This document provides details for a presolicitation notice and draft performance work statement for the BRAC Environmental Construction Optimization Services contract. The Air Force is seeking performance-based remediation services at 40 closed military installations under the Base Realignment and Closure program. The work includes environmental remediation, construction, and maintenance of remedies to complete site closures. The contract will have a period of performance from July 2020 to July 2030. The solicitation will be released in November 2019, with questions due by November 4th. The final contract is expected to have a firm fixed price structure with some cost reimbursable elements. Awards will include a full and open competition, as well as small business set aside contracts. The performance work statement outlines remediation and monitoring requirements at the former Bergstrom Air Force Base in Texas. Services include long-term landfill maintenance, site closures, land use control monitoring and reporting, and five-year review preparation.
CS TO2 PWS 7
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA4890-06-R-9999
Attachment 1
APRIL XX, 2009
- final –
BECOS TO 2
ATTACHMENT 2
20 September 2019
1.1 Scope
The former Bergstrom Air Force Base (AFB) is located in Austin, Texas. Bergstrom AFB was closed on 30 September 1993. Whole-base transfer completed in August 2005. The City of Austin now operates Bergstrom International Airport on 2,864 aces that reverted to the city.
At the former Bergstrom AFB, the 17 sites are being addressed following the Resource Conservation & Recovery Act (RCRA) process or Military Munitions Response Program (MMRP). Decision Documents have been completed for all RCRA sites and remedies are in place. Five sites require landfill long-term maintenance (LTM) (Sites LF003, LF004, LF005, LF006, and LF007). One RCRA site is not anticipated to achieve closure in FY20 (Site SS031). Three MMRP sites are anticipated to achieve closure in FY20 (Sites XU403, XU407, and GR408). If closure is not achieved, these sites will be included in this PBR contract. All 17 Sites require Land Use Control/Institutional Control (LUC/IC) monitoring/reporting and Five-Year Reviews.
In addition to the requirements presented in this PWS, this scope includes the following:
· No additional requirements.
Contractors are not responsible for the following:
· No additional base-specific exclusions.
1.3 Applicable Documents
Key Documents
| Entry No. |
| Document Title |
| Location |
| Date Issued |
| 1. |
| Technical Report, Final Closure of North Landfills 1 and 2 |
| AR#491 |
| August 1999 |
| 2. |
| Final Decision Document, LF-1 |
| AR#519 |
| July 1990 |
| 3. |
| Final Decision Document, LF-2 |
| AR#520 |
| July 1990 |
| 4. |
| Technical Report Final Closure of Combined Southeast Landfills |
| AR#s480-485 |
| August 1999 |
| 5. |
| Draft Decision Document, Combined Southeast Landfill Area and South Fork Drainage Ditch, 1996 |
| AR#375 |
| August 1996 |
| 6. |
| Final Decision Document, SS-14 |
| AR#524 |
| July 1990 |
| 7. |
| Closure Report for Installation Restoration Program (IRP) Site SD- 17 |
| AR#412 |
| August 1997 |
| 8. |
| RCRA Facility Assessment/RCRA Facility Investigation, Site Closure Report, Solid Waste Management Unit 9, FT-23 |
| AR#s476.1 & 476.2 |
| December 1998 |
| 9. |
| Final Decision Document, Fire Department Training Area, FT-23 |
| AR#212 |
| April 1992 |
| 10. |
| RCRA Facility Assessment/RCRA Facility Investigation Draft Final Corrective Measures Study for Solid Waste Management Unit 76 Area 1 and Area 2 |
| AR#588 |
| July 1998 |
1.4 Work Ramp-Up and Transition
Transition of Work
| Contract No. |
| Project Name |
| Field Support |
Complete Reporting Complete
| FA8903-09-D-8565-0007 |
| Performance-Based Remediation at Former Bergstrom AFB, TX, Former Carswell AFB, TX, Former Eaker AFB, AR, Former Homestead AFB, FL, Former Richards-Gebaur AFB, MO |
| 9/24/2020 |
| 9/24/2020 |
| W9128F-14-D-0036 |
| Air Force Military Munitions Response Program Site Inspections, Former Bergstrom AFB, TX, and Former Eaker AFB, AR |
| 9/30/2020 |
| 9/30/2020 |
1.5 Remedial System Components
· See Attachment 1 regarding remedial system components.
2.6.1 Meeting/Teleconference Support
· The Contractor participate in Quarterly Teleconferences with the United States Air Force (USAF) representatives to discuss the progress toward accomplishing project objectives.
2.6.2 Public Meetings and Hearings
· There are no base-specific meetings or hearing requirements.
2.6.5 Site Access: Permits, Easements, and Work Site Access
· There are no base-specific permit/easement requirements.
2.9 Contractor Documentation
· No base-specific requirements.
3.4 Computer Aided Design Drawing (CADD) and Geographic Information Systems (GIS) Updates
· No base-specific requirements.
6.14 Land Use Controls (LUC)
· The Contractor shall conduct annual LUC/IC monitoring at all sites and prepare a report. The first LUC/IC monitoring event is due in 2020.
6.15 Five-Year Reviews
· The Contractor shall prepare a Five-Year Review Report for sites managed under the RCRA/MMRP Program as a policy review. The signature date for the Fourth Bergstrom Five-Year Review Report is due June 2021.