FA8903-16-Q-0005_-_Exhibit_B_Amendment_1.PDF
PDF 872 KB Posted
- Solicitation number
- FA8903-16-Q-0005
About this file
CDRLs Exhibit B Amendment 1
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(COMPUTER GENERATED)
CONTRACT DATA REQUIREMENTS LIST
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate forInformation Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
(1 Data Item) Form Approved OMB No. 0704-0188
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP TM OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT 10. FREQUENCY
11. AS OF DATE
12.DATE OF FIRST SUBMISSION
13.DATE OF SUBSEQUENT
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final Reg Repro
16. REMARKS
15. TOTAL
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
17. PRICE GROUP 18. ESTIMATED TOTAL PRICE
DD Form 1423-1, JUN 90 PREVIOUS EDITIONS ARE OBSOLETE Page of Pages USAPPC V3.00
REQUIRED
SUBMISSION
0002 B ADMN
LTM, RA-O JBSA FA8903-16-Q-0005 TBD
B001 CONFERENCE MINUTES N/A
DI-ADMN-81250A PWS PARA - 4.1, 4.2, 5.4 AFCEC/CZRX
LT
A A
ASREQ
JOSE HURTADO, AFCEC/CZRX01-Jul-2016DAVID HOLGUIN
N/A
01-Jul-2016
AFCEC/CZRX 1 0 1
772 ESS/PKS 0 0 1
JBSA-LACKLAND POC 1 0 1
SEE BLOCK 16
NSP
BLOCK 16
N/AN/A
2 0 3
Block 4: Para 10.1a(2) - Include Government Project number, Contract number, Task Order number, and date of meeting.
Block 12 & 13: Submit draft 5 calendar days after any meeting or conference. The government will require 5 calendar days to review minutes. Submit final meeting minutes 3 calendar days after receipt of government comments.
Block 14: All deliverables shall be submitted by e-mail. Final electronic deliverable shall be in PDF format and native file (i.e., MS Word, Excel, AutoCad, etc.). For AFCEE (EXHPA and ACV) and 611 CES provide each one final CD-ROM copy of all final project document completed under this contract.
1 1
FOR OFFICIAL USE ONLY
FA8903-16-Q-0005
Exhibit: B t ---- - DATA REM OESCRIPtlON w e -@- = - o f i f a8
5.1 C o n f e m minu- piir'vidr a 6 c l l m m T u i p T u i P ~ ~ ~ Lalirmrrton provided. &d d f f i r ~ o n ~ md m - 4 m, a mpctlugr. . .
7.1 ?hi8 Da@ ltan Dcoeriptbn p(D)conWniLho forms md conkat prepvutoa hrlruclionr for tk be p m d w g a m e d hy the cpccific and discre& tnsk ra~u~romeat U-de1incPrd.h the ~ n ~ a c ~
7.2 Thlr DID mpaledtr DMDMN4125Q.
a. A LLI. p;lpc cwdoIng Ibc fobwing:
1) l l t l a - i y p oCmwtLq rsd dnta ) I&uuiC&n of h e rquldtlm (r ( tkn. qutpmen~ umt# numbor) b; which L a mkun w u held.
1) ISp- I b r ~ p u n . o r b ~ . d rcp-tukaofchn o n m a o r ~8wldtiat d&. P
(4) T h w mumo of tbdcbdwak-r mhd riklicrr m whlch the uquhklon rorivlty nhaldachourlcdga m d p r oirrrmmau.
c. A Urn nf rucndac by n r m ~ rank, m', gnQ or porldm, d v i t y roprstcrYed. d v i t y coda, lad phone n u m b u vpt-vn*.
I. Acliua L~anr w l t i n g h r n h e d c m c e .
18. OlfllUWTBN 6TATOvlCNF
D m l B U n O N STAllMBNT A. Approved 6 r public n b : didrlbulbn k unlimllcd.
FA8903-16-Q-0005
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate forInformation Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
(1 Data Item) Form Approved OMB No. 0704-0188
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP TM OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT 10. FREQUENCY
11. AS OF DATE
12.DATE OF FIRST SUBMISSION
13.DATE OF SUBSEQUENT
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final Reg Repro
16. REMARKS
15. TOTAL
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
17. PRICE GROUP 18. ESTIMATED TOTAL PRICE
DD Form 1423-1, JUN 90 PREVIOUS EDITIONS ARE OBSOLETE Page of Pages USAPPC V3.00
REQUIRED
SUBMISSION
0002 B ADMN
LTM, RA-O JBSA FA8903-16-Q-0005 TBD
B002 CONFERENCE AGENDA N/A
DI-ADMN-81249A PWS PARA - 4.1, 4.2, 5.4 AFCEC/CZRX
LT
A A
ASREQ
JOSE HURTADO, AFCEC/CZRX01-Jul-2016DAVID HOLGUIN
N/A
01-Jul-2016
AFCEC/CZRX 1 1 1
772 ESS/PKS 0 0 LT
JBSA-LACKLAND POC 1 1 1
SEE BLOCK 16
NSP
BLOCK 16
BLOCK 16N/A
2 2 2
Blocks 12 & 13: Within 15 days prior to scheduled meeting. The government will require 5 day review of draft. The contractor shall incorporate government comments and submit final within 2 days prior to scheduled meeting.
Block 14: All deliverables shall be submitted by e-mail or on CD-ROM, as necessary. The government uses Microsoft Office Suite. E-mail addresses shall be provided by the COR.
1 1
FOR OFFICIAL USE ONLY
FA8903-16-Q-0005
DATA ITEM DESCRIPTION
I 3.1 The conference agenda provides information conuMlinp purpose, Wnn, and schedule of conferences required to m a g e the acquisiition of system equipmenl, related items. and services. I
I
P ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ , ~ ~ - ~ . ~ ~ I ~ ~ ~ ~ ~ I O M L - . P Y ) ~ ~ ~ I D I ~ N ~ L L I ( I I I YMIN.F-.OYLI
-ad--- narw.",,a - w ~ m - 1 D l l l l l C D l - - ~ . ~ ~ u . I l b . Y I * ~ - d ~ V I S ~ - ' D I -, b . 1 ~ -m ~ A ~ ~ . ~ ~ D L ~ ~ ~ - ~ O ~ ~ P . D I I R . ~ P ~ ~ ~ I D X Y Q ~ Y I W Y * ~ Q I I I ~ -d I 112
Conlerence Agenda
-- 7.1 This Data Item Description (DID) mntains the format and m e n f preparation instructions lor the data produd I Qenerated by the Specific and dime task requirement as delmeaed in me contract.
2 I D E N ? Y a T I O H W E R
DI-ADMK-8 1249A
7.2 Th~s DID supersedes Dl-ADMN-81249.
& . G l D E P * P P L w .
r
7. APPULXTlOr t NERRELATDNSHIP
&DTCAPPLY;ABLE 4. APPROVAL DATE
V ~ O ) 931001
I 10.2 m. The agenda shall indude the Wowmg, where applitable: I
5. OFFICE OF P W R Y RESPWIBlim (OPR)
F/ESC/ENd
8. Af'f'RWKUIRIATION r
I a The plrpae am objective OI me cantereme. I I b. The wnlerertce location. date. and &ration. I
10. Pwwuncw H~RUCTYHS
10.1 F_brmat. Contractor tormat is scceptabk.
O AP- FOrPlhi
I c. A h i l y chmnolDpul liainp of each mpr topic or subtopic to be dscussed and the time to be devoted to each topic. I
a. Ab6C M I s E R
F6968
I d. A list of activiiies lo be representad and i d e n t i f i n of their respanslbiiai.
I e. A CIst 01 subcommittees to be establshcd dmbg the eantersnce and the pnqmed adiviy rqnesentabn lor each submmmmee. I I i. Refereme to and brif desu@tm of the resub of previous meetings, when relevant. I
(Cuatinud rn Page 2)
11 DISTRILIUTON
I DISTRIBUTION STATEMENT A. Apptoved tor plMic rdease: diiribulion is unlimited.
L DD Form 1664, APR 89 (EF) J
~ r & l m . n c l g d . e .
I m T J -1d2-0-
FA8903-16-Q-0005
g. Locallon, sheduk, and purpose or subject area to be covered by each su!xommmee, when appkcable.
h. Names of the conference chairperron, =hair, and subcornmiltee chairs, when applicable.
i . Inlormation on billeting, messing, transportation, and administrative services available to conference anend-.
j. Complete list at all documentation to be available for reuiew.
k. Brief description of pmgress on actions or problems identified m previous meetings, when applicable.
I. Other pertinent intormation arch as tom to be used, identification of any deviatians or waivers. security classification, and clearance requirements.
Page 2 ot 2 Pages
FA8903-16-Q-0005
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate forInformation Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
(1 Data Item) Form Approved OMB No. 0704-0188
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP TM OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT 10. FREQUENCY
11. AS OF DATE
12.DATE OF FIRST SUBMISSION
13.DATE OF SUBSEQUENT
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final Reg Repro
16. REMARKS
15. TOTAL
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
17. PRICE GROUP 18. ESTIMATED TOTAL PRICE
DD Form 1423-1, JUN 90 PREVIOUS EDITIONS ARE OBSOLETE Page of Pages USAPPC V3.00
REQUIRED
SUBMISSION
0002 B ADMN
LTM, RA-O JBSA FA8903-16-Q-0005 TBD
B003 PRESENTATION MATERIALS N/A
DI-ADMN-81373 PWS PARA - 4.1, 4.2, 4.3, 5.4 AFCEC/CZRX
LT
A A
ASREQ
JOSE HURTADO, AFCEC/CZRX01-Jul-2016DAVID HOLGUIN
N/A
01-Jul-2016
AFCEC/CZRX 1 1 1
772 ESS/PKS 0 0 LT
JBSA-LACKLAND POC 1 1 1
SEE BLOCK 16
NSP
BLOCK 16
BLOCK 16N/A
2 2 2
Blocks 12 & 13: Submit drafts 15 days prior to presentation, publications or mailings. The government will require 5 days for review of drafts. Contractor shall make all required changes and have final available 2 days prior to presentation, publications or mailings.
Block 14: All deliverables shall be submitted by e-mail or on CD-ROM, as necessary. The government uses Microsoft Office Suite. E-mail addresses shall be provided by the COR.
1 1
FOR OFFICIAL USE ONLY
FA8903-16-Q-0005
I DATA ITEM DESCRIPTION
Preremlon Material I OX-ADMN-81373
CI '
S. D E W I P T M 1 PURPOEE
(3.1 Resenlalion materials are iu&vIsual old& mh us viewgraphs, photographs, slides or deUmlc equivdam. They are US Pd LO present informution during mh, brkfhgs. and similar activities involving more than one PErHm.
4. APPRQYAL DATE - ~~"uFKX OT P R W RESPONSWUIY (WRI w PWAPPUEIBLE B*, 6@€.PA"PLImLE
V r r r Z Y )
,, 931001 . -, , . ,,, FIESCIEN-4
7. hPPutXTlON I W T E A R E U T ~ ~ ~ ~ S ~ I P
7.1 This Data Item Description (DID) comPine the fonnrt and ccrdenl ptvpmion instNdions for the data produ~t Qeneratd by the specib and zliscmle mk requimmed aa delinealed in the eorftrad.
7.2 Thib DID may be applied on any eepuisii.
7.3 This DID supmedes Old-30UA
10.1 h n a L CwrtnclPr format Is maptable, with the e~eeptkn that the ~ e m m e n t must approve the use of any contraor insignia, uade names or Bymbpls, Dmliiwy media tormar ahall be defined on h a OD F m 1423. Cmacl Data Requirements L i .
I 10.2 Contcnt. Presetnation material cWl i n e M 8 text d my mmmp8nyhg verbal material unless the verbal portion is included as part of an eleCtmnic pretsentatbn. In oilher m e !he text or audk shall W e the followirsp ctatemwrt:
. I 7 h e publlcalbn of thla material does not corrsti!ule a p m l by Ihe Oovernment of the findings or amlush herein. Wide d i s t w i or mnr ;sment at this mai~ia l shall nat be made withcat specific approval by the apanming governmerd activity.'
1 DISTRIBUTION STATEMENT A. Apprwed lor publi nleuse: distrikrlbn ie unlimited.
FA8903-16-Q-0005
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate forInformation Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
(1 Data Item) Form Approved OMB No. 0704-0188
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP TM OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT 10. FREQUENCY
11. AS OF DATE
12.DATE OF FIRST SUBMISSION
13.DATE OF SUBSEQUENT
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final Reg Repro
16. REMARKS
15. TOTAL
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
17. PRICE GROUP 18. ESTIMATED TOTAL PRICE
DD Form 1423-1, JUN 90 PREVIOUS EDITIONS ARE OBSOLETE Page of Pages USAPPC V3.00
REQUIRED
SUBMISSION
0002 B MGMT
LTM, RA-O JBSA FA8903-16-Q-0005 TBD
B004 PROJECT PLANNING CHART N/A
DI-MGMT-80507C PWS PARA - 4.4 AFCEC/CZRX
LT
A A
ASREQ
JOSE HURTADO, AFCEC/CZRX01-Jul-2016DAVID HOLGUIN
N/A
01-Jul-2016
AFCEC/CZRX 1 1 1
772 ESS/PKS 0 0 LT
JBSA-LACKLAND POC 1 1 1
SEE BLOCK 16
NSP
BLOCK 16
BLOCK 16BLOCK 16
2 2 2
Block 4: DID TAILORING: Paragraph 10.3.1: Delete reference to the computer software tasks.
Paragraphs 10.3.15, 10.3.16, and 10.4 do not apply.
Block 12 & 13: Not later than 20 calendar days after contract award. The government will have 5 calendar days for review of the draft. All commments/changes shall be incorporated by the contractor.
Subsequent submission shall be at the request of the COR or upon any changes to the schedule and shall be submitted within 10 days of the request and/or changes.
Block 14: All deliverables shall be submitted by e-mail or on CD-ROM, as necessary. The government uses Microsoft Office Suite. E-mail addresses shall be provided by the COR.
1 1
FOR OFFICIAL USE ONLY
FA8903-16-Q-0005
DATA ITEM DESCRIPTION
Title: Project Planning Chart
Number: DI-MGMT-80507C Approval Date: 14 Apr 2009 AMSC Number: 9061 Limitation: N/A DTIC Applicable: No GIDEP Applicable: No Office of Primary Responsibility: NS/BA02 Applicable Forms: N/A
Use/relationship:
The Project Planning Chart graphically depicts the schedule and actual progress of work on a contract.
This Data Item Description (DID) contains format and content preparation instructions for the data product generated by the specific and discrete task requirement as delineated in the contract.
This DID is used as a attachment to a status or progress report to illustrate the amount of work accomplished relative to the work schedule.
For fixed prices contracts, tailor out 3.18 and 3.19.
This DID supersede DI-MGMT-80507B
Requirements:
1. Reference documents. None.
2. Format: The chart shall be in contractor’s format.
3. Content.
3.1 Project planning chart. It shall depict actual and schedules progress for each subdivision using horizontal lines and symbols. Actual progress will be noted by a percentage of the completion figure.
3.2 Progress of work. Subsequent additions to the work breakdown shall be made as they occur in contract work performance. Items shall not be deleted even though work may be cancelled or stopped before completion.
3.3 Description. Description entry on the chart will be by task. Tasks are divided into
Source: https://assist.dla.mil -- Downloaded: 2015-05-08T19:17Z
Check the source to verify that this is the current version before use.
FA8903-16-Q-0005
DI-MGMT-80507C
subdivisions. For computer software task, the subdivisions shall be Design, Coding, Debugging, Acceptance Testing, and Management. Entries shall be complete and reflect all contract effort.
3.4 Milestone symbol. The triangle symbol will be white if the task has not be achieved. It shall be shaded if the task has been achieved.
3.5 Date released. Last date to which chart was posted.
3.6 Date revised. Date of subsequent contract modification.
3.7 Contractor name.
3.8 Contract title.
3.9 Contract number.
3.10 Purchase description number.
3.11 Security classification.
3.12 Delivery dates. Includes dates for all deliverable items.
3.13 Scheduled starting date. Date each subdivision of work is scheduled to start.
3.14 Actual starting date. Date each subdivision of work actually started.
3.15 Scheduled completion date. Date each subdivision of work is scheduled for completion.
3.16 Actual completion date. Date each subdivision of work actually was completed.
3.17 Manhours Expended. Total manhours expended per task for each reporting period.
Manhours defined as total number of direct labor hours regardless of type.
3.18 Funds expended. Contracts funds expended per task for each reporting period.
Costs defined as total direct cost plus burden, overhead, general and administrative (G&A), and any other load. Total of all items to equal the total target cost.
FA8903-16-Q-0005
DI-MGMT-80507C
3.19 Expenditures. Manhours expended figures and contract funds expended figures used on the chart will be developed on the same basis as the planned figures. Chart depicts these figures for each report period as cumulative totals, accurate to the as-of-date of the report.
4. END OF DI-MGMT-80507C
FA8903-16-Q-0005
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate forInformation Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
(1 Data Item) Form Approved OMB No. 0704-0188
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP TM OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT 10. FREQUENCY
11. AS OF DATE
12.DATE OF FIRST SUBMISSION
13.DATE OF SUBSEQUENT
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final Reg Repro
16. REMARKS
15. TOTAL
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
17. PRICE GROUP 18. ESTIMATED TOTAL PRICE
DD Form 1423-1, JUN 90 PREVIOUS EDITIONS ARE OBSOLETE Page of Pages USAPPC V3.00
REQUIRED
SUBMISSION
0002 B MGMT
LTM, RA-O JBSA FA8903-16-Q-0005 TBD
B005 CONTRACTOR'S PROGRESS, STATUS AND MANAGEMENT
REPORT
STATUS REPORT
DI-MGMT-80227 PWS PARA - 4.5 AFCEC/CZRX
LT
N/A A
MTHLY
JOSE HURTADO, AFCEC/CZRX01-Jul-2016DAVID HOLGUIN
N/A
01-Jul-2016
AFCEC/CZRX 0 0 1
772 ESS/PKS 0 0 LT
JBSA-LACKLAND POC 0 0 1
SEE BLOCK 16
NSP
BLOCK 16
BLOCK 16DAILY
0 0 2
Block 4: DID TAILORING: Paragraphs 10.3.g, 10.3h, and 10.3i do not apply.
Block 11: As of date shall be the end of the contractor's montly cost accounting period.
Blocks 12 & 13: Submissions shall be within 20 days after the end of the contractor's monthly cost accounting period.
Block 14: All deliverables shall be submitted by e-mail or on CD-ROM, as necessary. The government uses Microsoft Office Suite. E-mail addresses shall be provided by the COR.
For AFCEE/EXP provide each one final CD-ROM copy of all final project documents completed under this contract.
AFCEE/CDUT: https://afcee-eim.brooks.af.mil/Projects/PM/DZ/default.aspx
1 1
FOR OFFICIAL USE ONLY
FA8903-16-Q-0005
I ~ontroctor ' 6 Progreoc , S t a t u s and hbeha&ement Report I DT-HC?R-80217
DATA ITEM DESCRlPnON
3 DESCRIPTlONbUlPOSE
3.1 The C o n t r a e t e r ' r Progrr ss, S t a t u s and Management Repor t i n d i c a t e 6 the progrcas of work and t h e s t a t u s of the proprnm and of the a se igned task^, t e p o r t n costm. and inform6 ~f e x i s t i n g o r p o t e n t i a l problem a r o a r .
-m * W W
OMI NO, ~FWPIII
€dm O#ft, run 10. 1986
7 . 1 This Data I t em Description (DID) concains t h e format and c o n t e n t p r e p a r a t i o n i n s t r u c t i o n s f o r the data product genera ted by t h e s p e c i f i c and d i r c r e t e t a n k requi rement fo r t h i s data inc luded in t ho c o n t r a c t .
7 . 2 This D I D may b e app l i ed i n any c o n t r a c t m d d u r i n g any program phase.
7 . 3 This DID s u p e r o e d e r Dl-A-2090A. PI-A-3025A, UPI-A-220508, UDI-A-22052.4, UDI-A-23960, Dl-A-3DD24, mad Dl-A-3D6Db. ( c o n t . on page 2 )
1 I~TLE [ 3 . IDLNil#ICA?bON NuM&(R
I 10, r a f r r r U T ~ o r INSTRUCTIONS
10.1 Contrac t - Thir data i t e m i s gene ra t ed by t h e c o n t r a c t vfiich cantsinr a specif ic and d i o c r e t e work t a s k co develop t h i c d a t e product .
10.2 Format - Thio r c p o r t a h a l l be t y p e w r i t t e n on 8 tandard s i t e ( c . 0 . 8 1/2" by 11") 'whi te pape r , and e e c u r e l y s t a p l e d . Pages s h a l l be s c q u e n t f a l 3 y numbered. A l l e t tachments s h a l l be i d e n t i f i e d and r e f e r e n c e d i n t h e t e x t o f t h e r e p o r t . The r e p o r t s h a l l be prepared i n t h e c o n t r a c t o r ' s format and a h a l l be l e g i b l e and s u i t a b l e f o r r e p r o d u c t i o n .
10 .3 Conrent - The r e p o r t u h a l l i nc lude :
a . A f r o n t c o v e r sheet vh ich i n c l u d e s the c o n t r a c t o r ' s name and addreoe , the c o n t r a c t number, t h e nomencla ture of the syctam o r program, the d a t e of the report, t he period covered by t h e r e p o r t , the t i t l e of the r e p o r t , t i t h e r t he a e r i a l number of the r e p o r t or t h e Contrac t Data Requirements L i s t (CDfU) atquence number, the mccur i ty c l a s s i f i c a t i o n , and t h e name o f t he i s s u i n g Covtrumctrt a c t i v i t y ;
b . D e s c r i p t i o n of rhe p rogres s made a g a i n s t m i l e s t o n e s d u r i n g the r e p o r t i n g pe r iod ;
c . R e s u l t s , p o s i t i v e or n e g a t i v e , ob ta ined r e l a t e d t o p r e v i o u o l y - i d e n t i f i e d problem araam, w i t h conclueion8 and recamnandat i o n s ;
d . Any o i g n i f i e a n t chmgen t o the contractor's o r g a n i z a t i o n o r method of qmra tLon , t o t h e p r o j e c t management ne twork, or t o t h e m i l e s t o n e c h a r t ;
e , Problcm a r c a s a f fec t ing t e c h n i c a l or scheduling e lemen t s , w i t h background and my recommtndationr f o r molutions beyond the s c o p t o f the c o n t r a c t ;
f . Problem a r e a s a f f ec t i ng coa t elements, w i t h background and any recomnendations fa solutions beyond t h e Bcope of t h e c o n t r a c t ;
g. Cost curves ahowing a c t u a l and projected c o n d i t i o n s throughout the cont r&et ;
h . Any c o s t i ncu r red f o r the repor t ing per iod and t o t a l c o n t r a c t u a l expendi ture6 a8 o f r e p o r t i n g date;
i . Perron-hours cxpcnded f a r the r e p o r t i n g pe r iod aad cumrr ls t ivr ly f o r t h e c o n t r e c t ;
j. Any t r i p e and s i g n i f i c a n t r c e u l t s ; ( con t . on page 2 )
I -- 00 Form 1664. FE9 PS CI*V~D~# wlrgn IS DIG^ 1 36 1 .rc51
FA8903-16-Q-0005
7 . 4 Paragrapha 10.3.f, 10.3.g, and 10.3.h herein should be t a i l o r e d on W Form 1423 when such cost d a t a i n a l r e a d y rubmi t t e d through s sophimtlcatcd coet report ing r y f t e a under the contract.
10. PREPARATION INSTRUCTIONS (Cont ' d
k. Urncord of all oigr.ificant telephone cal l8 and any cow~ihkents made by te lephone ;
1. Sumary o f Engineering Change Propoaal (ECP) r t a t u n , including i d e n t i f i c a t i o n of proposed ECPs , approved ECPa, and implemented E C P P ~
rn. Contract schedule stat UB ;
n. Plane for activities dur ing the following reporting period;
o . Name and telephone number of preparer of the report;
p , Appendixes for any necesbaty t a b l e s , r e f e r e n c e s , photographs, l l l u o t r a t i m s , and chart&.
FA8903-16-Q-0005
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate forInformation Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
(1 Data Item) Form Approved OMB No. 0704-0188
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP TM OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT 10. FREQUENCY
11. AS OF DATE
12.DATE OF FIRST SUBMISSION
13.DATE OF SUBSEQUENT
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final Reg Repro
16. REMARKS
15. TOTAL
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
17. PRICE GROUP 18. ESTIMATED TOTAL PRICE
DD Form 1423-1, JUN 90 PREVIOUS EDITIONS ARE OBSOLETE Page of Pages USAPPC V3.00
REQUIRED
SUBMISSION
0002 B MISC
LTM, RA-O JBSA FA8903-16-Q-0005 TBD
B006 MASTER DOCUMENT LIST (MDL) N/A
DI-MISC-80393A PWS PARA - 5.3.1 AFCEC/CZRX
LT
A A
ONE/R
JOSE HURTADO, AFCEC/CZRX01-Jul-2016DAVID HOLGUIN
N/A
01-Jul-2016
AFCEC/CZRX 0 0 1
772 ESS/PKS 0 0 LT
JBSA-LACKLAND POC 0 0 1
SEE BLOCK 16
NSP
BLOCK 16
BLOCK 16N/A
0 0 2
Blocks 12 & 13: Submit master document list within 30 calendar days of completion of all work on this contract. The contractor shall not finalize document without approval from the COR.
Block 14: All deliverables shall be submitted by e-mail or on CD-ROM, as necessary. The government uses Microsoft Office Suite. E-mail addresses shall be provided by the COR.
For AFCEE/EXP provide each one final CD-ROM copy of all final project documents completed under this contract.
AFCEE/CDUT: https://afcee-eim.brooks.af.mil/Projects/PM/DZ/default.aspx
1 1
FOR OFFICIAL USE ONLY
FA8903-16-Q-0005
I F'mi~c rspi.3 ng tvidon l r r l lhlr c* a:lKn nl inlorrnalmr i s ~ % l m l m d ) o aurrlac 110 h-1s pal fsiwnse, hclbang IM lms lor nwww nrlIucloW. FOlrChw*a41np d?Y SWrCa*.
;athering and mamlaining Ihr a1sn.tdm.i ard cmrrml.m rnd rtranim (rz Doil*a,~1 of nlQfmEllm. Send COtmImlC nperdng #%I$ buroen ~ t i m r ( r or #ny d h 4 r a w ~ I 0 r I h coltcc~~oo uf inlormr~,at. ~ ~ l u d i t b r.(ige,ro,rr tbf red~ctnp lnist~rnan IC wsanlnpm tiasMuans16 Sawica;. Di~eF(umle $I htormrliw C w r r ~ b a and Fiou~tr. 1215 JrR4rbbn Dd-6 naghrav. Sult~ :2W. *rlnglon. V A 22202.43U2. and to meOl(lre 01 Managtlmml am Budgel Paprwork RWUEIIO~ R0j.a (07044180\. Wahngwn. 0.C w.
DATA ITEM DESCRIPTION Fom Appqved
OM8 No. 07044188
1.TlTt.E
Master Document List (MDL)
1 1 50 SPACE WING-LG
P 7 0 1 - - 2 4
7 . APPLlCATIONlNTEFiRELhTlONS~lP
2. IOENTIFICATKIN NUMBFR
Dl-M ISC-80393A
4 APPROVAL DATE
( rvhr,ul/DD)
7.1 Th~s Data Item Description (DID) contains the format and content preparation instructions for the data prodllct generated by the specific and discrete task requirement as delineated in the contract.
7.2 This DID applicable lo O&M contracls requiring contractors to maintain contract libraries.
7.3 This DID supersedes Dl-MlSC-80393.
3. DESCiiIPTIOWWHPOSE
3.1 The MDL provides a master hsting of all documents maintained in libraries. The listing includes publications. operating instructions, drawings. and training material. The listing is used to ensure all required documents are being maintained.
Pb. AUSC NUMBER
F7230
5. OFFICE OF PRIMAAY AESPONSIBIUTY {OPR)
I
10. PREPARATION INSTRUCTIONS
10.1 Format. Contractor format is acceptable.
10.2 Comer& The MDL shall be categorized by type and agency and shall include document number. title, date and specific location of the document. The MDL shall list all revisions. changes.
supplsrnenls and amendments lo all documents. The portion of the MDL containing computer programs and computer prograrn docurnentation shall include the subject or keyword.
6.. DTlC APPLICABLE
1 1 . DISTRIDU'IION STATEMENT
DIST RiBUTION STATEIJENT A. Approved for public release: distribution is unlimited.
6b. WDEP APPLRABLE
DD Fbr~n 1864. APR 88 Plav~ous sdilionh ere ob861bIs PLal-Lot U W *
FA8903-16-Q-0005
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate forInformation Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
(1 Data Item) Form Approved OMB No. 0704-0188
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP TM OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT 10. FREQUENCY
11. AS OF DATE
12.DATE OF FIRST SUBMISSION
13.DATE OF SUBSEQUENT
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final Reg Repro
16. REMARKS
15. TOTAL
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
17. PRICE GROUP 18. ESTIMATED TOTAL PRICE
DD Form 1423-1, JUN 90 PREVIOUS EDITIONS ARE OBSOLETE Page of Pages USAPPC V3.00
REQUIRED
SUBMISSION
0002 B MISC
LTM, RA-O JBSA FA8903-16-Q-0005 TBD
B007 DIGITAL IMAGING N/A
DI-MISC-81579 PWS PARA - 7.1 AFCEC/CZRX
LT
A A
BLK16
JOSE HURTADO, AFCEC/CZRX01-Jul-2016DAVID HOLGUIN
N/A
01-Jul-2016
SEE BLOCK 16
NSP
BLOCK 16
BLOCK 16N/A
Blocks 12 & 13: Digital Imaging shall be submitted in support of appropriate Technical Reports and Plans. B/W photocopies acceptable for drafts, color for finals.
Block 14: The purpose of this CDRL is to present technical guidance for inserting digital images into relevant task order documents and is not intended to provide copy distribution data. Actual digital image distribution will be governed by their usage in the individual documents containing them.
1 1
FOR OFFICIAL USE ONLY
FA8903-16-Q-0005
Source: https://assist.dla.mil -- Downloaded: 2015-05-08T19:20Z
FA8903-16-Q-0005
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate forInformation Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
(1 Data Item) Form Approved OMB No. 0704-0188
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP TM OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT 10. FREQUENCY
11. AS OF DATE
12.DATE OF FIRST SUBMISSION
13.DATE OF SUBSEQUENT
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final Reg Repro
16. REMARKS
15. TOTAL
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
17. PRICE GROUP 18. ESTIMATED TOTAL PRICE
DD Form 1423-1, JUN 90 PREVIOUS EDITIONS ARE OBSOLETE Page of Pages USAPPC V3.00
REQUIRED
SUBMISSION
0002 B MGMT
LTM, RA-O JBSA FA8903-16-Q-0005 TBD
B008 PROJECT PLANNING CHART ERPIMS SCHEDULE
DI-MGMT-80507C PWS PARA - 5.5 AFCEC/CZRX
LT
A B
ASREQ
JOSE HURTADO, AFCEC/CZRX01-Jul-2016DAVID HOLGUIN
N/A
01-Jul-2016
AFCEC/CZRX 1 1 1
772 ESS/PKS 0 0 LT
AFCEC/ERPIMS TEAM 1 1 1
SEE BLOCK 16
NSP
BLOCK 16
BLOCK 16N/A
2 2 2
Block 3: Environmental Resources Program Information Management System (ERPIMS) Data Submission Schedule Block 4: DID tailoring: DID paragraphs 3.4, 3.11 and, 3.17 through 3.19 are not applicable. Change paragraph 3.9 to read: "Contract and Task Order Number". Change paragraph 3.10 to read: "Installation and Site Location".
Blocks 12, & 13: First submission date shall be within 30 days after receipt of contract, subsequent submissions shall be within 10 days of any updates/changes.
Blocks 14 & 15: Deliverables to AFCEC shall be submitted by Email or, CD as directed by the Government. Schedule shall list the project name and number, delineation of anticipated sampling events to include sampling frequency (e.g., monthly, quarterly, etc.), field sampling event projected begin and end dates, and the expected submission date for the associated ERPIMS data deliverable. E-mail addresses shall be provided by the COR.
1 1
FOR OFFICIAL USE ONLY
FA8903-16-Q-0005
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate forInformation Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
(1 Data Item) Form Approved OMB No. 0704-0188
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP TM OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT 10. FREQUENCY
11. AS OF DATE
12.DATE OF FIRST SUBMISSION
13.DATE OF SUBSEQUENT
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final Reg Repro
16. REMARKS
15. TOTAL
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
17. PRICE GROUP 18. ESTIMATED TOTAL PRICE
DD Form 1423-1, JUN 90 PREVIOUS EDITIONS ARE OBSOLETE Page of Pages USAPPC V3.00
REQUIRED
SUBMISSION
0002 B CMAN
LTM, RA-O JBSA FA8903-16-Q-0005 TBD
B009 TECHNICAL DATA PACKAGE ENVIRONMENTAL RESOURCES PROGRAM INFO
MGMT SYSTEM (ERPIMS)
DI-CMAN-80776 PWS PARA - 5.5 AFCEC/CZRX
LT
A B
ASREQ
JOSE HURTADO, AFCEC/CZRX01-Jul-2016DAVID HOLGUIN
N/A
01-Jul-2016
AFCEC/CZRX LT LT
772 ESS/PKS LT LT
AFCEC/ERPIMS TEAM 1 1 1
SEE BLOCK 16
NSP
BLOCK 16
BLOCK 16N/A
1 1 1
Block 4: DID tailoring: The following paras are tailored as indicated:
Para 7.1 - This Data Item Description (DID) contains the format and content preparation instructions for the TDP resulting from the work task described in the Statement of Work.
Para 10.1 - Replace with the following: The latest versions of the ERPIMS Data Loading Handbook (DLH) and the applicable ERPTools or ERPTools Users Guide provide the guidance necessary for the Contractor to prepare ERPIMS Data Submissions timely and accurately.
Para 10.2 - Replace with the following: Content shall be in accordance with the latest version of the
ERPIMS DLH.
Block 11: As of Date shall be the date of the first analytical sample collection for each period sampled.
Blocks 12 & 13: ERPIMS data submissions shall be submitted no later than 90 days after collection of the first analytical sample collected for the applicable periodic data submission (unless written extension or waiver is approved by CO and AFCEC/CZR). If the ERPIMS system is down during the 90 day period, one additional day will be added to the 90 days for each day the system is down. For each 30 day period that the system is down, an additional five days will be added to account for backlogging purposes. Any data submitted by the Contractor in subsequent reports or other documents shall match the data submitted to ERPIMS. The ERPIMS data requirement will only be satisfied upon the data's insertion into the ERPIMS Production database and formal acceptance.
Blocks 14 & 15: Deliverables to AFCEC shall be submitted using the latest ERPIMS Data Loading Software (e.g. ERPToolsX, etc.) or by Email or, CD as directed by the Government.
NOTE 1: ERPIMS Data deliverables will not be accepted unless they are accompanied by a transmittal letter. Format and content of the transmittal letter will be as specified in the Statement of Work. Provide electronic copy of the transmittal letter to AFCEC ERPIMS DATA SUPPORT.
NOTE 2: E-mail addresses will be provided on a separate letter.
NOTE 3: Draft and Final will be evaluated by AFCEC ERPIMS DATA SUPPORT** for format compliance, data intergrity, and meets the requirements of the ERPIMS DLH. Final acceptance of ERPIMS deliverables will not occur until data has been validated and errors detected corrected.
1 1
FOR OFFICIAL USE ONLY
FA8903-16-Q-0005
FA8903-16-Q-0005
| DI-MGMT-80507C.pdf |
| DATA ITEM DESCRIPTION |
| Requirements: |
File details come from the government source that posted it. Updated .