OWS_Site_Visit_Presentation.pptx
PPTX presentation 863 KB Posted
- Attached to
- Oil Water Separators Maintenance & Repair
- Solicitation number
- FA9301-13-R-0002
About this file
Oil Water Separator site visit briefing slides.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| OWS_Remaining_QA.docx | DOCX document | |
| Attachment_3_OWS_Past_Performance_Questionnaire_R1.doc | DOC document | |
| Exhibit_F_Amend_1.xls | XLS spreadsheet | |
| Exhibit_B_Amend_1.xls | XLS spreadsheet | |
| Exhibit_E_Amend_1.xls | XLS spreadsheet | |
| Exhibit_D_Amend_1.xls | XLS spreadsheet | |
| Exhibit_C_Amend_1.xls | XLS spreadsheet | |
| OWS_RFP_AMEND1.doc | DOC document | |
| PWS_Amend_1.doc | DOC document | |
| Exhibit_A_Amend_1.xls | XLS spreadsheet | |
| OWS_Q_and_A.docx | DOCX document | |
| OWS_RFP_CONFORMED.doc | DOC document | |
| FA9301-13-R-0002_v2.pdf | ||
| Attachment_2_Wage_Determination.pdf | ||
| Bid_Schedule_and_Requriements_Pricing_Exhibit_A-F.xls | XLS spreadsheet | |
| Attachement_1_PWS.doc | DOC document |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pre-Proposal Conference
Oil Water Separators Maintenance and Repair
Solicitation:
FA9301-13-R-0002
Air Force Test Center
I n t e g r i t y - S e r v i c e - E x c e l l e n c e
Agile, Responsive & Competitive, Warriors Supporting Warriors A Great Place to Live and Work
AFTC
General Information
Restrooms Questions Copy of presentation and Q&A will be posted on FedBizOpps. www.fbo.gov Source Selection Information See FAR 2.101 and 3.104
Where the restrooms are and be sure to visit before leaving to view OWS. Nowhere to go.
Rundown on how the questions will work
Acquisition Team
Contract Specialists Richard Barzaghi, AFTC/PZRA Nicole Huber, AFTC/PZIEA Tim Palen, PZRA Wendell Brown, PZIOC
Contracting Officer Judy Gayler, AFTC/PZRA
Primary Performance Management Specialist Bob Landolt, 412 TW/CEOSS
Secondary Performance Management Specialist Tom Allen, 412 TW/CEOSS
Presentation Description of Requirement Acquisition Overview CLIN Structure ELINs Over and Above Evaluation Factors Terms and Conditions OWS Tour Questions
Agenda
Description of Requirement The contractor shall provide all management, personnel, tools, vehicles, supplies, materials, equipment, and labor necessary to maintain and repair oil water separators (OWS) located at Edwards Air Force Base (EAFB), and the Air Force Research Lab (AFRL), in accordance with the manufacturer's operation and maintenance (O&M) manuals, and federal, state, local environmental laws and regulations. All work shall comply with government and commercial standards, whichever is more stringent. The contractor shall also be responsible for preventive maintenance and repairs to the high-performance oil water separators (HPOWS) and pressure washer system at Bldg. #9505, Precision Impact Range Area (PIRA). For each oil water separator system, the contractor's responsibility begins at the clarifier (or initial entry storage) and ends where the effluent enters the sewer system; typically where the above ground piping transitions to the underground.
Bob Landolt
Acquisition Overview Solicitation issued 14 March 2013, proposals due 15 April 2013 Competitive Procedures 100% Small Business Set-Aside Contract Type Firm Fixed Price, Performance Price Trade-off (PPT) Period of Performance Five Years (01 October 2013- 30 September 2018) 6 Month Option if needed (01 October 2018 – 30 March 2019) Instructions to Offerors can be found in the solicitation at 52.212-1 (pages 24 - 30 ) Ensure that the Performance Information Form is completed in its entirety before proposal submission (page 29) Evaluation procedures can be found on the solicitation at 52.212-2 (pages 30 - 38)
CLIN Structure Price Proposal Preventative Maintenance, enter total price on CLINs 0001, 1001, 2001, 3001, 4001 and 5001 in the CLIN Schedule CLIN x002, Service Calls, enter prices on Exhibits A-F and transfer totals to the CLIN Schedule Do not propose on Over and Above CLIN x003, this price is provided by the Government
| CLIN | Description | Unit of Issue | Quantity | Unit Price | Total Price |
| x001 | Preventative Maintenance | Monthly | 12 | - | - |
| x002 | Service Calls | See Exhibits | - | TBD | TBD |
| x003 | Over and Above | Lot | 1 | $10,000 | $10,000 |
ELIN Structure – Example: Exhibit A CLIN x002, Service Calls Billing Emergency Service Calls (A001) or Routine Service Calls (A002) Routine Service Calls: Respond within 24 hours.
Emergency Service Calls: Respond within 3 hours.
Elements of Routine or Emergency Service calls are to be billed accordingly.
Exhibit A: FA9300-13-R-0002, 01 Oct 2013-30 Sep 2014
CLIN SUPPLIES/SERVICE EST QTY UNIT UNIT PRICE TOTAL PRICE
0001 FFP Oil Water Separator Unit Inspection and Maintenance 12 MO $0.00
0002 OIL/WATER SEPARATOR REQUIREMENT ITEMS
A001 Emergency Service Calls 10 HR $0.00
A002 Routine Service Calls 100 HR $0.00
| Disposal Services | 1 | LO | $0.00 | |
| Profiling of Waste - | ||||
| A003 | Waste Water Disposal Services | 1000 | Per Gallon | $0.00 |
| A004 | Solids Realized from the wastewater >1% | 100 | Per Gallon | $0.00 |
| A005 | Disposal of solids (spent filters & carbon) | 30 | CU YD | $0.00 |
| A006 | Non hazardous liquid (bulk) hydrocarbons | 50 | Per Gallon | $0.00 |
| Non RCRA hazardous liquid (bulk) | ||||
| A007 | 0-10% hydrocarbons (oil & diesel) | 100 | Per Gallon | $0.00 |
| A008 | 11-20% hydrocarbons | 100 | Per Gallon | $0.00 |
| RCRA hazardous waste liquid | ||||
| A009 | D001 flammable (bulk) 0-10% | 75 | Per Gallon | $0.00 |
| A010 | D001 flammable (bulk) 11-20% | 75 | Per Gallon | $0.00 |
Laboratory Tests 1 LO Estimated $0.00
| Testing Rates: | ||||
| A011 | Total suspended solids E160.2 test | 6 | Per Test | $0.00 |
| A012 | Oil and Grease E413.1 test | 6 | Per Test | $0.00 |
| A013 | Biochemical oxygen demand SM5210 | 6 | Per Test | $0.00 |
| A014 | Total organic carbon E415.1 test | 6 | Per Test | $0.00 |
| A015 | Heavy metals group 1 SW6010/7000 test | 6 | Per Test | $0.00 |
| A016 | Heavy metals group 2 SW6010/7000 test | 6 | Per Test | $0.00 |
| A017 | Volatile organic 8260 | 6 | Per Test | $0.00 |
| Clean Oil/Water Separators (does not include transportation) | ||||
| A018 | Bldg 1435 | 1 | Ea | $0.00 |
| A019 | Bldg 1615 | 1 | Ea | $0.00 |
| A020 | Bldg 1634 | 1 | Ea | $0.00 |
| A021 | Bldg 2440 | 1 | Ea | $0.00 |
| A022 | Bldg 3510/3511 | 1 | Ea | $0.00 |
| A023 | Bldg 3810 | 1 | Ea | $0.00 |
| A024 | Bldg 9505 | 1 | Ea | $0.00 |
A025 Disposal Transportation 21 HR $0.00
| 0003 | Over and Above Line Items ( No Bid Line Item) | NTE | |
| TOTAL | $0.00 |
Over and Above CLIN x003 Over and Above Work Work discovered during the course of performing Preventative Maintenance (CLIN 0001) Not Covered by the line items(s) for the basic work under the contract Necessary in order to satisfactorily complete the contract All Over and Above work must be authorized by the Government. Reference DFAR 252.217-7028, pgs. 73-74 of Solicitation
Additional CLIN Information Once a Month Invoicing for CLIN x001 Option notice will be provided 30 days prior to the start of the Period of Performance for CLIN 5001 in accordance with FAR 52.217-8.
Evaluation Criteria Firm Fixed Performance Price Trade-off (FFP/PPT) Past Performance is approximately equal to price when being evaluated
Basis for Contract Award Price Evaluation Rank by price Performance Confidence Evaluation Relevancy Ratings Confidence Rating
Terms and Conditions Quality Control Plan (QCP) Must be submitted to the CO within 10 days of award
Base Support:
Clinic support for emergency use
Surveillance:
Contracting Officer’s Representative(s) (COR) will be designated by the Contracting Officer to monitor contractor performance Findings documented in CPARS
Limitations on Subcontracting:
In accordance with FAR 52.219-14(c)(1), Limitations on Subcontracting, at least 50 percent of the cost of contract performance incurred for personnel shall be expended for employees of the concern
Security Requirements, see 1.8 of Performance Work Statement:
AF Form 1199, Restricted Area Card Flight Line Vehicle Training
Procurement Integrity In order to ensure procurement integrity Please channel all communications to and/or from potential contractors and government personnel through the contracting office.
Judy Gayler, Contracting Officer Richard Barzaghi, Contract Specialist Nicole Huber, Contract Specialist
Estimated Milestones
| Last Day to Submit Questions | 26 March 2013 |
| Q&As and Slides Posted | 29 March 2013 |
| Proposal Due Date | 15 April 2013 |
| Contract Award Date | 01 August 2013 |
| Contract Start Date | 01 October 2013 |
| Debriefings Complete | 09 August 2013 |
Questions Provide written questions, we will review and answer today. If we can’t provide an answer today, the questions and answers will be posted in the Q&As/slides on FBO image18.png image19.png image2.wmf image3.png image15.jpeg image16.png image1.jpeg image4.png image5.wmf image6.wmf image7.wmf image8.wmf image9.wmf image10.wmf image11.wmf image12.wmf image13.png image14.jpeg
File details come from the government source that posted it. Updated .