engineering approval required prior to removing containment, NPE, etc.)
SD-07 Certificates: Closeout submittal to Government Project Manager.
Some items may not be required for every project. ALL MUST BE READILY AVAILABLE ON THE JOB-SITE for Edwards AFB review.
FA9301-15-R-0005, Attachment 2, Appendix A Asbestos Specifications Page 15 of 63
Asbestos Specification
SECTION 02080 - Page 16
Private qualified person documentation; G
Contractor's license; G
Permits and licenses; G
Worker's license; G
Landfill approval; G
Employee training; G
Medical certification requirements; G
Respiratory Protection Program; G
Respirator program records; G
Vacuums (manufacturer & filter documentation); G
Water filtration equipment (manufacturer & filter documentation); G
Ventilation systems (manufacturer & filter documentation); G
Challenge testing documentation for HEPA filtered equipment; G
Other equipment used to contain airborne asbestos fibers; G
Chemical encapsulants / sealers; G
1.5 QUALITY ASSURANCE
1.5.1 Private Qualified Person Documentation
Submit for review and approval, the name, address, and telephone number of the Private Qualified Person (PQP) selected to prepare the Asbestos Hazard Abatement Plan, perform monitoring/oversight, perform final clearance and training, and documented evidence that the PQP has successfully completed training in and is accredited and where required is certified as, a Building Inspector, Contractor/Supervisor Abatement Worker, and Asbestos Project Designer as described by 40 CFR 763 and has successfully completed the National Institute of Occupational Safety and Health (NIOSH) 582 course "Sampling and Evaluating Airborne Asbestos Dust" or equivalent (see section
1.3.10 for more sampling/analysis requirements). The PQP shall be appropriately licensed in the State of California. The PQP and the asbestos contractor shall not have an employee/employer relationship or financial relationship which could constitute a conflict of interest. The PQP shall be a first tier subcontractor.
1.5.2 Competent Person Documentation
Submit training certification and a current State of California Asbestos Contractor's and Supervisor's License.
FA9301-15-R-0005, Attachment 2, Appendix A Asbestos Specifications Page 16 of 63
Asbestos Specification
SECTION 02080 - Page 17
1.5.3 Worker's License
Submit documentation that requires all workers have a current State of California Asbestos Workers License.
1.5.4 Contractor's License
Contractor shall have current asbestos contractor's license. Submit a copy of the asbestos contractor's license issued by the State of California.
1.5.5 Air Sampling Results
Complete fiber counting and provide results of personal and area sampling to the PQP (if analysis is performed by an offsite lab) and Government Project Manager (and/or Base Asbestos Personnel) for review within 24 hours of the "time off" of the sample pump; sample results are to be posted/stored on the job site within the prescribed 24 hour time frame. Notify the Contracting Officer and Project Manager immediately of any airborne levels of asbestos fibers in excess of the acceptable limits (typically background level or
0.010 f/cc as determined on a case by case basis). Submit sampling results to the Government Project Manager and the affected Contractor’ employees where required by law; include sampling Chain of Custody signed by the testing laboratory/employee performing air sampling analysis. Notify the Contractor, Base Asbestos Personnel and the Contracting Officer immediately of any variance in the pressure differential which could cause adjacent unsealed areas to have asbestos fiber concentrations in excess of 0.01 fibers per cubic centimeter or background (if allowed/used) as applicable. In no circumstance shall levels exceed 0.1 fibers per cubic centimeter.
1.5.6 Pressure Differential Recordings for Local Exhaust System
Provide a local exhaust system that creates a negative pressure of at least
0.025 inches of water relative to the pressure external to the enclosure and operate it continuously, 24 hours a day, until the temporary enclosure of the asbestos control area is removed. Submit pressure differential recordings for each work day to the PQP and Government Project Manager for review within 24 hours, or as requested, from the end of each work day.
1.6 EQUIPMENT
1.6.1 Rental Equipment
Any equipment rented and delivered to the site for the purpose of conducting asbestos abatement work must be accompanied with documentation verifying that the rental agency has been notified, and acknowledges receipt of notification that the equipment being rented will be used for asbestos abatement work.
This documentation must be submitted to the Project Monitor prior to the equipment being delivered to the job site. Rental equipment, including scaffolding, will be held to the same standard of cleanliness as all other equipment on this project.
All rented equipment must be inspected and accepted by the Project Monitor as it arrives onsite. Any equipment covered with dust (no matter the source of dust), plaster debris, multiple layers of encapsulant and/or spray glue, or any other debris will not be accepted. Delays caused by a lack of clean equipment will not extend Contractor’s schedule. Equipment rejected due to a lack of cleanliness must be removed from Owner’s grounds in order to be cleaned. Dirty equipment wrapped in plastic will not be acceptable.
FA9301-15-R-0005, Attachment 2, Appendix A Asbestos Specifications Page 17 of 63
Asbestos Specification
SECTION 02080 - Page 18
The Project Monitor must be informed 24 hours prior to the delivery of any rental equipment.
PART 2 PRODUCTS
2.1 ENCAPSULANTS
Shall conform to current USEPA requirements, shall contain no toxic or hazardous substances as defined in 29 CFR 1926.59, and shall conform to the following performance requirements.
2.1.1 Removal Encapsulants
Requirement Test Standard
Flame Spread - 25, Smoke Emission - 50 ASTM E 84
Life Expectancy - 20 years ASTM C 732 Accelerated Aging Test
Permeability - Minimum 0.4 perms ASTM E 96
2.1.2 Bridging Encapsulant
Fire Resistance - Negligible affect on ASTM E 119 fire resistance rating over 3 hour test (Classified by UL for use over fibrous and cementitious sprayed fireproofing)
Impact Resistance - Minimum ASTM D 2794 43 in/lb Gardner Impact Test
Flexibility - no rupture or cracking ASTM D 522
Mandrel Bend Test
2.1.3 Penetrating Encapsulant
Cohesion/Adhesion Test - ASTM E 736
FA9301-15-R-0005, Attachment 2, Appendix A Asbestos Specifications Page 18 of 63
50 pounds of force/foot
Fire Resistance - Negligible affect on ASTM E 119
(Classified by UL for use over fibrous and cementitious sprayed fireproofing)
Impact Resistance - Minimum ASTM D 2794 43 in/lb Gardner Impact Test
Flexibility - no rupture or cracking ASTM D 522
Mandrel Bend Test
2.1.4 Lock-down Encapsulant
Flame Spread: 25, Smoke Emission - 50 ASTM E 84
Life Expectancy: 20 years ASTM C 732 Accelerated
Permeability: Minimum 0.4 perms ASTM E 96
Fire Resistance: Negligible affect on ASTM E 119
(Tested with fireproofing over encapsulant applied directly to steel member)
Bond Strength: 100 pounds of force/foot ASTM E 736 (Tests compatibility with cementitious and fibrous fireproofing)
PART 3 EXECUTION
3.1 EQUIPMENT
At all times, provide the Government Project Manager or the Government Project Manager Representative, with complete sets of personal protective equipment as required for entry to and inspection of the asbestos control area.
3.1.1 Respirators
All respiratory protection shall be provided to workers in accordance with the submitted written respiratory protection program, which includes all items as required by OSHA. This program shall be posted in the clean room of the worker decontamination enclosure system or adjacent to the clean room.
The Contractor shall ensure that all workers entering the regulated area wear appropriate respiratory protection. Respiratory protection provided workers shall be in accordance with 29 CFR 1910.134, 8 CCR 1529, and 8 CCR 5144 and the respiratory protection program submitted by the Contractor.
This program shall be available at the worksite.
The Project Monitor, EAFB or their representative may deny access to the regulated area to anyone who, in the final judgment of the Project Monitor, SECTION 02080 - Page 18
FA9301-15-R-0005, Attachment 2, Appendix A Asbestos Specifications Page 19 of 63 is not properly wearing adequate respiratory protection for the project conditions. This includes but is not limited to those wearing unidentified respirators, those with improperly sealed respirators, those wearing respirators in an improper manner such as over their protective suit hood, or in any other fashion judged by the on-site Project Monitor (or Owner Representative) to be improper or inadequate to protect the individual from the airborne asbestos at the project site.
The Contractor shall provide each worker needing respiratory protection with his or her own, individually identified, NIOSH-approved respirator. At a minimum, these respirators will be equipped with a P-100 series HEPA filter.
The Contractor shall provide additional filter types if that becomes necessary for specific hazards discovered on the job site or if required in the contract documents.
The Contractor shall ensure that all workers use the respirator in compliance with the manufacturer's instructions for proper use and care of that product.
Workers must perform positive and negative air pressure fit tests each time a respirator is put on, whenever the respirator design so permits. Powered air purifying respirators shall be tested for adequate flow as specified by the manufacturer before every entry into the work space. Respirators that do not meet the minimum flow as specified shall be taken out of service or repaired as necessary.
Workers shall be given, at least, a qualitative fit test in accordance with procedures detailed in the Cal/OSHA requirements for all respirators to be used on this abatement project. An appropriately administered quantitative fit test may be substituted for the qualitative fit test.
The Contractor shall ensure and provide written records to the Project Monitor that all workers wearing tight-fitting respirators have been appropriately fit tested in accordance with the requirements of 8 CCR 5144.
The Contractor shall ensure that nothing interferes with the seal of the respirator to the face of the worker. This includes but is not limited to facial hair, clothing, protective clothing, equipment or anything else that comes between the respirator and the face of the worker.
Workers conducting any work that may create an airborne release of asbestos must wear appropriate respiratory protection. This includes, but is not limited to the pre-cleaning of asbestos contamination of furniture, equipment and floors, waste handling and the set-up of contaminated work areas.
In no event will a negative exposure assessment be allowed to lower respiratory protection, from that listed in this specification or required by regulation in the absence of an NEA, prior to the start of a project.
Air samples used for negative exposure assessments created after the project has started must be from work conducted under this contract and individual project(s).
Minimum Respiratory Protection for OSHA Class I Work Unless specified differently in the contract documents, the Contractor’s employees conducting Class I work will wear tight-fitting, full-face powered-air purifying respirators for all Class I work. Contract documents
SECTION 02080 - Page 19
FA9301-15-R-0005, Attachment 2, Appendix A Asbestos Specifications Page 20 of 63 may require additional respiratory protection, such as the use of supplied air respirator systems if, in the opinion of the Project Monitor or Owner, the airborne asbestos levels are expected to exceed one fiber per cubic centimeter of air (1 f/cc).
After work has begun, if the Contractor wishes to lower respiratory protection requirements, such as for glovebag or other work, he or she must demonstrate to the Project Monitor that personal air sampling results from that project prove that airborne fiber levels are below the Cal/OSHA Permissible Exposure Limit. The Project Monitor will normally require sampling results used for this purpose to include several days of sampling taken during the work expected to generate the highest airborne levels. The Project Monitor will submit a written request for respirator reduction to the Owner Asbestos Representatives, who will have final authority regarding whether or not the respiratory protection may be reduced below the need for powered-air purifying respirators.
Unless stated otherwise in the contract documents, for the purposes of respiratory protection, Class I work will include the removal of materials such as…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .