FA9301-15-R-0005 _Amendment_0001 _Attachment_7 _L-1 _Revised_ELIN_Schedule.xlsx
XLSX spreadsheet 42 KB Posted
- Attached to
- Demolition and Abatement IDIQ
- Solicitation number
- FA9301-15-R-0005
About this file
FA9301-15-R-0005 Amendment 0001 Revised Solicitation Attachment 7 L-1 Revised ELIN Schedule dated 07 May 2015
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1 ELIN ITEM SUPPLIES/SERVICES Unit of Issue Quantity Unit Price Extended Price
| A001 | Removal/Return of General Office Furniture | SF | 10000 | $ - 0 |
| A002 | Removal/Return of Complex Equipment | SF | 10000 | $ - 0 |
| A003 | Equipment Rental (Including delivery / pickup) | DAY | 250 | $ - 0 |
| A004 | Large Equipment Removal | DAY | 125 | $ - 0 |
| A005 | Small Equipment Removal | DAY | 125 | $ - 0 |
| A006 | Sandbags UV Protected LF up to 2' High | LF | 10000 | $ - 0 |
| A007 | Errosion Control (Silkscreening, silt fencing, hay bales, binders) | LF | 2500 | $ - 0 |
| Enclosures | ||||
| A008 | Limited Containment Barriers | SF | 70000 | $ - 0 |
| A009 | Exterior Full Containment Barriers | SF | 400000 | $ - 0 |
| A010 | Interior Full Containment Barriers | SF | 400000 | $ - 0 |
| A011 | Limited Containment Barriers - Inside 6 mil | SF | 25000 | $ - 0 |
| A012 | Limited Containment Barriers - Outside 10 mil | SF | 25000 | $ - 0 |
| A013 | Exterior Hard Enclosure Decon | SF | 10000 | $ - 0 |
| A014 | Decon Facility Interior | EA | 500 | $ - 0 |
| A015 | Decon Facility Exterior | EA | 250 | $ - 0 |
| A016 | Decontamination Area | EA | 250 | $ - 0 |
| A017 | Installation of New Permanent Fence | LF | 25000 | $ - 0 |
| A018 | Fence Rental (Per Day 6' high) | LF | 20000 | $ - 0 |
| A019 | Fence Rental (Month 6' high) | LF | 200 | $ - 0 |
| A020 | Fence Rental (Year 6' high) | LF | 5000 | $ - 0 |
| A021 | Fence Gates (6' high) | EA | 50 | $ - 0 |
| Sampling/Testing | ||||
| A022 | Air Monitoring (CAC, CIH) | HR | 7500 | $ - 0 |
| A023 | Air Monitoring (CSST) | HR | 5000 | $ - 0 |
| A024 | TEM Sampling/Analysis | EA | 500 | $ - 0 |
| A025 | PCM Sampling/Analysis | EA | 2500 | $ - 0 |
| A026 | Soil Sampling/Analysis for Lead Materials | EA | 50 | $ - 0 |
| A027 | Dust Wipe Sampling/Analysis, AAS or Equivalent | EA | 50 | $ - 0 |
| A028 | Waste Stream Sampling/Analysis (TCLP, Lead Only) | EA | 250 | $ - 0 |
| A029 | Air Sampling/Analysis for Lead | EA | 250 | $ - 0 |
| A030 | Sampling for Waste Water Discharge Permit | EA | 25 | $ - 0 |
| A031 | Sampling for Petroleum contamination in soil or water | EA | 25 | $ - 0 |
| Abatement of Asbestos Containing Materials | ||||
| A032 | Notification Fee - Not to Exceed $2,400/Task Order | LS | 150 | $ - 0 |
| A033 | Asbestos Decontamination | SF | 2500 | $ - 0 |
| A034 | Lead Decontamination | SF | 2500 | $ - 0 |
| Abatement of Insulation Removal in Containment | ||||
| A035 | Abate Pipe Insulation, up to 3" dia. | LF | 1250 | $ - 0 |
| A036 | Abate Pipe Insulation, > 3" dia. < 8" | LF | 1250 | $ - 0 |
| A037 | Abate Pipe Insulation, > 8" dia. | LF | 1000 | $ - 0 |
| A038 | Abate Pipe Joint Insulation. Up to 3" dia. | EA | 200 | $ - 0 |
| A039 | Abate Pipe Joint Insulation.> 3" dia.<8" | EA | 100 | $ - 0 |
| A040 | Abate Pipe Joint Insulation,> 8" dia. | EA | 60 | $ - 0 |
| A041 | Abate Insulation on Boilers/Tanks | SF | 2000 | $ - 0 |
| A042 | Abate HVAC Duct Insulation | SF | 2000 | $ - 0 |
| Glove Bag | ||||
| A043 | Abate Pipe Insulation, glove bag, <12" dia. | LF | 500 | $ - 0 |
| A044 | Abate Thru Pipe Removal <4"dia. | LF | 500 | $ - 0 |
| A045 | Abate Thru Pipe Removal >4"dia.<8"dia. | LF | 500 | $ - 0 |
| A046 | Abate Thru Pipe Removal >8"dia. | LF | 500 | $ - 0 |
| Spray-On Insulation | ||||
| A047 | Abate Spray-On Insulation, Beams and Columns | SF | 10000 | $ - 0 |
| A048 | Abate Spray-On Insulation, Ceilings | SF | 5000 | $ - 0 |
| A049 | Abate Spray-On Insulation, Complex Ceilings | SF | 2500 | $ - 0 |
| A050 | Abate Overspray on Air Ducts | SF | 500 | $ - 0 |
| A051 | Abate Overspray on Pipes Conduits | LF | 500 | $ - 0 |
| A052 | Abate Overspray on Beams and Columns | SF | 500 | $ - 0 |
| Air Duct Insulation | ||||
| A053 | Abate ACM, Removal of Flex Joints on Ducts | LF | 300 | $ - 0 |
| A054 | Abate Friable ACM within Air Ducts | SF | 2500 | $ - 0 |
| Flooring/Interior Finishes | ||||
| A055 | Removal of VAT | SF | 250000 | $ - 0 |
| A056 | Removal of Sheet Flooring | SF | 25000 | $ - 0 |
| A057 | Removal of Ceramic Tile | SF | 5000 | $ - 0 |
| A058 | Removal of Mastic on Concrete Slab Under Floor | SF | 250000 | $ - 0 |
| A059 | Removal of Plywood Floor w/ Mastic w/ ACM | SF | 10000 | $ - 0 |
| A060 | Removal of Carpeting on Mastic w ACM | SF | 250000 | $ - 0 |
| A061 | Removal of Wallcovering | SF | 5000 | $ - 0 |
| A062 | Removal of Base Cove and Baseboards | LF | 20000 | $ - 0 |
| Removal of Interior Ceilings and Walls | ||||
| A063 | Abate ACM Removal of Suspended Ceilings | SF | 10000 | $ - 0 |
| A064 | Abate ACM Removal of Plaster Ceilings | SF | 5000 | $ - 0 |
| A065 | Abate ACM Acoustical Ceiling including Mastic | SF | 10000 | $ - 0 |
| A066 | Removal of Drywall Ceiling w/ACM | SF | 100000 | $ - 0 |
| A067 | Removal of Acoustical Wall Panels including Mastic | SF | 10000 | $ - 0 |
| A068 | Removal of Plaster Walls w/ ACM | SF | 10000 | $ - 0 |
| A069 | Removal of Stucco Walls w/ ACM (interior) | SF | 2500 | $ - 0 |
| A070 | Removal of Drywall Wall w/ACM per layer of Drywall | SF | 200000 | $ - 0 |
| A071 | Removal of Transite Wall | SF | 50000 | $ - 0 |
| Exteriors | ||||
| A072 | Removal of Transite/Siding/Roofing Material/Mastic | SF | 50000 | $ - 0 |
| A073 | Removal of Roofing Mastic Only | SF | 20000 | $ - 0 |
| A074 | Removal of Roofing Material Only | SF | 75000 | $ - 0 |
| A075 | Removal of Transite Siding Only | SF | 20000 | $ - 0 |
| A076 | Removal of Transite Roofing Only | SF | 10000 | $ - 0 |
| A077 | Removal of Built up Roofing Insulation 1-3" | SF | 50000 | $ - 0 |
| A078 | Encapsulation of Asbestos Surfaces (bridging) | SF | 5000 | $ - 0 |
| A079 | Encapsulation of Asbestos Surfaces (penetrating) | SF | 500000 | $ - 0 |
| A080 | Sandblasting Exterior Asbestos Paint | SF | 50000 | $ - 0 |
| A081 | Sandblasting Exterior Lead Paint | SF | 50000 | $ - 0 |
| A082 | Removal of Soil w/ ACM | CF | 1000 | $ - 0 |
| A083 | Removal of Stucco Walls w/ ACM | SF | 200000 | $ - 0 |
| A084 | Scrape ACM Containing Paint/Stucco on Exterior Walls | SF | 75000 | $ - 0 |
| Transite Pipe | ||||
| A085 | Removal of Transite Pipe Above Ground | LF | 1000 | $ - 0 |
| A086 | Removal of Transite Pipe Below Ground <4' Under | LF | 2500 | $ - 0 |
| A087 | Removal of Transite Pipe Below Ground >4' Under | LF | 2500 | $ - 0 |
| A088 | Transportation, Handling, Packaging, Disposal of Transite Pipe | CY | 5000 | $ - 0 |
| Remove Windows w/ ACM | ||||
| A089 | Remove Windows Glazing, Single Pane, Fixed | SF | 1000 | $ - 0 |
| A090 | Remove Windows Glazing Double Pane, Fixed | SF | 200 | $ - 0 |
| A091 | Remove Window Caulking w/ ACM | LF | 5000 | $ - 0 |
| A092 | Remove Window Unit Whole including Frame | SF | 5000 | $ - 0 |
ABATEMENT OF MATERIAL CONTAINING LEAD AND LEAD-BASED PAINT
| Removal of Doors and Wndows With LBP | ||||
| A093 | Abate LBP by Removing Hollow Core Wood Doors | EA | 10 | $ - 0 |
| A094 | Abate LBP by Removing Pre-Hung Wood Doors, Interior solid core | EA | 5 | $ - 0 |
| A095 | Abate LBP by Removing Pre-Hung Wood Doors, Exterior solid core | EA | 5 | $ - 0 |
| A096 | Abate LBP by Removing Pre-Hung Metal Doors, Exterior | EA | 5 | $ - 0 |
| A097 | Abate LBP by Removing Windows Frames | SF | 500 | $ - 0 |
| Abatement of LBP Surfaces by Encapsulation | ||||
| A098 | Abate LBP by Encapsulating w/ Flexible Wall Covering | SF | 2500 | $ - 0 |
| A099 | Abate LBP by Encapsulating w/ Wood Paneling | SF | 1000 | $ - 0 |
| A100 | Abate LBP by Encapsulating w/ PVC Vinyl Siding | SF | 1000 | $ - 0 |
| A101 | Abate LBP by Encapsulating w/ Hardboard Wood Siding | SF | 1000 | $ - 0 |
| A102 | Abate LBP by Encapsulating w/ Aluminum or Metal Siding | SF | 5000 | $ - 0 |
| A103 | Abate LBP by Encapsulating w/ 3/4" Thick Gypboard | SF | 500 | $ - 0 |
| A104 | Abate LBP by Encapsulating w/ Elastomeric Material | SF | 5000 | $ - 0 |
| A105 | Abate LBP by Encapsulating w/ Glazed Urethane/Epoxy Coatings | SF | 500 | $ - 0 |
| Abate/Removal of LBP Surfaces | ||||
| A106 | Abate LBP Surfaces, Painted Wall Surfaces, Interior | SF | 5000 | $ - 0 |
| A107 | Abate LBP Surfaces, Door | SF | 500 | $ - 0 |
| A108 | Abate LBP Surfaces, Windows and Sills | SF | 500 | $ - 0 |
| A109 | Abate LBP Exterior Walls | SF | 5000 | $ - 0 |
| A110 | Abate LBP Eaves and Facias | SF | 5000 | $ - 0 |
| A111 | Abate LBP Metal Surfaces | SF | 5000 | $ - 0 |
| A112 | Abate LBP on Concrete/Asphalt Exterior Surface | SF | 5000 | $ - 0 |
| A113 | Abate LBP Interior Floors | SF | 100000 | $ - 0 |
| A114 | Abate LBP Road Striping | SF | 25000 | $ - 0 |
| A115 | Abate LBP Airfield Striping | SF | 25000 | $ - 0 |
| A116 | Removal of Soil Contaminated w/Lead | CY | 100 | $ - 0 |
| Miscellaneous Environmental Remediation | ||||
| A117 | Mold Remediation | SF | 25000 | $ - 0 |
| A118 | Mold Remediation, Remove Contaminated Materials | SF | 10000 | $ - 0 |
| A119 | Feces Removal, rodent/bird etc. | SF | 10000 | $ - 0 |
| A120 | Feces Removal, Remove Contaminated Materials | SF | 10000 | $ - 0 |
| A121 | Anti-Microbial Disinfectant Spraying | SF | 25000 | $ - 0 |
| A122 | Removal of Underground Storage Tank | GAL | 50000 | $ - 0 |
| A123 | Removal of Aboveground Storage Tank | GAL | 50000 | $ - 0 |
| A124 | Removal of Septic Tank | GAL | 2500 | $ - 0 |
| A125 | Purging/Rinsing Piping (Non-hazardous) up to 3" dia. | LF | 15000 | $ - 0 |
| A126 | Purging/Rinsing Piping (Non-hazardous) > 3" < 8" dia. | LF | 1000 | $ - 0 |
| A127 | Purging/Rinsing Piping (Non-hazardous) > 8" dia. | LF | 5000 | $ - 0 |
| A128 | Purging/Rinsing Piping (Hazardous) up to 3" dia. | LF | 15000 | $ - 0 |
| A129 | Purging/Rinsing Piping (Hazardous) > 3" < 8" dia. | LF | 10000 | $ - 0 |
| A130 | Purging/Rinsing Piping (Hazardous) > 8" dia. | LF | 5000 | $ - 0 |
| A131 | Equipment Decon (Complex) | SF | 30000 | $ - 0 |
| A132 | Equipment Decon (Simple) | SF | 30000 | $ - 0 |
| A133 | Miscellaneous Material Decon | SF | 30000 | $ - 0 |
| A134 | Asbestos Debris Cleanup | SF | 50000 | $ - 0 |
| A135 | Lead Debris Cleanup | SF | 35000 | $ - 0 |
| A136 | General Debris Cleanup | SF | 20000 | $ - 0 |
| A137 | Removal of POL contaminated Soil | CY | 250 | $ - 0 |
| A138 | Removal of Paints, Solvents, Oil, Pesticides (Universal liquid waste only) | GAL | 3000 | $ - 0 |
| A139 | Removal of "E" Waste (flourescent tubes, thermostats, mercury switches, smoke detectors, gauges) | EA | 10000 | $ - 0 |
Removal And Disposal of Devices and Liquids Contianing PCB's
| A140 | Remove Leaking Lighting Ballasts | EA | 5 | $ - 0 |
| A141 | Remove Non-Leaking Ballasts | EA | 5 | $ - 0 |
| A142 | Remove PCB Spills | SF | 5 | $ - 0 |
| A143 | Remove PCB Contaminated Soil | CF | 5 | $ - 0 |
| A144 | Sampling & Testing for PCB's | EA | 100 | $ - 0 |
| A145 | Removal of PCB Transformer <2ppm | GAL | 100 | $ - 0 |
| A146 | Removal of PCB Transfomer >2ppm but < 50ppm | GAL | 100 | $ - 0 |
| A147 | Removal of PCB Transformer > 50ppm but < 499ppm | GAL | 100 | $ - 0 |
| A148 | Removal of PCB Transformer >500ppm | GAL | 100 | $ - 0 |
DEMOLITION
| Selective Demolition | ||||
| A149 | Remove Non-Load Bearing Wall, Wood, Interior | SF | 5000 | $ - 0 |
| A150 | Remove Building Siding | SF | 6000 | $ - 0 |
| A151 | Saw cutting concrete/asphalt <6" thick | LF | 10000 | $ - 0 |
| A152 | Saw cutting concrete/asphalt >6"-18" thick | LF | 10000 | $ - 0 |
| Removal of Structures, Complete, Except for Foundation | ||||
| A153 | Demolish Wood Framed Structure | SF | 250000 | $ - 0 |
| A154 | Demolish Standing Steel Structure | SF | 250000 | $ - 0 |
| A155 | Demolish Standing Masonry Structure | SF | 250000 | $ - 0 |
| A156 | Demolish Concrete Reinforced Structure | SF | 250000 | $ - 0 |
| A157 | Transportation, Handling, and disposal of non-hazardous debris on Base | CY | 5000 | $ - 0 |
| A158 | Transportation, Handling, and disposal of non-hazardous debris off Base | CY | 60000 | $ - 0 |
| A159 | Mobilization/Demobilization for Off-Base Remote Demolition | JB | 5 | $ - 0 |
| Removal of Structures, Deconstruct/Recycle, Except for Foundation | ||||
| A160 | Deconstruct/recycle Wood Framed Structure | SF | 10000 | $ - 0 |
| A161 | Deconstruct/recycle Standing Steel Structure | SF | 10000 | $ - 0 |
| A162 | Deconstruct/recycle Standing Masonry Structure | SF | 10000 | $ - 0 |
| A163 | Deconstruct/recycle Concrete Reinforced Structure | SF | 10000 | $ - 0 |
| Removal Of Miscellaneous Items | ||||
| A164 | Remove Chain Link Fence. | LF | 5000 | $ - 0 |
| A165 | Remove Guardrail. | LF | 300 | $ - 0 |
| A166 | Remove Solid Block, Cavity, Brick or Tile Masonry Walls. | CF | 5000 | $ - 0 |
| A167 | Remove Stone w/ Mortar. | CF | 100 | $ - 0 |
| A168 | Remove Stone, dry set. | CF | 100 | $ - 0 |
| A169 | Remove Bituminous Pavement including Streets, Sidewalks, Curbing | CY | 50000 | $ - 0 |
| A170 | Remove Mesh Reinforced Concrete | CY | 50000 | $ - 0 |
| A171 | Remove Rod Reinforced Concrete. | CY | 50000 | $ - 0 |
| A172 | Remove Unreinforced Concrete | CY | 5000 | $ - 0 |
| A173 | Remove Plain Concrete Curbs | LF | 2500 | $ - 0 |
| A174 | Sidewalk Removal, Set In Mortar | CY | 100 | $ - 0 |
| A175 | Pipe removal | LF | 5000 | $ - 0 |
| A176 | Remove Subflooring, Non-ACM, Wood, to 1" | SF | 5000 | $ - 0 |
| A177 | Remove Gypboard, Non-ACM, Non-LBP, to 1" | SF | 10000 | $ - 0 |
| A178 | Remove Suspended Ceilings | SF | 5000 | $ - 0 |
| A179 | Paint Removal, Non-LBP on Concrete/Asphalt | SF | 5000 | $ - 0 |
| A180 | Removal & Disposal of Treated Wood Waste | CY | 5000 | $ - 0 |
| A181 | Removal of Gasket Material | LF | 500 | $ - 0 |
| A182 | Metal Tower Demolition | SF | 5000 | $ - 0 |
| A183 | Metal Tower Tank Demolition | SF | 5000 | $ - 0 |
| A184 | Asbestos Door Removal | SF | 5000 | $ - 0 |
| Utilities Demolition | ||||
| A185 | Utiliies removal <4' deep including Gas, Water, Electric, Sewer, Cable, Communication, Fuel, Etc. | LF | 2500 | $ - 0 |
| A186 | Utiliies removal >4' <8' deep including Gas, Water, Electric, Sewer, Cable, Communication, Fuel, Etc. | LF | 2500 | $ - 0 |
| A187 | Utiliies removal >8' deep including Gas, Water, Electric, Sewer, Cable, Communication, Fuel, Etc. | LF | 1000 | $ - 0 |
| A188 | Removal of Power Poles includes Disconnection/Removal of Lines | EA | 500 | $ - 0 |
| A189 | Disposal of undergroung utilities debris including handling, transportation and disposal | CY | 500 | $ - 0 |
| A190 | Disposal of power poles and associated lines | CY | 2500 | $ - 0 |
| A191 | Disconnection of Utilities including Water, Gas, Electric, Sewer, Cable, Communication, Fuel, Etc. | LS | 500 | $ - 0 |
RESTORATION AND REPAIR
| Carpentry, General, Materials and Installation | ||||
| A192 | Rough Carpentry | SF | 125 | $ - 0 |
| A193 | Sheathing, Wall and Roof | SF | 125 | $ - 0 |
| A194 | Caulking and Sealing, General | LF | 2500 | $ - 0 |
| A195 | Apply Stucco, 3 Coats | SF | 10000 | $ - 0 |
| Doors and Windows, General, Materials and Installation | ||||
| A196 | Door, Wood, Interior, Hollow Core | EA | 25 | $ - 0 |
| A197 | Door, Wood, Interior, Solid Core | EA | 25 | $ - 0 |
| A198 | Door, Wood, Interior, 1-hr Fire Rated | EA | 5 | $ - 0 |
| A199 | Door, Wood, Interior, Hollow Core, Prehung | EA | 15 | $ - 0 |
| A200 | Door, Wood, Interior, Solid Core, Prehung | EA | 15 | $ - 0 |
| A201 | Door, Metal, Exterior, Prehung | EA | 10 | $ - 0 |
| A202 | Door, Aluminum, Tinted Glass, Interior, Dark Bronze Finish | SF | 500 | $ - 0 |
| A203 | Door, Aluminum, Tinted Glass, Exterior, Dark Bronze Finish | SF | 500 | $ - 0 |
| A204 | Window, single pane including glazing | SF | 250 | $ - 0 |
| A205 | Windows, Interior/Exterior Frames/Trim/Dual Pane/Tinted/Dark Bronze Finish | SF | 250 | $ - 0 |
| A206 | Windows, Interior/Exterior Frames/Trim/Dual Pane/Tinted/Dark Bronze Finish with Opening Pane | SF | 250 | $ - 0 |
| Gypsum Wallboard, Materials and Installation | ||||
| A207 | Vertical Walls, Std. 1/2" Thick, including mudding/taping/texturing | SF | 5000 | $ - 0 |
| A208 | Ceilings, Std. 1/2" Thick, including mudding/taping/texturing | SF | 5000 | $ - 0 |
| A209 | Vertical Walls, Std. 5/8" Thick, including mudding/taping/texturing | SF | 5000 | $ - 0 |
| A210 | Ceilings, Std. 5/8" Thick, including mudding/taping/texturing | SF | 5000 | $ - 0 |
| Install Ceiling System, materials and Installation | ||||
| A211 | Suspended Ceiling, 2' x 4' Grid | SF | 5000 | $ - 0 |
| A212 | Suspended Ceiling, 2' x 2' Grid | SF | 25000 | $ - 0 |
| A213 | Suspended Acoustic Ceiling Tile, 3/4" thick, fine textured, 2 X 2' | SF | 2500 | $ - 0 |
| A214 | Suspended Acoustic Ceiling Tile, 3/4" thick, fine textured, 2 X 4' | SF | 2500 | $ - 0 |
| Flooring, Interior, Materials and Installation | ||||
| A215 | Place Subflooring, Plywood, 3/4" Thick | SF | 2500 | $ - 0 |
| A216 | Resilient, Vinyl Composition Tile | SF | 25000 | $ - 0 |
| A217 | Resilient, Vinyl Sheet | SF | 5000 | $ - 0 |
| A218 | Ceramic Tile | SF | 1000 | $ - 0 |
| A219 | Sheet Carpet, Nylon, With Pad | SY | 7500 | $ - 0 |
| A220 | Base Cove, Rubber/Vinyl | LF | 5000 | $ - 0 |
| A221 | Install 1/4" Plywood Over Existing Subfloor | SF | 5000 | $ - 0 |
| A222 | Install Stair Treads/Risers | LF | 2500 | $ - 0 |
| A223 | Wax Floors | SF | 25000 | $ - 0 |
| Wall Finishes, Interior, Materials and Installation | ||||
| A224 | Flexible (Wallpaper, Linen) | SF | 500 | $ - 0 |
| A225 | Wood Paneling, Plywood | SF | 500 | $ - 0 |
| A226 | Apply Gypsum Plaster, 2 coats | SF | 250 | $ - 0 |
| A227 | Ceramic Tile | SF | 250 | $ - 0 |
| A228 | Texture Coat Interior Walls/Ceilings to match existing | SF | 25000 | $ - 0 |
| Insulation of Hot/Cold Water Systems, Materials and Installation | ||||
| A229 | Fiberglass, 1" Wall w/Jacket 1/2"-2" dia.. | LF | 50 | $ - 0 |
| A230 | Fiberglass, 1" Wall w/Jacket 2 1/2"-4" dia.. | LF | 50 | $ - 0 |
| A231 | Fiberglass, 1" Wall w/Jacket, 5"-6" dia.. Pipe | LF | 50 | $ - 0 |
| A232 | Fiberglass, 1" Wall w/Jacket, 7"-8" dia.. Pipe | LF | 50 | $ - 0 |
| A233 | Fiberglass, 1" Wall w/Jacket, 1/2"-2" dia..(Elbows/Valves/Tees) | EA | 50 | $ - 0 |
| A234 | Fiberglass, 1" Wall w/Jacket, 2 1/2"-4" dia..(Elbows/Valves/Tees) | EA | 50 | $ - 0 |
| A235 | Fiberglass, 1" Wall w/Jacket, 5"-6" dia.. Pipe (Elbows/Valves/Tees) | EA | 50 | $ - 0 |
| A236 | Fiberglass, 1" Wall w/Jacket, 7"-8" dia.. (Elbows/Valves/Tees) | EA | 50 | $ - 0 |
| A237 | Melamine Foam, 1" Wall w/Jacket 1/2"-3/4" dia.. | LF | 50 | $ - 0 |
| A238 | Melamine Foam, 1" Wall w/Jacket, 1" dia.. | LF | 50 | $ - 0 |
| A239 | Melamine Foam, 1" Wall w/Jacket, 1 1/4" dia.. | LF | 50 | $ - 0 |
| A240 | Melamine Foam, 1" Wall w/Jacket, 1 1/2" dia.. | LF | 50 | $ - 0 |
| A241 | Melamine Foam, 1" Wall w/Jacket, 2" dia.. | LF | 50 | $ - 0 |
| A242 | Melamine Foam, 1" Wall w/Jacket, 2 1/2" dia.. | LF | 50 | $ - 0 |
| A243 | Melamine Foam, 1" Wall w/Jacket, 3" dia.. | LF | 50 | $ - 0 |
| A244 | Melamine Foam, 1" Wall w/Jacket, 4" dia.. | LF | 50 | $ - 0 |
| A245 | Melamine Foam, 1" Wall w/Jacket, 5" dia.. | LF | 50 | $ - 0 |
| A246 | Melamine Foam, 1" Wall w/Jacket, 6" dia.. | LF | 50 | $ - 0 |
| A247 | Melamine Foam, 1" Wall w/Jacket, 8" dia.. | LF | 50 | $ - 0 |
| A248 | Melamine Foam, 1" Wall w/Jacket 1/2"-3/4" dia..(Elbows/Valves/Tees) | EA | 50 | $ - 0 |
| A249 | Melamine Foam, 1" Wall w/Jacket, 1" dia..(Elbows/Valves/Tees) | EA | 50 | $ - 0 |
| A250 | Melamine Foam, 1" Wall w/Jacket, 1 1/4" dia..(Elbows/Valves/Tees) | EA | 50 | $ - 0 |
| A251 | Melamine Foam, 1" Wall w/Jacket, 1 1/2" dia..(Elbows/Valves/Tees) | EA | 50 | $ - 0 |
| A252 | Melamine Foam, 1" Wall w/Jacket, 2"-2 1/2" dia..(Elbows/Valves/Tees) | EA | 25 | $ - 0 |
| A253 | Melamine Foam, 1" Wall w/Jacket, 3" dia..(Elbows/Valves/Tees) | EA | 25 | $ - 0 |
| A254 | Melamine Foam, 1" Wall w/Jacket, 4" dia..(Elbows/Valves/Tees) | EA | 10 | $ - 0 |
| A255 | Melamine Foam, 1" Wall w/Jacket, 5" dia..(Elbows/Valves/Tees) | EA | 10 | $ - 0 |
| A256 | Melamine Foam, 1" Wall w/Jacket, 6" dia..(Elbows/Valves/Tees) | EA | 10 | $ - 0 |
| A257 | Melamine Foam, 1" Wall w/Jacket, 8" dia..(Elbows/Valves/Tees) | EA | 10 | $ - 0 |
| A258 | Warm/Cold Air Duct (Sheetmetal), Flexible Type, Fiberglass, 2" Thick w/Vapor Barrier | SF | 50 | $ - 0 |
| A259 | Boilers and Tanks | SF | 50 | $ - 0 |
| A260 | Hot Water Heaters, 1 1/2" Thick | SF | 50 | $ - 0 |
| A261 | Cold Equipment, Mineral Fiber, 1 1/2" Thick | SF | 50 | $ - 0 |
| A262 | Blanket Insulation (covers) for Backflow Preventers | SF | 50 | $ - 0 |
| A263 | Re-Insulation of HVAC Ducting (Interior) | SF | 2500 | $ - 0 |
| A264 | Re-Insulation of HVAC Ducting (Exterior) | SF | 2500 | $ - 0 |
| Painting, General, Materials and Installation | ||||
| A265 | Exterior Walls, Wood/Metal | SF | 500 | $ - 0 |
| A266 | Exterior Walls, Stucco/Masonry | SF | 500 | $ - 0 |
| A267 | Exterior Trim, Handwork | LF | 2500 | $ - 0 |
| A268 | Interior Walls, Gypboard/Plaster | SF | 25000 | $ - 0 |
| A269 | Ceilings, Tile/Gypboard/Plaster | SF | 25000 | $ - 0 |
| A270 | Cabinets/Casework, Handwork | SF | 5000 | $ - 0 |
| A271 | Doors, Interior/Exterior, Both Sides, Frame & Trim | SF | 250 | $ - 0 |
| A272 | Interior/Exterior Steel Piping | SF | 50 | $ - 0 |
| A273 | Wood Trim, Interior, up to 6" Wide | LF | 50 | $ - 0 |
| A274 | Airfield Striping | SF | 50000 | $ - 0 |
| A275 | Road Striping | SF | 2500 | $ - 0 |
| A276 | Epoxy Mortar Flooring System for Aircraft Maintenance Facilities | SF | 50000 | $ - 0 |
| Polyurea/Epoxy Coatings on Concrete/Steel Surfaces | |||||
| A277 | Moisture Testing on Concrete Before Epoxy Coating Application | SF | 5000 | $ - 0 | |
| A278 | Apply Flexible Rapid Curing Polyurea Elastomer Coating On Concrete/Metal, | ||||
| 40 mil, Exterior/interior including Surface preparation, Patching, Primer, Etc | SF | 25000 | $ - 0 | ||
| A279 | Apply Flexible Rapid Curing Polyurea Elastomer Coating On Concrete/Metal, | ||||
| 60 mil, Exterior/interior including Surface preparation, Patching, Primer, Etc | SF | 25000 | $ - 0 | ||
| A280 | Apply Flexible Rapid Curing Polyurea Elastomer Coating On Concrete/Metal, | ||||
| 80 mil, Exterior/interior including Surface preparation, Patching, Primer, Etc | SF | 25000 | $ - 0 | ||
| A281 | Apply Epoxy Coating On Concrete/Metal, 3 coats, Exterior/interior including Surface preparation, Patching, Primer, Etc | SF | 25000 | $ - 0 | |
| A282 | Apply Epoxy Coating On Concrete/Metal, 2 coats, Exterior/interior including Surface preparation, Patching, Primer, Etc | SF | 25000 | $ - 0 | |
| A283 | Clear Floor Sealant | SF | 25000 | $ - 0 | |
| A284 | Aircraft Hanger Floor Epoxy (as per Spec) | SF | 25000 | $ - 0 |
| Landscaping, General, for Restoration of Demolished Building Sites | ||||
| A285 | Import & Place Fill Material From On Base Barrow Pit | CY | 5000 | $ - 0 |
| A286 | Import & Place Fill Material From Off Base | CY | 500 | $ - 0 |
| A287 | Install Irrigation Pipe 1/2" PVC, Sch 40 w/Fittings | LF | 500 | $ - 0 |
| A288 | Install Irrigation Pipe 3/4" PVC,Sch 40 w/Fittings | LF | 250 | $ - 0 |
| A289 | Install Irrigation Pipe 1" PVC, Sch 40 w/Fittings | LF | 125 | $ - 0 |
| A290 | Install Sprinkler Heads, 2 1/2" Pop-up w/Fittings | EA | 100 | $ - 0 |
| A291 | Install Control Valves, w/Backflow Preventer | EA | 25 | $ - 0 |
| A292 | Install U/G Conduit 3/4" PVC w/Wiring, Complete | LF | 250 | $ - 0 |
| A293 | Controllers, Digital, 6 Zone-3 Programs | EA | 25 | $ - 0 |
| A294 | Deliver & Place Topsoil | CY | 500 | $ - 0 |
| A295 | Apply Soil Amendments | SF | 500 | $ - 0 |
| A296 | Hydroseeding, Desert Mix | SF | 500 | $ - 0 |
| A297 | Place Sod, Drought Tolerant | SF | 500 | $ - 0 |
| A298 | Plant Sprigs, 25 Sprigs/sy. | SY | 50 | $ - 0 |
| A299 | Install Street Curbing | LF | 500 | $ - 0 |
| A300 | Install Sidewalk | SF | 1000 | $ - 0 |
| A301 | Install Landscape Curbing | LF | 500 | $ - 0 |
| A302 | Remove Trees and Stumps | EA | 500 | $ - 0 |
| A303 | Relocation of Trees | EA | 50 | $ - 0 |
CLEANING OF AIR CONVEYANCE SYSTEMS
| Provide Access to ACS Componets | ||||
| A304 | Cut Access Holes in Sheetmetal Duct and Repair With Removable Metal Covers 3"-6" dia.. | EA | 5 | $ - 0 |
| A305 | Cut Access Holes in Sheetmetal Duct and Replace With Removable Metal Covers 6'-12" dia.. | EA | 5 | $ - 0 |
| A306 | Remove and Replace Existing Ceiling Tiles for Access to HVAC System Components | SF | 2500 | $ - 0 |
| A307 | Remove Section of Plaster Ceiling and Install Steel Access Door With Frame 12" x 12" | EA | 5 | $ - 0 |
| A308 | Remove Section of Plaster Ceiling and Install Steel Access Door With Frame 24" x 24" | EA | 5 | $ - 0 |
| A309 | Demo HVAC Equipment (Exterior roof or ground mounted units, or interior units 3 ton capacity) | EA | 1500 | $ - 0 |
| A310 | Demo HVAC Equipment (rooftop, self contained, up to 5 ton) | EA | 1500 | $ - 0 |
| Cleaning of ACS System | ||||
| A311 | General Duct Cleaning | CF | 25000 | $ - 0 |
| A312 | Remove, Clean and Replace Ceiling, Wall and Floor Diffusers, Registers and Grills | EA | 100 | $ - 0 |
| A313 | Remove and Replace Insulated Flex Duct, 6" dia. . | LF | 100 | $ - 0 |
| A314 | Remove and Replace Insulated Flex Duct, 7"-12" | LF | 100 | $ - 0 |
| A315 | Remove and Replace Insulated Flex Duct, 14"-20" | LF | 100 | $ - 0 |
| A316 | Clean Multi-Blade Fire Dampers in Metal Duct 50 sq.in. to 300 sq.in. Section | EA | 5 | $ - 0 |
| A317 | Clean Multi-Blade Fire Dampers in Metal Duct Over 300 sq.in. To 600 sq.in. Section | EA | 5 | $ - 0 |
| A318 | Clean In-Line Supply Air or Return Air Fans 50 sq.in. to 300 sq.in. Section | EA | 5 | $ - 0 |
| A319 | Clean In-Line Supply Air or Return Air Fans Over 300 sq.in. To 600 sq.in. Section | EA | 5 | $ - 0 |
| A320 | Clean Heating and Cooling Coils, In Duct, 50 sq.in. to 300 sq.in. Section | EA | 5 | $ - 0 |
| A321 | Clean Heating and Cooling Coils, In Duct, Over 300 sq.in. To 600 sq.in. Section | EA | 5 | $ - 0 |
| A322 | Clean VAV Box Assembly, 50 sq.in. To 300 | EA | 5 | $ - 0 |
| A323 | Clean VAV Box Assembly, 300 sq.in. To 600 | EA | 5 | $ - 0 |
| A324 | Clean AHU/FAU, Over 2,000 CFM to 7,000 CFM With Access Panel | EA | 5 | $ - 0 |
| A325 | Clean AHU/FAU, Over 7,000 CFM to 15,000 CFM With Access Panel | EA | 5 | $ - 0 |
| A326 | Clean AHU/FAU, Over 15,000 CFM to 25,000 CFM With Access Panel | EA | 5 | $ - 0 |
| A327 | Clean High Pressure Plenum, With Floor Access 150 CF up to 500 CF | EA | 5 | $ - 0 |
| A328 | Clean High Pressure Plenum, With Floor Access Over 500 CF up to 1,000 CF | EA | 5 | $ - 0 |
| A329 | Clean High Pressure Plenum, Access From Above Only, Over 500 CF up to 1,000 CF | EA | 5 | $ - 0 |
| A330 | Sanitize Cleaned ACS Components | SF | 2500 | $ - 0 |
| Verification Testing of Cleaned ACS Components | ||||
| A331 | Perform NADCA Vacuum Test | EA | 10 | $ - 0 |
| A332 | Validate Air Heating/Cooling Coil Pressure Drop | EA | 10 | $ - 0 |
| Replace Existing Air Filters with Electrostatic Air Filterss and Frames | ||||
| A333 | Frame Size 100 sq.in. Up to 200 sq.in. | EA | 5 | $ - 0 |
| A334 | Frame Size Over 200 sq.in. To 400 sq.in. | EA | 5 | $ - 0 |
| A335 | Frame Size Over 400 sq.in. To 600 sq.in. | EA | 5 | $ - 0 |
| Storage Tank Cleaning | ||||
| A336 | Storage Tank Cleaning POL (Up To 100,000 Gallon Tank) | GAL | 250000 | $ - 0 |
| A337 | Storage Tank Cleaning POL (100,001 To 250,000 Gallon Tank) | GAL | 500005 | $ - 0 |
| A338 | Storage Tank Cleaning POL (250,001 To 500,000 Gallon Tank) | GAL | 1250005 | $ - 0 |
| A339 | Storage Tank Cleaning POL (500,001 To 1,000,000 Gallon Tank) | GAL | 2500005 | $ - 0 |
| A340 | Storage Tank Cleaning Water (Up To 100,000 Gallon Tank) | GAL | 250000 | $ - 0 |
| A341 | Storage Tank Cleaning Water (100,001 To 250,000 Gallon Tank) | GAL | 500005 | $ - 0 |
| A342 | Storage Tank Cleaning Water (250,001 To 500,000 Gallon Tank) | GAL | 1250005 | $ - 0 |
| A343 | Storage Tank Cleaning Water (500,001 To 1,000,000 Gallon Tank) | GAL | 2500005 | $ - 0 |
| A344 | Waste Profile | EA | 50 | $ - 0 |
| A345 | Tank Sampling Analysis | EA | 50 | $ - 0 |
| A346 | Disposal of Sludge/Residue prior to Tank Cleaning | GAL | 5000 | $ - 0 |
| A347 | Sludge Removal | CY | 500 | $ - 0 |
| A348 | Transportation of Sludge Off-Base/Waste Disposal Fees | TON | 500 | $ - 0 |
| Five Year Total | $ - 0 | |||
| Six Month Option | $ - 0 | |||
| Five Year and Six Month Total | $ - 0 |
Demolition and Abatement FA9301-15-R-0005, Amendment 0001 Offeror Name:_____________________________________
FA9301-15-R-0005, Amendment 0001, Attachment 7, L-1 Revised ELIN Schedule 07 May 2015
Sheet2
Sheet3
File details come from the government source that posted it. Updated .