RFQ QUESTIONS / RESPONSES

Attachment 4

FA8903-16-Q-0005

Long-Term Management and Remedial Action-Operations at Environmental Restoration

Program Sites LF001, LF012 (WEST), LF014, LF015, LF016, LF017, SS043 and WP029, Leon Creek Mitigation Monitoring at Environmental Restoration Program Site LF011 and

Restoration Advisory Board Support at JBSA-Lackland, TX and Remedial Action-Operations at ERP Site LF002 at JBSA-Camp Bullis, TX

6 July 2016

QUESTIONS ANSWERS

1. Section 5.2, first bullet – says that visual inspections of landfills will be conducted by an engineer. Please clarify the qualifications of the person who shall conduct the visual inspections of the landfill sites. Is the engineer required to be a P.E.? Can the visual inspections be conducted by a P.G.? Can other staff members (i.e. staff engineer, staff geologist, etc.) conduct the visual inspections, if under the supervision of an engineer?

Visual inspections may be conducted by a P.G. or other staff members (staff engineer, staff geologist, etc.) under the supervision of an engineer. However, landfill cap integrity issues shall be inspected by a PE licensed in TX.

2. Does weed control only include herbicide application or does it also require use of a weedeating machine? Is weed control to be performed over the entire surface area of each landfill? If not, please define the total area (acreage) requiring weed control for the one weed control event.

Weed control includes herbicide application only. The total area is dependent on the specific site conditions. For planning purposes, assume a total area of 1 acre. Assume a 1 acre area for treatment and 2 events per year.

3. Please specify the size of rip-rap required?

All repair work will be performed in accordance with the CMI Work Plan/Report and design specifications, which have been uploaded to the Google site.

4. Is there a borrow source on base for the 50 CY of clay, 50 CY of fill, and 50 CY of topsoil. If so, please provide a map showing the location of the borrow source and the contact information for the operator of the borrow pit.

No.

5. Will the Work Plan require review by regulatory agencies?

No.

FOR OFFICIAL USE ONLY

FA8903-16-Q-0005

Long-Term Management and Remedial Action-Operations at Environmental Restoration

Program Sites LF001, LF012 (WEST), LF014, LF015, LF016, LF017, SS043 and WP029, Leon Creek Mitigation Monitoring at Environmental Restoration Program Site LF011 and

Restoration Advisory Board Support at JBSA-Lackland, TX and Remedial Action-Operations at

6. Will the Landfill Inspection Monthly Summary Reports and Annual Summary Report require review by regulatory agencies?

No.

7. Please specify if seeding of the one-acre area is a one-time event? Does seeding of the one-acre area require scarifying or discing the soil prior to spreading seed? Does seeding require use of hydroseeding equipment, a seed drill, or is manual spreading of seed acceptable?

Seeding may require several events as needed in order to address areas/spots that require seeding to promote a healthy cover. Seeding method is up to Contractor as long as the application is effective in maintaining a healthy cover.

8. Is there a sprinkler system in place for the one-acre area to be seeded or does the contractor need to supply water for watering after the seeding event? Will the contractor be required to water the seeded area regularly and if so, please specify the number of watering events?

A sprinkler system is in place at the landfill sites.

Since the seeding area(s) are not pre-determined, water may be required to promote seed/grass growth. Yes, Contractor will be required to water the seeded area(s). Number of watering events depends on the weather and on how well the seeds do.

9. Please clarify the requirement for sign replacement. Are the signs on posts and the contractor needs to replace the sign and post? If post replacement is required, please provide the specifications for the post.

The replacement of signs is required when the information on those signs is incorrect (Such as incorrect P.O.C.) or when the sign is damaged by mowing equipment or any other event.

Generally signs are either on posts of attached to fences. In the case of a sign on a post needing to be replaced, the sign its self may only need to be replaced, if the post is still in working condition (I.E. Not rusted, bent, or otherwise unserviceable). Replacement posts shall be 2 3/8’’ round galvanized steel pipe. With a wall thickness of at least .065’’. The post shall be concreted into the ground and the sign shall be between 6 and 8 feet from the ground. The sign shall be secured with 2 3/8’’ galvanized steel post brackets.

FA8903-16-Q-0005

Long-Term Management and Remedial Action-Operations at Environmental Restoration

Program Sites LF001, LF012 (WEST), LF014, LF015, LF016, LF017, SS043 and WP029, Leon Creek Mitigation Monitoring at Environmental Restoration Program Site LF011 and

Restoration Advisory Board Support at JBSA-Lackland, TX and Remedial Action-Operations at

10. What are the working hours on Base?

0800-1700 hrs

11. Are there any restrictions on Base that will impact this work?

No.

12. Based on the information provided in the PWS with regard to the size of each landfill, it appears that the total area of all of the landfill sites is 134 acres. Please confirm the total acreage for mowing during each of the 6 mowing events.

Approximate mowing area is about 128 acres which includes all landfills except LF002 at Camp Bullis.

13. In order for the contractors to gain a thorough understanding of the site conditions and task to be completed, it is important to have access to the documents identified in Section 2.0 of the PWS. When will the documents be made available to the contractors for review?

All documents have been uploaded to Google site.

14. Do the 20 Point of Exposure Wells and 12 Corrective Action Observation Wells contain dedicated pumps?

Most of the wells contain dedicated pumps and tubing. Approximately seven do not contain dedicated pumps and tubing.

15. If the 20 Point of Exposure Wells and 12 Corrective Action Observation Wells do not contain dedicated pumps, do the wells contain dedicated tubing?

Most of the wells contain dedicated pumps and tubing. Approximately seven do not contain dedicated pumps and tubing.

16. Please provide well information for the 20 Point of Exposure Wells and 12 Corrective Action Observation Wells, including well depth, screen interval, and well diameter.

Well information is included in the Final Response Action Plan for Site 8, which has been uploaded to the Google site.

FA8903-16-Q-0005

Long-Term Management and Remedial Action-Operations at Environmental Restoration

Program Sites LF001, LF012 (WEST), LF014, LF015, LF016, LF017, SS043 and WP029, Leon Creek Mitigation Monitoring at Environmental Restoration Program Site LF011 and

Restoration Advisory Board Support at JBSA-Lackland, TX and Remedial Action-Operations at

17. Can the sampling purge water be discharged to the ground, to the sanitary sewer, or to an onsite treatment system or does the purge water need to be containerized and transported off site for disposal?

The purge water must be containerized and tested to determine whether it is hazardous or non-hazardous waste. If determined to be non-hazardous, it may be disposed of to the sanitary sewer. If determined to be hazardous waste, it must be transported off site for disposal.

18. If purge water is to be transported off site for disposal, please clarify if the purge water is to be classified as non-hazardous or hazardous waste.

Purged groundwater will need to be analyzed to determine its classification. Only hazardous waste must be transported offsite for disposal.

19. Are all of the wells directly accessible by pickup truck where you can drive up to the well?

Yes, monitoring wells are accessible via 4X4 pick-up truck.

20. Will the contractor be required to enter the groundwater sample data into ERPIMS or will that be done by another contractor?

Yes, Contractor will be required to enter the groundwater sample data into ERPIMS. This requirement has been added to the PWS.

21. Since the contractor is not preparing a groundwater sampling report, will the contractor be required to generate groundwater contour or contaminant plume maps to give to the contractor preparing the RCRA Compliance Plan Semiannual Report?

Yes, the contractor will be required to generate groundwater contour/contaminant plume maps to give to the contractor preparing the RCRA Compliance Plan Semiannual Report.

22. Is this a follow-on requirement? If so, could you please provide the incumbent contract number for this opportunity? If not, is this a new requirement?

Yes. FA8903-15-F-0033.

23. How deep are the monitoring wells at Camp Bullis?

Well information is included in the Final Response Action Plan for Site 8, which has been uploaded to the Google site.

24. What is the current conditions of the wells at Camp Bullis?

The wells are in good condition and are currently being monitored.

FA8903-16-Q-0005

Long-Term Management and Remedial Action-Operations at Environmental Restoration

Program Sites LF001, LF012 (WEST), LF014, LF015, LF016, LF017, SS043 and WP029, Leon Creek Mitigation Monitoring at Environmental Restoration Program Site LF011 and

Restoration Advisory Board Support at JBSA-Lackland, TX and Remedial Action-Operations at

25. Are the wells easily accessible? Yes, monitoring wells are accessible via 4X4 pick-up truck.

26. What is the present condition of the landfill at Lackland? Will there be a site walk?

All JBSA-LAK landfills/wells are in good condition and are easily accessible by four-wheel drive vehicle. A site walk is not necessary as current site conditions are documented in the monthly landfill reports which have been uploaded to the Google site.

27. When was the last inspection and is this report be available?

Latest report has been uploaded to the Google site.

28. How many outside-the-norm significant rain events should we include in our proposal? Section 5.2, attachment 1? Do we have flexibility to substitute for a monthly if it is within 1 week of monthly?

Assume two significant rain events per year. You may substitute the monthly landfill inspection with an inspection conducted after a significant rain event if it occurs within one week of the normal inspection period.

29. What is the status of the trees along Leon Creek since the flooding this spring? How many replacement trees/bushes are needed?

Some trees were lost due to the flooding.

Current Contractor will be replacing 25 trees at the site. However, most trees are thriving.

30. What is the current status of the irrigation system? Is it fully functional and maintained? Has it been used during the past year?

The irrigation system is in working condition and has been used during the past year.

31. What is the likelihood of needing a Spanish interpreter for the RAB meetings? Previous meetings have not needed one.

No need for a Spanish interpreter.

32. Given this is a low-price, technically acceptable evaluation, will all respondents be required to quote to the assumed quantities of replacement materials identified in the PWS?

Yes.

FA8903-16-Q-0005

Long-Term Management and Remedial Action-Operations at Environmental Restoration

Program Sites LF001, LF012 (WEST), LF014, LF015, LF016, LF017, SS043 and WP029, Leon Creek Mitigation Monitoring at Environmental Restoration Program Site LF011 and

Restoration Advisory Board Support at JBSA-Lackland, TX and Remedial Action-Operations at

33. Does the estimate of replacement of 8 sprinkler guns represent a 12-month period, or is that an estimate over the life of the contract (5 years)?

It represents a 12-month period.

34. From Section 5.3.2 of the PWS, please confirm the proposing contractor will prepare the RCRA Semiannual Report Summaries (twice a year) for the current PBR contractor (A001G).

No, Contractor will provide the data, along with contour maps to current Compliance PBR Contractor.

35. From 5.3.2 of the PWS, will data for the three (3) RA-O stage-based sampling events be included in a separate report or will it be combined with the two (2) semiannual summary reports and submitted to the current PBR contractor semiannually (CDRL A001G)?

There will be one combined report.

36. Please clarify if there is a separate CDRL deliverable for the RA-O data mentioned in the previous question not included in the PWS.

No, there is not.

37. In Section 5.4 of the PWS, are the RAB activities associated with JBSA-LAK only, or does the RAB include JBSA-BUL? Please clarify the bases the RAB support is intended to cover.

RAB support is only for JBSA-Lackland.

38. Will the UFP-QAPP components be prepared as addendums to the current UFP-QAPP provided by the government at the time of award?

Yes.

FA8903-16-Q-0005

Long-Term Management and Remedial Action-Operations at Environmental Restoration

Program Sites LF001, LF012 (WEST), LF014, LF015, LF016, LF017, SS043 and WP029, Leon Creek Mitigation Monitoring at Environmental Restoration Program Site LF011 and

Restoration Advisory Board Support at JBSA-Lackland, TX and Remedial Action-Operations at

39. Section 5.3.2 of the PWS includes a requirement to conduct 3 rounds of stage-based groundwater sampling during, low, moderate, and high (flood) flow stages. Please clarify if this sampling is limited to only groundwater sampling, or is surface water sampling also required?

The sampling during, low, moderate, and high (flood) flow stages is for both groundwater and surface water.

40. Can the Government clarify how the low, moderate and high (flood) flow stages for the stage-based groundwater sampling events are determined?

This information is included in the RCRA Permit, which has been uploaded to the Google site.

41. Please provide the RCRA Permit and Groundwater Compliance Plan for Camp Bullis.

The RCRA Permit and GW Compliance Plan has been uploaded to the Google site.

42. The PWS gives quantities for planning purposes, however in order to prepare the bid and determine the level of effort required requests the following documents referenced in the PWS be provided:

• RCRA and HW permits,

• RCRA Compliance Plan

• O&M plans (irrigation system

• Technical reports (quarterly, annual, groundwater, soil)

• CMS studies

• Remedial Action Plan

• Base wide or site wide plans (HSP, WP, SAP, QAPP)?

All documents have been uploaded to the Google site.

FA8903-16-Q-0005

Long-Term Management and Remedial Action-Operations at Environmental Restoration

Program Sites LF001, LF012 (WEST), LF014, LF015, LF016, LF017, SS043 and WP029, Leon Creek Mitigation Monitoring at Environmental Restoration Program Site LF011 and

Restoration Advisory Board Support at JBSA-Lackland, TX and Remedial Action-Operations at

43. Section 1.1 of the PWS: Have all CMS recommendation been implemented? Has the prepared Compliance Plan modifications been submitted?

Yes.

44. Are there any base wide SAPs or site SAPs currently that can be used to make addendum for the new work?

Yes, the previous documentation has been uploaded to the Google site.

45. Will onsite space be provided so a small office can be set up to aid inspection and maintenance duties? Or will a trailer need to be brought in? If so will the trailer be able to be stored on site at the storage area?

There is an on post space for a Trailer.

46. Section 3.4.5 of the PWS: Are CAC card required or will base passes work?

For individuals that will be on the installation on a daily or weekly basis CAC Cards will be required. For individuals that only need access to the installation every few months a “base pass” will be fine.

FA8903-16-Q-0005

Long-Term Management and Remedial Action-Operations at Environmental Restoration

Program Sites LF001, LF012 (WEST), LF014, LF015, LF016, LF017, SS043 and WP029, Leon Creek Mitigation Monitoring at Environmental Restoration Program Site LF011 and

Restoration Advisory Board Support at JBSA-Lackland, TX and Remedial Action-Operations at

47. Section 5.2 pg. 14 of the PWS: Are there any guidelines or requirements for the visual inspections for the landfill cap?

A Landfill inspection form has been uploaded to the Google site.

Items to be inspected include but are not limited to:

-Landfill cap -Penetrations of the cap -Vegetation -Drainage features including grass swales, riprap-lined areas, perimeter ditches, gabions, etc.

-Surface erosion -Trails and paths -Perimeter and boundary fencing and signage -Evidence of unauthorized activities -Settling, cracking or subsidence around concrete structures -Adjacent activities or conditions that may adversely impact the site.

48. Section 5.2 pg. 14 of the PWS: References rip rap will be placed in the landfill repair sites per specifications. What are the specifications?

All repair work will be performed in accordance with the CMI Work Plan/Report and design specifications, which have been uploaded to the Google site.

49. Section 5.2 pg. 14 of the PWS: In reference to the inspection and repair of the existing institutional controls: Are there details for the signs that will be replaced? Size, dimensions, wording, construction material?

Signs that require replacement shall be replaced with signs of like size, shape, construction and durability. Wording will vary based on sign location.

50. Section 5.2 pg. 15 of the PWS: In reference to the operation of the irrigation system, is there an estimation of level of effort for monitoring the system during use?

No.

FA8903-16-Q-0005

Long-Term Management and Remedial Action-Operations at Environmental Restoration

Program Sites LF001, LF012 (WEST), LF014, LF015, LF016, LF017, SS043 and WP029, Leon Creek Mitigation Monitoring at Environmental Restoration Program Site LF011 and

Restoration Advisory Board Support at JBSA-Lackland, TX and Remedial Action-Operations at

51. Section 5.2 pg. 15 of the PWS: Are there any guidelines or requirements for the site evaluation of the Leon Creek mitigation monitoring?

All documents outlining the guidelines for the Leon Creek Mitigation have been uploaded to the Google site.

52. Section 5.2 pg. 16 of the PWS discusses replacement of trees that perished due to lack of water from the 2013 tree planting does this requirement start in October or are there current trees that fit this requirement already?

The PWS states the government will not pay for tree replacement from lack of water; does this exclusion start for trees that die after award only? The PWS lists 25 replacement trees/shrub for planning purposes, are these trees the assumed replacements for trees that perish for reasons other than lack of water? Therefore we are to assume these plants are replaced due to other reasons?

Currently there are no trees that need to be replaced due to lack of water. The contractor is responsible for maintaining the trees and shrubs that were planted in 2013 to ensure survival.

Existing trees and/or shrubs that perish due to lack of water shall be replaced by the Contractor at no cost to the Government.

The 25 replacement trees are to replace any previously planted trees and/or shrubs that perish for causes other than lack of water. It is the Contractor’s responsibility to ensure survival of these newly planted trees and/or shrubs. Any of the newly planted trees and/or shrubs that perish during the 12-month period shall be replaced by Contractor at no additional cost to the Government.

53. Section 5.3.2 of the PWS: Are there any specific requirements for the surface water sampling or is grab sampling and flow acceptable?

Grab sampling and flow are acceptable.

54. Section 5.3.2 of the PWS: What are the well details and specifications? Construction materials & diagrams, Depth, diameter, attached or dedicated equipment, etc.

Well information is included in the Final Response Action Plan, which has been uploaded to the Google site.

FA8903-16-Q-0005

Long-Term Management and Remedial Action-Operations at Environmental Restoration

Program Sites LF001, LF012 (WEST), LF014, LF015, LF016, LF017, SS043 and WP029, Leon Creek Mitigation Monitoring at Environmental Restoration Program Site LF011 and

Restoration Advisory Board Support at JBSA-Lackland, TX and Remedial Action-Operations at

55. Section 5.3.2 of the PWS: What type of access will be encountered at each well and surface sampling site? Are there any access issues to get the wells or surface sampling locations? May a standard 4x4 access adjacent to all areas be assumed?

All wells and sampling locations are accessible by four-wheel drive vehicles.

56. Section 5.3.2 of the PWS: When were the wells last sampled? Do they need to be redeveloped prior to sampling?

Groundwater wells are currently being sampled.

Well redevelopment will not be necessary;

especially when sampling by low-flow method.

However, refer to UFP-QAPP for redevelopment requirements. UFP-QAPP has been uploaded to the Google site.

57. Does the JBSA-BUL currently keep track of the stages of flood or flow at the LF002 area? Will we have access to this data for bidding?

No.

58. Section 5.3.2 of the PWS references DHW analysis via PCR DNA analysis. Is further information on this sampling and analysis available (e.g., methods, how long the microbial traps are in the wells, how are the traps to be frozen prior to shipping, etc.)

Recommendations for PCR DNA analysis for DHE are available in the Final Response Action Plan Site 8, Landfill 8, Camp Bullis, Texas which is available on the Google site.

59. The CRDL A001E states Submit draft report within 14 business days after completion of the sampling event. Can we assume 14 days after the laboratory results submitted to the contractor?

Yes.

60. The CRDL A001G states Submit draft report within 14 business days after completion of the semiannual RA-O sampling period. Can we assume 14 days after the laboratory results submitted to the contractor

Yes.

FA8903-16-Q-0005

Long-Term Management and Remedial Action-Operations at Environmental Restoration

Program Sites LF001, LF012 (WEST), LF014, LF015, LF016, LF017, SS043 and WP029, Leon Creek Mitigation Monitoring at Environmental Restoration Program Site LF011 and

Restoration Advisory Board Support at JBSA-Lackland, TX and Remedial Action-Operations at

61. Section 5.2 of the PWS gives a list of trees/shrubs to be replaced. Should we assume that the same types and quantities of trees/shrubs should be used for option year pricing as well as the Base year?

Yes.

62. For the weed control events for the landfills (Section 5.2 of the PWS) should acreage for the herbicide application be assumed to be for the total acreage for each landfill?

No. Weed control will occur only when needed at different times. Weed control includes herbicide application only. The total area is dependent on the specific site conditions.

Historically, areas that require treatment are along walking trails and bench areas. Assume a 1 acre area for treatment and 2 events per year.

FA8903-16-Q-0005

Long-Term Management and Remedial Action-Operations at Environmental Restoration

Program Sites LF001, LF012 (WEST), LF014, LF015, LF016, LF017, SS043 and WP029, Leon Creek Mitigation Monitoring at Environmental Restoration Program Site LF011 and

Restoration Advisory Board Support at JBSA-Lackland, TX and Remedial Action-Operations at

63. As stated in CDRL A004, preparation and submittal of the Draft Work Plan will be within 30 days of task order award, AFCEC review time will require up to 14 calendar days, and the Final Work Plan submitted within 7 business days following receipt of government comments/approval of the Draft. Based on this, the first 2 months of the task order would be administrative with no field work able to occur until after review, approval and submittal of the Final planning documents.

Please clarify if the planning document phase is to be included in the proposed project schedule within the POP of 12 months, or if 12 months of field work is intended and should be depicted as a 12 month duration with the 2 month planning phase included ahead of the start of field work (i.e. 14 month schedule).

The POP is 12 months and any option exercised will have a 12 month POP. The contractor will need to account for 12 months of fieldwork in the base year and in any option year exercised.

The contractor can perform fieldwork initially by using the current UFP-QAPP and updating to accelerate field efforts.

FA8903-16-Q-0005

Long-Term Management and Remedial Action-Operations at Environmental Restoration

Program Sites LF001, LF012 (WEST), LF014, LF015, LF016, LF017, SS043 and WP029, Leon Creek Mitigation Monitoring at Environmental Restoration Program Site LF011 and

Restoration Advisory Board Support at JBSA-Lackland, TX and Remedial Action-Operations at

64. Section 5.2, 1st bullet, last sentence states that, “For planning purposes assume a total of 12 visual inspections will be required throughout the Period of Performance of this TO; first monthly inspection shall be conducted during the month of October 2016.”

a. CDRL A001D states that Landfill Inspection

Monthly Reports are to be submitted within 14 business days after the monthly inspection period, the Government has up to 7 days to for review of draft, and the Final shall be submitted within 7 days after receipt of Government comments/approval.

This same schedule applies to Quarterly Monitoring Reports, and Annual Summary Report. If 12 visual inspections are required, these reports would then follow in the 13th month and thereby extending the schedule beyond the 12 month POP.

Please clarify the POP duration.

The POP is 12 months and any option exercised will have a 12 month POP. The PWS will be amended to indicate the following: first monthly inspection shall be conducted during the month of September 2016.

Please note that 12 visual inspections would also be required for each of the four option years if exercised.

65. Based on the question about planning phase of approximately 2 months and a field work duration of 12 months, and the scheduling question associated with completion reports (Quarterly Monitoring Report, Landfill Inspection Monthly Reports) due the month after the completion of 12 months of field work, this equates to schedule duration of approximately 15 months.

Please clarify the POP.

POP is for 12 months. Tasks may run concurrently to meet the 12 month POP.

FA8903-16-Q-0005

Long-Term Management and Remedial Action-Operations at Environmental Restoration

Program Sites LF001, LF012 (WEST), LF014, LF015, LF016, LF017, SS043 and WP029, Leon Creek Mitigation Monitoring at Environmental Restoration Program Site LF011 and

Restoration Advisory Board Support at JBSA-Lackland, TX and Remedial Action-Operations at

66. Are replacement or major repairs of pumps and major components of the landfills irrigation system included with this effort?

If yes, please provide a listing of anticipated repairs for planning purposes.

No.

67. Please clarify if maintenance and/or repairs of the barrier walls at LF012 West, LF014 and LF015 are included in the scope.

Only maintenance is included in the scope.

Major repairs do not apply.

68. Has a court reporter been used for past RAB/ CCR meetings?

No.

69. Are offerors required to provide a 100% GSA solution for all activities within the PWS allowing only GSA schedule holders to provide service under this contract?

No. This requirement is not being procured under a GSA schedule.

70. Can trees in the Leon Creek Mitigation Area be irrigated directly from the water source or is other equipment required?

The source area is within 100 yards of the tree area. Other equipment will be required to transport the water to the trees.

71. How far is the Leon Creek Mitigation Area water source from the trees?

The source is within 100 yards.

72. Are there any maintenance requirements for the Leon Creek Mitigation Area water source?

The water source maintenance falls under the landfill sprinkler system maintenance.

73. Are the trees in the Leon Creek Mitigation Area required to be watered with treated water from the Pump and Treat System?

No but it is more cost effective to use the P&T System water.

74. Is mowing of the Leon Creek Mitigation Area required?

No. Mowing of the area is under a different Contract.

FA8903-16-Q-0005

Long-Term Management and Remedial Action-Operations at Environmental Restoration

Program Sites LF001, LF012 (WEST), LF014, LF015, LF016, LF017, SS043 and WP029, Leon Creek Mitigation Monitoring at Environmental Restoration Program Site LF011 and

Restoration Advisory Board Support at JBSA-Lackland, TX and Remedial Action-Operations at

75. How often does the Leon Creek Mitigation Area flood?

Assume twice per year.

76. Is the contractor responsible for any flood damage to the existing trees or any other damages to the mitigation area?

No. However, some of those damaged trees may be replaced with the 25 trees included in the PWS.

77. What is the status of the erosion control rip rap features on landfills JBSA-LAK ERP Sites LF001, LF012 (West), LF014, LF015, LF016, LF017, SS043 and WP029?

Good, however, please review the current status which is available in the monthly landfill inspection reports which are available on the Google site.

78. Are there any erosion areas of concern currently or historically on the JBSA-LAK ERP landfills?

No, however, please review the current status which is available in the monthly landfill inspection reports which are available on the Google site.

79. Please define significant weather events pertaining to required visual inspections of the landfills.

Events of heavy rains/floods.

80. Are there any GPS coordinates for the monitoring wells and surface water sampling locations required to be sampled at JBSA-BUL ERP Site LF002?

Yes. The coordinates will be provided after award.

81. We request a site walk at all of the non- Camp Bullis, TX sites listed in the PWS.

A site walk is not necessary as current site conditions are documented in the monthly landfill reports which have been uploaded to the Google site.

82. We are unable to download the linked documents from Google Drive. Can the documents be provided via another method?

The updated link previously posted on FBO has been tested and is working. The documents will not be provided via another method.

FA8903-16-Q-0005

Long-Term Management and Remedial Action-Operations at Environmental Restoration

Program Sites LF001, LF012 (WEST), LF014, LF015, LF016, LF017, SS043 and WP029, Leon Creek Mitigation Monitoring at Environmental Restoration Program Site LF011 and

Restoration Advisory Board Support at JBSA-Lackland, TX and Remedial Action-Operations at

83. We did not see the current SAP listed in documents provided. Please provide. The most recent SAP should contain required QA/QC procedures needed for accurate quote preparation, for example: What are the QC requirements under this work for Field Duplicates 10%, MS/MSD 20%, Trip Blanks, Equipment Blanks, and Ambient Blanks (all of which are normally included under AFCEC rules).

Refer to UFP-QAPP. UFP-QAPP has been uploaded to the Google site.

84. Please clarify PWS 5.2, 2nd bullet: Should the proposal include the "for planning purposes'" 50 cubic yards (cy) of clay, 50 cy of fill and 50 cy of topsoil for the 12-month period for each of the sites (LF001, LF012 (West), LF014, LF015, LF016, LF017, SS043 and WP029) or are these total volumes to cover all sites during the 12 months?

This is for total volumes for all sites during the 12 months.

85. Please clarify PWS 5.2, 4th bullet: "For planning purposes", assume that a total of 25 cubic yards of rip-rap will be required for the 12-month period; rip-rap shall be placed in the landfill sites per specifications. Shall Contractor assume 25 cubic yards of rip-rap as a twelve month total for all cap sites, or 25 cy for each cap?

25 cubic yards of rip-rap as a 12-month total for all cap sites.

86. What are the engineering specifications of the rip-rap?

All documents/specifications have been uploaded to the Google site.

87. What herbicide has been used in the past for weed control?

Gordon SpeedZone Southern and AgriSolutions Cornerstone Plus Herbicide.

FA8903-16-Q-0005

Long-Term Management and Remedial Action-Operations at Environmental Restoration

Program Sites LF001, LF012 (WEST), LF014, LF015, LF016, LF017, SS043 and WP029, Leon Creek Mitigation Monitoring at Environmental Restoration Program Site LF011 and

Restoration Advisory Board Support at JBSA-Lackland, TX and Remedial Action-Operations at

88. Please clarify PWS 5.2, 8th bullet: “For planning purposes, assume $100 per month for electricity use for a 12-month period.” Should the assumption be $100/month total or per each of the eight sites?

Total for all sites.

89. Please clarify PWS 5.2, 8th bullet: Paragraph first states for planning purposes eight sites to be irrigated six times in the 12-month period, then later states as a minimum four times during the 12-mointh period. For planning and pricing purposes, please clarify quantity of irrigation events.

For planning and pricing, assume 6 times. The PWS has been revised to indicate 6 irrigation events in the last sentence of the 8th bullet.

90. Is any analytical data required to be entered into

ERPIMS?

Yes. The requirement has been added to the

PWS.

91. Regarding the landfill cover, erosion control, and Leon Creek bank management, the PWS provides quantities to assume for various potentially required repairs. Should the contractor assume that each repair assumption specified will occur as a single event within the 12 month POP or should a different number of repair events be assumed? For example, should the 50 CY of clay, 50 CY of fill, and 50 CY of topsoil to be placed as landfill cover repairs (as specified on Page 14 of 22 of the PWS) be assumed to occur as a single repair event, or 5 separate events of 10 CY each?)

Assume a single event per year. All quantities mentioned in the PWS is for a single year.

FA8903-16-Q-0005

Long-Term Management and Remedial Action-Operations at Environmental Restoration

Program Sites LF001, LF012 (WEST), LF014, LF015, LF016, LF017, SS043 and WP029, Leon Creek Mitigation Monitoring at Environmental Restoration Program Site LF011 and

Restoration Advisory Board Support at JBSA-Lackland, TX and Remedial Action-Operations at

92. For the weed control event specified on Page 14 of 22 of the PWS, what herbicide and quantity have been used for past weed control events? Will the government provide an assumed quantity or herbicide specification for the contractor to use?

Gordon SpeedZone Southern AgriSolutions Cornerstone Plus Herbicide have been used in the past. Weed control includes herbicide application only. The total area is dependent on the specific site conditions. Historically, areas that require treatment is along walking trails and bench areas. Assume a 1 acre area for treatment and 2 events per year.

93. The CDRL specifications appear to specify only

Draft and Final versions of each of the documents. Does this mean that none of the documents will be sent to TCEQ for review, which could require a 3rd version to address their comments?

Correct, TCEQ does not review the reports.

94. The first paragraph on page 15 of 22 of the PWS states to assume six irrigation events, but the paragraph later mentions a minimum of four events. Please clarify if contractors should assume a minimum of four or six events for this solicitation.

For planning and pricing, assume 6 times. The PWS has been revised to indicate 6 irrigation events in the last sentence of the 8th bullet.

FA8903-16-Q-0005

Long-Term Management and Remedial Action-Operations at Environmental Restoration

Program Sites LF001, LF012 (WEST), LF014, LF015, LF016, LF017, SS043 and WP029, Leon Creek Mitigation Monitoring at Environmental Restoration Program Site LF011 and

Restoration Advisory Board Support at JBSA-Lackland, TX and Remedial Action-Operations at

95. For the community involvement described in Section 5.4 of the PWS, which local newspaper(s) should be assumed for publishing English and Spanish advertisements for the RAB, and are there any specifications for the size and content of the advertisements that the contractors can assume when gathering pricing?

Local paper includes the San Antonio Express news and the La Prensa De San Antonio (Spanish). There are no size specifications.

However, previous publications include the following: a print ad that was 1x28 (28 lines) on 6C Basic Legal template, printed on Legal Bids & Proposal section (no color) of the print newspaper as well as the webpage. The print ad ran weekly on consecutive Sundays and the web posting was listed daily for the duration.