RFI_7.24.2019.02.docx

DOCX document 13 KB Posted

Attached to
Tunnel D Vacuum Pump
Solicitation number
FA9101-19-Q-0052
Issued by

About this file

See attached

View the file

Other files

File Type Posted
RFI_7.24.2019.docx DOCX document
RFI_7.22.2019.docx DOCX document
RFI_7.18.2019.docx DOCX document
RFI_7.17.2019.docx DOCX document
Containerized_Vacuum_Pump_System_Procurement_SOW_Tunnel_D_FBO_Edit.docx DOCX document
FA9101-19-Q-0052_Tunnel_D_Vacuum_Pump_Combined_Synopsis.docx DOCX document
Tunnel_D_Vacuum_Pump_Evaluation_Criteria.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Tunnel D RFI- 7.24.2019

Q. I have another question. I was told that it is better to meet the power requirement than to meet the pumpdown spec.

In that case do they want a spare they can open into the system utilizing a valve, and also closing the other valve to pull out the existing pump with an issue.

A. A “hot spare” of this type (i.e. connected and ready to use, but only operable within the power budget if another pump is down) would be valued if space and cost allow for it, but is not required per the spec.