SF30_Amendment0001.pdf

PDF 104 KB Posted

Attached to
Sounding Rocket Program-4 RFP Amendment Federal contract opportunity
Solicitation number
FA8818-16-R-0022
Issued by
Department of the Air Force Space Command Space and Missile Systems Center

About this file

SRP-4 SF-30 Amendment 1

View the file

Other files for this federal contract opportunity

Other files attached to Sounding Rocket Program-4 RFP Amendment, newest first.
File Type Posted
SRP-4_RFP_CRM.pdf PDF
SRP-4_RFP_FINAL_(05_January).pdf PDF
FA8818-18-F-00XX_RFP_Package_FINAL05JAN18.pdf PDF
SRP-4_DRFP_CRM.pdf PDF
FA8818-16-R-0022_DRFP_11_APR_2017_finalDRFP.pdf PDF
Industry_DRFP_CRM_Template.docx DOCX document
SRP-4_Questions_and_Answers.docx DOCX document
Industry_Day_Briefing.pdf PDF
SRP-4_Draft_Section_M.docx DOCX document
SRP-4_Draft_Section_L.docx DOCX document
Draft_Performance_Work_Statement_(PWS)_Draft_SRP-4.docx DOCX document
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

See Block #2

PAGE OF PAGES

2. AMENDMENT/MODIFICATION NO.

3. EFFECTIVE DATE

4. REQUISITION/PURCHASE REQ.NO.

5. PROJECT NO. (If applicable)

6. ISSUED BY SMC/ADK CODE FA8818 7. ADMINISTERED BY (If other than Item 6) CODE

SMC/ADK

3548 ABERDEEN AVE SE

KIRTLAND AFB, NM 87117

LUCIA A. CORRAL 505-853-5873

lucia.corral@us.af.mil

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NO.

FA8818-16-R-0022

X 9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers X is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.

If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATION OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(X )

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: ( ) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

RFP FA8818-16-R-0022 is amended to correct administrative errors in the PWS and Section M, add an additional item to GFE list in Section M. Change pages to the RFP reflecting these corrections and additions are attached to this amendment.

Additionally, FAR 52.232-16 Progress Payments was inadvertently left out of the RFP and will be included in any awarded SRP-4 contract. See attached schedule for details of the changes.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print).

16A. NAME AND TITLE OF SIGNER (Type or print)

15B. CONTRACTOR/OFFEROR

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

16C. DATE SIGNED

(Signature of person authorized to sign)

BY________________________________________

(Signature of Contracting Officer)

NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV.10-83)

PREVIOUS EDITION UNUSABLE Prescribed by GSA ConWrite Version 6.15.4 FAR (48 CFR) 53.243 Created 13 Feb 2018 4:49 PM

SCHEDULE OF CHANGES

FA8818-16-R-0022 0001

The purpose of Amendment 0001 is to change the following: (Page numbers are specified to locate each change)

A. Section L, Appendix H (Page L - 50 of 54) - added four SR73 motors to the Government Furnished Property List for Minuteman motors;

B. Performance-Based Work Statement (PWS) - corrections have been made in paragraph 1.8.1.10.12 (Page 16 of 40, the correct paragraph is now referenced as 1.8.2.2.9 vs 1.8.2.2.11) and in paragraph

1.8.2.2.9 (Page 22 of 40, the correct paragraph is now referenced as 1.8.1.10.10 vs 1.8.1.11.10);

C. Section M - paragraph 3.2.1 (Page 6 of 11, "the lowest color rating of" has been deleted); and

D. Section I - FAR 52.232-16 Progress Payments with respect to payment for performance of Firm Fixed Price (FFP) CLINs 0003 and 0013 will be included in Section I of the final IDIQ contract award.

Change pages reflecting the above are attached hereto. The pages referenced in this Amendment replace the corresponding pages from the original RFP, posted 5 Jan 2018. Changes are highlighted.

SRP-4 PWS – Dec 2017 Page 16 of 40 include all launch day participants (e.g., Range, LSC, Payload contractor, Government, and others as applicable) unless otherwise specified. The LSC shall coordinate and conduct academics (training sessions on specific day of launch activities), delta academics, and tabletop exercises as required. The LSC shall compile mission launch notebook data and identify corrections. [CDRL A016, B016]

1.8.1.10.11 Mission Constraints: The LSC shall compile all Payload and LV launch constraints, and coordinate these with the MM prior to inclusion in the mission launch notebook data. [CDRL A016, B016]

1.8.1.10.12 Launch Activities: The LSC shall prepare the LV for launch, conduct prelaunch checkout, conduct launch operations, ensure the collection and recording of telemetry during the launch, support post launch mission activities, perform post-flight analysis, and conduct site shutdown. During the launch campaign, the LSC shall identify all daily planned activities to the MM. Additional Day of Launch requirements for MA Category 2 missions are listed in paragraph 1.8.2.2.9.

1.8.1.10.12.1 Nets and Telemetry: The LSC shall provide the Government with access to all voice (transmit and receive), video, and data networks used for launch support. The LSC shall provide for instrumentation at the launch site, downrange, and on the LV in order to measure the predicted (modeled) launch and flight environments. At Government ranges, the LSC shall provide requirements for range and downrange telemetry collection via the UDS process. Telemetry from this instrumentation shall be provided real-time to a demarcation point defined in the ICD. The LSC shall provide all conversions (engineering unit conversion file) necessary to convert the raw data to engineering units. [A016, B016]

1.8.1.10.12.2 Day of Launch: For MA Category 1 missions, the LSC shall be responsible for Day of Launch operations and the final readiness decision for the combined LV/Payload system. The LSC shall accommodate a small contingent of Government personnel to monitor launch operations for Government insight. The Government will not have an MD for these launches or have an approval role in the launch decision. The LSC shall accommodate Payload personnel on console. The LSC shall not launch if the Payload lead informs the LSC of non-readiness to launch during the final poll for launch readiness. In addition, if GFP motors are involved in a MA Category 1 launch, the LSC shall accommodate a small Government team on console to monitor the status of the GFP motors. The LSC shall not launch if the Government team informs the LSC of non-readiness to launch, based solely upon GFP motor status, during the final poll for launch readiness.

1522176636C Highlight

SRP-4 PWS – Dec 2017 Page 22 of 40

• Post Flight Review (PFR) T+60 Days This support will include summarizing analyses, test results, technical data, subassembly graphics, and other information on current, emerging and closed launch service issues. [CDRL A022, B022]

1.8.2.2.9 Additional Launch Rehearsals: A mission simulation test, or other suitable combined systems test, shall be performed by the LSC and shall include a simulated countdown exercising range interfaces to verify the operational readiness of the entire AVE and ground system.

In addition to the launch rehearsals detailed in paragraph 1.8.1.10.10, the LSC shall also coordinate and conduct a minimum of one communication-only (Green Card) rehearsals (an exercise to practice anomaly handling and resolution which shall be conducted by key members of the launch team).

Additional Launch Activities: The Government Launch Vehicle Single Manager will make the final decision concerning launch readiness for the combined LV/ Payload system, with recommendations from all involved parties.

The LSC shall provide real time vehicle telemetry data displays to Government personnel for all testing and launch operations conducted at the launch site. Specific data requirements shall be coordinated with the COR.

1.8.2.2.10 Additional Post-Flight Activities: The LSC shall host an in-depth post-flight review TIM at the LSC facility to review the final mission performance (at approximately L+45 days, or as directed by the COR).

This review will not be considered a formal review. [CDRL A017, B017, A018, B018]

The LSC shall identify all data products developed during the launch service. [CDRL A036, B036]

1.8.3 Technical Analysis Service (CLIN 0005). The LSC shall conduct Technical Analysis Services in response to analysis requirements supplemental to this PWS as identified in MRDs. These supplemental analysis requirements may include, but are not limited to, early mission design, development and/or integration trade studies, feasibility studies and alternate mission trajectory studies. The LSC shall host monthly discussions to update the government team on Technical Analysis Service progress. [CDRL C018, C026].

1.8.4 Concept Analysis Service (CLIN 0007). The LSC shall conduct feasibility studies, perform configuration trades, conduct debris/loads/contamination analyses, and/or perform general engineering analyses per a Concept Analysis Requirements Document. [CDRL D018, D026]

1.8.5 Hardware Service (CLIN 0009). The LSC shall provide ground support equipment and/or flight hardware per a supplied Hardware Service Requirements Document.

For hardware services, the LSC shall specify system performance, design, interface

PART IV – REPRESENTATIONS AND INSTRUCTIONS

SECTION L – INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS

SECTION L FA8818-16-R-0022

PAGE L - 50 of 54

Appendix H: Government Furnished Property List The Minuteman GFP items listed below are available as of 15 May 2016. When current supplies are exhausted no additional units will be available. The values in the following table will be used during the evaluation as the GFP Cost Offset.

Government Furnished Property List – Minuteman

ITEM Designation Operational GFP Cost Offset (each)

Minuteman Stage 1 M55 47 $2,019,062 Stage 2 SR19 142 $2,144,022 Stage 2 Flexseal SR19M 4 $4,760,440 Stage 3 M57 119 $1,917,871 Stage 3 SR73 4 $315,353 Other Flight Hardware

Lower UMB cable 21-53482-0627 92 Included in motor costs

9W3 J1 Pigtail (MM Stg 3 Cable) 85077-102-41 163 Included in motor costs

SE13G Battery 7327690-10

NSN: 613-00-819-

200 Included in motor costs

Transporter/Erector

Tractor 2320-01-261-

2835AH 2 $250,000

Trailer 1450-01-261-0306 2 Included above

Note: All Minuteman stages include MMODs, SR19M is converted from SR19.

Peacekeeper GFP items and cost offsets will be available as required for future mission awards. TBDs will be updated prior to TO competition that may require Peacekeeper GFP items.

Government Furnished Property List – Peacekeeper

ITEM NSN AVAIL Cost Offset (each)

AVE

SR118* **** 1337012797886 40 $1,938,743

SR119* ****

1/2 interstage 1337012797887 40 $1,9,11,169

SR120* ****

2/3 interstage 1337012808699 40 $1,851,004

Shroud(s) w/o ordnance and tractor motors

12 $10,000

PART IV – REPRESENTATIONS AND INSTRUCTIONS

SECTION M – EVALUATION FACTORS FOR AWARD

SECTION M FA8818-16-R-0022

PAGE M - 6 of 11

3.1.2 Technical Criteria: The Government will evaluate whether or not:

a. Launch Vehicle Design: Offeror proposes an approach for designing a variety of launch vehicles that demonstrate the use of flight proven designs.

b. Hardware Manufacturing: Offeror proposes a flight proven approach to build/acquire flight hardware.

c. Software Development: Offeror proposes a flight proven approach to build/acquire flight software.

d. Hardware Test: Offeror’s proposal demonstrates a flight proven approach for acceptance and qualification to ensure hardware will meet mission requirements.

e. Software Test: Offeror’s proposal demonstrates a flight proven methodology for software testing to ensure software will meet mission requirements.

f. Mission Assurance: Offeror’s proposal demonstrates an effective process for internal mission assurance and support of the Government’s mission assurance process.

g. Program Management: Offeror proposes a complete Program Management Plan (PMP).

h. Initial Minimum Award Special Study : Offeror’s proposal to execute the Minimum Order - Task Order 0001 is complete.

A “does not meet” evaluation finding for one or more of these items (“a-h”) will result in an “Unacceptable” rating for this subfactor.

3.2 Technical Subfactor 2: Mission Accomplishment: Technical Subfactor 2 will be rated using the Technical Rating and the Technical Risk Rating per DoD Source Selection Procedures, Table 2-A and 2-B.

3.2.1 Technical Rating: The technical rating evaluates the quality of the offeror’s technical solution for meeting the Government’s requirement. Technical Subfactor 2 will receive one color rating based on the two sample missions described in DoD Source Selection Procedures, Table 2A – Technical Rating Method, excerpted below. The color rating depicts how well the Offeror’s proposal meets Technical Subfactor 2 requirements. The following definitions support Table 2A:

Strength is an aspect of an Offeror's proposal that has merit or exceeds specified performance or capability requirements in a way that will be advantageous to the Government during contract performance. Note: The Government reserves the right to incorporate a “Strength” process or feature into the final contract requirements.

Deficiency is a material failure of a proposal to meet a Government criterion or a combination of significant weaknesses in a proposal that increases the risk of unsuccessful contract performance to an unacceptable level. See FAR 15.001.

http://www.acq.osd.mil/dpap/policy/policyvault/USA007183-10-DPAP.pdf http://www.acq.osd.mil/dpap/policy/policyvault/USA007183-10-DPAP.pdf

SRP-4 PWS RFP (Pg 16 & 22 of 40).pdf
1.0 Description of Services/General Information
1.1 Scope and Objectives: This PWS delineates the Launch Service Contractor (LSC) tasks required to perform launch operations and associated services necessary to conduct sub-orbital missions in support of the Sounding Rocket Program-4 (SRP-4) Indefi...
1.2 General Description of Services: SMC requires launch services composed of design, integration, and launch activities as defined in this document and the associated Mission Requirements Documents (MRDs). A launch service is the totality of the la...
1.2.1 Government Furnished Property (GFP): The Government will offer excess ballistic missile motors, as well as related handling and test equipment, to be furnished as GFP for use at the LSC's discretion. Excess ballistic missile motors are provide...
1.2.1.1 The LSC shall report quarterly GFP and Contractor Acquired Property status [CDRL A011, B011] during active task order periods while in possession of GFP items.
1.3 Management and Communications: SMC will assign a Contracting Officer’s Representative (COR) to each TO awarded under this contract. This COR will act as the primary interface with the LSC and will provide Quality Assurance Surveillance on behalf...
1.4 Systems Engineering (SE) Insight: The LSC shall provide services that reflect a structured systems engineering approach to support provision of a reliable launch service and coordinated execution of the various engineering processes, including re...
1.4.1 Entry Criteria: The first group of evidence must meet the entry criteria specified for the review as detailed in Annex 2. Entry criteria evidence shall be submitted forty five (45) calendar days (or earlier if available) in advance of the revi...
1.4.2 Exit Criteria: The second group of evidence is a draft of the formal review package and is submitted to demonstrate that the LSC plans to substantially address all of the exit criteria for the review. This evidence shall be submitted twenty on...
1.4.3 Delta Review: For evidence supporting either entry or exit criteria, that has previously been reviewed under a prior TO, only changes made since the previous review (deltas) need to be covered in subsequent reviews.
1.4.4 Technical Performance Measures (TPM): For developmental efforts, the LSC shall establish TPMs that characterize developmental system design performance progress against the mission criteria which, as a minimum, include the following: 1) Defini...
1.5 Mission Assurance: The LSC shall conduct mission assurance (MA) in accordance with its internal processes and procedures. In addition, the LSC shall provide support for the Government’s independent MA as described in Section 1.8.2. The LSC shal...
1.6 Cybersecurity:
1.6.1 Unclassified Missions Requirements: All nonfederal computer systems and software packages that will be used for processing, transmitting, and/or storing Government unclassified information shall adhere to all recommendations outlined within NIS...
1.6.2 Classified Missions: All nonfederal computer systems and software packages that will be used for processing, transmitting, and/or storing Government classified information shall be accredited following the Defense Security Service (DSS) Office ...
1.7 Associate Contractor Agreements and Non-Disclosure Agreements:
1.7.1 Associate Contractor Agreements (ACA): The LSC shall enter into ACAs for any portion of the contract requiring joint participation in the accomplishment of the Government’s requirement(s). These agreements shall include the basis for sharing i...
ACAs shall include the following general information:
1.7.2 Non-Disclosure Agreements: The LSC shall establish Non-Disclosure Agreements with other contractors performing related services for the Government such as Payload Contractors (PLC) who may be responsible for payload operations and Mission Assur...
1.8 Detailed Description of Services: The LSC shall perform the services described in this section as specified in a Mission Requirements Document for the awarded TO in accordance with the LSC’s Program Management Plan for this contract. Services ar...
1.8.1 Design, Integration, and Launch Service (CLIN 0001/0003). The LSC shall complete design and development of the mission launch solution, conduct mission trade studies and mission design, complete fabrication/integration, payload integration and...
1.8.1.1 Mission Planning Service. The LSC shall develop and maintain a Contractor Work Breakdown Structure (CWBS), CWBS Dictionary and an Integrated Schedule (IS) for each mission TO. The CWBS, CWBS Dictionary and IS shall use a common numbering sys...
1.8.1.1.1 The CWBS shall reflect the LSC’s overall view of the effort and serve as the framework for organizing activities involving the LSC and its subcontractors, Government, Range and Associated Contractors.
1.8.1.1.2 The CWBS Dictionary shall define the tasks to be performed in each element of the CWBS and corresponding element of the IS. This task definition shall include a complete definition of the task to be accomplished, the key processes, procedur...
1.8.1.1.3 The Integrated Schedule shall reflect all the tasks/activities in the CWBS planned for the mission. Tasks/activities shall be logically linked together and show predecessor/successor relationships and establish the logical flow of dates pro...
1.8.1.2 Integrated Baseline Review: For cost-based missions, the LSC shall conduct an initial Integrated Baseline Review (IBR) to establish the Performance Measurement Baseline (PMB) and assess the PMB risks. The LSC shall conduct this IBR not later...
1.8.1.3 Periodic and Technical Interchange Meetings: The LSC shall support weekly meetings of the Government IPT led by the Government COR and/or MM. The LSC shall support any IPT working groups designated by the IPT and MM to address specific missi...
1.8.1.4 Formal Reviews: To provide the Government with opportunities for performance surveillance and insight into the processes, methodology and progress being made by the LSC, the following formal reviews shall be hosted at the LSC’s facility:
The timing of these reviews shall be agreed upon by the COR and the LSC. Reviews may be waived by the COR if they are deemed of low value to the mission. The COR may also combine reviews for the sake of cost and efficiency.
1.8.1.5 On-Site Government Representative(s): If required by the MRD, the LSC shall host up to two (2) full time Government representatives, and provide a workspace in an office environment. The workspace provided shall be in reasonable proximity to...
1.8.1.6 Requirements Analysis and SRR: The LSC shall perform requirements analysis for the specific mission; including mission requirements decomposition, allocation and validation. At the conclusion of the requirements analysis (no later than 60 ca...
1.8.1.7 Mission Design: The LSC shall perform the mission design for the specific mission. In this activity the LSC designs the complete mission launch solution. Excess payload capacity is reserved for the Government.
1.8.1.7.1 Interface Control Document (ICD): The LSC shall maintain configuration control and coordinate the ICD change process throughout the life of a TO. The ICDs shall be generated to document the interfaces between the LV and the payload, and th...
1.8.1.7.2 PDR: Before the LSC conducts a detailed launch solution design (approximately T-16 months to launch or as directed to by the COR) the LSC shall have a preliminary design that meets (or is converging on meeting) the requirements generated in...
1.8.1.7.3 CDR: At the conclusion of the mission design phase (approximately T-10 months to launch or as directed to by the COR) the LSC shall hold a CDR. The objective of the CDR is to demonstrate critical design of any design items that were previo...
1.8.1.7.4 Pedigree Review (PR): The LSC shall host a PR at approximately T-70 days to launch (or as approved by the COR). The main purpose of a PR is to ensure that the flight hardware/software has been built and satisfactorily tested to establish f...
1.8.1.8 Mission Build and Test: The LSC shall fabricate and test hardware and software to ensure that the Government is provided a launch solution design capable of meeting all the requirements of the SRP-4 Task Order MRD and this PWS.
1.8.1.8.1 Coupled Loads Analyses (CLA): CLAs shall be performed by the LSC to predict the maximum loads that can be expected by the payload during the launch event. The CLA will address key loading events (e.g. lift-off, maximum dynamic pressure, tr...
1.8.1.8.2 Fabricate & Test: The LSC shall develop, fabricate and test flight hardware and flight software, necessary to conduct the mission described in the MRD. The LSC shall conduct hardware and software system level testing to meet qualification ...
1.8.1.8.3 Predicted Environments: The LSC shall generate predicted launch environments based upon mission development activities. The LSC shall ensure that the predicted environments meet the requirements stated in the MRD and ICD. The LSC shall be...
1.8.1.9 PSR and Shipping: The PSR must be completed prior to shipping major LV components or support equipment to the launch site so that the Government and other launch campaign stakeholders may assess LSC launch campaign readiness and schedule risk...
1.8.1.9.1 Readiness: At the PSR, the LSC shall provide an overview demonstrating completion of the Range Safety preparations and tailoring (if required), an acceptable approach to Flight Safety and Flight Termination, and readiness of the launch site...
1.8.1.9.2 Shipment of GFE Motors and Equipment: If GFE motors are used; the Government will be responsible for shipping these motors and direct support equipment from the processing facilities at Hill AF Base, Utah to a motor processing location at o...
1.8.1.10 Launch Campaign: The LSC shall execute the launch campaign, coordinate all safety operations with the Range and ensure that critical skills and qualified personnel are available when required for integration, testing and on-console operation...
1.8.1.10.1 Launch Site and Services: The Government will provide Government services at Government ranges (e.g., Flight Safety, Telemetry, Radar, etc.). The LSC shall specify all required Government range services/support. All spaceport services, n...
1.8.1.10.2 Range Requirements Coordination and Documentation: The LSC shall comply with Range processes to ensure that the requirements specified in the MRD and this PWS are safely executed and properly coordinated with the Range. The LSC is respons...
1.8.1.10.3 Range Safety: The LSC shall comply with AFSPCMAN 91-710 (or equivalent, when specified by the cognizant range) for all applicable launch site activities. These safety requirements may be tailored by the LSC, as detailed below. The Range ...
1.8.1.10.4 Ground and Flight Safety Hazard Analyses: Ground and flight safety hazard analyses shall be performed in accordance with AFSPCMAN 91-710 (or equivalent when specified by the cognizant Range) and MIL-STD-882E Task 106, Task 202, and Task 205.
The LSC shall work with the cognizant range safety office in coordination with program office to tailor the applicable flight safety requirements for the launch system, complete development of a compliant flight safety system and gain range safety app...
1.8.1.10.4.1 Safety and Environmental: The LSC shall support the Government safety and environmental reporting required for safety, hazards, debris, and environmental analysis in accordance with MIL-STD-882E Task 301. [CDRL A020, B020]
1.8.1.10.5 Facilities and Services: The LSC shall provide the required facilities and services at the launch site, which meets all mission requirements defined in the MRD and this PWS unless otherwise stated in the mission specific MRDs. These requi...
1.8.1.10.6 Approvals and Waivers: The LSC shall obtain any necessary coordination or approval from the launch base or test range for activities taking place at the launch base or test range. The LSC shall obtain appropriate documentation, approvals,...
1.8.1.10.7 New START Treaty Requirements: If the LV uses GFP motors subject to New START treaty considerations (e.g. Minuteman III ICBM first stage motors), the LSC shall provide “interpretive data” on all telemetry that is transmitted prior to the L...
1.8.1.10.8 Classified Payloads: When classified payloads are processed the LSC shall provide trained people with the proper clearance to perform the required work in compliance with the applicable Security Classification Guide. Classification requir...
1.8.1.10.9 LV/Payload Operations: The LSC shall integrate the payload(s) with the LV in a clean room environment as specified in the MRD, and perform end-to-end testing with the payload(s). End-to-end verifications tests are tests of the hardware/so...
1.8.1.10.9.1 Launch Verification Testing: The LSC shall conduct these tests during launch processing in support of each mission. An integrated field processing procedure will be prepared by the LSC test conductor in each test. All anomalies shall b...
1.8.1.10.9.2 LV/Payload Integrated Processing: Integrated LV/Payload processing shall be performed in preparation for Payload emplacement on the LV at the launch site. During integrated processing, the Payload contractor shall furnish certified hand...
1.8.1.10.9.3 LV/Payload Mating: Unless otherwise specified in the MRD, the Payload contractor will be responsible for all Payload integration activities prior to integrated operations. The Payload contractor will transfer responsibility for the Payl...
1.8.1.10.9.4 LV/ Payload Flight Integration Tests: The flight integration test shall be performed using the flight hardware to verify electrical compatibility and system performance between the Payload and the LV upper section(s) prior to movement to...
1.8.1.10.9.5 Payload Support Equipment and Ground System Checkout: The Payload contractor will install the required Payload Support Equipment at the launch site in locations to be defined in the LV/ Payload ICD. A design compatibility test to establ...
1.8.1.10.10 Simulations & Rehearsals: The LSC shall coordinate and conduct, one green card (simulated countdown) dress rehearsals, one full mission dress rehearsal (a simulated countdown, exercising range interfaces to verify the operational readine...
1.8.1.10.11 Mission Constraints: The LSC shall compile all Payload and LV launch constraints, and coordinate these with the MM prior to inclusion in the mission launch notebook data. [CDRL A016, B016]
1.8.1.10.12 Launch Activities: The LSC shall prepare the LV for launch, conduct prelaunch checkout, conduct launch operations, ensure the collection and recording of telemetry during the launch, support post launch mission activities, perform post-fl...
1.8.1.10.12.1 Nets and Telemetry: The LSC shall provide the Government with access to all voice (transmit and receive), video, and data networks used for launch support. The LSC shall provide for instrumentation at the launch site, downrange, and on...
1.8.1.10.12.2 Day of Launch: For MA Category 1 missions, the LSC shall be responsible for Day of Launch operations and the final readiness decision for the combined LV/Payload system. The LSC shall accommodate a small contingent of Government person...
1.8.1.10.13 Post-Flight Activities: The LSC shall conduct an analysis of and participate in a review of all launches, operations, flight telemetry, and other data to determine LV performance.
1.8.1.10.13.1 Quicklook Analysis: The LSC shall develop the T+4 hours (Quicklook) analysis and L+4 day post-flight analysis report. Analyses shall include characterization of trajectory parameters, mission timeline/events, environments, telemetry pe...
1.8.1.10.13.2 Lessons Learned: The LSC shall collect lessons learned throughout the performance of the TO. [CDRL A017, B017]
1.8.1.10.13.3 Post-Flight Analysis: The LSC shall complete the post-flight analysis by L+30 days. The LSC shall attend and support a Government post flight review at SMC (Los Angeles, CA) at approximately L+60 days. [CDRL A017, B017]
1.8.1.10.13.4 Failure Review: In the event of a complete or partial mission failure, the LSC shall participate in a Government-led evaluation of the root cause of the failure event to identify remedial actions required to prevent recurrence. Mission...
1.8.2 Mission Assurance Support Service:
1.8.2.1 Category 1: These missions will not be subject to the SMC flight worthiness certification process or MAC IV&V activities. These missions will be licensed under Federal Aviation Administration (FAA) licensing guidelines. The LSC shall obtain...
1.8.2.2 Category 2: The LSC shall provide additional information and support for the Government’s MA efforts and the Government’s Independent Readiness Review Team (IRRT). In addition, the following launch service requirements shall be applicable fo...
1.8.2.2.1 Spaceflight Worthiness: The mission will be certified spaceflight worthy by SMC and require the LSC to support the SMC Readiness Review process, the IV&V efforts of the MAC and the SMC IRRT. Details of the required data submittals are in A...
1.8.2.2.1.1 SFWC Discussions: The LSC shall make available appropriate personnel for the discussion and clarification of issues related to items detailed in Annex 1 on a monthly basis during the design, development, and test phase, and weekly during...
1.8.2.2.2 Software & Flight Computer: The LSC shall develop flight software requirements, design, and source code with version description, test description, and test reports.
The LSC shall deliver a flight representative computer to the Government no later than 45 calendar days after CDR. This computer will be used by the MAC to run hardware-in-the-loop simulations. The LSC shall assign to the computer an Item Unique Ide...
1.8.2.2.3 Requirements Decomposition & Validation: Requirements shall be decomposed in a hierarchical structure starting with the highest level requirements. These high-level requirements are decomposed into functional and performance requirements a...
At each level of decomposition (solution, system, subsystem, component, etc.), the total set of derived requirements (to include ICD) must be validated against the higher level parent requirements as specified in the PWS, MRD, and other compliance doc...
1.8.2.2.4 Risk Assessment. Risk assessments shall include the LSC's assessment of LV risks, to include those identified by other organizations as provided by the COR, and shall comply with the SMC Risk Management Process Guide criteria for consequenc...
1.8.2.2.5 Test Planning and Qualification/Acceptance Testing: The LSC shall perform Test Planning and Qualification Testing to ensure that the Government is provided with a launch solution design that is qualified and capable of meeting all the requi...
1.8.2.2.5.1 Test Planning: All testing shall be consistent with test-like-you-fly (TLYF) practices; any planned deviations from TLYF practices shall be documented and presented at the Test Readiness Review (TRR). Any deviations from TLYF due to unfo...
1.8.2.2.5.2 TRR: At the conclusion of the test planning phase (approximately T-13 months to launch, or as directed by the COR) the LSC shall hold a TRR to review the adequacy of the planned testing. [CDRL A002, B002]
1.8.2.2.5.3 Support Equipment: The LSC shall identify, design, test, qualify and approve all GSE and LSE required for flight operations at the Range prior to the PSR. This equipment may include, but is not limited to, lifting slings, transportation ...
1.8.2.2.5.4 Qualification Testing: For qualification testing, the LSC shall release all drawings under configuration control, and manufacture, fabricate or acquire the qualification items. The LSC shall then perform qualification testing on flight-r...
1.8.2.2.5.5 Acceptance Testing: Once the design has been qualified, acceptance testing of flight hardware may commence. The LSC shall not ship major hardware to the Range for field processing until acceptance testing has been successfully completed,...
1.8.2.2.5.6 Formal Testing Results: Results from all formal testing (qualification data summary, acceptance test data, and system test data) will be summarized and reviewed as part of the PSR, including test anomalies and failures.
1.8.2.2.5.7 Flight Hardware Risks: The LSC shall evaluate flight hardware risks associated with Government-Industry Data Exchange Program and Missile Defense Agency advisories. The LSC shall have an internal process to identify sibling issues and ev...
1.8.2.2.5.8 QTR: At the conclusion of the qualification testing phase (approximately T-5 months to launch or as directed by the COR) the LSC shall hold a Qualification Testing Review (QTR) to review the qualification testing results. [CDRL A002, B002]
1.8.2.2.6 Design Verification Tests: Design verification tests shall be conducted to establish confidence in compatibility between the LSC hardware and any other contractor or stakeholder hardware, or to verify complex launch vehicle functions. The ...
1.8.2.2.6.1 Integrated Mechanical / Structural Analysis and Verification Tests: A series of mechanical/structural tests shall be conducted at the LSC facilities to verify the LV mechanical and structural characteristics. The LSC shall conduct the te...
1.8.2.2.6.2 LV / payload Mechanical Interface Verification: A mechanical fit check shall be performed to verify the mechanical compatibility between the LV and the Payload separation system as documented in the LV/Payload ICD, including cable routing...
1.8.2.2.6.3 Non Destructive Testing (NDT): The LSC shall conduct NDT on all flight structures fabricated with composite materials. For structures that do not have other hardware mounted on them, 100% testing shall be performed. For structures that ...
1.8.2.2.7 Electrical Verification Tests: End-to-end testing shall be conducted to verify the electrical interface between the LV and Payload. The testing will use flight-representative hardware furnished by the LSC as well as applicable Payload comp...
1.8.2.2.8 Government Readiness Reviews: In addition to the formal reviews previously discussed, the LSC shall support the following government reviews by providing presentation material and technical data as required. LSC programmatic and technical ...
Mission Readiness Review (MRR) T-60 Days
Executive Mission Readiness Review T-55 Days
Independent Readiness Review (IRR) x3 T-30 Days
Flight Readiness Review (FRR) T-14 Days
Launch Readiness Review (LRR) T-2 Days
Post Flight Review (PFR) T+60 Days
This support will include summarizing analyses, test results, technical data, subassembly graphics, and other information on current, emerging and closed launch service issues. [CDRL A022, B022]
1.8.2.2.9 Additional Launch Rehearsals: A mission simulation test, or other suitable combined systems test, shall be performed by the LSC and shall include a simulated countdown exercising range interfaces to verify the operational readiness of the e...
Additional Launch Activities: The Government Launch Vehicle Single Manager will make the final decision concerning launch readiness for the combined LV/ Payload system, with recommendations from all involved parties.
1.8.2.2.10 Additional Post-Flight Activities: The LSC shall host an in-depth post-flight review TIM at the LSC facility to review the final mission performance (at approximately L+45 days, or as directed by the COR). This review will not be consider...
1.8.3 Technical Analysis Service (CLIN 0005). The LSC shall conduct Technical Analysis Services in response to analysis requirements supplemental to this PWS as identified in MRDs. These supplemental analysis requirements may include, but are not li...
1.8.4 Concept Analysis Service (CLIN 0007). The LSC shall conduct feasibility studies, perform configuration trades, conduct debris/loads/contamination analyses, and/or perform general engineering analyses per a Concept Analysis Requirements Document...
1.8.5 Hardware Service (CLIN 0009). The LSC shall provide ground support equipment and/or flight hardware per a supplied Hardware Service Requirements Document. For hardware services, the LSC shall specify system performance, design, interface requi...
1.8.6 GFP Closeout Service (CLIN 0011).
1.8.6.1 The LSC shall return to the Government all GFP that was received or developed and not consumed for use in the execution of the contract
1.8.6.2 GFP shall be returned in the same or better condition as initially received from the Government; unless the contracting officer grants specific exception.
1.8.6.3 The LSC shall transport GFP in appropriate shipping containers to the Government specified storage location. (Reference will be provided. TBD)
1.8.6.4 The LSC shall provide a complete listing of any returned GFP (CDRL F011)

1.8.7 Initial Minimum Award Special Study (CLIN 0013). The LSC shall conduct the initial minimum award special study in accordance with the Statement of Work (SOW). [CDRL G029, G030, G031, G034].

2.0 Service Summary - The COR for the launch service contract will perform surveillance of the service provided. The table below provides an overview of the performance thresholds the COR will employ to evaluate the services provided. For services w...
3.0 Documents
3.1 Applicable Documents: Utilize the latest revision of the following documents as guidance in accomplishing the work outlined in this PWS.
3.2 Reference Documents: The following documents are to be considered as reference material for the purpose of interpreting the requirements of this PWS but are not contractual documents.
3.3 Compliance Documents: All launch related services require compliance with the governing regulations and laws affecting the procurement and execution of launch services. Compliance with the following is mandatory. However, the LSC’s use of alter...

Annex 2: Performance Threshold Entrance and Exit Criteria

Sec L Appendix H - GFP List (Pg 50 of 54).pdf
Peacekeeper GFP items and cost offsets will be available as required for future mission awards. TBDs will be updated prior to TO competition that may require Peacekeeper GFP items.
SRP-4 Section M RFP (Pg 6 of 11).pdf
1.1 Number of Contracts to be Awarded
1.1.1 Basic Contracts: The Government intends to award up to a maximum of four (4) Indefinite Delivery, Indefinite Quantity (IDIQ) contracts for the Sounding Rocket Program (SRP)-4. Offeror proposals will be evaluated and contracts awarded based on ...
1.1.1.1 Sample Missions: The Government reserves the right to award (contingent on funds availability and mission requirements) one or more sample missions to one or multiple contractor(s) awarded an IDIQ contract within six months from the date of p...
1.2 Rejection of Unrealistic Offers: The Government may reject any proposal that is evaluated to be unrealistic in terms of program commitments such that the proposal is deemed to reflect an inherent lack of competence or failure to comprehend the co...
1.3 Competitive Advantage from Use of GFP: Government Furnished Property (GFP) includes Government Furnished Equipment (GFE) used for the contracted effort by the contractor but not consumed, and Government Furnished Material (GFM) consumed in the co...
1.4 Discussions: The Government intends to award without discussions; however, if during the evaluation period, it is determined to be in the best interest of the Government to hold discussions, Offeror responses to Evaluation Notices (ENs) and the F...
2.1 Proposal Evaluation: Each proposal will be evaluated based upon an integrated assessment of the following evaluation factors and subfactors:
2.2 Relative Importance of Factors and Subfactors: Factor 1 (Technical) is significantly more important than Factor 2 (Price/Cost). Within the Technical Factor, Subfactor 1 and Subfactor 2 are of equal importance.
2.2.1 Source Selection Decision Matrix for Technical and Price/Cost Factor (IDIQ)
3.1 Technical Subfactor 1: Mission Capability
3.1.1 Technical Rating: Technical Subfactor 1 will be rated as acceptable/unacceptable per DoD Source Selection Procedures, Table C-1. Technical Acceptable/Unacceptable Rating Method, excerpted below.
3.1.2 Technical Criteria: The Government will evaluate whether or not:
3.2 Technical Subfactor 2: Mission Accomplishment: Technical Subfactor 2 will be rated using the Technical Rating and the Technical Risk Rating per DoD Source Selection Procedures, Table 2-A and 2-B.
3.2.1 Technical Rating: The technical rating evaluates the quality of the offeror’s technical solution for meeting the Government’s requirement. Technical Subfactor 2 will receive one color rating based on the two sample missions described in DoD So...
3.2.2 Technical Risk Rating: Assessment of technical risk, which is manifested by the identification of weakness(es), considers potential for disruption of schedule, increased costs, degradation of performance, the need for increased Government overs...
3.2.3 Technical Criteria: The Government will evaluate each sample mission proposal for the extent to which:
4.1 Evaluation Area Details
4.1.1 Reasonableness
4.1.1.1 The Offeror’s proposal will be assessed for reasonableness, where reasonableness is an assessment of whether the price is too high. The price/cost is reasonable, if, in its nature and amount, it does not exceed that amount which would be paid...
4.1.1.2 In conducting the reasonableness analysis, the Government will use one or more analysis techniques described in, but not limited to, FAR 15.404-1. If after receipt of proposals the PCO determines that there is insufficient data available to d...
4.1.1.3 A determination of unreasonableness will render the proposal unawardable.
4.1.1.4 In addition, proposals that have been assessed to be technically unacceptable are ineligible for award, and as a result, a reasonableness determination will not be made for technically unacceptable, unawardable proposals.
4.1.2 Cost Realism (applies to CLIN 0001)
4.1.2.1 The Offeror’s proposed costs as provided in the Price/Cost Volume will be evaluated via a cost analysis approach. This process involves the Government’s review and evaluation of specific cost elements of the Offeror’s price/cost. The Offeror...
4.1.2.1.1 The cost analysis will consider the Offeror’s proposed approach.
4.1.2.1.2 Cost adjustments will consider weaknesses in the technical proposal that impact the costs.
4.1.2.1.3 Cost adjustments will also consider missing costs that will likely be incurred for the contract with the proposed solution.
4.1.2.1.4 Cost adjustments will consider any Offeror-initiated unsubstantiated decrements to historical hours/costs.
4.1.2.1.5 The cost adjustments will result in the Government’s Most Probable Cost that will become part of the TEP calculation for best value consideration.
4.1.2.2 No Government Most Probable Cost (MPC) adjustment will be made for deficiencies; however, deficiencies may render your proposal unrealistic. MPC adjustments will not be made for proposals that are determined to be technically unacceptable.
4.1.2.3 The Offeror’s proposal must be clear and convincing in demonstrating that the costs in the Offeror’s proposal are realistic for the work to be performed, reflect a clear understanding of the requirements, and are consistent with various elemen...
4.1.2.4 Over-proposing of unwanted tasks and associated costs will NOT result in a probable cost adjustment, but may result in an unreasonableness determination.
4.1.2.5 An offer may be rejected if the Contracting Officer determines that the lack of realism poses an unacceptable risk to the Government.

4.1.3 Total Proposed Price (TPP): The Offeror’s proposal will be assessed for accuracy in calculating the proposed TPP and for compliance with the instructions for calculating the TPP.

4.2 Total Evaluated Price (TEP): The Government will adjust the TPP as shown below to incorporate the Government’s Most Probable Cost. The Government-calculated TEP will be used in the best value decision process for evaluation purposes only.