About this file

This document provides information on a draft request for proposal for BRAC Environmental Construction Optimization Services contracts. The Air Force plans to award six single-award IDIQ contracts to provide environmental remediation and construction services at 40 BRAC installations across five CONUS regions and Galena, AK. Services will maintain remedies and advance sites to completion. The 10-year contracts are anticipated to run from July 2020 to July 2030 with a potential three-year extension. Questions on the draft RFP are due by November 4, 2019. The final solicitation is expected in November 2019.

PPQ

View the file

Other files for this federal contract opportunity

Other files attached to BRAC Environmental Construction Optimization Services (BECOS), newest first.
File Type Posted
RFI_5_BECOS_Response_Matrix_Attch_1.xlsx XLSX spreadsheet
Northeast_Region_BECOS_IDIQ_PWS_Attachment_3.docx DOCX document
Northeast Region BECOS TO 2 PWS Attch 2 - Base Specific Req Dft Loring 24 SEP 19 v2.0.docx DOCX document
Midwest Region BECOS TO 2 PWS Attch 2 - Base Specific Req Rickenbacker Dft 24 SEP 19 v3.0.docx DOCX document
Southwest_Region_BECOS_TO_1_PWS_Draft_17_OCT_19_v3.0.docx DOCX document
NorCal Region BECOS TO 2 PWS Attch 2 - Base Specific Req McClellan Dft 19 SEP 19 v3.0.docx DOCX document
BECOS_TO_2_DD1423_CDRLS_EXHIBIT_A010_(QCIC)_03_Oct_19.zip ZIP file
TO2 PWS Central South Dft 25 SEP 19 v3.0.docx DOCX document
NorCal Region BECOS TO 2 PWS Attch 2 - Base Specific Req Castle Dft 19 SEP 19 v3.0.docx DOCX document
20191024_Section_M_Draft_RFP.pdf PDF
BECOS_TO_2_DD1423_CDRLS_EXHIBIT_B006-B007-B008_(ADMN)_03_Oct_19.zip ZIP file
TO2 PWS Attch 2 Central South - Base Specific Req Bergstrom Dft 20 SEP 19 v3.0.docx DOCX document
Galena_-_Alaska_Region_BECOS_IDIQ_PWS_Attachment_3_-_Deliverable_Review_Process_Draft_18_Sept_19_v1.0.docx DOCX document
TO2 PWS Attch 2 Central South - Base Specific Req Eaker Dft 20 SEP 19 v3.0.docx DOCX document
Galena_AK_Region_BECOS_TO_2_PWS_Draft_25_SEP_19_v3.0.zip ZIP file
DRAFT_10242019_NorCal_IDIQ_TO1_TO2_CLIN_Structure_and_Price_Model.xlsx XLSX spreadsheet
Section_I_Draft_RFP_FA890320R0002.pdf PDF
Southwest Region BECOS TO 2 PWS Attch 2 - Base Specific Req Norton Dft 20 SEP 19 v3.0.docx DOCX document
Northeast_Region_BECOS_TO_2_PWS_Attachment_1_-_Site_List_Dft_25_SEP_19_v2.0.zip ZIP file
Midwest_Region_BECOS_IDIQ_QASP_dft_24_Oct_19_v1.0.docx DOCX document
Northeast_Region_BECOS_IDIQ_QASP_dft_24_Oct_19_v1.0.docx DOCX document
Northeast Region BECOS TO 2 PWS Attachment 1 - Site List Dft 25 SEP 19 v2.0.xlsx XLSX spreadsheet
Midwest_Region_BECOS_IDIQ_PWS_Attachment_4_-_Performance_Objectives_Defined_Draft_18_Sept_19_v1.0.docx DOCX document
Northeast Region BECOS TO 2 PWS Attch 2 - Base Specific Req Dft Plattsburgh 24 SEP 19 v2.0.docx DOCX document
TO2 PWS Attch 2 Central South - Base Specific Req Carswell Dft 20 SEP 19 v3.0.docx DOCX document
Attachment_6_Fully_Burdened_Labor_Table_Compensation_Plan.xlsx XLSX spreadsheet
IDIQ_PWS__Attch_4_Central_South_-_Performance_Objectives_Defined_Dft_18_Sept_19_v1.0.docx DOCX document
Midwest Region BECOS TO 2 PWS Attch 2 - Base Specific Req Grissom Dft 24 SEP 19 v3.0.docx DOCX document
NORCAL_Region_BECOS_IDIQ_PWS_Attachment_4_-_Performance_Objectives_Defined_Draft_18_Sept_19_v1.0.docx DOCX document
BECOS_IDIQ_DD1423_CDRLS_EXHIBIT_C002_(MGMT)_27_Sep_19.zip ZIP file
NorCal_Region_BECOS_TO_2_PWS_Draft_25_SEP_19_v3.0.zip ZIP file
DRAFT_10242019_Midwest_IDIQ_TO1_TO2_CLIN_Structure_and_Price_Model.xlsx XLSX spreadsheet
Southwest_Region_BECOS_IDIQ_QASP_dft_24_Oct_19_v1.0.docx DOCX document
20191024_Section_L_Draft_RFP.pdf PDF
TO1_DD1423_CDRLS_Central_South_EXH_B006-B007-B008_(ADMN)_Dft_17_Oct_19.zip ZIP file
Northeast Region BECOS TO 2 PWS_Draft_25 SEP 19 v3.0.docx DOCX document
Southwest_Region_BECOS_IDIQ_PWS_Attachment_3_-_Deliverable_Review_Process_Draft_18_Sept_19_v1.0.docx DOCX document
Central_South_Region_BECOS_IDIQ_QASP_dft_24_Oct_19_v1.0.docx DOCX document
Southwest_Region_BECOS_IDIQ_PWS_Draft_18_SEP_19_v4.0.docx DOCX document
NorCal_Region_BECOS_TO_1_PWS_Draft_17_OCT_19_v3.0.docx DOCX document
Draft_RFP_FA890320R0002_Standard_Form_33_-_Solicitation,_Offer_and_Award.pdf PDF
Draft_RFP_BECOS_Section_E_Clauses.pdf PDF
BECOS_TO_1_DD1423_CDRLS_EXHIBIT_B006-B007-B008_(ADMN)_17_Oct_19.zip ZIP file
Attachment_4_BECOS_Relevancy_Matrix_Draft_RFP.pdf PDF
DRAFT_10242019_Southwest_IDIQ_TO1_TO2_CLIN_Structure_and_Price_Model.xlsx XLSX spreadsheet
NORCAL_Region_BECOS_IDIQ_PWS_Attachment_2_-_Acronyms_and_Definitions_Draft_18_Sept_19_v1.0.docx DOCX document
BECOS_IDIQ_DD1423_CDRLS_EXHIBIT_C002_(MGMT)_27_Sep_19.zip ZIP file
Midwest Region BECOS TO 2 PWS Attch 2 - Base Specific Req Newark Dft 24 SEP 19 v3.0.docx DOCX document
Midwest Region BECOS TO 2 PWS Attch 2 - Base Specific Req General Mitchell Dft 24 SEP 19 v3.0.docx DOCX document
NorCal Region BECOS TO 2 PWS Attch 2 - Base Specific Req Mather Dft 19 SEP 19 v3.0.docx DOCX document
Show all 50

BRAC Environmental Construction Optimization Services (BECOS) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOURCE SELECTION INFORMATION IAW FAR 2.101 & 3.104

SOURCE SELECTION INFORMATION IAW FAR 2.101 & 3.104

DRAFT

Past Performance Questionnaire Record Solicitation BECOS

VENDOR NAME:

PAST PERFORMANCE REFERENCE CONTRACT #:

1. What type of services did / does the contractor provide under the referenced contract number?

Response:

2. The Government will consider a higher relevancy rating on projects that exceed $5,000,000.

The Government will consider a higher relevancy rating on projects that are more complex in nature.

3. PERFORMANCE INFORMATION: If “Yes” or “No”, place an “X” in the appropriate column. For each area, using the definitions matrix (E, V, S, M, U), indicate the rating that most accurately describes the contractor’s performance or situation. PLEASE PROVIDE A NARRATIVE EXPLANATION FOR ANY RATINGS OF M or U

E V S M U

Exceptional Very Good Satisfactory Marginal Unsatisfactory

Performance meets contractual requirements and exceeds many to the Government's benefit. The element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.

Performance meets contractual requirements and exceeds some to the Government's benefit. The element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.

Performance meets contractual requirements.

The element being assessed contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory

Performance does not meet some contractual requirements. The element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions.

Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The element being assessed contains a serious problem(s) for which the contractor's corrective actions appear or were ineffective.

SOURCE SELECTION INFORMATION IAW FAR 2.101 & 3.104

SOURCE SELECTION INFORMATION IAW FAR 2.101 & 3.104

1. Program Management and Quality

Assurance The Contractor:

E VG S M U N/A

A. Provided documents, technical plans, and reports accurate, timely and complete and with demonstrated quality. (did not require excessive revision)

B. Performed site work in compliance with required and applicable regulations.

(such as, health and safety, ARARs, environmental, OSHA, state, federal, professional certifications and registrations)

C. Performed record of decision, decision documents, feasibility studies and / or conceptual site models preparation and amendments timely, as required, and IAW regulation.

D. Implemented RCRA processes and / or CERCLA processes IAW regulation and protective of Human Health and the Environment (an "exceptional or very good" represents completion of combined actions / interrelated pieces of the entire the RCRA and / or CERCLA process).

E. Worked with state regulatory processes IAW regulation and protective of Human Health and the Environment.

SOURCE SELECTION INFORMATION IAW FAR 2.101 & 3.104

SOURCE SELECTION INFORMATION IAW FAR 2.101 & 3.104

2. Regulatory Interaction and

Stakeholder Coordination The Contractor:

E VG S M U N/A

A. Worked proactively and collaboratively with the Government and engaged regulatory agencies well in order to achieve goals such as project and / or performance objectives, reduced Life Cycle Costs, modification of remedies and decision documents.

B. Implemented and / or facilitated Community Involvement, addressed challenging stakeholders and / or collaborated with community stakeholders such as public events, meetings and during work related to Site Closeout, Restoration Advisory Boards, and / or additional outreach.

C. Transitioned work well, providing all the required documents (such as, GIS, mapping, records, and plans) to coordinate contract closeout and assist the incoming contractor successfully without major issues.

D. Performed an effort that required work on multiple areas with more than (5) five contract designated sites such as installations or former installations. (able to coordinate work on multiple sites and areas well)

E. Managed environmental restoration activities on property with multiple owners / stakeholders. Such as local redevelopment authorities, private entities, federal agencies and municipalities.

SOURCE SELECTION INFORMATION IAW FAR 2.101 & 3.104

SOURCE SELECTION INFORMATION IAW FAR 2.101 & 3.104

Narrative:

SOURCE SELECTION INFORMATION IAW FAR 2.101 & 3.104

SOURCE SELECTION INFORMATION IAW FAR 2.101 & 3.104

3. Analysis and Data Management

The Contractor:

E VG S M U N/A

A. Provided reports (such as, work plans and conceptual site models) that demonstrate knowledge and technical acumen in Environmental Remediation and / or Restoration.

B. Applied an innovative approach in order to accelerate site closeout at a site.

C. Exhibited technical acumen in assessing, analyzing, and validating data. (quality data analysis and integrity in sampling data)

D. Designed, installed, operated, maintained, and / or optimized remediation systems, such as, a pump and treat system in a manner that ensures maintenance of the selected remedy.

E. Consistently monitored the current remedy progress and / or tracked site progress issues, communicated progress / metrics, and reported on achievement of cleanup goals and performance objectives. (organized and clear metrics / reporting)

Narrative:

SOURCE SELECTION INFORMATION IAW FAR 2.101 & 3.104

SOURCE SELECTION INFORMATION IAW FAR 2.101 & 3.104

4. Were there any adverse performance issues/problems? If so, how were they resolved? (Please reference questions above by topic area and letter.)

Reports/Letters Y/N

Contract Discrepancy Report Cure Notice Show Cause Notice Suspension of Payment Termination for Convenience/Default Denial of Claim Other

Remarks:

Response by:

Print Name Title

Signature Date