Specification - HVAC Building 651
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment0004.pdf | ||
| Amendment0003.pdf | ||
| Questions-_Answers-1.pdf | ||
| Amendment_0002.pdf | ||
| Bldg_651_HVAC_photos.pptx | PPTX presentation | |
| Amendment_.pdf | ||
| Cooling_Raw_Water_Photos.pdf | ||
| Updated_page_3_of_25_for_RFP.pdf | ||
| QUESTIONS-ANSWERS_.pdf | ||
| ATTENDEE_LIST_FOR_CE_BUMP_SITE_VISIT-_18_FEB_2016_.pdf | ||
| Attach_6_Bypass_Valves_Cool_Water_Construction-Spec.pdf | ||
| Attach_4_Install_Cooler_Water_Strainer_PWT-Motor_Drive_Bldg_780_Spec-.pdf | ||
| Attach_1_-_SOW.pdf | ||
| RFP-FA9101-15-R-0040-CE-BUMP.pdf | ||
| Attach_8_Wage_Determination.pdf | ||
| Attach_9_-_Addendum_to_SOW.pdf | ||
| Attach_11_-_Section_L.pdf | ||
| Attach_10_-_PPQ.pdf | ||
| Attach_13_Subcontractor_Consent_Letter.pdf | ||
| Attach_3_HVAC_Drawings.pdf | ||
| Attach_12_Section_M.pdf | ||
| Attach_5__Cooling_Water_Strainer_PWT-Motor_Drive_Bldg_780_Drawings.pdf | ||
| Attach_7_Bypass_Valves_Cool_Water_Isolation_Valves_Drawings.pdf |
Show all 23
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
13437-13-005 NOT SENSITIVE
ANZY999156
SPEC NO. 13437-13-005
6 May 2013
CONSTRUCTION SPECIFICATION
TO
REPAIR HVAC BUILDING 651
ARNOLD ENGINEERING DEVELOPMENT COMPLEX
ARNOLD AIR FORCE BASE, TENNESSEE 37389-9998
NOT SENSITIVE
Attachment 2
ANZY999156 Index-1
INDEX
DIVISION 01 GENERAL REQUIREMENTS
01 10 00 Summary 01 33 00 Submittal Procedures 01 45 00 Regulatory Requirements
DIVISION 02 EXISTING CONDITIONS
02 08 00 Asbestos Removal 02 08 50 Lead and Heavy Metal Removal 02 41 19 Selective Structural Demolition
DIVISION 03 CONCRETE
03 10 00 Concrete Forming and Accessories 03 20 00 Concrete Reinforcing 03 30 00 Cast-In-Place Concrete
DIVISIONS 03 - 08 NOT USED
DIVISION 09 FINISHES
09 51 13 Acoustical Panel Ceiling 09 90 00 Painting and Coating
DIVISIONS 10 - 22 NOT USED
DIVISION 23 HEATING, VENTILATING, AND AIR-CONDITIONING
(HVAC)
23 05 03 Pipes and Tubes for HVAC Piping and Equipment 23 05 29 Hangers and Supports for HVAC Piping and
Equipment 23 05 48 Vibration and Seismic Controls for HVAC Piping and Equipment 23 05 53 Identification for HVAC Piping and Equipment 23 05 93 Testing, Adjusting, and Balancing For HVAC 23 07 00 HVAC Insulation 23 22 16 Steam and Condensate Piping Specialties 23 31 00 HVAC Ducts and Casings 23 33 00 Air Duct Accessories 23 34 00 HVAC Fans 23 37 00 Air Outlets and Inlets 23 55 05 Steam Unit Heaters 23 81 26 Split-System Air-Conditioners
DIVISIONS 24 - 25 NOT USED
ANZY999156 Index-2
DIVISION 26 ELECTRICAL
26 05 03 Equipment Wiring Connections 26 05 19 Low-Voltage Electrical Power Conductors and
Cables 26 05 26 Grounding and Bonding for Electrical Systems 26 05 29 Hangers and Supports for Electrical Systems 26 05 33 Raceways and Boxes for Electrical Systems 26 05 53 Identification for Electrical Systems 26 27 26 Wiring Devices 26 28 19 Enclosed Switches 26 28 23 Enclosed Circuit Breakers 26 51 00 Interior Lighting
DIVISION 27 NOT USED
DIVISION 28 ELECTRONIC SAFETY AND SECURITY
28 31 76 Interior Fire Alarm and Mass Notification System
DIVISIONS 29 - 49 NOT USED
ANZY999156 01 10 00-1
SECTION 01 10 00
SUMMARY
PART 1 GENERAL
1.1 The work consists of providing all materials, labor, equipment, and transportation necessary to remove and replace the existing HVAC system, ceiling, electrical, and lighting for Facility 651 in accordance with these specifications, applicable drawings, and contract documents. The work shall be accomplished in such a manner that at least one of the two floors can be occupied during construction.
Work for one floor shall be completed before work is started on the other floor.
The Contractor shall provide spot heating and cooling in the occupied area and shall assist the Government in the relocation of personnel from one area to another. Move personnel boxes to a location within 5 miles of the building. Cover and protect furniture. After work is completed, return to original location.
Computers, printers, and copiers will be moved by the Government. Major items of work include, but are not limited to the following:
A. Demolish one 15 ton water-cooled condenser and air handling unit along with associated fans, ductwork, piping components, controls, and electrical service.
B. Demolish one unit steam heater and convector along with associated piping and controls.
C. Remove exhaust fans and ductwork.
D. Demolish acoustical tile ceiling.
E. Provide two air-cooled split heat pump units with associated fans, ductwork, electrical supply, condensers, controls, and piping components.
F. Provide one heat pump for control room.
G. Provide one new unit steam heater and associated piping, piping specialties, and controls.
H. Provide new acoustical tile ceiling as shown on the drawings.
I. Provide ductwork, suspended ceiling, and wall modifications as required to provide a finished product.
J. Assume all painted finishes or equipment being removed as containing lead paint and handle in accordance with Section 02 08 50 herein.
K. Asbestos materials are identified on drawings and shall be disposed of in accordance with Section 02 08 00 herein.
ANZY999156 01 10 00-2
L. Remove selected lighting fixtures and provide new lighting fixtures in new location.
M. Replace PA system as shown on drawings.
N. Spot heating/cooling system.
O. Relocation of personnel, furnishings, and equipment.
P. Protection of existing equipment and furnishings during construction.
1.2 DEFINITIONS
A. Certain terms used in the contract documents are defined below.
Definitions and explanations contained in this section are not complete, but are general for the work to the extent that they are not stated more explicitly in another element of the contract documents.
1. Furnish. The term "furnish" means to supply and deliver to the project site, ready for unloading, unpacking, assembly, installation, and similar operations.
2. Install. The term "install" describes operations at the project site, including the actual unloading, unpacking, assembly, erection, placing, anchoring, applying, working to dimensions, finishing, curing, protecting, cleaning, and similar operations.
3. Provide. The term "provide" means "provide complete in place";
that is, "furnish and install.”
4. Indicated. Where "as indicated" or words of similar import are used, it shall be understood that the reference is made to the drawings accompanying this contract unless stated otherwise.
5. Postconsumer material (FAR 52.223-9): a material or finished product that has served its intended use and has been discarded for disposal or recover, having completed its life as a consumer item. Postconsumer material is a part of the broader category of “recovered materials”.
6. Recovered material (FAR 2.101): waste materials and by-products recovered or diverted from solid waste. The term does not include those materials and by-products generated from, and commonly reused within, an original manufacturing process.
7. Biobased product (FAR 2.101): a product determined by the U.S.
Department of Agriculture (USDA) to be a commercial or industrial product (other than food or feed) that is composed, in whole or in significant part, of biological products, including renewable domestic agricultural materials (including plant, animal, and marine materials) or forestry materials.
8. USDA-designated item (FAR 233.401): a generic grouping of products that are or can be made with Biobased materials (1) that is listed by USDA in a procurement guideline (7 CFR 2902, Subpart
ANZY999156 01 10 00-3
B); and (2) for which USDA has provided purchasing recommendations.
1.3 CODES AND STANDARDS
A. AEDC Safety Standards, available at http://www.aerospacetestingalliance.com/SHE/index.htm
1. A6 with Supplement User and Subcontractor Safety
(Mandatory Documents/Submittals), 2009.
2. A9 Hazardous Communication, 2011.
3. A10 Job Safety Analysis, 2011.
4. B1 Master Work Permit, 2011.
5. B2 Lockout/Tagout (LOTO), 2012.
6. B3 Control of Hazardous Areas Using
Safety Signs, Tags, and Barricades, 2011.
7. B5 Confined Spaces, 2011.
8. B6 Low-Voltage Electrical Safety Related
Work Practices, 2011.
9. C2 Contaminated Equipment, 2012.
10. D3 Identification of Piping Systems, 2012.
11. D9 Fixed and Portable Ladders, 2012.
12. D10 Scaffolds, 2012.
13. E7 Asbestos, 2011.
14. E17 Oil and Hazardous Substances Spill
Response, 2012.
15. E18 Managing Wastes Containing Chemical or Petroleum Products, 2011.
16. E19 Lead and Heavy Metals, 2010.
17. F2 Personal Protection Equipment (PPE), 2011.
18. F6 Fall Protection, 2012.
B. Air Force Federal Acquisition Regulation:
1. AFFARS 2.101 Definitions of Words and Terms.
2. AFFARS 233.401 Use of Recovered Materials Definition.
3. AFFARS 52.223-9 Estimate of Percentage of Recovered
Material Content for EPA-Designated Items.
4. AFFARS 5352.223-9000 Elimination of Use of Class I Ozone Depleting Substances (ODS).
C. Code of Federal Regulations (CFR):
1. 7 CFR 2902 Subpart B Guidelines for Designating Biobased
Products for Federal Procurement, Designated Items, 2012.
2. 29 CFR 1926.1101 Asbestos, 2012.
ANZY999156 01 10 00-4
3. 40 CFR 261 Identification and Listing of Hazardous Waste, 2012.
4. 40 CFR 370 EPA Hazardous Chemical Reporting and Community Right to Know Requirement, 2012.
D. US Army Corp of Engineers:
1. USACE EM 385-1-1 Safety and Health Requirements
Manual, 2008.
1.4 JOB CONDITIONS
A. Plan and execute this project in a manner to minimize downtime.
Schedule all work in advance with the Government Representative.
B. Test schedules in the areas may result in work areas being inaccessible.
Coordinate work schedule with Government Representative.
C. Furnish new components and devices, complete, with all necessary materials for installation to meet this objective.
D. Do not interrupt existing utilities or commence power outages without signed authorization from the Government Representative. Submit each utility outage request for Government approval at least two weeks prior to each requested outage date. Outages may be granted depending upon the Government’s schedule for facility use, and may occur on weekends and/or holidays.
E. Keep work area clean and free from waste and debris. Dispose of waste as directed by the Government Representative.
F. Do not close or obstruct egress width to any building or site exit without written permission from the Government Representative.
G. Do not disable or disrupt building fire or life safety systems without written permission from the Government Representative.
H. Conform to applicable procedures when any hazardous or contaminated materials are discovered.
I. Cease operations immediately for any unsafe conditions and notify the Government Representative. Do not resume operations until authorized by the Government Representative.
J. Provide temporary barricades and other forms of protection as required to protect Government personnel and the general public from injury due to the work. Provide temporary signage as needed or directed.
K. Remove protections at the completion of work.
ANZY999156 01 10 00-5
L. Do not close, block, or otherwise obstruct streets, walks, or other occupied or used facilities without written permission from the Contracting officer.
M. Submit sketches of proposed scaffolding, if utilized. All scaffolding shall be in accordance with AEDC Safety Standard D10 and shall be inspected, approved, and tagged by AEDC Safety Representative after it has been erected and prior to use.
N. Verify lighting circuits are as indicated on the drawings. Mark up the drawings to show any changes.
O. Submit record as-built drawings.
1.5 PROTECTION OF EXISTING IMPROVEMENTS:
A. Protection of the grounds, walkways and structures from deterioration due to excessive vehicular traffic, equipment disturbance, and material staging is critical to maintaining the quality appearance of AEDC. The Contractor shall protect against damage incurred by service vehicles, construction activities, maintenance and repair, and all other work that detracts from the overall appearance of the grounds and increases the costs of grounds maintenance.
B. Prior to commencement of work, inspect areas in which work will be performed. Submit a report with the Contracting Officer listing existing conditions which could be construed as damage resulting from the work.
The Government Representative may also photograph or video tape areas or improvements susceptible to damage to document conditions prior to the start of work.
C. The activity of vehicles and equipment on the grounds shall be limited to only that which is essential and required for completing the work. The Government Representative will approve all access and haul routes required for the work prior to any on site operations to preclude damage to sensitive utilities or improvements which may not be readily apparent.
D. Minimize travel paths and staging areas to limit the impact and damage to work areas. Lay out the work site, material and equipment staging, and vehicle and equipment activity to minimize visibility and aesthetic impact of activities to surrounding areas.
E. Protect above and below grade utilities, plant life, lawns, and other features or improvements to remain.
F. Protect benchmarks, existing structures, sidewalks, curbs, and pavements from excavation equipment and vehicular traffic.
ANZY999156 01 10 00-6
G. Use protective materials, such as sheeting, steel plating, rigger pads, to protect grounds and pavement from heavy equipment activity and damage.
H. Protect existing facilities from falling debris during construction such as roof materials, ductwork scraps, or other materials, by use of protective materials such as sheeting, steel plates, netting, or other materials.
I. Provide temporary weather protection during any interval between demolition and removal of existing construction on exterior surfaces and installation of new construction to ensure no water leakage or damage occurs to the structure, interior areas, or contents of the existing facility.
J. Implement a daily procedure for area clean up and organized parking of vehicles and equipment.
K. Provide temporary barricades, shoring, bracing, supports or other forms of protection as required to protect all existing improvements not scheduled to be demolished for both above and below ground improvements and to prevent movement, settlement, collapse or damage of any kind.
L. Maintain personnel and vehicular access and existing utilities to all buildings and other structures during the course of the work. Any changes or interruptions shall be coordinated and approved by the Government Representative well in advance. Temporary protections or services may be required as a condition of approval of any such change or interruption.
M. The Contractor shall be responsible for damage caused by the work and shall repair or replace same to the satisfaction of the Government. Obtain Government Representative’s approval of methods, materials, equipment or products for repair or replacement prior to use. All such repair or replacement shall be performed promptly at no additional cost to the Government. The Government will place special emphasis and requirements for repair or replacement of damage to underground utilities, lawns, grassed areas, existing structures, sidewalks, curbing, railings and pavements.
N. Remove all temporary barricades, shoring, bracing, supports or other forms of protection at completion of work. Restore all adjacent structures and surfaces to conditions existing prior to construction. Clean up all stockpiles and spoil areas, and restore all surrounding areas to conditions existing prior to construction.
1.6 SAFETY REQUIREMENTS
A. All work shall be accomplished in compliance with AEDC Safety A6 with Supplement, A9, A10, B1, B2, B3, B5, B6, C2, D3, D9, D10, E7, E17, E18, E19, F2, and F6. Submit a safety and health plan in accordance with AEDC Safety Standard A6 with supplement and USACE EM 385-1-1.
ANZY999156 01 10 00-7
1.7 DISPOSAL OF CONTAMINATED EQUIPMENT
A. The Contractor shall clean equipment or material of contaminants prior to disposal at the AEDC Salvage Yard (with the exception of lead paint, unless the paint is flaking in which case the flaking paint shall be removed prior to transport to prevent contamination during transport). If cleaned equipment is to be turned-in to the Government for storage or excessing, a GC-1785, Special Material Turn-in Certification, shall be completed and submitted to the Government with the equipment or material prior to disposal. The Government Representative will assist the Contractor in filling out the form and in coordinating with Industrial Hygiene and Environmental Quality.
1.8 CONNECTIONS TO POTABLE WATER
A. Contractor shall not make any connections to an AEDC potable water system without specific approval from the Government Representative.
B. Notify Government Representative if connections to hose bibs are needed. Do not connect to any hose bibs without Government-supplied backflow preventer and specific approval from Government Representative.
1.9 TOOL CONTROL: Coordinate tool control with the Government Representative.
1.10 EPA-DESIGNATED ITEMS
A. The Contractor, on completion of this contract in accordance with AFFARS 52.223-9, shall:
1. Estimate the percentage of the total recovered material content for
EPA-designated item(s) delivered and/or used in contract performance, including, if applicable, the percentage of post-consumer material content; and
2. Submit this estimate to the Contracting Officer.
1.11 ELIMINATION OF ODS CHEMICALS
A. The use of Class I ozone depleting substances (ODS) is prohibited.
Reference text of AFFARS clause 5352.223-9000.
1.12 DISALLOWED PRODUCTS
A. Do not use products or materials that contain lead, chromium, mercury, cadmium, silver, barium, selenium, beryllium, or arsenic on this project except as expressly authorized by the Contracting Officer. If no substitutes for products containing the listed materials are available, and the Contracting Officer approves the use of products containing the listed materials, highlight and detail their exact location on the drawings.
ANZY999156 01 10 00-8
1.13 ASBESTOS PRODUCTS
A. Do not use products or materials that contain asbestos on this project except as expressly authorized by the Contracting Officer. If no substitutes for asbestos products are available, and the Contracting Officer approves the use of asbestos products, highlight and detail their exact location on the drawings and identify their location in the field following 29 CFR
1926.1101 guidelines.
1.14 HAZARDOUS WASTE
A. Where hazardous waste (as identified in 40 CFR 261) is generated, follow the procedures in AEDC Safety Standard E18, Chemical and Petroleum Products Waste Management, for storing and turning in hazardous waste.
These procedures include the requirement to complete Forms GC-565 and GC-1337, which will be furnished by the Government Representative.
1.15 HAZARDOUS MATERIAL IDENTIFICATION AND MATERIAL SAFETY DATA
A. The following procedures shall be followed to meet 40 CFR 370, EPA Hazardous Chemical Reporting and Community Right to Know Requirement.
1. Procedures:
a. The Contractor shall furnish information on the hazardous materials he brings on AEDC property prior to beginning on-site work. Hazardous materials may include solvents, paints, adhesives, acids, or any other substance which could be included within the definitions in paragraph 2.
b. The information required is:
1) Company name, point of contact, and phone number.
2) Brief statement indicating how the hazardous material will be used within the scope of the contract.
3) List of all hazardous materials to be used (product name, manufacturer’s name, and address).
4) Amount of each material to be stored on site and where it will be stored.
5) Where the product Material Safety Data Sheets
(MSDS) will be maintained.
c. All unused product is the responsibility of the Contractor and shall be removed from AEDC property at the completion of the project.
d. The Contractor shall coordinate with the Government Representative and the Hazardous Waste Operations Group (454-3628) if any hazardous waste is to be generated.
2. Definitions
a. Hazard communication standard. A chemical right-to-know law under OSHA that requires chemical manufacturers and importers to assess the hazards of chemicals they make or
ANZY999156 01 10 00-9
import and to distribute this information to inform workers of the hazards associated with these chemicals. This written information is a Material Safety Data Sheet (MSDS).
b. Hazard classes. Hazardous materials that have been grouped into classes by the Department of Transportation (DOT). These classes include explosives, flammables, oxidizers and organic peroxides, compressed gases, corrosives, and poisons.
c. Hazardous material. Any substance that may be harmful when used. Specific substances have been designated as hazardous under the Clean Water Act, the Resource and Conservation and Recovery Act, and the hazardous air pollutants under the Clean Air Act.
d. Hazardous waste. Any waste that may cause or significantly contribute to serious illness or death or that may pose a substantial threat to human health or the environment, if not properly managed. Hazardous wastes may be solids, liquids, semi-solids, or compressed gases.
1.16 PROPRIETARY AND BRAND NAMES: Proprietary and brand names used in this document are meant to describe physical, performance, and quality characteristics of items and materials, and are not meant to limit competition or exclude Contractors, Vendors, or Manufacturers from submitting like products to the Contracting Officer for approval.
END OF SECTION
ANZY999156 01 33 00-1
SECTION 01 33 00
SUBMITTAL PROCEDURE
PART 1 GENERAL
1.1 DESCRIPTION OF REQUIREMENTS. This section specifies procedural requirements for non-administrative submittals, including but not limited to shop drawings, product data, manufacturer’s certificate, design data, calculations, and verifications, manufacturer’s instructions, manufacturer’s field service reports, samples, operation and maintenance manuals, and other miscellaneous work-related submittals. These submittals are required to amplify, expand, and coordinate other information contained in the contract. This section describes the type and content of submittals that may be required for this work. The list of required submittals is included in the Statement of Work or Specification.
Non-work-related submittals are addressed elsewhere in the contract rather than in the specification and may include items such as: contract progress schedule, permits, payment applications, performance and payment bonds, insurance certificates, and progress reports.
The Contracting Officer may request submittals in addition to those specified when deemed necessary to adequately describe the work covered in the respective sections of the specification or statement of work.
1.2 SUBMITTAL PROCEDURE
A. Definition: For the purposes of this section, the term “Contractor” denotes the prime Contractor.
B. Listing: At the end of this section is a summarized listing of item submittals requiring approval for the work. The listing is included for the convenience of users of the contract documents. The listing may not be all inclusive and additional item submittals may be required. Within 14 calendar days after receiving contract award, Contractor shall submit a copy of the summarized submittal listing with calendar dates assigned to each item submittal indicating when submittal will be received by the Government. If contract requires a pre-construction conference, Contractor may submit completed submittal listing at the conference.
C. Risk: Do not proceed with the part of the work covered by an item submittal including purchasing, fabricating, and delivering until approval is received. Machinery, equipment, material, and articles that do not have the required approval shall be installed or used at the risk of subsequent rejection. Any fabrication or other work performed in advance of the receipt of accepted item submittals and approvals shall be entirely at the Contractor’s risk and expense.
ANZY999156 01 33 00-2
D. Transmittal Timing: Coordinate the preparation and processing of item submittals with the performance of the work. Prepare and transmit each item submittal to the Contracting Officer sufficiently in advance of the performance of related work and other applicable activities. Transmit related item submittals for the same unit of work so that processing will not be delayed by the Government's need to review submittals concurrently for coordination. No delay damages or time extensions will be allowed for time lost in late submittals.
E. Content: Each submittal shall be complete and in sufficient detail to allow ready determination of compliance with contract requirements. All submittals which are generic and list more information than is specifically required shall be marked to identify required information. Complete AF Form 3000 and attach as cover sheet for each submittal. Contractor may include multiple item numbers on an AF Form 3000.
F. Language: All item submittals shall be written in English, including documents, notes on drawings, sketches, and/or samples, calculations, manuals, and all other instances of written text and communication.
G. Units: All item submittals shall be marked or show dimensions and values in the same units as specified in the contract documents.
H. Review Time: Allow sufficient time so that contract performance will not be delayed as a result of the time required to properly process submittals, including time for re-submittals, if necessary. Allow 14 calendar days for initial Government processing of each submittal. No extension of time will be authorized because of the Contractor's failure to transmit submittals to the Government sufficiently in advance of the work.
I. Contractor Certification: All submittals shall be carefully reviewed by an authorized representative of the Contractor prior to submission to the Government. Each submittal shall be dated, signed, and certified by the Contractor as being correct and in strict conformance with the contract documents. No consideration for review by the Government of any Contractor’s submittal will be made for any items which have not been so certified by the Contractor. All noncertified submittals will be returned to the Contractor without action taken by the Government, and any delays caused thereby shall be the total responsibility of the Contractor.
J. Deviations: Should any item submittals required by the contract documents show deviations from the contract requirement, the Contractor shall make specific mention of such deviations in the letter of transmittal, including stating cost effects, and product and system limitations which may adversely affect the work, in order that if acceptable, suitable action may be taken for proper adjustment of the contract; otherwise the Contractor will not be relieved of the responsibility for executing the work
ANZY999156 01 33 00-3
in accordance with the contract documents and the approved submittals.
Contractor shall clearly mark the proposed variation in all documentation and specifically point out deviations from contract requirements in transmittal letters. Failure to point out deviations may result in the Government requiring rejection and removal of such work at no additional cost to the Government. Deviations from contract requirements require Government approval and will only be considered when advantageous to the Government. When proposing deviations, deliver written request to the Contracting Officer, with documentation of the nature and features of the deviation and why the deviation is desirable and beneficial to the Government. If lower cost is a benefit, include an estimate of the cost savings. In addition to documentation required for deviation, include the submittal information required for the item. Allow an additional 14 calendar days beyond normal submittal review period for consideration by the Government of submittals with deviations.
K. Approved Submittals: The part of the work covered by the approved item submittal may proceed provided it complies with the requirements of the contract documents. Final acceptance will depend upon that compliance.
The term “Approved” shall only indicate that there is no exception taken to the submittal. Approval of the item submittal shall not be construed as a complete check, and indicates only that the general method or other information appears to meet the contract requirements. Approval does not relieve the Contractor of the responsibility for any error which may exist.
After item submittals have been approved by the Contracting Officer, no resubmittal for the purpose of substituting materials or equipment, or changes to any other information will be considered unless accompanied by an explanation of why a substitution or change is necessary.
L. Disapproved Submittals: Contractor shall correct disapproved item submittals and resubmit for approval within timeframe noted. If no date is given, Contractor shall submit corrected submittal within 14 calendar days.
If the Contractor considers any correction or notation on the returned submittal to constitute a change to the contract drawings, specification, or statement of work the Contractor shall notify the Contracting Officer.
M. Responsibility: The Government’s review of Contractor submittals shall not relieve the Contractor of the entire responsibility for the correctness of details and dimensions and conformance to the specifications. The Contractor shall assume all responsibility and risk for any mistakes and/or costs due to any errors in submittals.
N. Inconsistencies: If a conflict or inconsistency arises between an approved item submittal and the contract documents, the contract documents shall govern.
ANZY999156 01 33 00-4
1.3 SPECIFIC SUBMITTAL DESCRIPTIONS AND REQUIREMENTS: Submittal requirements for individual units of work are specified in the applicable specification section or Statement of Work (SOW). Except as otherwise indicated in the individual specification sections or SOW, comply with the following requirements for each type of submittal.
A. Shop Drawings: These are technical drawings and data specially prepared for this contract including fabrication and installation drawings, setting and seaming diagrams, and coordination drawings (for use on-site). Shop drawings include drawings, diagrams and schedules specifically prepared to illustrate some portion of the work, diagrams and instructions from a manufacturer or fabricator for use in producing the product and as aids to the Contractor for integrating the product or system into the project, or drawings prepared by or for the Contractor to show how multiple systems and interdisciplinary work will be coordinated. Information required on shop drawings includes dimensions, identification of specific products and materials which are included in the work, compliance with specified standards, and notations of coordination requirements with other work.
Provide special notations of dimensions that have been established by field measurements. Highlight, encircle, or otherwise indicate deviations from the contract documents on the shop drawings. Furnish one hard copy and one electronic copy.
B. Product Data: This data includes standard printed information on manufactured products that has not been specially prepared for this contract, including manufacturers' product specifications illustrating size, physical appearance and other characteristics of materials, installation instructions, standard color charts, catalog cuts, illustrations, schedules, standard wiring diagrams, standard product operating and maintenance manuals, and samples of warranty language when the contract requires extended product warranties. General information required specifically as product data includes manufacturers' standard printed recommendations for application and use, compliance with recognized standards of trade associations and testing agencies, the application of their labels and seals (if any), special notation of dimensions which have been verified by way of field measurement, and special coordination requirements for interfacing the material, product, or system with other work. Furnish three hard copies and one electronic copy.
C. Samples: These are physical examples of work, including, swatches showing color, texture, and pattern, color-range sets, and units of work to be used for independent inspection and testing. Samples include fabricated or unfabricated physical examples of materials, equipment or workmanship that illustrate functional and aesthetic characteristics of a material or product and establish standards by which the work can be judged, color samples from the manufacturer’s standard line (or custom color samples if specified) to be used in selecting or approving colors for
ANZY999156 01 33 00-5
the project, and field samples and mock-ups constructed on the project site to establish standards by which the ensuring work can be judged. This includes assemblies or portions of assemblies which are to be incorporated into the project and those which will be removed at conclusion of the work. Submit samples for the Contracting Officer's visual review of general kind, color, pattern, and texture for a final check of the coordination of these characteristics with other related elements of the work and for quality control comparison of these characteristics between the final sample submittal and the actual work as it is delivered and installed. Submit one each.
D. Design Data: Design data includes design calculations, mix designs, analyses or other data pertaining to a part of work. Refer to individual sections of the specification or statement of work for required quantities, formats, and signatures or certifications required. Furnish three hard copies and one electronic copy.
E. Test Plans and Reports: Test plans shall include planned testing, including a description of the test, equipment and supplies needed, and step-by-step notation of test activities and tasks. Test reports include reports signed by an authorized official of a testing laboratory that a material, product or system identical to the material, product or system to be provided has been tested in accordance with the specified requirements.
Testing shall have been within three years of date of contract award for the project. Reports also include findings of tests required to be performed by the Contractor on an actual portion of the work or prototype prepared for the project before shipment to the job site, findings of tests made at the job site or on a sample taken from the job site, investigation reports, daily logs and checklists, and final acceptance test and operational test procedures. Furnish three hard copies and one electronic copy of each such report required.
F. Certificates: These include statements printed on the manufacturer’s letterhead and signed by the responsible officials of the manufacturer of a product, system or material attesting that the product, system or material meets specification requirements. Certificates include documentation required of the Contractor, or of a manufacturer, supplier, installer or subcontractor through the Contractor, to further demonstrate the quality of orderly progressions of a portion of the work by documenting procedures, acceptability of methods or personnel qualifications. Examples include confined space entry permits, and text of posted operating instructions.
Certificates shall be dated after award of the project contract and clearly name the project. Furnish three hard copies and one electronic copy of each certificate required.
G. Manufacturer’s Instructions: Preprinted material describing installation of a product, system or material, including special notices and Material Safety
ANZY999156 01 33 00-6
Data sheets concerning impedances, hazards and safety precautions.
Furnish three hard copies and one electronic copy.
H. Manufacturer’s Field Reports: Documentation of the testing and verification actions taken by a manufacturer’s representative at the job site, in the vicinity of the job site, or on a sample taken from the job site, on a portion of the work, during or after installation, to confirm compliance with the manufacturer’s standards or instructions. The documentation shall be signed by an authorized official of a testing laboratory or agency and shall state the test results, and indicate whether the material, product, or system has passed or failed the test. Furnish three hard copies and one electronic copy.
I. Operation and Maintenance Data: Data furnished by the manufacturer, or the system provider, to the equipment operating and maintenance personnel, including manufacturer’s help and product line documentation necessary to maintain and install the equipment, and needed by operating and maintenance personnel for the safe and efficient operation, maintenance, and repair of the item. The data is intended to be incorporated in an operations and maintenance manual or control system.
Furnish two hard copies and one electronic copy.
J. Final Design Drawings and Documentation: Final design documentation including drawings, specifications, estimates, and other required deliverables. Electronic documentation submitted shall include every associated component file of drawings and other documentation, including raster images, jpeg, tiff, Excel, and any related items required to view, modify, or manipulate the electronic files. Furnish a CD-ROM of all final design documentation, and drawings in AutoCAD 2005 through 2010 format, to the Contracting Officer for approval prior to applying for final payment.
K. Record (As-Built) Drawings: Record drawings showing final configuration of work accomplished. Show all changes, additions, and deviations from the original contract drawings and documentation. If no changes occur, furnish certification to that effect. Drawings may be redlined hardcopies or electronic drawings, and shall accurately show as-built conditions during the progress of the job. If electronic, furnish drawings on a CD-ROM, in AutoCAD 2005 through 2010 format, including every associated component file of the drawings, including raster images, jpeg, tiff, Excel, and any related items required to view, modify, or manipulate the electronic files. Submit to the Contracting Officer for approval prior to applying for final payment.
ANZY999156 01 33 00-7
L. Miscellaneous Submittals: These are work-related, non-administrative submittals that do not fit in the previous categories, including the following:
1. Maintenance agreements. Furnish one hard copy and one electronic copy.
2. Survey data and reports. Furnish one hard copy and one electronic copy.
3. Project photographs. Furnish both hard copies and digital files.
4. Keys and other security protection devices.
5. Maintenance tools, spare parts, and overrun or maintenance stock.
Refer to individual sections of the specification for required quantities of spare parts, extra and overrun stock, maintenance tools and devices, keys, and similar physical units to be submitted.
6. Qualification certificates. Furnish one hard copy and one electronic copy.
7. Employee training certificates and documentation showing successful completion of training.
8. Documentation of percentage of recovered material content used during contract.
9. Contractor safety and work plans and schedules.
10. Warranties.
1.4 REQUIRED SUBMITTALS
No. Section Reference Description Due 1 01 10 00 para 1.4D Outage Request 2 weeks prior to outage 2 01 10 00 para 1.4M Proposed Scaffolding Before beginning onsite work 3 01 10 00 para 1.4O Record As-Built Drawings Before final inspection 4 01 10 00 para 1.5B Existing Conditions Report
Which could be Construed as Damage Resulting from Work
Before beginning onsite work
5 01 10 00 para 1.6A Safety and Health Plan 10 days after contract award
6 01 10 00 para 1.7B Form GC-1785 Prior to disposal 7 01 10 00 para 1.10.A.2 Percentage of Recovered
Material Content Before final inspection
8 01 10 00 para 1.12A Disallowed Products Locations Before final inspection
9 01 10 00 para 1.13A Asbestos Locations Before final inspection
10 01 10 00 para 1.14A Forms GC-565 and GC-1337 Before final inspection
Table I. Required submittal list - Continued
ANZY999156 01 33 00-8
No. Section Reference Description Due 11 01 10 00 para 1.15.A.1.a Hazardous Material Info Before beginning on-site work 12 01 33 00 para 1.2B Summarized submittal listing with delivery dates 14 days after contract award 13 02 08 00 para 1.3A Employee Certification Before beginning on-site work 14 02 08 00 para 1.3B Training and Medical
Certifications Before beginning on-site work 15 02 08 00 para 1.3C Training and Hazard
Communications Certification Before beginning on-site work 16 02 08 00 para 1.3D Product List Before beginning on-site work 17 02 08 00 para 1.3E Equipment List Before beginning on-site work 18 02 08 00 para 1.3F Notice of Violation Before beginning on-site work 19 02 08 00 para 1.3G Environmental, Health, and
Safety Plan Before beginning on-site work 20 02 08 00 para 1.3H Asbestos Removal Plan Before beginning on-site work 21 02 08 00 para 1.3I Air Sampling Reports Before beginning on-site work 22 02 08 00 para 1.3J Testing Certifications Before beginning on-site work 23 02 08 00 para 1.3K CPR Certification Before beginning on-site work 24 02 08 00 para 1.3L Insurance Coverage
Certification Before beginning on-site work 25 02 08 00 para 1.3M Sampling List Before beginning on-site work 26 02 08 00 para 1.3N Operator’s Log and Shipper’s
Log Before beginning on-site work 27 02 08 00 para 1.3O Daily Logs: Sign-In and Field
Notes Before beginning on-site work 28 02 08 50 para 1.4A Employee Certification Before beginning on-site work 29 02 08 50 para 1.4B Training and Medical
Certification Before beginning on-site work 30 02 08 50 para 1.4C Notice of Violation Before beginning on-site work 31 02 08 50 para 1.4D Environmental, Health, and
Safety Plan Before beginning on-site work
ANZY999156 01 33 00-9
No. Section Reference Description Due 32 02 08 50 para 1.4E Training and Hazard
Communications Certification Before beginning on-site work 33 02 08 50 para 1.4F Product List Before beginning on-site work 34 02 08 50 para 1.4G Lead Abatement Plan Before beginning on-site work 35 02 08 50 para 1.4H Air & Substrate Sampling
Reports Before beginning on-site work 36 02 08 50 para 1.4I Testing Laboratory
Qualifications Before beginning on-site work 37 02 08 50 para 1.4J Air Monitoring Results Before beginning on-site work 38 02 08 50 para 1.4K Equipment List Before beginning on-site work 39 02 08 50 para 1.4L Rental Equipment List Before beginning on-site work 40 02 08 50 para 1.4M Shower Water Test Results Before beginning on-site work 41 02 41 19 para 1.3A Detailed Demolition Plan Before beginning on-site work 42 03 10 00 para 1.3A Product Data Before final inspection 43 03 20 00 para 1.3A Manufacturers’ Certificate Before beginning on-site work 44 03 20 00 para 1.3B Mill Test Reports Prior to placement
45 03 30 00 para 1.3A Manufacturers’ Certificate Before beginning on-site work
46 03 30 00 para 1.3B Test Results 1st test-7 days after placement, 2nd test-
28 days after placement
47 09 51 23 para 1.3A Product Data Prior to purchasing 48 09 51 23 para 1.3B Samples Prior to purchasing 49 09 90 00 para 1.4A Product Data Prior to purchasing 50 09 90 00 para 1.4B Samples Prior to purchasing 51 23 05 03 para 1.3A Welders’ Certificate Before beginning on-site work 52 23 05 03 para 1.3B Welding Procedure Before beginning on-site work 53 23 05 03 para 1.3C Test Reports 2 weeks after test 54 23 05 48 para 1.3A Product Data Prior to purchasing 55 23 05 48 para 1.3B Manufacturer’s Installation
Instructions Before beginning on-site work
ANZY999156 01 33 00-10
No. Section Reference Description Due 56 23 05 48 para 1.3C Manufacturer’s Certificate Prior to purchasing 57 23 05 53 para 1.3A Nameplate and Pipe Marker
Sample Before beginning on-site work 58 23 05 93 para 1.3A Testing, Adjusting and
Balancing Reports Before beginning on-site work 59 23 05 93 para 1.3B Adjusting and Balancing Agency 30 days after contract award 60 23 05 93 para 1.3C Test Reports 2 weeks after test 61 23 05 93 para 1.3D Project Record Documents Prior to final inspection 62 23 07 00 para 1.3A Product Data Prior to purchasing 63 23 07 00 para 1.3B Manufacturer’s Installation
Instructions Prior to purchasing
64 23 22 16 para 1.5A Product Data Prior to purchasing 65 23 22 16 para 1.5B Test Reports 2 weeks after test 66 23 31 00 para 1.3A Product Data Prior to purchasing 67 23 34 00 para 1.3A Shop Drawings Prior to purchasing 68 23 34 00 para 1.3B Product Data Prior to purchasing 69 23 34 00 para 1.3C Manufacturer’s Installation
Instructions Prior to purchasing
70 23 34 00 para 1.3D Manufacturer’s Certificate Prior to purchasing 71 23 34 00 para 1.3E Operation and Maintenance
Data Prior to purchasing
72 23 34 00 para 1.3F Warranty Prior to purchasing 73 23 37 00 para 1.3A Product Data Prior to purchasing 74 23 37 00 para 1.3B Test Reports 75 23 55 05 para 1.2A Product Data Prior to purchasing 76 23 55 05 para 1.2B Operation and Maintenance
Data Prior to purchasing
77 23 81 26 para 1.3A Product Data Prior to purchasing 78 23 81 26 para 1.3B Manufacturer’s Certificate Prior to purchasing 79 23 81 26 para 1.3C Shop Drawings Prior to purchasing 80 23 81 26 para 1.3D Operation and Maintenance
Data Prior to purchasing
81 23 81 26 para 1.3E Design Data Before beginning on-site work
82 23 81 26 para 1.3F Filters for Heat Pumps System Prior to final inspection
83 23 81 26 para 1.3G Warranty Prior to purchasing 84 26 05 03 para 1.3A Manufacturer’s Descriptive
Literature Prior to purchasing
85 26 05 19 para 1.3A Product Data Prior to purchasing
ANZY999156 01 33 00-11
No. Section Reference Description Due 86 26 05 19 para 1.3B Test Results Day of test 87 26 05 26 para 1.3A Manufacturer’s Descriptive
Literature Prior to purchasing
88 26 05 33 para 1.3A Product Data Prior to purchasing 89 26 27 26 para 1.3A Equipment/Material List Before beginning on-site work 90 26 27 26 para 1.3B Manufacturer’s Descriptive
Literature Prior to purchasing
91 26 28 19 para 1.3A Manufacturer’s Descriptive Literature
Prior to purchasing
92 26 28 19 para 1.3B Equipment/Material List Before beginning on-site work
93 26 28 23 para 1.3A Equipment/Material List Before beginning on-site work
94 26 28 23 para 1.3B Manufacturer’s Descriptive Literature
Prior to purchasing
95 26 51 00 para 1.5A Equipment/Material List Before beginning on-site work
96 26 51 00 para 1.5B Manufacturer’s Descriptive Literature
Prior to purchasing
97 26 51 00 para 1.5C Operation and Maintenance Manual
At final inspection
98 28 31 76 para 1.3A Documentation of Qualifications Before beginning on-site work
99 28 31 76 para 1.3B Design Drawings Before beginning on-site work
100 28 31 76 para 1.3C Shop Drawings Prior to final inspection
101 28 31 76 para 1.3D Wiring Diagrams Prior to installation 102 28 31 76 para 1.3E Product Data Prior to purchasing 103 28 31 76 para 1.3F Battery Calculations Prior to purchasing 104 28 31 76 para 1.3G Itemized Sequence of Operation Prior to installation 105 28 31 76 para 1.3H Operation and Maintenance
Manual Prior to purchasing
106 28 31 76 para 1.3I Test Results Day of test 107 28 31 76 para 1.3J Warranty At final inspection
Table I. Required submittal list - Completed.
ANZY999156 01 45 00-1
SECTION 01 45 00
REGULATORY REQUIREMENTS
PART 1 GENERAL
1.1 This section lists regulations, codes, and standards which specify procedural and administrative requirements imposed upon the work.
1.2 The Contractor shall comply with provisions of the following documents to the extent referenced herein.
A. Government Documents:
1. AEDC Safety Standards, available at http://www.aerospacetestingalliance.com/SHE/index.htm
a. A6 with Supplement User and Subcontractor Safety
(Mandatory Documents/Submittals), 2009.
b. A9 Hazardous Communication, 2011.
c. A10 Job Safety Analysis, 2011.
d. B1 Master Work Permit, 2011.
e. B2 Lockout/Tagout (LOTO), 2012.
f. B3 Control of Hazardous Areas Using
Safety Signs, Tags, and Barricades, 2011.
g. B5 Confined Spaces, 2011.
h. B6 Low-Voltage Electrical Safety Related
Work Practices, 2011.
i. C2 Contaminated Equipment, 2012.
j. D3 Identification of Piping Systems, 2012.
k. D9 Fixed and Portable Ladders, 2012.
l. D10 Scaffolds, 2012.
m. E7 Asbestos, 2011.
n. E17 Oil and Hazardous Substances Spill
Response, 2012.
o. E18 Managing Wastes Containing Chemical or Petroleum Products, 2011.
p. E19 Lead and Heavy Metals, 2010.
q. F2 Personal Protection Equipment (PPE), 2011.
r. F6 Fall Protection, 2008.
2. Air Force Federal Acquisition Regulation (AFFARS):
a. AFFARS 2.101 Definitions of Words and Terms.
b. AFFARS 233.401 Use of Recovered Materials Definition.
c. AFFARS 52.223-9 Estimate of Percentage of Recovered
Material Content for EPA-Designated Items.
d. AFFARS 5352.223-9000 Elimination of Use of Class I Ozone Depleting Substances (ODS).
ANZY999156 01 45 00-2
3. Architectural Barriers Act (ABA), 1968.
4. Code of Federal Regulations:
a. 7 CFR 2902 Subpart B Guidelines for Designating Biobased Products for Federal Procurement Designated Items, 2012.
b. 29 CFR 1910.134 Respiratory Protection, 2012.
c. 29 CFR 1910.1200 Hazard Communication, 2012.
d. 29 CFR 1926.55 Gases, Vapors, Fumes, Dusts, and
Mists, 2012.
e. 29 CFR 1926.57 Ventilation, 2012.
f. 29 CFR 1926.59 Hazard Communication, 2012.
g. 29 CFR 1926.62 Lead Standard, 2012.
h. 29 CFR 1926.1101 Asbestos, 2012.
i. 40 CFR 61 National Emission Standards for
Hazardous Air Pollutants (NESHAP), 2012.
j. 40 CFR 260 Hazardous Waste Management Systems: General, 2012.
k. 40 CFR 261 Identification and Listing of Hazardous Wastes, 2012.
l. 40 CFR 262 Generators of Hazardous Waste, 2012.
m. 40 CFR 370 EPA Hazardous Chemical Reporting and Community Right to Know Requirement, 2012.
n. 47 CFR 15 Federal Communications Commission - Private Land Mobile Radio Services, 2012.
o. 47 CFR 90 Federal Communications Commission – Radio Frequency Devices, 2012.
p. 49 CFR 172 Department of Transportation (DOT) Regulations for Use of Hazardous Materials Tables and for Communication, 2012.
q. 49 CFR 178 DOT Specifications for Packaging, 2012.
5. Environmental Protection Agency Document:
a. EPA SW-846 Proposed Sampling and Analytical
Methodologies for Additions to Test Methods for Evaluating Solid Waste:
Physical/Chemical Methods, 2012.
6. Public Law:
a. PL 101-637 The Asbestos School Hazard
Abatement Reauthorization Act
(ASHARA), 1990.
7. Tennessee Department of Environment and Conservation Standard:
a. Chapter 1200-01-20 Asbestos Accreditation Requirements, 2009.
ANZY999156 01 45 00-3
b. Chapter 1200-3-11-02 Hazardous Air Contaminants, Asbestos, 2011.
8. Unified Facilities Criteria:
a. UFC 3-600-01-09 Fire Protection Engineering for
Facilities.
b. UFC 4-010-01-09 DoD Minimum Antiterrorism Standards for Buildings.
c. UFC 4-021-01-10 Design and O&M: Mass Notification
Systems.
9. US Army Corp of Engineers:
a. USACE EM 385-1-1 Safety and Health Requirements Manual, 2008.
B. Non-Government Documents:
1. Air-Conditioning, Heating, and Refrigeration Institute:
a. AHRI 210/240-08 Performance Rating for…