C149
C156
C150
W161
W163A
W163
W161
RECONFIGURE CEILING THIS ROOM
W161
A
EXISTING MASONRY WALL
REPLACE CARPET THIS ROOM
EXTERIOR WALL
6" 25 GAUGE CORROSION-
PROTECTED STEEL STUDS
AT 24" O.C. (MAX)
ACOUSTIC INSULATION
6" 20 GAUGE
CORROSION-PROTECTED
STEEL RUNNERS TOP &
BOTTOM
(1) LAYER 5/8" CEMENT
BOARD EACH SIDE
SLAB
SCHEDULED
CEILING
ACOUSTICAL SEALANT
ROME RESEARCH SITE
REPAIR RESTROOMS W161/WC2
B/106
7 10 JUL 2019
EF
ULDF 180002
BLDG. 106
ARCHITECTURAL
FLOOR/CEILING PLANS
A-101 1
EF
EF
N
AREA OF WORK
CONSTRUCTION NOTES:
1. CONTRACTOR TO VERIFY ALL DIMENSIONS AND FIELD
CONDITIONS PRIOR TO BEGINNING CONSTRUCTION AND
NOTIFY THE CONTRACTING OFFICER AND ARCHITECT
IMMEDIATELY OF ANY DISCREPANCIES.
2. REMOVE CERAMIC TILE FLOORING AND CEILING
COMPONENTS IN THEIR ENTIRETY, EXISTING RM W161.
3. REMOVE ALL GYPSUM WALLBOARD, TILE WAINSCOTING
TO STUDS ALL WALLS WHERE SHOWN.
4. REMOVE WALL BETWEEN W161 AND W163 AS SHOWN.
5. REMOVE ALL PLUMBING FIXTURES/COUNTER AND
TOILET PARTITIONS
6. REMOVE AND SALVAGE HAND DRYER, PAPER TOWEL
DISPENSER, AND SOAP DISPENSERS - AND REUSE.
7. REMOVE EXISTING DOOR AND FRAME.
8. REMOVE CLOSET W163A AND SINK/COUNTER ADJACENT
9. RELOCATE MASS NOTIFICATION AND FIRE ALARMS AS
INDICATED.
10. RELOCATE HVAC COMPONENTS AS INDICATED.
11. RELOCATE SPRINKLERS AS INDICATED.
12. CONSTRUCT PARTITION WALL WHERE SHOWN.
13. INSTALL ALL WALL AND FLOOR FINISHES AS INDICATED
ON FINISH SCHEDULE.
14. INSTALL NEW CEILING GRID AND TILES AS INDICATED
AND SPECIFIED, RECONFIGURE IN W163.
15. INSTALL LIGHTING AS INDICATED.
16. INSTALL ALL PLUMBING FIXTURES/PARTITIONS WHERE
INDICATED.
17. INSTALL ALL ACCESSORIES NEW AND REUSED, WHERE
SHOWN, INCLUDING MIRRORS.
18. REPLACE CARPET IN W163 WITH CARPET TILE.
19. CLEAN AREA AND PREPARE SPACE FOR OCCUPATION.
DEMOLITION FLOOR PLAN - W161
SCALE: 1/4"=1'-0"
DEMOLITION CEILING PLAN - W161
SCALE: 1/4"=1'-0"
PROPOSED FLOOR PLAN - W161
SCALE: 1/4"=1'-0"
PROPOSED REFLECTED CEILING PLAN -W161
SCALE: 1/4"=1'-0"
WALL TYPE A
SCALE: None
FA875119RA004 - ATTACHMENT 9
Suite E2B
Suite F2B
W2C
WH
W2C1
WATER HEATER TO BE REPLACED
AND RELOCATED ABOVE NEW MOP SINK
W2C
W2C1
W2C
WH
EXISTING WINDOW TO REMAIN.
REPLACE SILL TO MATCH COUNTER
NEW WATER HEATER LOCATED
ABOVE MOP SINK ON SHELF
NEW FLOOR MOUNTED
MOP SINK
MOP RAIL
W2C
REPAIR RESTROOMS W161/W2C
7 10 JUL 2019
EF
ULDF 180002
BLDG. 106
ARCHITECTURAL
FLOOR/CEILING PLANS
A-102 2
EF
EF
N
AREA OF WORK
CONSTRUCTION NOTES:
1. CONTRACTOR TO VERIFY ALL DIMENSIONS AND FIELD
CONDITIONS PRIOR TO BEGINNING CONSTRUCTION AND
NOTIFY THE CONTRACTING OFFICER AND ARCHITECT
IMMEDIATELY OF ANY DISCREPANCIES.
2. REMOVE FLOORING AND CEILING COMPONENTS IN
THEIR ENTIRETY, EXISTING ROOM W2C.
3. REMOVE ALL GYPSUM WALLBOARD, TILE WAINSCOTING
TO STUDS ALL WALLS WHERE SHOWN.
4. REMOVE WALL BETWEEN SINKS AND TOILETS
5. REMOVE ALL PLUMBING FIXTURES/COUNTER AND
TOILET PARTITIONS
6. REMOVE AND SALVAGE HAND DRYER, PAPER TOWEL
DISPENSER, AND SOAP DISPENSERS - AND REUSE.
7. REMOVE EXISTING DOOR AND FRAME.
8. REMOVE JANITOR'S CLOSET EAST WALL.
9. RELOCATE MASS NOTIFICATION AND FIRE ALARMS AS
INDICATED.
10. RELOCATE HVAC COMPONENTS AS INDICATED.
11. RELOCATE SPRINKLERS AS INDICATED.
12. RELOCATE FLOOR DRAIN WHERE SHOWN ON MECH'L.
13. CONSTRUCT/RECONFIGURE PARTITION WALLS WHERE
SHOWN IN RESTROOM AND JANITOR'S CLOSET.
14. INSTALL ALL WALL AND FLOOR FINISHES AS INDICATED
ON FINISH SCHEDULE.
15. INSTALL NEW 36"W WOOD DOOR/FRAME IN W2C AND
NEW WOOD DOOR INTO JANITOR'S ROOM (W2C1)WHERE
SHOWN.
16. INSTALL NEW CEILING GRID AND TILES AS INDICATED
AND SPECIFIED.
17. INSTALL LIGHTING AS INDICATED.
18. INSTALL ALL PLUMBING FIXTURES/PARTITIONS WHERE
INDICATED.
19. INSTALL ALL ACCESSORIES NEW AND REUSED, WHERE
SHOWN, INCLUDING MIRRORS.
20. INSTALL NEW 24"X24" FLOOR MOUNTED MOP SINK IN
JANITOR'S CLOSET AND MOUNT NEW WATER HEATER ON
SHELF ABOVE. SEE MECHANICAL DRAWINGS.
16. CLEAN AREA AND PREPARE SPACE FOR OCCUPATION.
DEMOLITION PLAN - W2C
SCALE: 1/4"=1'-0"
DEMOLITION REFLECTED CEILING PLAN -W2C
SCALE: 1/4"=1'-0"
PROPOSED FLOOR PLAN - W2C
SCALE: 1/4"=1'-0"
PROPOSED CEILING PLAN - W2C
SCALE: 1/4"=1'-0"
M1 M1
PPB1
CT1
PPB1
CT1
SSM1
COUNTERTOP,
BACKSPLASH &
APRON
CT2
CT1
CT2
CT1
PAPER TOWEL
DISPENSER REUSED
SOAP DISPENSERS
REUSED
COLUMN IN
FOREGROUND
HD1
PPT1
PPT2
MEN'S
RESTROOM
SN1
GB42
GB36
TOILET PAPER
DISPENSER BY
REUSED
REPAIR RESTROOMS
W161 & W2C
7 10 JUL 2019
EF
ULDF 180002
BLDG. 106
ARCHITECTURAL
FINISH PLANS AND SCHEDULES
A-201 3
EF
EF
N
FINISH PLANS - WEST ELEVATION W161 - "TYPICAL"
SCALE: 1/2"=1'-0"
TOILET ACCESSORY SCHEDULE
Type Mark ITEM
BASIS OF DESIGN
FINISH COMMENTSMANUFACTURER MODEL
M1 MIRROR BOBRICK B-165 2436 S.S.
SN1 SANITARY NAPKIN DISPOSAL BOBRICK B-254 S.S.
TR1 TRASH RECEPTACLE Bobrick Washroom Equipment, Inc. B-3644 S.S.
HD1 HAND DRYER
ROOM FINISH SCHEDULE
ROOM
NUMBER ROOM NAME
FLOORING CEILINGS WALLS
COMMENTSFLOOR FINISH
BASE
MATERIAL CEILING HEIGHT CEILING FINISH
WALL FINISH -
NORTH
WALL FINISH -
SOUTH
WALL FINISH -
EAST
WALL FINISH -
WEST
W163 OFFICE CARPET TILE MATCH EXIST. MATCH EXIST. ACT TILE/ GRID NORTH /PAINT - - -
W161 MEN'S RESTROOM PPT1/ PPB2 PPB1 8'-0" ACT1 CT1/ CT2 CT1/ CT2 CT1/ CT2 CT1/ CT2
WC2 WOMEN'S RESTROOM PPT1/ PPB2 PPB1 8'-0" ACT1 CT1/ CT2 CT1/ CT2 CT1/ CT2 CT1/ CT2
WC2A JAN. CLO. PPT1 PPB1 8'-0" GWB/ PNT- FRP/ PNT1 FRP/ PNT1 FRP/ PNT1 FRP/ PNT1 PROVIDE FRP TO 4'-0" A.F.F. AND PAINT ABOVE TO
CEILING
FINISH LEGEND
MARK SPEC. DESCRIPTION MANUFACTURER SERIES/ MODEL COLOR COMMENTS
CT1 CERAMIC WALL TILE DALTILE ELEVARE LUNAR EL40 SIZE 4"X16"
CT2 CERAMIC WALL TILE DALTILE GLAZED/ MATTE CERAMIC TILE NAVY K189 SIZE 4"X4"
FRP-1 FIBERGLASS REINFORCED PANELS KEMLITE GLASBORD EMBOSSED WHITE 85 SIZE 4'X8'
PNT1 09 91 23 PAINT SHERWIN WILLIAMS - SW7030 ANEW GRAY LOW VOC. USED @ WALLS
PPB1 PORCELAIN BASE TILE DALTILE FORMULA AXIOM SILVER FM94 - UNPOLISHED
PPT1 PORCELAIN FLOOR TILE DALTILE FORMULA AXIOM SILVER FM94 - UNPOLISHED
PPT2 PORCELAIN FLOOR TILE DALTILE FORMULA EQUATION GREY FM96 - UNPOLISHED
SP1 SOLID PLASTIC PANELS ASI PRODUCTS FOLKSTONE GRAY #9400
SSM1 SOLID SURFACE MATERIAL WILSONART SOLID SURFACE YUKON RIVERSTONE 919RS
GENERAL FINISH NOTES
1 PROVIDE RESILIENT EDGE AND TRANSITION STRIPS (SIZE AND TYPE TO SUIT JOB CONDITION) AT ALL CHANGES IN FLOORING MATERIAL
2 REFER TO FINISH PLANS FOR FLOOR PATTERNS, AND ACCENT WALL EXTENTS.
3 CONTRACTOR SHALL PROVIDE 12" HIGH STENCILED LETTERING FOR EACH FIRE-RATED PARTITION (I.E. TWO-HOUR) WHERE POSSIBLE. IF
NOT POSSIBLE TO DO ABOVE CEILINGS, PROVIDE THE LARGEST LETTERING POSSIBLE AS DIRECTED BY OWNER AND ARCHITECT. PAINT
SHALL CONTRAST THE BACKGROUND PAINT COLOR OF THE WALL AND SHALL BE APPLIED EVERY 20 FEET (MINIMUM) OF LINEAR WALL
SURFACE. PLACEMENT OF THIS SIGNAGE SHALL BE COORDINATED WITH THE OWNER AND ARCHITECT.
NOTE:
1. TOILET PAPER DISPENSERS, PAPER TOWEL DISPENSERS, AND SOAP DISPENSERS SHALL BE PROVIDED BY OWNER AND
INSTALL BY CONTRACTOR. ALL OTHER ACCESSORIES SHALL BE PROVIDED AND INSTALL BE CONTRACTOR.
FINISH PLANS - FLOOR PATTERN W161 - "TYPICAL"
SCALE: 1/2"=1'-0"
"TYPICAL" - ELEVATION AT HC STALL
SCALE: 1/2"=1'-0"
CARPET TILE AS SELECTED BY ARCHITECT
RE-USE EXISTING
W163
7 10 JUL 2019
EF
ULDF 180002
BLDG. 106
MECHANICAL
PLUMBING DEMOLITION
PD-101 4
EVS
EVS
N
AREA OF WORK
DEMOLITION FLOOR PLAN - W161
SCALE: 1/4"=1'-0"
DEMOLITION FLOOR PLAN - W2C
SCALE: 1/4"=1'-0"
DEMOLITION NOTES:
1. CONTRACTOR TO VERIFY ALL DIMENSIONS AND FIELD CONDITIONS PRIOR TO BEGINNING CONSTRUCTION
AND NOTIFY THE CONTRACTING OFFICER TECHNICAL REPRESENTATIVE (COTR) IMMEDIATELY OF ANY
DISCREPANCIES.
2. REMOVE EXISTING CW, HW, AND SANITARY WASTE PLUMBING. PIPING TO POINTS AS SHOWN IN BOTH
RESTROOMS. PIPING TO BE REMOVED IS SHOWN WITH THICKENED LINES.
3. PIPING SERVING HAND SINK IN ADJACENT 1ST FLOOR OFFICE TO REMAIN.
4. REMOVE AND DISPOSE OF EXISTING ELECTRIC WATER HEATER IN 2ND FLOOR JANITOR'S CLOSET.
5. AUTOMATIC FLUSH VALVE IN 2ND FLOOR JANITORS CLOSET TO BE REPLACED.
CONNECT NEW PIPING TO
EXISTING COPPER CW PIPING.
HWH
7 10 JUL 2019
EF
ULDF 180002
BLDG. 106
MECHANICAL
PROPOSED PLUMBING PLAN
P-101 5
EVS
EVS
N
AREA OF WORK
PROPOSED FLOOR PLAN
SCALE: 1/4"=1'-0"
PROPOSED FLOOR PLAN
SCALE: 1/4"=1'-0"
CONSTRUCTION NOTES:
1. INSTALL CW, HW, AND SANITARY PIPING TO SERVE FIXTURES IN RESTROOMS.
ITEMS SHALL BE INSTALLED ACCORDING TO PLUMBING NOTES ABOVE AND
CONTRACT SPECIFICAITONS.
2. PROVIDE AND INSTALL FLOOR MOP SINK IN APPROXIMATE LOCATION OF THE
REMOVED JANITORS SINK.
3. PROVIDE AND INSTALL NEW ELECTRIC WATER HEATER TO SERVE BOTH
RESTROOMS AND CONNECT TO 2ND FLOOR BREAK AREA.
4. WATER HEATER SHALL BE MOUNTED ON WALL ABOVE FLOOR MOP SINK.
PROVIDE MOUNTING STRUCTURE TO PROPERLY SECURE HEATER TO WALL.
NEW WATER HEATER SHALL BE SIZED FOR 15 GALLONS.
PLUMBING NOTES:
A.PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL LABOR
REQUIRED TO INSTALL COMPLETE AND OPERABLE PLUMBING SYSTEMS AS
INDICATED ON THE DRAWINGS, AS SPECIFIED, AND AS REQUIRED BY THE
UNIFIED FACILITIES CRITERIA ( UFC ).
B. INFORMATION, SUCH AS SIZE, LOCATION OR INVERTS OF EXISTING
CONCEALED SERVICES, IS APPROXIMATE AND BASED ON REPUTED
INFORMATION FROM EXISTING DRAWINGS. IT IS THE CONTRACTOR'S
RESPONSIBILITY TO VERIFY THIS INFORMATION IN THE FIELD.
C.ALL PIPING WORK SHALL BE COORDINATED WITH ALL TRADES INVOLVED.
OFFSETS IN PIPING AROUND OBSTRUCTIONS SHALL BE PROVIDED AT NO
ADDITIONAL COST TO THE GOVERNMENT.
D.PROVIDE 1/4 INCH PER FOOT SLOPE FOR ALL SANITARY LINES 3 INCH AND
SMALLER AND 1/8 INCH PER FOOT SLOPE FOR ALL SANITARY LINES 4" AND
LARGER WITHIN THE BUILDING. UNLESS OTHERWISE NOTED.
E. COORDINATE LOCATION AND ROUTING OF PLUMBING LINES WITH OTHER
TRADES.
F. PROVIDE FIRE PROOFING FOR ALL PENETRATIONS THROUGH RATED WALLS.
G.PROVIDE INSULATION FOR ALL HW PIPING IN WORK AREA.
H.PROVIDE EASILY ACCESSIBLE CLEANOUTS AT THE BOTTOM OF ALL WASTE
AND SOIL STACKS.
I. PROVIDE EASILY ACCESSIBLE CLEANOUTS AT ALL CHANGES IN DIRECTION
GREATER THAN 45 DEGREES AS WELL AS WHERE SHOWN ON PLANS.
J. PROVIDE EASILY ACCESSIBLE SHUTOFFS ON ALL BRANCH LINES AND
TAKEOFFS, PROVIDE STOPS AT ALL FIXTURES.
K.PROVIDE CONNECTIONS TO SERVICES PROVIDED BY OTHER TRADES, UNLESS
OTHERWISE NOTED.
L. PROVIDE ALL PERMITS AND TESTING REQUIRED.
M.RUN ALL SOIL WASTE AND VENT PIPING WITH 2 PERCENT MINIMUM GRADE
UNLESS OTHERWISE NOTED. HORIZONTAL VENT PIPING SHALL BE GRADED TO
DRIP BACK TO THE SOIL OR WASTE PIPE BY GRAVITY.
N.PROVIDE SHUTOFF VALVES IN ALL DOMESTIC WATER PIPING BRANCHES IN
WHICH BRANCH PIPING SERVES TWO OR MORE FIXTURES.
O.UNLESS OTHERWISE NOTED, ALL PIPING IS OVERHEAD, TIGHT TO THE
UNDERSIDE OF THE SUPPORT SYSTEM, WITH SPACE FOR INSULATION IF
REQUIRED.
P. INSTALL PIPING SO ALL VALVES, STRAINERS, UNIONS, TRAPS, FLANGES, AND
OTHER APPURTENANCES REQUIRING ACCESS ARE ACCESSIBLE.
Q.WHERE DOMESTIC COLD AND HOT WATER PIPING DROPS INTO A PIPE CHASE,
THE SIZE SHOWN FOR THE PIPE DROPS SHALL BE USED FOR THE LAST
FIXTURE.
R.INSTALL ALL PIPING WITHOUT FORCING OR SPRINGING AND TO ALLOW FOR
EXPANSION WHERE REQUIRED.
S. ALL PIPING SHALL CLEAR DOORS AND WINDOWS.
T. ALL PIPING SHALL GRADE TO LOW POINTS. PROVIDE HOSE END DRAIN VALVES
AT THE BOTTOM OF ALL RISERS AND LOW POINTS.
U.UNIONS AND/OR FLANGES SHALL BE INSTALLED AT EACH PIECE OF
EQUIPMENT, IN BYPASSES, AND IN LONG PIPING RUNS (100FT OR MORE) TO
PERMIT DISASSEMBLY FOR ALTERATION AND REPAIRS.
V.ALL VALVES SHALL BE ADJUSTED FOR SMOOTH AND EASY OPERATION.
W. ALL VALVES (EXCEPT CONTROL VALVES) AND STRAINERS SHALL BE FULL
SIZE OF THE PIPE BEFORE REDUCING THE SIZE TO MAKE CONNECTIONS TO
THE EQUIPMENT AND CONTROLS.
X.UNLESS OTHERWISE NOTED DRAINS SHALL BE INSTALLED AT THE LOW POINT
OF ROOFS, ARE-WAYS, FLOORS, ETC…
Y.PROVIDE CLEANOUTS IN SANITARY AND STORM DRAINAGE SYSTEMS AT ENDS
OF RUNS, AT CHANGES IN DIRECTION, NEAR THE BASE OF STACKS, EVERY 50
FEET IN HORIZONTAL RUNS AND ELSEWHERE AS INDICATED.
Z. ALL CLEANOUTS SHALL BE THE FULL SIZE OF THE PIPE FOR PIPE SIZES 6” AND
SMALLER, AND SHALL BE 6” FOR PIE SIZES LARGER THAN 6”.
AA. ALL VALVES SHALL BE INSTALLED SO THE VALVE REMAINS IN SERVICE WHEN
THE EQUIPMENT OR PIPING ON THE EQUIPMENT SIDE OF THE VALVE IS
REMOVED.
W2C
7 10 JUL 2019
EF
ULDF 180002
BLDG. 106
MECHANICAL
MECHANICAL PLAN
M-101 6
EVS
EVS
N
AREA OF WORK
MECHANICAL NOTES:
A.PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL LABOR REQUIRED TO INSTALL COMPLETE AND OPERABLE
MECHANICAL SYSTEMS AS INDICATED ON THE DRAWINGS, AS SPECIFIED AND AS REQUIRED BY THE UNIFIFIED FACILITIES CRITERIA
(UFC).
B. CONTRACT DOCUMENT DRAWINGS FOR MECHANICAL WORK (HVAC, PLUMBING, AND FIRE PROTECTION) ARE DIAGRAMMATIC ONLY
AND ARE INTENDED TO CONVEY SCOPE AND GENERAL ARRANGEMENT ONLY.
C.INSTALL ALL MECHANICAL EQUIPMENT AND APPURTENANCES IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS, CONTRACT DOCUMENTS, AND APPLICABLE CODES AND REGULATIONS.
D.THE LOCATIONS OF ALL ITEMS SHOWN ON THE DRAWINGS OR CALLED FOR IN THE SPECIFICATIONS THAT ARE NOT DEFINITELY
FIXED BY DIMENSIONS ARE APPROXIMATE ONLY. THE EXACT LOCATIONS NECESSARY TO SECURE THE BEST CONDITIONS AND
RESULTS MUST BE DETERMINED BY THE PROJECT SITE CONDITIONS AND SHALL HAVE THE APPROVAL OF THE ENGINEER BEFORE
BEING INSTALLED. FIELD VERIFY CONDITIONS, REPORT ANY ERRORS TO COTR
E. COORDINATE CONSTRUCTION OF ALL MECHANICAL WORK WITH ARCHITECTURAL, STRUCTURAL, CIVIL. ELECTRICAL WORK, ETC… SHOWN ON OTHER CONTRACT DRAWINGS.
F. ALL TESTS SHALL BE COMPLETED BEFORE ANY MECHANICAL EQUIPMENT OR PIPING INSULATION IS APPLIED.
G.LOCATE ALL TEMPERATURE, PRESSURE, AND FLOW MEASURING DEVICES IN ACCESSIBLE LOCATIONS WITH THE STRAIGHT
SECTION OF PIPE OR DUCT UP AND DOWNSTREAM AS RECOMMENDED BY THE MANUFACTURER FOR GOOD ACCURACY.
H.LOCATE ALL MECHANICAL EQUIPMENT FOR UNOBSTRUCTED ACCESS TO UNIT ACCESS PANELS, CONTROLS, AND VALVING.
I. WHERE TWO OR MORE ITEMS OF THE SAME TYPE OF EQUIPMENT ARE REQUIRED, THE PRODUCT OF ONE MANUFACTURER SHALL
BE USED.
J. COORDINATE ALL EQUIPMENT CONNECTIONS WITH MANUFACTURER'S CERTIFIED DRAWINGS. COORDINATE AND PROVIDE ALL
DUCT AND PIPING TRANSITIONS REQUIRED FOR FINAL EQUIPMENT CONNECTIONS TO FURNISHED EQUIPMENT. FIELD VERIFY AND
COORDINATE ALL DUCT AND PIPING DIMENSIONS BEFORE FABRICATIONS.
K.PROVIDE ACCESS PANELS FOR INSTALLATION IN WALLS AND CEILINGS, WHERE REQUIRED, TO PROVIDE SERVICE DAMPERS, VALVES, SMOKE DETECTORS, AND OTHER CONCEALED MECHANICAL EQUIPMENT. ACCESS PANELS SHALL BE TURNED OVER TO
THE GENERAL CONTRACTOR FOR INSTALLATION.
L. ALL EQUIPMENT, DUCTWORK, PIPING, ETC. SHALL BE SUPPORTED AS DETAILED, SPECIFIED AND REQUIRED TO PROVIDE A
VIBRATION-FREE INSTALLATION.
M.ALL DUCTWORK, PIPING, AND EQUIPMENT SUPPORTED FROM STRUCTURAL STEEL SHALL BE COORDINATED WITH THE GENERAL
CONTRACTOR. ALL ATTACHMENTS TO STEEL BAR JOISTS, TRUSSES, OR JOIST GIRDERS SHALL BE AT PANEL JOINTS. PROVIDE
BEAM CLAMPS MEETING MSS STANDARDS. WELDING TO STRUCTURAL MEMBERS SHALL NOT BE PERMITTED. THE USE OF C-CLAMPS
SHALL NOT BE PERMITTED.
N.REFER TO TYPICAL DETAILS FOR DUCTWORK, PIPING, AND EQUIPMENT INSTALLATION.
EXISTING PLAN
SCALE: 1/4"=1'-0"
PROPOSED REFLECTED CEILING PLAN - W163
SCALE: 1/4"=1'-0"
DEMOLITION PLAN
SCALE: 1/4"=1'-0"
PROPOSED PLAN - W2C
SCALE: 1/4"=1'-0"
CONSTRUCTION NOTES:
A.MODIFY STEAM FINTUBE SYSTEM IN FIRST FLOOR RESTROOM AS
SHOWN
B.INSTALL NEW PENDENT SPRINKLER HEAD IN W163 AS SHOWN. NEW
SPRINKLER HEAD SHALL MATCH EXISTING SPRINKLER HEADS
W163
GFI
GFI
LVP-1-CORR.W-1
HAND DRYER
W161
W163
GFI
GFI
LVP-1-CORR.W-1
MOUNT ABOVE
COUTER TOP
HAND DRYER
W161
W163
W163A
F
M
LVP-1-CORR.W-1
W161
W163
F
M
OS
OS
LVP-1-CORR.W-1
OS
F
M
W2C
W2C1
OS
W2C
W2C1
F M
FM
W2C
W2C1
GFI
GFI
MOUNT ABOVE
COUTER TOP
HAND DRYER
W2C
HWH
W2C1
EXHAUST FAN SPEED
CONTROL AND TIME CLOCK
HWH DISCONNECT
SWITCH
UNKNOWN START/STOP
SWITCHES
HAND DRYER
DEMOLITION LEGEND:
EXISTING LIGHTING FIXTURES TO BE REMOVED.
EXISTING LIGHT SWICTH TO BE REMOVED.
EXISTING DUPLEX RECEPTACLE TO BE REMOVED.
EXISTING GFI DUPLEX RECEPTACLE TO BE REMOVED.
EXISTING WALL MOUNTED FIRE ALARM SPEAKER/STROBE TO BE REMOVED/RELOCATED
EXISTING WALL MOUNTED MASS NOTIFICATION STROBE TO BE REMOVED/RELOCATED.
GFI
F
M
PROPOSED LEGEND:
NEW DUPLEX WALL RECEPTACLE. MOUNT 18" A.F.F. UNLESS OTHERWISE NOTED.
NEW GFI DUPLEX WALL RECEPTACLE. MOUNT 18" A.F.F. UNLESS OTHERWISE NOTED.
NEW 2x2 LAY-IN LED LIGHTING FIXTURE. PROVIDE EATON CORELITE MODEL
R2X-W-O-2-L35-1-C-UNV-22 OR APPROVED EQUAL.
NEW 4' WALL MOUNTED LED LIGHTING FIXTURE. PROVIDE EATON METALUX MODEL
4BCLED-LD4-28SL-F-UNV-L835 OR APPROVED EQUAL.
NEW EMERGENCY LIGHTING UNIT-PROVIDE LITHONIA LIGHTING MODEL
ELMLT-W-LP06VSLTP-SD OR APPROVED EQUAL.
NEW CEILING MOUNTED LINE VOLTAGE MOTION SENSOR. PROVIDE
WATTSTOPPERMODEL UT-355-1 OR APPROVED EQUAL.
RELOCATED WALL MOUNTED FIRE ALARM SPEAKER/STOBE LOCATION.
RELOCATED WALL MOUNTED MASS NOTIFICATION STOBE LOCATION.
GFI
OS
F
M
DEMOLITION NOTES:
1. REMOVE AND DISPOSE OF ALL POWER RECEPTACLES IN THE WORK AREA RETAINING CIRCUITS
TO USE IN CONSTRUCTION PHASE.
2. REMOVE EXISTING WALL MOUNTED ELECTRIC HAND DRY AND RETAIN FOR REINSTALLATION.
3. REMOVE AND DISPOSE OF ALL FLUORESCENT, INCANDESCENT AND EMERGENCY LIGHTING
FIXTURES AND ASSOCIATED SWITCHES IN THE WORK AREA. RETAIN CIRCUIT FOR USE IN
CONSTRUCTION PHASE.
4. RETAIN FIRE ALARM/MASS NOTIFICATION DEVICES FOR RE-INSTALLATION IN CONSTRUCTION
PHASE AS SHOWN.
5. REMOVE AND RETAIN ALL WALL AND CEILING MOUNTED DEVICES AFFECTED BY THE WALL
DEMOLITION IN ROOM W2C1. COORDINATED WITH OTHER TRADES FOR REINSTALLATION IN
CONSTRUCTION PHASE.
PROPOSED NOTES:
1. EXECUTE ALL WORK IN ACCORDANCE WITH THE CURRENT EDITIONS OF THE NATIONAL ELECTRICAL
CODE AND UNIFIED FACILITIES CRITERIA.
2. PROVIDE AND INSTALL DUPLEX RECEPTACLES IN LOCATIONS AS SHOWN. POWER RECEPTACLES WITH
CIRCUITS RETAINED FROM DEMOLITION PHASE.
3. REINSTALL HAND DRYERS IN LOCATIONS AS SHOWN.
4. PROVIDE AND INSTALL NEW LIGHTING FIXTURES AS SHOWN. CENTER WALL MOUNTED FIXTURE OVER
SINK LOCATIONS. POWER LIGHTING WITH CIRCUIT RETAINED FROM DEMOLITION PHASE UTILIZING NEW
MOTION SENSORS FOR ON/OFF CONTROL.
5. PROVIDE AND INSTALL NEW EMERGANCY LIGHTING UNITS IN LOCATION AS SHOWN. POWER UNITS WITH
UNSWITCHED LEG OF ROOM LIGHTING CIRCUIT DISCUSSED IN NOTE 4.
6. REINSTALL FIRE ALARM/MASS NOTIFICATION EQUIPMENT REAINED FROM DEMOLITION PHASE AS SHOWN.
TURN OVER EXTRA DEVICES TO GOVERNMENT REPRESENTATIVE.
7. REINSTALL WALL AND CEILING DEVICES IN ROOM W2C1 SUBSEQUENT TO WALL RELOCATION. VERIFY
OPERATION OF ALL AFFECTED EQUIPMENT.
7 10 JUL 2019
EF
ULDF 180002
BLDG. 106
ELECTRICAL
FLOOR/CEILING PLANS
E-101 7
MWF
MWF
N
1/8"=1'-0"EXISTING RM 161 FLOOR & CEILING PLANS
PARTIAL B106 PLAN
N
1/8"=1'-0"PROPOSED RM 161 FLOOR & CEILING PLANS
PARTIAL B106 PLAN
N
1/8"=1'-0"EXISTING RM W2C FLR & CLNG PLANS
PARTIAL B106 PLAN
N
1/8"=1'-0"PROPOSED RM W2C FLR & CLNG PLANS
PARTIAL B106 PLAN
FIRST FLOOR
WORK AREA
SECOND
FLOOR
WORK AREA
N
NO SCALE
B106 FIRST FLOOR KEY PLAN
N
NO SCALE
B106 SECOND FLOOR KEY PLAN
| 180002 - ARCH-A-101 |
| 180002 - ARCH-A102 |
| 180002 - ARCH-A-201 |
| 180002 - MECH-PD-101 |
| 180002 - MECH-P-101 |
| 180002 - MECH-M-101 |
| 180002 - ELEC-E-101 |
File details come from the government source that posted it.