IAFNOS Appendix 4
Shift Requirements This appendix provides required shift coverage by PWS Task.
Table 4.1 – IAFNOS Shift Requirements by Task and Location: This table provides a reference for offerors that shows the required shifts by task. For instance, under Task 3.3 ESU the offeror is required to provide personnel for all three shifts (Day, Swing and Mids) seven days a week. Tasks with a five day requirement indicate covering Monday, Tuesday, Wednesday, Thursday and Friday of each week. Tasks that have an “On-Call” requirement require that the contractor provide a contact that can be on site within one hour of receiving a notification.
The 83 NOS can support up to 60 contractor personnel per shift and the 561 NOS can support up to 40 contractor personnel per shift. The contractor is expected to evenly distribute contractor personnel between shifts to stay within these capacity constraints.
1 | I A F N O S A p p e n d i x 4
Table 4.1 - IAFNOS Shift Requirements by Task and Location
PWS Task Organization Location Shifts Days per
Week On Call Day Swing Mids
3.2 I-NOSC 83 NOS Langley AFB, VA X X X 7 No 561 NOS Peterson AFB, CO X X X
3.3 ESU 83 NOS Langley AFB, VA X X X 7 No 561 NOS Peterson AFB, CO X X X
3.4 APC
83 NOS OL-B Andrews AFB, MD X X X
5 Yes* 561 NOS OL-B Scott AFB, IL X X X 83 NOS OL Wright-Patterson AFB, OH X X X
3.5.1 Change Management
690 COG Lackland AFB, TX X
5 No 83 NOS Langley AFB, VA X X 561 NOS Peterson AFB, CO X X
3.5.2 Release and
Deployment Management
690 COG Lackland AFB, TX X 5 No 83 NOS Langley AFB, VA X X
561 NOS Peterson AFB, CO X X
3.5.3 Configuration and
Service Asset Management
690 COG Lackland AFB, TX X 5 No 83 NOS Langley AFB, VA X
561 NOS Peterson AFB, CO X
3.5.4 Problem Management 690 COG Lackland AFB, TX X 5 No
3.5.5 Enterprise-Level
Mission Area Support 690 COG Lackland AFB, TX X 5 No
3.5.6 Incident Management 690 COG Lackland AFB, TX X 5 No
3.5.7 Automated Incident
Management Tools 690 COG Lackland AFB, TX X 5 No
3.5.8 AFIN Metric 690 COG Lackland AFB, TX X 5 No
3.5.9 CFP Operations 690 COG Lackland AFB, TX X 5 No
3.5.10 AFIN Trend Analysis 690 COG Lackland AFB, TX X 5 No
3.6.1 Monitoring Cell 690 COG Lackland AFB, TX X X X 7 No
3.6.2 AFIN Reporting Cell 609 COG Lackland AFB, TX X X X 7 No
3.6.3 Orders Management 609 COG Lackland AFB, TX X 5 No
* APC on-call hours is expected to be 1,920 hours per year