Attch 1 - 26q976 - List of Materials_Rev 01.xlsx

XLSX spreadsheet 19 KB Posted

Attached to
Auditorium Audio/Visual (A/V) Equipment, Programming, Installation & Support
Solicitation number
FA875126Q0976
Issued by

About this file

This is a List of Materials (LOM) attachment for a small business set-aside RFQ (FA875126Q0976) issued by the Department of the Air Force Materiel Command Research Laboratory for auditorium audio/visual equipment upgrades at AFRL/RF in Rome, NY. The LOM details existing equipment distributed across podium, booth, outside booth, and lighting areas that contractors must assess for reuse or replacement.

Equipment designated for reuse includes Crestron control panels, Biamp audio systems, Netgear switches, Rockville light board, Barco DLP projectors, LEA amplifiers, EV speakers, and various transmission and switching devices. The contractor must reprogram compatible units with updated software to work with the integrated system. Shure wireless microphone transmitters (4 units) are marked for replacement due to sound quality issues, with the specification noting the addition of a catch box plus system including both bodypack and handheld microphones. Existing lighting spotlights will be removed from the console, with control integrated into the Crestron panels via RS232 or relay interface modules. The contractor must provide complete installation and programming of all new and existing equipment, deliver system access information, codes and diagrams, and provide training on the solution. Delivery is required 60 days after receipt of order on a firm fixed price basis with FOB destination to Rome, NY.

View the file

Other files

File Type Posted
QA 3 14Jul26.pdf PDF
QA 2 13Jul26.pdf PDF
AUD_Equipment List_Redacted.pdf PDF
Aud Upgrade Narrative.pdf PDF
QA 15Jun26.pdf PDF
Attch 1 - 26q976 - List of Materials.xlsx XLSX spreadsheet
Attch 2 - Offeror Representations and Certifications.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

FA875126Q0976 - updated 30Jun26
Attachment No. 1 - List of Materials (LOM) - Existing Equipment
Line ItemLocationDescriptionPart NumberQTYReuse or ReplaceNotes
1PodiumCrestron panelTSW-1060-TTK-B-S1ReuseReprogram unit and program with updated software to be compatiable with

existing equipment.

PodiumCrestron cable TransmitterHD-TX-101-C-E1Reuse
PodiumCrestron DM Computer CenterDM-TX-201-C2Reuse
PodiumTrans Source PC1Reuse
PodiumMonoprice 4x4 HDMI switcher/splitterHDX-404E1Reuse
PodiumShure podium gooseneck microphone1Reuse
BoothShure wireless microphone transmittersJ3 572-5964ReplaceReplacing the existing ones as we are having issues with the sound quality. Also adding an additional microphone (i.e. Catch box plus); Includes both 2 bodypack mics and 2 handheld mics
BoothTesira Forte Dan VT Biamp1Reuse
BoothNetgear AV lineM4250-26G4F-PoEt1Reuse
BoothRockville- Rockforce 384 Light board1ReuseReprogram unit and program with updated software to be compatiable with

existing equipment.

Booth Crestron panel TSW-1060- TTK-B-S 1 Reuse Reprogram unit and program with updated software to be compatiable with existing equipment.

BoothBarco G62W11 DLP projector1ReuseTo be used as the primary projector
BoothSurgeX power supplies2Reuse
BoothCrestron 3 series HDBT1Reuse
Booth232 ATSC 4K HDTV tuner1Reuse
BoothLEA connect series1Reuse
BoothAV Rack1Reuse
Outside of BoothBarco 662 DLP projectors2ReuseUsed on an as needed basis
Outside of BoothAVER teleconference cameras2Reuse
Above StageEV speakers3ReuseTo remain and reworked into the system
LightingSpotlightRemove the programming
from the consolePanel is not properly working and cannot be reprogrammed at this time. A plan is included in adding the ability to control the room lighting from the existing Crestron panels with the addition of an RS232 or relay interface module.

The existing spotlight will NOT be used; an additional light was purchased and will be controlled by a light board currently in the booth

2Installation and programming of all new and existing equipment, as well as complete system access information, codes and diagrams of the solution.
3Training on use of solution