Attachment_9_Seed_Project_Drawings_Repair_Restrooms_W161_W2C.pdf

PDF 5 MB Posted

Attached to
Simplified Acquisition of Base Engineering Requirements (SABER)
Solicitation number
FA8751-19-R-A004
Issued by

About this file

Attachment 9 - Seed Project Drawings

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

C149

C156

C150

W161

W163A

W163

W161

RECONFIGURE CEILING THIS ROOM

W161

A

EXISTING MASONRY WALL

REPLACE CARPET THIS ROOM

EXTERIOR WALL

6" 25 GAUGE CORROSION-

PROTECTED STEEL STUDS

AT 24" O.C. (MAX)

ACOUSTIC INSULATION

6" 20 GAUGE

CORROSION-PROTECTED

STEEL RUNNERS TOP &

BOTTOM

(1) LAYER 5/8" CEMENT

BOARD EACH SIDE

SLAB

SCHEDULED

CEILING

ACOUSTICAL SEALANT

ROME RESEARCH SITE

REPAIR RESTROOMS W161/WC2

B/106

7 10 JUL 2019

EF

ULDF 180002

BLDG. 106

ARCHITECTURAL

FLOOR/CEILING PLANS

A-101 1

EF

EF

N

AREA OF WORK

CONSTRUCTION NOTES:

1. CONTRACTOR TO VERIFY ALL DIMENSIONS AND FIELD

CONDITIONS PRIOR TO BEGINNING CONSTRUCTION AND

NOTIFY THE CONTRACTING OFFICER AND ARCHITECT

IMMEDIATELY OF ANY DISCREPANCIES.

2. REMOVE CERAMIC TILE FLOORING AND CEILING

COMPONENTS IN THEIR ENTIRETY, EXISTING RM W161.

3. REMOVE ALL GYPSUM WALLBOARD, TILE WAINSCOTING

TO STUDS ALL WALLS WHERE SHOWN.

4. REMOVE WALL BETWEEN W161 AND W163 AS SHOWN.

5. REMOVE ALL PLUMBING FIXTURES/COUNTER AND

TOILET PARTITIONS

6. REMOVE AND SALVAGE HAND DRYER, PAPER TOWEL

DISPENSER, AND SOAP DISPENSERS - AND REUSE.

7. REMOVE EXISTING DOOR AND FRAME.

8. REMOVE CLOSET W163A AND SINK/COUNTER ADJACENT

9. RELOCATE MASS NOTIFICATION AND FIRE ALARMS AS

INDICATED.

10. RELOCATE HVAC COMPONENTS AS INDICATED.

11. RELOCATE SPRINKLERS AS INDICATED.

12. CONSTRUCT PARTITION WALL WHERE SHOWN.

13. INSTALL ALL WALL AND FLOOR FINISHES AS INDICATED

ON FINISH SCHEDULE.

14. INSTALL NEW CEILING GRID AND TILES AS INDICATED

AND SPECIFIED, RECONFIGURE IN W163.

15. INSTALL LIGHTING AS INDICATED.

16. INSTALL ALL PLUMBING FIXTURES/PARTITIONS WHERE

INDICATED.

17. INSTALL ALL ACCESSORIES NEW AND REUSED, WHERE

SHOWN, INCLUDING MIRRORS.

18. REPLACE CARPET IN W163 WITH CARPET TILE.

19. CLEAN AREA AND PREPARE SPACE FOR OCCUPATION.

DEMOLITION FLOOR PLAN - W161

SCALE: 1/4"=1'-0"

DEMOLITION CEILING PLAN - W161

SCALE: 1/4"=1'-0"

PROPOSED FLOOR PLAN - W161

SCALE: 1/4"=1'-0"

PROPOSED REFLECTED CEILING PLAN -W161

SCALE: 1/4"=1'-0"

WALL TYPE A

SCALE: None

FA875119RA004 - ATTACHMENT 9

Suite E2B

Suite F2B

W2C

WH

W2C1

WATER HEATER TO BE REPLACED

AND RELOCATED ABOVE NEW MOP SINK

W2C

W2C1

W2C

WH

EXISTING WINDOW TO REMAIN.

REPLACE SILL TO MATCH COUNTER

NEW WATER HEATER LOCATED

ABOVE MOP SINK ON SHELF

NEW FLOOR MOUNTED

MOP SINK

MOP RAIL

W2C

REPAIR RESTROOMS W161/W2C

7 10 JUL 2019

EF

ULDF 180002

BLDG. 106

ARCHITECTURAL

FLOOR/CEILING PLANS

A-102 2

EF

EF

N

AREA OF WORK

CONSTRUCTION NOTES:

1. CONTRACTOR TO VERIFY ALL DIMENSIONS AND FIELD

CONDITIONS PRIOR TO BEGINNING CONSTRUCTION AND

NOTIFY THE CONTRACTING OFFICER AND ARCHITECT

IMMEDIATELY OF ANY DISCREPANCIES.

2. REMOVE FLOORING AND CEILING COMPONENTS IN

THEIR ENTIRETY, EXISTING ROOM W2C.

3. REMOVE ALL GYPSUM WALLBOARD, TILE WAINSCOTING

TO STUDS ALL WALLS WHERE SHOWN.

4. REMOVE WALL BETWEEN SINKS AND TOILETS

5. REMOVE ALL PLUMBING FIXTURES/COUNTER AND

TOILET PARTITIONS

6. REMOVE AND SALVAGE HAND DRYER, PAPER TOWEL

DISPENSER, AND SOAP DISPENSERS - AND REUSE.

7. REMOVE EXISTING DOOR AND FRAME.

8. REMOVE JANITOR'S CLOSET EAST WALL.

9. RELOCATE MASS NOTIFICATION AND FIRE ALARMS AS

INDICATED.

10. RELOCATE HVAC COMPONENTS AS INDICATED.

11. RELOCATE SPRINKLERS AS INDICATED.

12. RELOCATE FLOOR DRAIN WHERE SHOWN ON MECH'L.

13. CONSTRUCT/RECONFIGURE PARTITION WALLS WHERE

SHOWN IN RESTROOM AND JANITOR'S CLOSET.

14. INSTALL ALL WALL AND FLOOR FINISHES AS INDICATED

ON FINISH SCHEDULE.

15. INSTALL NEW 36"W WOOD DOOR/FRAME IN W2C AND

NEW WOOD DOOR INTO JANITOR'S ROOM (W2C1)WHERE

SHOWN.

16. INSTALL NEW CEILING GRID AND TILES AS INDICATED

AND SPECIFIED.

17. INSTALL LIGHTING AS INDICATED.

18. INSTALL ALL PLUMBING FIXTURES/PARTITIONS WHERE

INDICATED.

19. INSTALL ALL ACCESSORIES NEW AND REUSED, WHERE

SHOWN, INCLUDING MIRRORS.

20. INSTALL NEW 24"X24" FLOOR MOUNTED MOP SINK IN

JANITOR'S CLOSET AND MOUNT NEW WATER HEATER ON

SHELF ABOVE. SEE MECHANICAL DRAWINGS.

16. CLEAN AREA AND PREPARE SPACE FOR OCCUPATION.

DEMOLITION PLAN - W2C

SCALE: 1/4"=1'-0"

DEMOLITION REFLECTED CEILING PLAN -W2C

SCALE: 1/4"=1'-0"

PROPOSED FLOOR PLAN - W2C

SCALE: 1/4"=1'-0"

PROPOSED CEILING PLAN - W2C

SCALE: 1/4"=1'-0"

M1 M1

PPB1

CT1

PPB1

CT1

SSM1

COUNTERTOP,

BACKSPLASH &

APRON

CT2

CT1

CT2

CT1

PAPER TOWEL

DISPENSER REUSED

SOAP DISPENSERS

REUSED

COLUMN IN

FOREGROUND

HD1

PPT1

PPT2

MEN'S

RESTROOM

SN1

GB42

GB36

TOILET PAPER

DISPENSER BY

REUSED

REPAIR RESTROOMS

W161 & W2C

7 10 JUL 2019

EF

ULDF 180002

BLDG. 106

ARCHITECTURAL

FINISH PLANS AND SCHEDULES

A-201 3

EF

EF

N

FINISH PLANS - WEST ELEVATION W161 - "TYPICAL"

SCALE: 1/2"=1'-0"

TOILET ACCESSORY SCHEDULE

Type Mark ITEM

BASIS OF DESIGN

FINISH COMMENTSMANUFACTURER MODEL

M1 MIRROR BOBRICK B-165 2436 S.S.

SN1 SANITARY NAPKIN DISPOSAL BOBRICK B-254 S.S.

TR1 TRASH RECEPTACLE Bobrick Washroom Equipment, Inc. B-3644 S.S.

HD1 HAND DRYER

ROOM FINISH SCHEDULE

ROOM

NUMBER ROOM NAME

FLOORING CEILINGS WALLS

COMMENTSFLOOR FINISH

BASE

MATERIAL CEILING HEIGHT CEILING FINISH

WALL FINISH -

NORTH

WALL FINISH -

SOUTH

WALL FINISH -

EAST

WALL FINISH -

WEST

W163 OFFICE CARPET TILE MATCH EXIST. MATCH EXIST. ACT TILE/ GRID NORTH /PAINT - - -

W161 MEN'S RESTROOM PPT1/ PPB2 PPB1 8'-0" ACT1 CT1/ CT2 CT1/ CT2 CT1/ CT2 CT1/ CT2

WC2 WOMEN'S RESTROOM PPT1/ PPB2 PPB1 8'-0" ACT1 CT1/ CT2 CT1/ CT2 CT1/ CT2 CT1/ CT2

WC2A JAN. CLO. PPT1 PPB1 8'-0" GWB/ PNT- FRP/ PNT1 FRP/ PNT1 FRP/ PNT1 FRP/ PNT1 PROVIDE FRP TO 4'-0" A.F.F. AND PAINT ABOVE TO

CEILING

FINISH LEGEND

MARK SPEC. DESCRIPTION MANUFACTURER SERIES/ MODEL COLOR COMMENTS

CT1 CERAMIC WALL TILE DALTILE ELEVARE LUNAR EL40 SIZE 4"X16"

CT2 CERAMIC WALL TILE DALTILE GLAZED/ MATTE CERAMIC TILE NAVY K189 SIZE 4"X4"

FRP-1 FIBERGLASS REINFORCED PANELS KEMLITE GLASBORD EMBOSSED WHITE 85 SIZE 4'X8'

PNT1 09 91 23 PAINT SHERWIN WILLIAMS - SW7030 ANEW GRAY LOW VOC. USED @ WALLS

PPB1 PORCELAIN BASE TILE DALTILE FORMULA AXIOM SILVER FM94 - UNPOLISHED

PPT1 PORCELAIN FLOOR TILE DALTILE FORMULA AXIOM SILVER FM94 - UNPOLISHED

PPT2 PORCELAIN FLOOR TILE DALTILE FORMULA EQUATION GREY FM96 - UNPOLISHED

SP1 SOLID PLASTIC PANELS ASI PRODUCTS FOLKSTONE GRAY #9400

SSM1 SOLID SURFACE MATERIAL WILSONART SOLID SURFACE YUKON RIVERSTONE 919RS

GENERAL FINISH NOTES

1 PROVIDE RESILIENT EDGE AND TRANSITION STRIPS (SIZE AND TYPE TO SUIT JOB CONDITION) AT ALL CHANGES IN FLOORING MATERIAL

2 REFER TO FINISH PLANS FOR FLOOR PATTERNS, AND ACCENT WALL EXTENTS.

3 CONTRACTOR SHALL PROVIDE 12" HIGH STENCILED LETTERING FOR EACH FIRE-RATED PARTITION (I.E. TWO-HOUR) WHERE POSSIBLE. IF

NOT POSSIBLE TO DO ABOVE CEILINGS, PROVIDE THE LARGEST LETTERING POSSIBLE AS DIRECTED BY OWNER AND ARCHITECT. PAINT

SHALL CONTRAST THE BACKGROUND PAINT COLOR OF THE WALL AND SHALL BE APPLIED EVERY 20 FEET (MINIMUM) OF LINEAR WALL

SURFACE. PLACEMENT OF THIS SIGNAGE SHALL BE COORDINATED WITH THE OWNER AND ARCHITECT.

NOTE:

1. TOILET PAPER DISPENSERS, PAPER TOWEL DISPENSERS, AND SOAP DISPENSERS SHALL BE PROVIDED BY OWNER AND

INSTALL BY CONTRACTOR. ALL OTHER ACCESSORIES SHALL BE PROVIDED AND INSTALL BE CONTRACTOR.

FINISH PLANS - FLOOR PATTERN W161 - "TYPICAL"

SCALE: 1/2"=1'-0"

"TYPICAL" - ELEVATION AT HC STALL

SCALE: 1/2"=1'-0"

CARPET TILE AS SELECTED BY ARCHITECT

RE-USE EXISTING

W163

7 10 JUL 2019

EF

ULDF 180002

BLDG. 106

MECHANICAL

PLUMBING DEMOLITION

PD-101 4

EVS

EVS

N

AREA OF WORK

DEMOLITION FLOOR PLAN - W161

SCALE: 1/4"=1'-0"

DEMOLITION FLOOR PLAN - W2C

SCALE: 1/4"=1'-0"

DEMOLITION NOTES:

1. CONTRACTOR TO VERIFY ALL DIMENSIONS AND FIELD CONDITIONS PRIOR TO BEGINNING CONSTRUCTION

AND NOTIFY THE CONTRACTING OFFICER TECHNICAL REPRESENTATIVE (COTR) IMMEDIATELY OF ANY

DISCREPANCIES.

2. REMOVE EXISTING CW, HW, AND SANITARY WASTE PLUMBING. PIPING TO POINTS AS SHOWN IN BOTH

RESTROOMS. PIPING TO BE REMOVED IS SHOWN WITH THICKENED LINES.

3. PIPING SERVING HAND SINK IN ADJACENT 1ST FLOOR OFFICE TO REMAIN.

4. REMOVE AND DISPOSE OF EXISTING ELECTRIC WATER HEATER IN 2ND FLOOR JANITOR'S CLOSET.

5. AUTOMATIC FLUSH VALVE IN 2ND FLOOR JANITORS CLOSET TO BE REPLACED.

CONNECT NEW PIPING TO

EXISTING COPPER CW PIPING.

HWH

7 10 JUL 2019

EF

ULDF 180002

BLDG. 106

MECHANICAL

PROPOSED PLUMBING PLAN

P-101 5

EVS

EVS

N

AREA OF WORK

PROPOSED FLOOR PLAN

SCALE: 1/4"=1'-0"

PROPOSED FLOOR PLAN

SCALE: 1/4"=1'-0"

CONSTRUCTION NOTES:

1. INSTALL CW, HW, AND SANITARY PIPING TO SERVE FIXTURES IN RESTROOMS.

ITEMS SHALL BE INSTALLED ACCORDING TO PLUMBING NOTES ABOVE AND

CONTRACT SPECIFICAITONS.

2. PROVIDE AND INSTALL FLOOR MOP SINK IN APPROXIMATE LOCATION OF THE

REMOVED JANITORS SINK.

3. PROVIDE AND INSTALL NEW ELECTRIC WATER HEATER TO SERVE BOTH

RESTROOMS AND CONNECT TO 2ND FLOOR BREAK AREA.

4. WATER HEATER SHALL BE MOUNTED ON WALL ABOVE FLOOR MOP SINK.

PROVIDE MOUNTING STRUCTURE TO PROPERLY SECURE HEATER TO WALL.

NEW WATER HEATER SHALL BE SIZED FOR 15 GALLONS.

PLUMBING NOTES:

A.PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL LABOR

REQUIRED TO INSTALL COMPLETE AND OPERABLE PLUMBING SYSTEMS AS

INDICATED ON THE DRAWINGS, AS SPECIFIED, AND AS REQUIRED BY THE

UNIFIED FACILITIES CRITERIA ( UFC ).

B. INFORMATION, SUCH AS SIZE, LOCATION OR INVERTS OF EXISTING

CONCEALED SERVICES, IS APPROXIMATE AND BASED ON REPUTED

INFORMATION FROM EXISTING DRAWINGS. IT IS THE CONTRACTOR'S

RESPONSIBILITY TO VERIFY THIS INFORMATION IN THE FIELD.

C.ALL PIPING WORK SHALL BE COORDINATED WITH ALL TRADES INVOLVED.

OFFSETS IN PIPING AROUND OBSTRUCTIONS SHALL BE PROVIDED AT NO

ADDITIONAL COST TO THE GOVERNMENT.

D.PROVIDE 1/4 INCH PER FOOT SLOPE FOR ALL SANITARY LINES 3 INCH AND

SMALLER AND 1/8 INCH PER FOOT SLOPE FOR ALL SANITARY LINES 4" AND

LARGER WITHIN THE BUILDING. UNLESS OTHERWISE NOTED.

E. COORDINATE LOCATION AND ROUTING OF PLUMBING LINES WITH OTHER

TRADES.

F. PROVIDE FIRE PROOFING FOR ALL PENETRATIONS THROUGH RATED WALLS.

G.PROVIDE INSULATION FOR ALL HW PIPING IN WORK AREA.

H.PROVIDE EASILY ACCESSIBLE CLEANOUTS AT THE BOTTOM OF ALL WASTE

AND SOIL STACKS.

I. PROVIDE EASILY ACCESSIBLE CLEANOUTS AT ALL CHANGES IN DIRECTION

GREATER THAN 45 DEGREES AS WELL AS WHERE SHOWN ON PLANS.

J. PROVIDE EASILY ACCESSIBLE SHUTOFFS ON ALL BRANCH LINES AND

TAKEOFFS, PROVIDE STOPS AT ALL FIXTURES.

K.PROVIDE CONNECTIONS TO SERVICES PROVIDED BY OTHER TRADES, UNLESS

OTHERWISE NOTED.

L. PROVIDE ALL PERMITS AND TESTING REQUIRED.

M.RUN ALL SOIL WASTE AND VENT PIPING WITH 2 PERCENT MINIMUM GRADE

UNLESS OTHERWISE NOTED. HORIZONTAL VENT PIPING SHALL BE GRADED TO

DRIP BACK TO THE SOIL OR WASTE PIPE BY GRAVITY.

N.PROVIDE SHUTOFF VALVES IN ALL DOMESTIC WATER PIPING BRANCHES IN

WHICH BRANCH PIPING SERVES TWO OR MORE FIXTURES.

O.UNLESS OTHERWISE NOTED, ALL PIPING IS OVERHEAD, TIGHT TO THE

UNDERSIDE OF THE SUPPORT SYSTEM, WITH SPACE FOR INSULATION IF

REQUIRED.

P. INSTALL PIPING SO ALL VALVES, STRAINERS, UNIONS, TRAPS, FLANGES, AND

OTHER APPURTENANCES REQUIRING ACCESS ARE ACCESSIBLE.

Q.WHERE DOMESTIC COLD AND HOT WATER PIPING DROPS INTO A PIPE CHASE,

THE SIZE SHOWN FOR THE PIPE DROPS SHALL BE USED FOR THE LAST

FIXTURE.

R.INSTALL ALL PIPING WITHOUT FORCING OR SPRINGING AND TO ALLOW FOR

EXPANSION WHERE REQUIRED.

S. ALL PIPING SHALL CLEAR DOORS AND WINDOWS.

T. ALL PIPING SHALL GRADE TO LOW POINTS. PROVIDE HOSE END DRAIN VALVES

AT THE BOTTOM OF ALL RISERS AND LOW POINTS.

U.UNIONS AND/OR FLANGES SHALL BE INSTALLED AT EACH PIECE OF

EQUIPMENT, IN BYPASSES, AND IN LONG PIPING RUNS (100FT OR MORE) TO

PERMIT DISASSEMBLY FOR ALTERATION AND REPAIRS.

V.ALL VALVES SHALL BE ADJUSTED FOR SMOOTH AND EASY OPERATION.

W. ALL VALVES (EXCEPT CONTROL VALVES) AND STRAINERS SHALL BE FULL

SIZE OF THE PIPE BEFORE REDUCING THE SIZE TO MAKE CONNECTIONS TO

THE EQUIPMENT AND CONTROLS.

X.UNLESS OTHERWISE NOTED DRAINS SHALL BE INSTALLED AT THE LOW POINT

OF ROOFS, ARE-WAYS, FLOORS, ETC…

Y.PROVIDE CLEANOUTS IN SANITARY AND STORM DRAINAGE SYSTEMS AT ENDS

OF RUNS, AT CHANGES IN DIRECTION, NEAR THE BASE OF STACKS, EVERY 50

FEET IN HORIZONTAL RUNS AND ELSEWHERE AS INDICATED.

Z. ALL CLEANOUTS SHALL BE THE FULL SIZE OF THE PIPE FOR PIPE SIZES 6” AND

SMALLER, AND SHALL BE 6” FOR PIE SIZES LARGER THAN 6”.

AA. ALL VALVES SHALL BE INSTALLED SO THE VALVE REMAINS IN SERVICE WHEN

THE EQUIPMENT OR PIPING ON THE EQUIPMENT SIDE OF THE VALVE IS

REMOVED.

W2C

7 10 JUL 2019

EF

ULDF 180002

BLDG. 106

MECHANICAL

MECHANICAL PLAN

M-101 6

EVS

EVS

N

AREA OF WORK

MECHANICAL NOTES:

A.PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL LABOR REQUIRED TO INSTALL COMPLETE AND OPERABLE

MECHANICAL SYSTEMS AS INDICATED ON THE DRAWINGS, AS SPECIFIED AND AS REQUIRED BY THE UNIFIFIED FACILITIES CRITERIA

(UFC).

B. CONTRACT DOCUMENT DRAWINGS FOR MECHANICAL WORK (HVAC, PLUMBING, AND FIRE PROTECTION) ARE DIAGRAMMATIC ONLY

AND ARE INTENDED TO CONVEY SCOPE AND GENERAL ARRANGEMENT ONLY.

C.INSTALL ALL MECHANICAL EQUIPMENT AND APPURTENANCES IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS, CONTRACT DOCUMENTS, AND APPLICABLE CODES AND REGULATIONS.

D.THE LOCATIONS OF ALL ITEMS SHOWN ON THE DRAWINGS OR CALLED FOR IN THE SPECIFICATIONS THAT ARE NOT DEFINITELY

FIXED BY DIMENSIONS ARE APPROXIMATE ONLY. THE EXACT LOCATIONS NECESSARY TO SECURE THE BEST CONDITIONS AND

RESULTS MUST BE DETERMINED BY THE PROJECT SITE CONDITIONS AND SHALL HAVE THE APPROVAL OF THE ENGINEER BEFORE

BEING INSTALLED. FIELD VERIFY CONDITIONS, REPORT ANY ERRORS TO COTR

E. COORDINATE CONSTRUCTION OF ALL MECHANICAL WORK WITH ARCHITECTURAL, STRUCTURAL, CIVIL. ELECTRICAL WORK, ETC… SHOWN ON OTHER CONTRACT DRAWINGS.

F. ALL TESTS SHALL BE COMPLETED BEFORE ANY MECHANICAL EQUIPMENT OR PIPING INSULATION IS APPLIED.

G.LOCATE ALL TEMPERATURE, PRESSURE, AND FLOW MEASURING DEVICES IN ACCESSIBLE LOCATIONS WITH THE STRAIGHT

SECTION OF PIPE OR DUCT UP AND DOWNSTREAM AS RECOMMENDED BY THE MANUFACTURER FOR GOOD ACCURACY.

H.LOCATE ALL MECHANICAL EQUIPMENT FOR UNOBSTRUCTED ACCESS TO UNIT ACCESS PANELS, CONTROLS, AND VALVING.

I. WHERE TWO OR MORE ITEMS OF THE SAME TYPE OF EQUIPMENT ARE REQUIRED, THE PRODUCT OF ONE MANUFACTURER SHALL

BE USED.

J. COORDINATE ALL EQUIPMENT CONNECTIONS WITH MANUFACTURER'S CERTIFIED DRAWINGS. COORDINATE AND PROVIDE ALL

DUCT AND PIPING TRANSITIONS REQUIRED FOR FINAL EQUIPMENT CONNECTIONS TO FURNISHED EQUIPMENT. FIELD VERIFY AND

COORDINATE ALL DUCT AND PIPING DIMENSIONS BEFORE FABRICATIONS.

K.PROVIDE ACCESS PANELS FOR INSTALLATION IN WALLS AND CEILINGS, WHERE REQUIRED, TO PROVIDE SERVICE DAMPERS, VALVES, SMOKE DETECTORS, AND OTHER CONCEALED MECHANICAL EQUIPMENT. ACCESS PANELS SHALL BE TURNED OVER TO

THE GENERAL CONTRACTOR FOR INSTALLATION.

L. ALL EQUIPMENT, DUCTWORK, PIPING, ETC. SHALL BE SUPPORTED AS DETAILED, SPECIFIED AND REQUIRED TO PROVIDE A

VIBRATION-FREE INSTALLATION.

M.ALL DUCTWORK, PIPING, AND EQUIPMENT SUPPORTED FROM STRUCTURAL STEEL SHALL BE COORDINATED WITH THE GENERAL

CONTRACTOR. ALL ATTACHMENTS TO STEEL BAR JOISTS, TRUSSES, OR JOIST GIRDERS SHALL BE AT PANEL JOINTS. PROVIDE

BEAM CLAMPS MEETING MSS STANDARDS. WELDING TO STRUCTURAL MEMBERS SHALL NOT BE PERMITTED. THE USE OF C-CLAMPS

SHALL NOT BE PERMITTED.

N.REFER TO TYPICAL DETAILS FOR DUCTWORK, PIPING, AND EQUIPMENT INSTALLATION.

EXISTING PLAN

SCALE: 1/4"=1'-0"

PROPOSED REFLECTED CEILING PLAN - W163

SCALE: 1/4"=1'-0"

DEMOLITION PLAN

SCALE: 1/4"=1'-0"

PROPOSED PLAN - W2C

SCALE: 1/4"=1'-0"

CONSTRUCTION NOTES:

A.MODIFY STEAM FINTUBE SYSTEM IN FIRST FLOOR RESTROOM AS

SHOWN

B.INSTALL NEW PENDENT SPRINKLER HEAD IN W163 AS SHOWN. NEW

SPRINKLER HEAD SHALL MATCH EXISTING SPRINKLER HEADS

W163

GFI

GFI

LVP-1-CORR.W-1

HAND DRYER

W161

W163

GFI

GFI

LVP-1-CORR.W-1

MOUNT ABOVE

COUTER TOP

HAND DRYER

W161

W163

W163A

F

M

LVP-1-CORR.W-1

W161

W163

F

M

OS

OS

LVP-1-CORR.W-1

OS

F

M

W2C

W2C1

OS

W2C

W2C1

F M

FM

W2C

W2C1

GFI

GFI

MOUNT ABOVE

COUTER TOP

HAND DRYER

W2C

HWH

W2C1

EXHAUST FAN SPEED

CONTROL AND TIME CLOCK

HWH DISCONNECT

SWITCH

UNKNOWN START/STOP

SWITCHES

HAND DRYER

DEMOLITION LEGEND:

EXISTING LIGHTING FIXTURES TO BE REMOVED.

EXISTING LIGHT SWICTH TO BE REMOVED.

EXISTING DUPLEX RECEPTACLE TO BE REMOVED.

EXISTING GFI DUPLEX RECEPTACLE TO BE REMOVED.

EXISTING WALL MOUNTED FIRE ALARM SPEAKER/STROBE TO BE REMOVED/RELOCATED

EXISTING WALL MOUNTED MASS NOTIFICATION STROBE TO BE REMOVED/RELOCATED.

GFI

F

M

PROPOSED LEGEND:

NEW DUPLEX WALL RECEPTACLE. MOUNT 18" A.F.F. UNLESS OTHERWISE NOTED.

NEW GFI DUPLEX WALL RECEPTACLE. MOUNT 18" A.F.F. UNLESS OTHERWISE NOTED.

NEW 2x2 LAY-IN LED LIGHTING FIXTURE. PROVIDE EATON CORELITE MODEL

R2X-W-O-2-L35-1-C-UNV-22 OR APPROVED EQUAL.

NEW 4' WALL MOUNTED LED LIGHTING FIXTURE. PROVIDE EATON METALUX MODEL

4BCLED-LD4-28SL-F-UNV-L835 OR APPROVED EQUAL.

NEW EMERGENCY LIGHTING UNIT-PROVIDE LITHONIA LIGHTING MODEL

ELMLT-W-LP06VSLTP-SD OR APPROVED EQUAL.

NEW CEILING MOUNTED LINE VOLTAGE MOTION SENSOR. PROVIDE

WATTSTOPPERMODEL UT-355-1 OR APPROVED EQUAL.

RELOCATED WALL MOUNTED FIRE ALARM SPEAKER/STOBE LOCATION.

RELOCATED WALL MOUNTED MASS NOTIFICATION STOBE LOCATION.

GFI

OS

F

M

DEMOLITION NOTES:

1. REMOVE AND DISPOSE OF ALL POWER RECEPTACLES IN THE WORK AREA RETAINING CIRCUITS

TO USE IN CONSTRUCTION PHASE.

2. REMOVE EXISTING WALL MOUNTED ELECTRIC HAND DRY AND RETAIN FOR REINSTALLATION.

3. REMOVE AND DISPOSE OF ALL FLUORESCENT, INCANDESCENT AND EMERGENCY LIGHTING

FIXTURES AND ASSOCIATED SWITCHES IN THE WORK AREA. RETAIN CIRCUIT FOR USE IN

CONSTRUCTION PHASE.

4. RETAIN FIRE ALARM/MASS NOTIFICATION DEVICES FOR RE-INSTALLATION IN CONSTRUCTION

PHASE AS SHOWN.

5. REMOVE AND RETAIN ALL WALL AND CEILING MOUNTED DEVICES AFFECTED BY THE WALL

DEMOLITION IN ROOM W2C1. COORDINATED WITH OTHER TRADES FOR REINSTALLATION IN

CONSTRUCTION PHASE.

PROPOSED NOTES:

1. EXECUTE ALL WORK IN ACCORDANCE WITH THE CURRENT EDITIONS OF THE NATIONAL ELECTRICAL

CODE AND UNIFIED FACILITIES CRITERIA.

2. PROVIDE AND INSTALL DUPLEX RECEPTACLES IN LOCATIONS AS SHOWN. POWER RECEPTACLES WITH

CIRCUITS RETAINED FROM DEMOLITION PHASE.

3. REINSTALL HAND DRYERS IN LOCATIONS AS SHOWN.

4. PROVIDE AND INSTALL NEW LIGHTING FIXTURES AS SHOWN. CENTER WALL MOUNTED FIXTURE OVER

SINK LOCATIONS. POWER LIGHTING WITH CIRCUIT RETAINED FROM DEMOLITION PHASE UTILIZING NEW

MOTION SENSORS FOR ON/OFF CONTROL.

5. PROVIDE AND INSTALL NEW EMERGANCY LIGHTING UNITS IN LOCATION AS SHOWN. POWER UNITS WITH

UNSWITCHED LEG OF ROOM LIGHTING CIRCUIT DISCUSSED IN NOTE 4.

6. REINSTALL FIRE ALARM/MASS NOTIFICATION EQUIPMENT REAINED FROM DEMOLITION PHASE AS SHOWN.

TURN OVER EXTRA DEVICES TO GOVERNMENT REPRESENTATIVE.

7. REINSTALL WALL AND CEILING DEVICES IN ROOM W2C1 SUBSEQUENT TO WALL RELOCATION. VERIFY

OPERATION OF ALL AFFECTED EQUIPMENT.

7 10 JUL 2019

EF

ULDF 180002

BLDG. 106

ELECTRICAL

FLOOR/CEILING PLANS

E-101 7

MWF

MWF

N

1/8"=1'-0"EXISTING RM 161 FLOOR & CEILING PLANS

PARTIAL B106 PLAN

N

1/8"=1'-0"PROPOSED RM 161 FLOOR & CEILING PLANS

PARTIAL B106 PLAN

N

1/8"=1'-0"EXISTING RM W2C FLR & CLNG PLANS

PARTIAL B106 PLAN

N

1/8"=1'-0"PROPOSED RM W2C FLR & CLNG PLANS

PARTIAL B106 PLAN

FIRST FLOOR

WORK AREA

SECOND

FLOOR

WORK AREA

N

NO SCALE

B106 FIRST FLOOR KEY PLAN

N

NO SCALE

B106 SECOND FLOOR KEY PLAN

180002 - ARCH-A-101
180002 - ARCH-A102
180002 - ARCH-A-201
180002 - MECH-PD-101
180002 - MECH-P-101
180002 - MECH-M-101
180002 - ELEC-E-101

File details come from the government source that posted it.