Drawings - HVAC Building 651
View the file
Other files for this federal contract opportunity
Show all 23
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ANZY999156
JOB NO. 13437
REPAIR HVAC BLDG. 651
NOTE:
Drawing Approved Electronically
RELEASED FOR EXECUTION
04/30/2013
N ot
S en si tiv e
Attachment 3
REFLECTED CEILING PLAN - FIRST FLOOR (PARTIAL) - BUILDING 651
LEGEND:
GENERAL NOTE:
Drawing Approved Electronically
RELEASED FOR EXECUTION
04/23/2013
N ot
S en si tiv
REFLECTED CEILING PLAN - SECOND FLOOR (PARTIAL) - BUILDING 651
GENERAL NOTE:
Drawing Approved Electronically
RELEASED FOR EXECUTION
04/24/2013
N ot
S en si
MODIFIED FIRE ALARM/PROTECTION PLAN - FIRST FLOOR - BUILDING 651
FIRE ALARM PANEL ASSIGNED ZONES NOTES: LEGEND:
Drawing Approved Electronically
RELEASED FOR EXECUTION
04/30/2013
N ot
S en si
MODIFIED FIRE ALARM/PROTECTION PLAN - SECOND FLOOR - BUILDING 651
FIRE ALARM PANEL ASSIGNED ZONES NOTES: LEGEND:
Drawing Approved Electronically
RELEASED FOR EXECUTION
04/30/2013
N ot
S en si
HVAC DEMOLITION PLAN - FIRST FLOOR (PARTIAL) - BUILDING 651
DEMOLITION NOTES:
LEGEND:
ROOM 102 EQUIPMENT DEMOLITION PLAN AIR HANDLING UNIT (ACU-1) DEMOLITION ELEVATION
Drawing Approved Electronically
RELEASED FOR EXECUTION
05/01/2013
N ot
S en si
HVAC DEMOLITION PLAN - SECOND FLOOR (PARTIAL) - BUILDING 651
DEMOLITION NOTES:
LEGEND:
Drawing Approved Electronically
RELEASED FOR EXECUTION
04/30/2013
N ot
S en si
HVAC MODIFIED PLAN - FIRST FLOOR (PARTIAL) - BUILDING 651
HVAC ELEVATION
NOTES:
LEGEND:
HVAC ELEVATION
Drawing Approved Electronically
RELEASED FOR EXECUTION
04/30/2013
N ot
S en si
HVAC MODIFIED PLAN - SECOND FLOOR (PARTIAL) - BUILDING 651
NOTES:
TYPICAL BOLLARD DETAIL ELEVATION - ROOM 102
LEGEND:
ELEVATION - WEST SIDE OF ROOM 102
Drawing Approved Electronically
RELEASED FOR EXECUTION
05/01/2013
N ot
S en si
ROOM 102 PLAN - FIRST FLOOR (PARTIAL) - BUILDING 651 ROOM 102 PLAN - FIRST FLOOR (PARTIAL) - BUILDING 651 - EXHAUST SYSTEM
ELEVATION - ROOM 102
ELEVATION - ROOM 102
LEGEND:
Drawing Approved Electronically
RELEASED FOR EXECUTION
04/30/2013
N ot
S en si
BRANCH DUCT TAKE-OFF
TYPICAL LOW PRESSURE
EQUIPMENT OR PIPE UPPER ATTACHMENT
FOR ROD SIZES UP TO 3/4-INCH
TYPICAL DIFFUSER CONNECTION
BOTTOM OF DUCT CONNECTION
TYPICAL DIFFUSER RUNOUT
DUCT SUPPORT DETAIL
SINGLE RECTANGULAR
RECTANGULAR FLEXIBLE CONNECTION DETAIL
FIRE/SMOKE DAMPER INSTALLATION DETAIL
WALL PENETRATION DETAIL
HORIZONTAL STEAM UNIT HEATER DETAIL
PIPING ARRANGEMENT - STEAM UNIT HEATER
FRONT ELEVATION
AIR CONDITIONING EQUIPMENT SCHEDULE
FAN SCHEDULE
Drawing Approved Electronically
RELEASED FOR EXECUTION
04/30/2013
N ot
S en si
MODIFIED LIGHTING PLAN - FIRST FLOOR (PARTIAL) - BUILDING 651
NOTES:
FIXTURE SCHEDULELIGHT SENSOR SCHEDULE
Drawing Approved Electronically
RELEASED FOR EXECUTION
05/02/2013
N ot
S en si
MODIFIED LIGHTING PLAN - SECOND FLOOR (PARTIAL) - BUILDING 651
NOTES:
Drawing Approved Electronically
RELEASED FOR EXECUTION
05/02/2013
N ot
S en si
HVAC POWER PLAN - FIRST FLOOR (PARTIAL) - BUILDING 651
ENLARGED PLAN ENLARGED PLAN
Drawing Approved Electronically
RELEASED FOR EXECUTION
04/30/2013
N ot
S en si
Drawing Approved Electronically
RELEASED FOR EXECUTION
04/29/2013
N ot
S en si
MODIFIED ONE-LINE DIAGRAM - UNIT SUBSTATION 10 - 480V - BUILDING 651
LEGEND:
Drawing Approved Electronically
RELEASED FOR EXECUTION
04/29/2013
N ot
S en si
EXISTING PUBLIC ADDRESS SYSTEM PLAN - FIRST FLOOR (PARTIAL) - BUILDING 651
NOTES:
Drawing Approved Electronically
RELEASED FOR EXECUTION
05/01/2013
N ot
S en si
EXISTING PUBLIC ADDRESS SYSTEM PLAN - SECOND FLOOR (PARTIAL) - BUILDING 651
LEGEND:
Drawing Approved Electronically
RELEASED FOR EXECUTION
05/01/2013
N ot
S en si tiv
Attachment 3
| VYT32421.A1_A_01_stamp |
| VYT32421.A2_A_01_stamp |
| VYT32421.E1_A_01_stamp |
| VYT32421.E2_A_01_stamp |
| VYT32421.E3_A_01_stamp |
| VYT32421.E4_A_01_stamp |
| VYT32421.E5_A_01_stamp |
| VYT32421.E6_A_01_stamp |
| VYT32421.E7_A_01_stamp |
| VYT32421.F1_A_01_stamp |
| VYT32421.F2_A_01_stamp |
| VYT32421.G1_A_01_stamp |
| VYT32421.M1_A_01_stamp |
| VYT32421.M2_A_01_stamp |
| VYT32421.M3_A_01_stamp |
| VYT32421.M4_A_01_stamp |
| VYT32421.M5_A_01_stamp |
| VYT32421.M6_A_01_stamp |
File details come from the government source that posted it. Updated .