RFI_7.24.2019.docx
DOCX document 12 KB Posted
- Attached to
- Tunnel D Vacuum Pump Federal contract opportunity
- Solicitation number
- FA9101-19-Q-0052
About this file
See attached
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFI_7.24.2019.02.docx | DOCX document | |
| RFI_7.22.2019.docx | DOCX document | |
| RFI_7.18.2019.docx | DOCX document | |
| RFI_7.17.2019.docx | DOCX document | |
| Tunnel_D_Vacuum_Pump_Evaluation_Criteria.doc | DOC document | |
| Containerized_Vacuum_Pump_System_Procurement_SOW_Tunnel_D_FBO_Edit.docx | DOCX document | |
| FA9101-19-Q-0052_Tunnel_D_Vacuum_Pump_Combined_Synopsis.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions The leak rates stated below as 500 CFM or 1000 CFM respectively. Is that SCFM (atmospheric) or ACFM at the lowest pressure? 500 SCFM at 5 Torr equals 76,000 ACFM.
A more normal leak rate might be few pounds per hour of air leakage. Are they putting a gas into the this vessel? Does it have a lot of water vapor?
As a straight calculation you need to average 5600 CFM of pumping speed to take a 200,000 ft3 chamber from 750 to 5 mm Hg. Abs.
Answer The 500 CFM-mmHg and 1000 CFM-mmHg leak rates specified are somewhat conservative, but not dramatically so. Recent data indicates an actual typical value of 200 CFM-mmHg. In simple term from the source data, this is an average pressure-rise slope of 0.06 Torr per hour in the 200,000 ft^3 vessel.
During a typical hold period between wind tunnel runs (i.e. leaks only), no air is being intentionally bled into the vessel – all valves are closed. During intermittent operation of the wind tunnel, process air that partially refills the vacuum vessel is dry, sourced from a high-pressure air source with nominal dew point < -40 degF at atmospheric pressure.