19ba3_Attach_2_Project_Drawings.pdf

PDF 14 MB Posted

Attached to
Modernize C4 Restrooms/Break Area Federal contract opportunity
Solicitation number
FA875119BA003
Issued by
Department of the Air Force Materiel Command Research Laboratory

About this file

Attachment 2 - Project Drawings

View the file

Other files for this federal contract opportunity

Other files attached to Modernize C4 Restrooms/Break Area, newest first.
File Type Posted
221316_FL_-_Sanitary_Waste_and_Vent_Piping_RFI_5.pdf PDF
19ba3_Additional_Information_5.docx DOCX document
Solicitation_Amendment_2_FA875119BA0030002_SF_30.pdf PDF
19ba3_Additional_Information_4.docx DOCX document
Solicitation_Amendment_FA875119BA0030001_SF_30.pdf PDF
19ba3_Additional_Information_3.docx DOCX document
19ba3_Additional_Information_2.docx DOCX document
A_-_18841_Rome_AF_B-3_asbestos_lead.pdf PDF
19ba3_Additional_Information_1.docx DOCX document
Solicitation_-_FA875119BA003.pdf PDF
19ba3_Attach_3_AFRL_RI_Suppl_Rqmts.pdf PDF
19ba3_Attach_5_RRS_Visit_Authorization_Rqst.pdf PDF
19ba3_Attach_4_Wage_Decision.pdf PDF
19ba3_Attach_1_Project_Specifications.pdf PDF
19ba3_Attach_1a_Project_Specs_Addendum_1.doc DOC document
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NKB

N. .______________________________________________________

ARCHITECTURE & ENGINEERING, PC..

K BHANDARI

SHEET SIZE: 24" x 36"

DESIGN FIRM NKB# 16340.09

NYS Education Law, Section 7209 Prohibits any person to alter these drawings other than a licensed architect or the design engineer. Information on these drawings remainsthe property of the licensed professionals who prepared them and may only be used on the project identified below.

Copyright 2019 N.K. BHANDARI, Architecture & Engineering, P.C.

DRAWING NO: SHEET: FACILITY NO:

OF

SHEET TITLE:

PROJECT TITLE:

Rev. Date Description Drawn Approved

DATE:

BUILDING 3

PROJECT MGR:

PROJECT

NO:

DRAFTER:

Rome Research Site

Air Force Research Laboratory

Rome Research Site, New York

RIO:

RIOCC:

RIOS:

66abw/def:

RIOC:

RIOCO:

RIOF:

USER:

RIOCC:

RIOCV:

DET 4/SE:

USER:DATE

DATE

DATE

DATE

DATE

DATE

DATE

DATE

DATE

DATE

DATE

DATE

DESIGNER:

CONSULTANT:

2/25/2019 12:05:09 PM

1 30G-001 02/22/2019

COVER SHEET

MODERNIZE C4

RESTROOMS AND BREAK

ROOM BUILDING 3

FA8751-18-F-AS08

AAT

AAT

DBH

AIR FORCE RESEARCH LABORATORY

ROME RESEARCH SITE

ROME, NEW YORK 13441

AE SERVICES TO MODERNIZE

C4 RESTROOMS BUILDING 3

DRAWING LIST

SHEET NUMBER SHEET NAME DRAWING NO.

G-001 COVER SHEET 1

A-001 GENERAL NOTES, SYMBOLS, & ANNOTATIONS 2

A-002 PARTITION TYPES 3

AD100 DEMOLITION PLANS 4

AE101 CONSTRUCTION PLAN 5

AE102 REFLECTED CEILING PLAN 6

AE103 AXONS 7

AE401 INTERIOR ELEVATIONS 8

AE402 INTERIOR ELEVATIONS 9

AE501 DETAILS 10

AE502 DETAILS 11

AE600 DOOR SCHEDULE 12

AE601 FINISH SCHEDULE 13

FP001 DETAILS, NOTES & SYMBOLS 14

FPD101 FIRST FLOOR DEMOLITION PLAN 15

FP101 FIRST FLOOR PLAN 16

M-001 NOTES, SYMBOLS AND ABBREVIATIONS 17

MD101 FIRST FLOOR DEMOLITION PLAN 18

M-101 FIRST FLOOR PLAN AND SCHEDULES 19

M-501 DETAILS 20

P-001 SYMBOLS, NOTES, SCHEDULES AND ABBREVIATIONS 21

PD101 FIRST FLOOR DEMOLITION PLAN 22

P-101 FIRST FLOOR PLUMBING PLAN 23

P-501 DETAILS 24

E-001 ELECTRICAL SYMBOLS, GENERAL NOTES AND

ABBREVIATIONS

ED101 FIRST FLOOR DEMOLITION PLAN 26

E-101 FIRST FLOOR PLAN 27

FA001 NOTES AND SYMBOLS 28

FAD101 FIRST FLOOR DEMOLITION PLAN 29

FA101 FIRST FLOOR PLAN 30

Grand total: 30

PROJECT NO. ULDF 18-0023 AE A/E CONTRACT NO. FA8751-18-F-AS08

SENSITIVE BUT UNCLASSIFIED (SBU)

PROPERTY OF THE UNITED STATES GOVERNMENT

COPYING, DISSEMINATION, OR DISTRIBUTION OF THIS DOCUMENT

TO UNAUTHORIZED RECIPIENTS IS PROHIBITED

Do not remove this notice Properly destroy or return documents when no longer needed.

PROJECT CERTIFICATION:

TO THE BEST OF MY KNOWLEDGE, BELIEF AND PROFESSIONAL

JUDGMENT, THE DRAWINGS AND SPECIFICATIONS WHICH COMPRISE

THE CONSTRUCTION DOCUMENTS FOR THE PROJECT ARE IN

COMPLIANCE WITH APPLICABLE CODES, INCLUDING THE LATEST

EDITIONS OF THE INTERNATIONAL BUILDING CODE AND NFPA 101.

ARCHITECT, SITE/ CIVIL ENGINEER, & STRUCTURAL ENGINEER:

MECHANICAL, ELECTRICAL, PLUMBING, & FIRE PROTECTION ENGINEER:

N.K. BHANDARI,

ARCHITECTURE & ENGINEERING, P.C.

1005 W. FAYETTE STREET, SUITE 4A

SYRACUSE, NEW YORK 13203

315.428.1177

C&S COMPANIES

499 COL. EILEEN COLLINS BLVD

SYRACUSE, NEW YORK 13212

315.455.2000

LOCATION MAP:PROJECT IMAGE:

1/8" = 1'-0"A0102 A0101

1 View Name

ROOM NAME

150 SF

901bs

ZZZ

ROOM TAG

VIEW TAG

BUILDING SECTION

WALL SECTION

FLOOR LEVEL

COLUMN GRID

METAL PANEL /

CURTAIN WALL

PANEL TAG

ITEM TAG

KEYED NOTE

REVISION TAG

DEMOLITION TAG

PARTITION TAG

ITEMS TO BE

DEMOLISHED

NEW CONSTRUCTION

EXISTING / NIC /

PREVIOUS WORK

SHEET

NUMBER OF

VIEW

SHEET NUMBER

OF VIEW

ORIGINATION

SHEET

NUMBER OF

VIEW

SECTION NUMBER

BREAK LINE

ALIGN

ALIGN ELEMENTS

DOOR TAG

P R

E

FLOOR

ELEVATION

FLOOR NAME

EXTERIOR ELEVATION

CALLOUT

ELEVATION

NUMBER

AE001

SIM

DETAIL CALLOUT

SHEET

NUMBER OF

VIEW

DETAIL NUMBER

ROOM NAME

ROOM NUMBER

ROOM AREA

FIRE/SMOKE

RATING

WALL

TYPE

AE001

AE001

INTERIOR ELEVATION

CALLOUT

NORTH ARROW

MAGNETIC

NORTH

PROJEC

T NORTH

TP1

SHEET

NUMBER OF

VIEW

SECTION NUMBER

SHEET

NUMBER OF

VIEW

ELEVATION

NUMBER

SHEET

NUMBER OF

VIEW

AE001

SIM

AE001

SIM

Name Elevation

NKB

N. .______________________________________________________

ARCHITECTURE & ENGINEERING, PC..

K BHANDARI

SHEET SIZE: 24" x 36"

DESIGN FIRM NKB# 16340.09

NYS Education Law, Section 7209 Prohibits any person to alter these drawings other than a licensed architect or the design engineer. Information on these drawings remainsthe property of the licensed professionals who prepared them and may only be used on the project identified below.

Copyright 2019 N.K. BHANDARI, Architecture & Engineering, P.C.

DRAWING NO: SHEET: FACILITY NO:

OF

SHEET TITLE:

PROJECT TITLE:

Rev. Date Description Drawn Approved

DATE:

BUILDING 3

PROJECT MGR:

PROJECT

NO:

DRAFTER:

Rome Research Site

Air Force Research Laboratory

Rome Research Site, New York

RIO:

RIOCC:

RIOS:

66abw/def:

RIOC:

RIOCO:

RIOF:

USER:

RIOCC:

RIOCV:

DET 4/SE:

USER:DATE

DATE

DATE

DATE

DATE

DATE

DATE

DATE

DATE

DATE

DATE

DATE

DESIGNER:

CONSULTANT:

2/25/2019 11:04:24 AM

2 30A-001 02/22/2019

GENERAL NOTES,

SYMBOLS, & ANNOTATIONS

MODERNIZE C4

RESTROOMS AND BREAK

ROOM BUILDING 3

FA8751-18-F-AS08

AAT

AAT

DBH

ABBREVIATIONS

SC SOLID CORE

SCH SCHEDULE

SCW SOLID CORED WOOD

SDT STATIC DISSIPATIVE TILE

SECT SECTION

SF SQUARE FOOT (FEET)

SG SPANDREL GLASS

SHT SHEET

SHWR SHOWER

SIM SIMILAR

SP SPECIAL

SPEC SPECIFICATION (S)

SPKR SPEAKER

SPL SPANDREL PANEL

SQ SQUARE

SS SOLID SURFACE

SST STAINLESS STEEL

ST STREET

STD STANDARD

STL STEEL

STOR STORAGE

STR STRUCTURE (AL)

SURF SURFACE

SUSP SUSPENDED

SW SWITCH

SY SQUARE YARD

SYM SYMMETRY (ICAL)

SYS SYSTEM

T

T TREAD

T&B TOP & BOTTOM

T&G TONGUE & GROOVE

T&P TAPE & PRIME

TBD TO BE DETERMINED

TEL TELEPHONE

TEMP TEMPORARY

TERR TERRAZZO

THK THICK (NESS)

TO TOP OF

TOL TOLERANCE

TOS TOP OF STEEL

TP TOILET PARTITION

TPH TOILET PAPER HOLDER

TRANS TRANSVERSE

TS TERMINATION STRIP

TV TELEVISION

TYP TYPICAL

TYPOS TYPICAL OTHER SIDE

U

UC UNDERCUT

UH UNIT HEATER

UL UNDERWRITERS'

LABORATORIES

UNEX UNEXCAVATED

UNF UNFINISHED

UON UNLESS OTHERWISE

NOTED

UR URINAL

V

VAR VARIES (ABLE)

VB VINYL BASE

VC VINYL COVE

VCT VINYL COMPOSITION TILE

VERT VERTICAL

VEST VESTIBULE

VG VISION GLASS

VIF VERIFY IN FIELD

VWC VINYL WALL COVERING

W

W WEST

W/ WITH

W/O WITHOUT

WC WATER CLOSET

WD WOOD

WNCT WAINSCOTING

WP WATERPROOFED (ING)

WT WEIGHT

WWF WELDED WIRE FABRIC

WWM WELDED WIRE MESH

X

XPS EXTRUDED POLYSTYRENE

INSULATION

ABBREVIATIONS

MTL METAL

MULL MULLION

N

N NORTH

NAT NATURAL

NF NEAR FACE

NIC NOT IN CONTRACT

NO NUMBER

NOM NOMINAL

NORM NORMAL

NTS NOT TO SCALE

O

OA OVERALL

OBS OBSCURE

OC ON CENTER (S)

OD OUTSIDE DIAMETER

OFF OFFICE

OH OVERHEAD

OPNG OPENING

OPP OPPOSITE

P

P LAM PLASTIC LAMINATE

P&R PATCH & REPAIR

PAVMT PAVEMENT

PC PLUMBING CONTRACTOR

PCC PRECAST CONCRETE

PCF POUNDS PER CUBIC FOOT

PERF PERFORATED

PERM PERMANENT

PL PLATE

PLAS PLASTER

PLAST PLASTIC

PLBG PLUMBING

PLYWD PLYWOOD

PNL PANEL

PNT PAINT

POLYIS

O

POLYISOCYANURATE

INSULATION

PR PAIR

PREP PREPARE (ATION)

PROJ PROJECT (ION)

PROP PROPERTY

PRTN PARTITION

PSF POUNDS PER SQUARE

FOOT

PSI POUNDS PER SQUARE

INCH

PT PRESSURE TREATED

PTD PAINTED

PVC POLYVINYL CHLORIDE

Q

QTY QUANTITY

R

R RISER, RADIUS

RA RETURN AIR

RAD RADIUS

RB RUBBER BASE

RD ROOF DRAIN

RECP RECEPTICLE

REF REFERENCE

REFL REFLECT (ED), (IVE), (OR)

REFR REFRIGERATOR,

REFRIGERATION

REINF REINFORCE (D), (ING)

REQD REQUIRED

RES RESILIENT

RET RETURN, RETAINING

REV REVISION (S), REVISED

RH RIGHT HAND

RI RIGID INSULATION

RM ROOM

RO ROUGH OPENING

ROW RIGHT-OF-WAY

RUBR RUBBER

S

S SOUTH

SA SUPPLY AIR

SAD SADDLE

SAN SANITARY

ABBREVIATIONS

H

H/C HANDICAPPED

HB HOSE BIB

HC HOLLOW CORE

HD HAND

HDR HEADER

HDWE HARDWARE

HGT HEIGHT

HM HOLLOW METAL

HMI HOLLOW METAL

INSULATED

HORIZ HORIZONTAL

HP HIGH POINT

HR HANDRAIL, HOUR

HTG HEATING

HTR HEATER

HVAC HEATING/VENTILATING/AIR

CONDITIONING

HW HOT WATER

I

ID INSIDE DIAMETER

IN INCH OR INCHES

INCL INCLUDE (ING)

INSUL INSULATE (D), (ION)

INT INTERIOR

INV INVERT

J

J JOIST

JAN JANITOR

JCT JUNCTION

JT JOINT

K

KD KNOCKED DOWN

KIT KITCHEN

L

L LENGTH, LONG

LAB LABORATORY

LAM LAMINATE (D)

LAV LAVATORY

LF LINEAR FOOT (FEET)

LH LEFT HAND

LIN LINEAR

LL LIVE LOAD

LLH LONG LEG HORIZONTAL

LLV LONG LEG VERTICAL

LONG LONGITUDINAL

LOUV LOUVER

LP LOW POINT

LT LIGHT

LW LONG WAY

M

MAG MAGNETIC

MAR MARBLE

MAS MASONRY

MAX MAXIMUM

MBD MARKER BOARD

ME MATCH EXISTING

MECH MECHANICAL

MED MEDIUM

MEM MEMBER

MEMB MEMBRANE

MEP MECHANICAL,

ELECTRICAL, PLUMBING

MEPFP MECHANICAL,

ELECTRICAL, PLUMBING,

FIRE PROTECTION

MET METAL

MEZZ MEZZANINE

MFR MANUFACTURER

MH MANHOLE

MIN MINIMUM

MIRR MIRROR

MISC MISCELLANEOUS

MLDG MOULDING

MO MASONRY OPENING

MR

GWB

MOISTURE RESISTANT

GYPSUM WALL BOARD

MTD MOUNTED

MTG MOUNTING

ABBREVIATIONS

DOM DOMESTIC

DR DOOR

DS DOWNSPOUT

DWG DRAWING

E

E EAST

EA EACH

EC ELECTRICAL

CONTRACTOR

EF EACH FACE

EIFS EXTERIOR INSULATION

FINISH SYSTEM

EJ EXPANSION JOINT

EJCP EXPANSION JOINT COVER

PLATE

EL ELEVATION

ELEC ELECTRIC (AL)

ELEV ELEVATOR

EMER EMERGENCY

ENCL ENCLOSURE

EP ELECTRICAL PANEL

EPDM ETHYLENE PROPYLENE

DIENE MONOMER

EPS EXPANDED POLYSTYRENE

INSULATION

EQ EQUAL

EQUIP EQUIPMENT

ES EXPOSED SLAB

EST ESTIMATE (D)

ETR EXISTING TO REMAIN

EXH EXHAUST

EXIST EXISTING

EXP EXPANSION, EXPAND

EXPO EXPOSED

EXT EXTERIOR

EXTR EXTRUDED

F

FA FIRE ALARM

FAB FABRICATE

FAP FIRE ALARM CONTROL

PANEL

FD FLOOR DRAIN

FE FIRE EXTINGUISHER

FEC FIRE EXTINGUISHER

CABINET

FF FINISHED FLOOR

FH FLOOR HATCH

FHC FIRE HOSE CABINET

FIG FIGURE

FIN FINISH (ED)

FIXT FIXTURE

FL FLANGE

FLASH FLASHING

FLEX FLEXIBLE

FLR FLOOR (ING)

FLUOR FLUORESCENT

FM FLOOR MOUNTED

FNDN FOUNDATION

FO FACE OF

FP FIRE PROTECTION

FR FRAME (ING)

FRP FIBERGLASS REINFORCED

PANEL

FT FOOT OR FEET

FTG FOOTING

FURR FURRING

FUT FUTURE

G

GA GAUGE

GAL GALLON

GALV GALVANIZED

GB GRAB BAR

GC GENERAL CONTRACTOR

GEN GENEARL

GL GLASS / GLAZING

GR GUARDRAIL

GRG GLASS REINFORCED

GYPSUM

GT GLAZED TILE

GWB GYPSUM WALL BOARD

GYP GYPSUM

ABBREVIATIONS

A

A/C AIR CONDITIONING

AB ANCHOR BOLT

ACC ACCESS

ACOUS ACOUSTIC (AL)

ACT ACOUSTICAL CEILING TILE

ADD ADDENDUM

ADJ ADJACENT

ADJUST ADJUSTABLE

AFF ABOVE FINISHED FLOOR

AGGR AGGREGATE

ALT ALTERNATE

ALUM ALUMINUM

AP ACCESS PANEL

APPRO

X

APPROXIMATE (LY)

ARCH ARCHITECTURAL

ASPH ASPHALT

AVG AVERAGE

B

BD BOARD

BET BETWEEN

BIT BITUMINOUS

BLDG BUILDING

BLK BLOCK

BLKG BLOCKING

BM BENCHMARK

BN BULLNOSE

BO BOTTOM OF

BOD BASIS OF DESIGN

BRD BOARD

BSMT BASEMENT

BUR BUILT-UP-ROOF

C

CAB CABINET

CB CATCH BASIN

CEM CEMENT

CER CERAMIC

CF CUBIC FOOT (FEET)

CFMF COLD FORMED METAL

FRAMING

CG CORNER GUARD

CI CAST IRON

CIP CAST IN PLACE

CJ CONTROL JOINT

CKBD CORKBOARD

CL CLOSET

CLG CEILING

CLKG CAULKING

CLL CONTRACT LIMIT LINE

CLR CLEAR

CM CEILING MOUNTED

CMU CONCRETE MASONRY

UNIT

CO CLEANOUT

COL COLUMN

CONC CONCRETE

CONN CONNECTION

CONST CONSTRUCTION

CONT CONTINUE (OUS)

CONTR CONTRACTOR

CPT CARPET

CR CHAIR RAIL

CT CERAMIC TILE

CTR CENTER

CW COLD WATER

CY CUBIC YARD (S)

D

DBL DOUBLE

DEG DEGREES

DEMO DEMOLITION

DEPT DEPARTMENT

DET DETAIL

DF DRINKING FOUNTAIN

DH DOUBLE HUNG

DIA DIAMETER

DIAG DIAGONAL

DIM DIMENSION

DIV DIVISION

DL DEAD LOAD

DN DOWN

DO DOOR OPENING

GENERAL CONSTRUCTION NOTES

1 DESIGN CONSTRUCTION AND SAFETY SHALL CONFORM TO ALL LOCAL, STATE AND OWNER SPECIFIC CODES, INCLUDING (BUT NOT LIMITED TO) THE “INTERNATIONAL BUILDING CODE 2015 (IBC)", THE NFPA 101 LIFE SAFETY CODE, LATEST REVISION, ANSI A117.1 - LATEST REVISION, OSHA, "DoD MINIMUM ANTITERRORISM STANDARDS FOR BUILDINGS" - LATEST REVISION, AND ANY OTHER CODES GOVERNED BY THE JURISDICTION IN WHICH THIS PROJECT IS BEING CONSTRUCTED

2 THIS CONTRACT REQUIRES COMPLETE, FINISHED WORKABLE PROJECT OF THE AREAS INDICATED BY THE CONTRACT DOCUMENTS, AND SHALL INCLUDE ALL MATERIALS AND LABOR NECESSARY TO COMPLETE, REGARDLESS OF WHETHER OR NOT ALL WORK OR EACH ITEM IS SPECIFICALLY INDICATED ON ANY OTHER PORTION OF THE DRAWINGS AND/OR NOTES.

3 WHERE MATERIALS REFERENCED ON DRAWINGS, OR NECESSARY TO COMPLETE THE WORK OF THIS CONTRACT ARE NOT SPECIFIED HEREIN, PROVIDE BEST QUALITY MATERIAL. WHERE MATERIALS ARE INTENDED TO MATCH EXISTING, PROVIDE CLOSEST POSSIBLE MATCH, SUBJECT TO OWNER'S APPROVAL. ALL ITEMS AND WORK ON DRAWINGS ARE NEW, UNLESS INDICATED EXISTING. ALL WORK WHICH HAS BEEN DAMAGED SHALL BE REPAIRED TO A “NEW CONDITION,” OR WHERE THE STRUCTURAL INTEGRITY HAS BEEN AFFECTED, ITEMS SHALL BE REPLACED AT NO

COST TO THE OWNER.

4 CONTRACTOR IS RESPONSIBLE TO VERIFY ALL SITE, FIELD AND BUILDING CONDITIONS PRIOR TO SUBMITTING BIDS AND COMMENCING WORK. IF THERE ARE ANY DISCREPANCIES BETWEEN DRAWINGS AND FIELD CONDITIONS, NOTIFY THE CONSTRUCTION MANAGER AND ARCHITECT/ENGINEER AND REQUEST CLARIFICATION.

5 DRAWINGS MAY NOT INDICATE ALL DEMOLITION/ REMOVALS. CONTRACTOR SHALL REFER TO DRAWINGS, SPECIFICATIONS AND VERIFY FIELD CONDITIONS TO DETERMINE FULL SCOPE AND PARTICULARS OF REMOVALS AS REQUIRED FOR AND COORDINATED WITH THE NEW WORK PRIOR TO BIDDING WORK. VERIFY AND CONFIRM WITH OWNER WHICH ITEMS ARE TO BE SAVED FOR

OWNER’S USE OR REINSTALLATION BY CONTRACTOR.

6 WHERE CONSTRUCTION OR ITEMS HAVE BEEN INFILLED, REMOVED AND/OR DISTURBED FOR INSTALLATION OF NEW WORK, CAUSING THE EXPOSURE OF UNFINISHED AND/OR DAMAGED SURFACES, RESULTING SURFACES AND INFILLED SURFACES SHALL BE RECONSTRUCTED WITH MATERIALS TO MATCH FINISHED AREAS. ALL ABANDONED OPENINGS (I.E., DUCT/PIPE REMOVALS, ETC.) AT WALLS, ROOF OR FLOOR TO BE INFILLED SOLID.

7 WHERE CONSTRUCTION RESULTS IN DEPRESSIONS AND/OR UNEVEN FLOOR CONDITIONS, PATCH, LEVEL AND FEATHER AREAS AS REQUIRED TO PROVIDE UNIFORMITY OF NEW FLOORING.

8 WORK IS REQUIRED IN VARIOUS PORTIONS OF THE FACILITY TO EXECUTE WORK OF OTHER TRADES (I.E. ELECTRICAL, MECHANICAL). ALTHOUGH NOT NECESSARILY SHOWN ON DRAWINGS, WORK IS REQUIRED IN THESE AREAS CONSISTING OF PLACEMENT OF CEILINGS, WALLS, FINISHES, PAVEMENT AND OTHER CONSTRUCTION AS NECESSARY TO PERFORM WORK AND RESTORE THESE

SPACES OR AREAS TO ORIGINAL CONDITIONS.

9 CONTRACTOR SHALL OBTAIN FROM OWNER ALL REQUIREMENTS FOR INSTALLATION OF OWNER PROVIDED EQUIPMENT INCLUDING ROUGHING DIAGRAMS, INSTALLATION INSTRUCTIONS, ELECTRICAL SCHEMATICS, TEMPLATES, LAYOUTS AND DIMENSIONS AND ALL OTHER INFORMATION NECESSARY FOR A PROPER, WELL COORDINATED INSTALLATION. PRIOR TO ROUGH-IN OF

SERVICES, CONFER WITH OWNER EXACT LOCATION OF ALL ITEMS.

10 CONTRACTOR SHALL COORDINATE THE WORK WITH EACH TRADE SO THAT THE WORK AND SCHEDULE ARE NOT IMPEDED. SCHEDULE WORK PROGRESS THROUGHOUT THE ENTIRE PROJECT TO PREVENT CONFLICTS AND INTERFERENCES. OBTAIN ALL NECESSARY INFORMATION SUCH AS SIZES, LOCATIONS, TEMPLATES, LAYOUT, DIMENSIONS AND ALL OTHER INFORMATION NECESSARY FOR A PROPER AND WELL COORDINATED INSTALLATION. PRIOR TO INSTALLATION OF ITEMS, VERIFY AND CONFIRM WITH EACH TRADE EXACT LOCATION OF ALL ITEMS

11 ALL PENETRATIONS THROUGH FLOORS AND FULL HEIGHT WALLS TO BE FIRE STOPPED. ALL GAPS AND JOINTS AT RATED FLOORS, ROOFS AND WALL TO BE FIRE AND SMOKE STOPPED. GAPS AND JOINTS INCLUDE (BUT ARE NOT LIMITED TO) TOP OF WALL TO FLOOR OR ROOF DECK WALL TO BEAMS, AND CONTROL OR EXPANSION JOINTS. FIRE STOPPING INCLUDES BOTH FORM OR

PACKING MATERIAL AND THE FILL, VOID OR CAVITY MATERIAL.

12 ITEMS INSERTED IN AN EXTERIOR WALL SHALL BE SEALED WEATHER TIGHT WHETHER INDICATED ON DRAWINGS OR NOT.

13 NOT USED

14 FINISHED DOOR OPENINGS SHALL BE NOMINAL 6" FROM FINISHED CORNER OF ROOM AT HINGE SIDE, EXCEPT WHERE DIMENSIONED OTHERWISE, ON THE ‘PULL’ SIDE OF A DOOR OPENING , THE STRIKE SIDE SHALL BE NOMINAL 18" FROM A PERPENDICULAR WALL ON THE ‘PUSH’ SIDE OF A DOOR OPENING EQUIPPED WITH BOTH A CLOSER AND LATCH, THE STRIKE SIDE SHALL BE NOMINAL

12” FROM A PERPENDICULAR WALL.

15 SUSPENDED GRID CEILINGS SHALL BE ARRANGED SO THAT A GRID IS SPACED EQUALLY FROM EACH MOST REMOTE WALL IN EACH DIRECTION, WITH NO TILE LESS THAN 6” UNLESS OTHERWISE INDICATED. CEILING MOUNTED ITEMS TO BE CENTERLINE OF CEILING TILES, UNLESS OTHERWISE NOTED.

16 CONCRETE SLABS SHALL BE SEPARATED FROM ANY VERTICAL SURFACE WITH AN ISOLATION JOINT. ALL SLAB ON-GRADE (CONTROL, EXPANSION, CONSTRUCTION (COLD), ETC.) JOINTS TO RECEIVE SEALANT. ALL EXTERIOR SLABS TO SLOPE TO DRAIN AWAY FROM BUILDING AT 1/8” PER 1’-0” UON.

17 ALL DRAWINGS INDICATED AS GENERAL APPLY TO ENTIRE PROJECT, INCLUSIVE OF ALL BUILDINGS.

18 ALL TRADES ARE RESPONSIBLE FOR REVIEWING AND BECOMING FAMILIAR WITH THE ENTIRE SET OF CONTRACT DOCUMENTS PRIOR TO THE START OF ANY WORK. NO ADDITIONAL COSTS WILL BE ALLOWED FOR LACK OF COORDINATION WITH THE ENTIRE BID DOCUMENTS. ANY WORK WHICH IS REQUIRED TO BE CORRECTED OR REPLACED DUE TO LACK OF COORDINATION WITH THE ENTIRE CONTRACT DOCUMENTS WILL BE DONE SO AT THE CONTRACTOR'S SOLE EXPENSE, NOT THE OWNER'S.

TYPICAL SYMBOLS

5 1/2" NOMINAL

WALL TYPE 411:

UL --

RATING 0 HOUR

STC ---

CMU

5 5/8" CMU

REINFORCING PER

STRUCTURAL

NOTCHED STUD TRACK, MIN 20

GA.

V A

R

IE

S S

E E

D E

T A

IL

S

PROVIDE BLOCKING WHERE FASTENERS ARE

LOCATED AT WALL MOUNTED ITEMS (TYPICAL).

SECURE BLOCKING W/ 2 SCREWS PER STUD

SCHEDULED PARTITION FRAMING

SCHEDULED PARTITION

SHEATHING

WALL TYPE 980:

UL --

RATING 0 HOUR

STC ---

METAL STUD / GYPSUM WALL BOARD

3 5/8" 20 GAUGE

CORROSION-PROTECTED

STEEL STUDS AT 16" O.C.

(MAX)

(1) LAYER 5/8" GWB ONE

SIDE

3 5/8" 20 GAUGE

CORROSION-PROTECTED

STEEL RUNNERS

WALL TYPE 920:

UL U419

RATING 0 HOUR

STC 49

METAL STUD / SOUND INSULATION / GYPSUM WALL BOARD

5" NOMINAL

3 5/8" 25 GAUGE

CORROSION-PROTECTED

STEEL STUDS AT 24" O.C.

(MAX)

ACOUSTIC INSULATION

3 5/8" 25 GAUGE

CORROSION-PROTECTED

STEEL RUNNERS

(1) LAYER 5/8" GWB EACH

SIDE

NKB

N. .______________________________________________________

ARCHITECTURE & ENGINEERING, PC..

K BHANDARI

SHEET SIZE: 24" x 36"

DESIGN FIRM NKB# 16340.09

NYS Education Law, Section 7209 Prohibits any person to alter these drawings other than a licensed architect or the design engineer. Information on these drawings remainsthe property of the licensed professionals who prepared them and may only be used on the project identified below.

Copyright 2019 N.K. BHANDARI, Architecture & Engineering, P.C.

DRAWING NO: SHEET: FACILITY NO:

OF

SHEET TITLE:

PROJECT TITLE:

Rev. Date Description Drawn Approved

DATE:

BUILDING 3

PROJECT MGR:

PROJECT

NO:

DRAFTER:

Rome Research Site

Air Force Research Laboratory

Rome Research Site, New York

RIO:

RIOCC:

RIOS:

66abw/def:

RIOC:

RIOCO:

RIOF:

USER:

RIOCC:

RIOCV:

DET 4/SE:

USER:DATE

DATE

DATE

DATE

DATE

DATE

DATE

DATE

DATE

DATE

DATE

DATE

DESIGNER:

CONSULTANT:

2/25/2019 11:04:25 AM

3 30A-002 02/22/2019

PARTITION TYPES

MODERNIZE C4

RESTROOMS AND BREAK

ROOM BUILDING 3

FA8751-18-F-AS08

AAT

AAT

DBH

GENERAL PARTITION NOTES - CMU

1 INTERIOR PARTITIONS OF CONCRETE MASONRY UNITS (CMU) ARE

SPECIFICALLY INDICATED ON FLOOR PLANS. ALL PARTITIONS TO BE 8” CMU

UNLESS OTHERWISE NOTED. ALL DIMENSIONS ARE NOMINAL TO FACE OF CMU.

2 PROVIDE JOINT REINFORCEMENT EVERY TWO COURSES, 16" OC, PROVIDE

VERTICAL ROD REINFORCEMENT IN GROUTED CORES WHERE INDICATED BY

STRUCTURAL SPECIFICATIONS AND DRAWINGS AND AT ALL WALL

INTERSECTIONS AND OPENINGS (DOORS, WINDOWS, NICHES, PASSAGES, ETC.).

3 ALL PARTITIONS TO EXTEND FULL HEIGHT TO UNDERSIDE OF DECK UNLESS

OTHERWISE NOTED. PROVIDE PARTITION TOP ANCHORS, 24” OC WHERE

PARTITIONS ARE NOT BRACED BY STRUCTURAL FRAMING (HOHMANN BARDARD

PTA SERIES TO SUIT JOB CONDITION OR EQUAL) TO STABILIZE PARTITIONS AT

TOP OF WALL.

4 PROVIDE FIRE RATED PARTITIONS WHERE INDICATED. FIRE STOP/FIRE SAFE

AND SMOKE STOP ALL PENETRATIONS THROUGH PARTITIONS, GAPS AND

JOINTS. ALL FIRE RATED PARTITION ASSEMBLIES SHALL EXTEND FULL HEIGHT

FROM FLOOR TO UNDERSIDE OF METAL DECK ABOVE. ALL OTHER PARTITIONS

TO EXTEND FULL HEIGHT UNLESS OTHERWISE NOTED. FIRE RATED PARTITION

TERMINATIONS SHALL BE FIRE STOPPED/FIRE SAFED TO PROVIDE THE

SCHEDULED FIRE RESISTANCE RATING. REFER TO BUILDING CODE REVIEW

PLAN(S).

5 PROVIDE ACOUSTICAL SEALANT AT ALL ELECTRICAL OUTLETS, PENETRATIONS,

CAPS AND OPENINGS.

6 ALL EXPOSED CMU CORNERS TO BE BULL-NOSED UNLESS OTHERWISE NOTED.

7 ALL MASONRY OPENINGS TO RECEIVE LINTELS. SEE LINTEL SCHEDULE FOR

TYPES. SEE ARCHITECTURAL, MECHANICAL, PLUMBING AND ELECTRICAL

DRAWINGS FOR OPENING LOCATIONS.

GENERAL PARTITION NOTES - GWB

1 ALL DIMENSIONS ARE NOMINAL TO FACE OF GWB. WHERE CERAMIC TILE IS

SCHEDULED, DIMENSIONS ARE TO FACE OF GWB.

2 ALL METAL FRAMING TO BE 3 5/8” UNLESS OTHERWISE NOTED. METAL

STUDS TO BE PLACED 16” ON CENTER. WHERE REQUIRED STUD WIDTH

CANNOT BE INSTALLED, PROVIDE STUD WIDTH, FRAMING OF SUITABLE

GAGE AND STYLE TO SUIT JOB CONDITION.

3 ALL GYPSUM BOARD (GWB) TO BE 5/8” TYPE-X 1 HOUR FIRE RATED. AT

SHOWER, TUB, LOCKER ROOM OR WET AREAS ALL GWB (CEILINGS OR

PARTITIONS) TO BE MOISTURE RESISTANT TYPE. AT CERAMIC TILE AREAS

PROVIDE CEMENT BACKER UNIT (CEMENT BOARD) IN LIEU OF GWB TO

RECEIVE CERAMIC TILE.

4 PROVIDE ACOUSTICAL SEALANT AT ALL PARTITIONS, PERIMETERS,

RUNNERS, ELECTRICAL OUTLETS, PENETRATIONS AND OPENINGS, TO

MINIMIZE SOUND TRANSMISSION. ELECTRICAL OUTLETS SHALL BE

SEPARATED BY MINIMUM ONE STUD, BACK TO BACK RECEPTACLES ARE

NOT ACCEPTABLE.

5 ALL PARTITIONS TO RECEIVE 3” SOUND ATTENUATION BLANKET UNLESS

INDICATED IN PARTITION REMARKS SECTION OF PARTITION SYMBOL.

6 PROVIDE FIRE RATED PARTITIONS WHERE INDICATED. FIRE STOP/FIRE

SAFE AND SMOKE STOP ALL PENETRATIONS THROUGH PARTITIONS, GAPS

AND JOINTS. ALL FIRE RATED PARTITION ASSEMBLIES SHALL EXTEND FULL

HEIGHT UNLESS OTHERWISE NOTED. FIRE RATED PARTITION

TERMINATIONS SHALL BE FIRE STOPPED/FIRE SAFED TO PROVIDE THE

SCHEDULED FIRE RESISTANCE RATING. REFER TO BUILDING CODE REVIEW

PLAN(S).

7 WHERE GWB PARTITION EDGE ALIGNS WITH CMU PARTITION EDGE, ADJUST

ALIGNMENT SO THAT GWB SURFACE LAMINATES OVER CMU, EXTEND GWB

TO CORNER.

8 METAL STUDS IN CHASE PARTITIONS TO BE BRACED TO EACH OTHER AT 1/3

POINTS.

9 PROVIDE SOLID BLOCKING AT ALL WALLS RECEIVING WALL MOUNTED

EQUIPMENT AND/OR ACCESSORIES. COORDINATE WITH ALL TRADES AND

OWNERS EQUIPMENT/FURNITURE LAYOUTS.

10 ALL RECESSED ITEMS SUCH AS ELECTRICAL PANELS, FIRE HOSE AND

EXTINGUISHER CABINETS, ETC., LOCATED IN FIRE RATED PARTITION

ASSEMBLIES SHALL BE BACKED W/ GWB AS REQUIRED TO MAINTAIN FIRE

RESISTANCE RATING.

11 WHERE INSULATION EXTENDS FULL HEIGHT AND IS NOT CONCEALED BY

GYPSUM BOARD, PROVIDE COMPRESSION RODS OR SUITABLE FRAMING TO

SUPPORT INSULATION.

12 GWB CONSTRUCTION SHALL BE ISOLATED WITH CONTROL JOINTS WHERE:

- PARTITIONS OR CEILINGS OF DISSIMILAR CONSTRUCTION MEET AND

REMAIN IN THE SAME PLANE.

- WHERE WINGS OF “L”, “U”, & “T” SHAPED CEILING AREAS ARE JOINED.

- EXPANSION OR CONTROL JOINTS OCCUR IN THE BUILDING STRUCTURE OR

WALL CONSTRUCTION. PROVIDE CONTROL JOINTS IN THE FACE OF GWB

PARTITIONS AND CEILINGS WHEN THE SIZE OF THE SURFACE EXCEEDS THE

FOLLOWING CONTROL JOINT SPACING:

- PARTITIONS: 30’ MAXIMUM IN EITHER DIRECTION.

- INTERIOR CEILINGS: 50’ MAX IN EITHER DIRECTION (W/PERIMETER

RELIEF). 30’ MAX IN EITHER DIRECTION (W/O PERIMETER RELIEF).

13 PARTITION TYPES ARE INDICATED ON FLOOR PLANS. EACH PARTITION TYPE

SCHEDULED PROVIDES A COMPLETE ASSEMBLY DESCRIPTION INCLUDING

METAL STUD SIZE, THICKNESS AND NUMBER OF LAYERS OF GWB REQUIRED.

SOUND ATTENUATION BLANKET, AND OTHER DATA, WHERE PARTITION

TYPES ARE NOT INDICATED ON FLOOR PLANS, PROVED THE FOLLOWING:

- 3 5/8” METAL STUDS, (MIN GAUGE OF 20)

- (1) LAYER 5/8” GWB (BOTH SIDES).

- SOUND ATTENUATION BLANKET IN STUD CAVITY.

1" = 1'-0"A-002

1 WALL TYPE 411

3/4" = 1'-0"A-002

3 TYPICAL BLOCKING DETAIL

1" = 1'-0"A-002

5 WALL TYPE 980

1" = 1'-0"A-002

2 WALL TYPE 920

WH

DEMO

50' - 6"

/2

3 3 3 3

76 SF

JANITOR'S

CLOSET

C4-D

AD100

115 SF

ELECTRIC ROOM

D3-C

14 14

16 16

AD100

12 11 V

IF

88 9

9 9 9

NKB

N. .______________________________________________________

ARCHITECTURE & ENGINEERING, PC..

K BHANDARI

SHEET SIZE: 24" x 36"

DESIGN FIRM NKB# 16340.09

NYS Education Law, Section 7209 Prohibits any person to alter these drawings other than a licensed architect or the design engineer. Information on these drawings remainsthe property of the licensed professionals who prepared them and may only be used on the project identified below.

Copyright 2019 N.K. BHANDARI, Architecture & Engineering, P.C.

DRAWING NO: SHEET: FACILITY NO:

OF

SHEET TITLE:

PROJECT TITLE:

Rev. Date Description Drawn Approved

DATE:

BUILDING 3

PROJECT MGR:

PROJECT

NO:

DRAFTER:

Rome Research Site

Air Force Research Laboratory

Rome Research Site, New York

RIO:

RIOCC:

RIOS:

66abw/def:

RIOC:

RIOCO:

RIOF:

USER:

RIOCC:

RIOCV:

DET 4/SE:

USER:DATE

DATE

DATE

DATE

DATE

DATE

DATE

DATE

DATE

DATE

DATE

DATE

DESIGNER:

CONSULTANT:

2/25/2019 11:04:32 AM

4 30AD100 02/22/2019

DEMOLITION PLANS

MODERNIZE C4

RESTROOMS AND BREAK

ROOM BUILDING 3

FA8751-18-F-AS08

AAT

AAT

DBH

DEMO PLAN- KEYED NOTES- SHEET AD100

NUMBER DESCRIPTION

1 REMOVE AND DISCARD FULL HEIGHT MASONRY AND/OR STUD

WALLS.

2 REMOVE ALL PLUMBING FIXTURES AND EQUIPMENT, EXISTING

SINKS, WATER CLOSETS, URINALS, MOP SINKS AND RELATED

PLUMBING. SEE PLUMBING DRAWINGS FOR SCHEDULED WORK.

3 REMOVE AND DISCARD DOORS, FRAMES AND HARDWARE.

4 REMOVE AND DISCARD TOILET PARTITONS IN THEIR ENTIRETY.

5 REMOVE AND DISCARD ALL WALL MOUNTED EQUIPMENT IN THEIR

ENTIRETY.

6 REMOVE AND DISCARD WATER HEATERS. SEE PLUMBING PLANS

FOR SCHEDULED WORK.

7 REMOVE AND DISCARD EXISTING CASEWORK AND COUNTERTOPS

IN THEIR ENTIRETY.

8 REMOVE AND DISCARD ALL CEILING MOUNTED EQUIPMENT IN

THEIR ENTIRETY.

9 REMOVE AND DISCARD ALL CEILING TILE AND GRID IN THEIR

ENTIRETY.

10 REMOVE AND DISCARD GYPSUM AND SOFFITS IN THEIR ENTIRETY.

11 CARFULLY REMOVE AND DISCARD CONCRETE "TABLE"

STRUCTURE IN ITS ENTIRETY IN SEGMENTS AND SHORE UP AS

NEEDED.

12 AFTER REMOVING THE CONCRETE STRUCTURE IN ITS ENTIRETY,

FLUSH CUT THE REMAINS BACK TO EXISTING CMU WALLS AND

FLOORS.

13 REMOVE AND DISCARD ALL SHEETROCK AND/ OR TILES FROM

WALLS.

14 REMOVE AND DISCARD EXISTING GLASS BLOCK AND TRIM PIECES.

PREPARE EXISTING OPENING FOR INFILL. SEE CONSTRUCTION

PLANS FOR SCHEDULED WORK.

15 REMOVE AND STORE IN SAFE PLACE, EXISTING WALL DISPLAY.

REINSTALL ON EAST WALL OPPOSITE FROM THE RENOVATED

TOILET ROOMS.

16 SAW-CUT EXISTING CONCRETE SLAB IN PREPARATION FOR NEW

ELECTRICAL TO BREAK ROOM ISLAND. REFER TO ELECTRICAL

DRAWINGS FOR SHEDULED WORK AND EXTENTS OF REQUIRED

SAW-CUTTING.

17 REINSTALL WALL DISPLAY ON EAST SIDE OF MAIN CORRIDOR,

OPPOSITE FORM RESTROOM OPENING.

GENERAL DEMOLITION NOTES

1 ANY ITEM NOT SPECIFICALLY IDENTIFIED BUT REQUIRED TO BE REMOVED OR REPAIRED TO

PREPARE THE BUILDING FOR THE NEW WORK OR TO OTHERWISE PRODUCE THE FINISHED

PRODUCT SHOWN IN THE CONTRACT DOCUMENTS, IS THE RESPONSIBILITY OF THE GENERAL

CONTRACTOR. SOME ITEMS REQUIRING REMOVALS ARE NOT VISIBLE AT THIS TIME, DUE TO

EXISTING CONSTRUCTION.

2 DEMOLITION WORK SHALL BE SCHEDULED AT ALL TIMES AND BE SUBJECT TO THE DIRECTION

AND APPROVAL OF THE OWNER.

3 EXISTING CONSTRUCTION TO REMAIN SHALL BE PRESERVED AND PROTECTED DURING

CONSTRUCTION. DAMAGE TO EXISTING CONSTRUCTION TO REMAIN SHALL BE PATCHED AND

REPAIRED TO MATCH EXISTING CONDITIONS AT NO ADDITIONAL COST TO THE OWNER,

INCLUDING THE MAINTENANCE OF ALL FIRE RATINGS AT STRUCTURAL MEMBERS, FLOORS,

WALLS, CEILINGS, ETC.

4 PRIOR TO ANY DEMOLITION, THE GENERAL CONTRACTOR SHALL COORDINATE BRACING TO

MAINTAIN THE STRUCTURAL INTEGRITY OF THE REMAINING ELEMENTS OF THE BUILDING AS

REQUIRED.

5 CONTRACTOR SHALL REMOVE ALL MATERIALS IN A WORKMAN-LIKE MANNER APPROVED BY THE

OWNER AND DISPOSE OF ALL MATERIALS PER APPLICABLE CODES.

6 COMPLY WITH GOVERNING REGULATIONS PERTAINING TO ENVIRONMENTAL PROTECTION FOR

POLLUTION CONTROL & HAZARDOUS MATERIALS.

7 REMOVE AND DISPOSE OF ALL EXISTING CASEWORK AND ACCESSORIES. FILL ANY OPENINGS IN

FLOOR AND CEILING SLAB TO MATCH EXISTING.

8 REFER TO M/E/P DEMOLITION DRAWINGS FOR REMOVAL OF EXISTING ELECTRICAL,

TELECOMMUNICATION, DATA, WALL-MOUNTED CONDUITS, MEDICAL GAS OUTLETS, LINES,

METERS, DUCT WORK, PLUMBING.

9 EXISTING CEILING SYSTEM AND FIXTURES TO BE REMOVED THROUGHOUT. COORDINATE

DISCONNECTION OF SERVICES WITH OTHER TRADES PRIOR TO REMOVAL.

10 EXISTING FLOOR FINISHES TO BE REMOVED DOWN TO EXISTING SOUND SUBSTRATE AND

PREPARED TO RECEIVE NEW FLOORING AS SCHEDULED.

1/4" = 1'-0"AD100

1 DEMOLITION - FLOOR PLAN

1/4" = 1'-0"AD100

2 CEILING DEMOLITION PLAN

1/4" = 1'-0"AD100 AD100

3 DEMOLITION SECTION AT RESTROOMS

AD100

4 3D DEMOLITION VIEW

EXISTING CONCRETE "TABLE"

STRUCTURE ABOVE RESTROOM

CEILINGS TO BE REMOVED IN ITS

ENTIRETY, INCLUDING, VERTICAL

"LEGS" AND FLOOR "BULKHEADS".

M ic ro w a v e

M ic ro w a v e

AE4026

AE401XX 5

AE502

65 SF

VESTIBULE

C4-VEST

52 SF

ADA TOILET

C4-C

54 SF

ADA TOILET

C4-A

440 SF

EMPLOYEE

BREAK ROOM

B4-E

AE402

AE402

AE402

AE4016 2

4C4-B4

C4-B3

C4-B2

C4-B1 C4-B5

C4-B6

C4-B7

C4-B8

76 SF

JANITOR'S

CLOSET

C4-D

AE4011

AE501

AE501

AE501

AE501

EQ. EQ.

980980

920 920 920

920920920

AE401

1 1

AE502

13' - 4"

OPENING

3' - 6" 19' - 2 1/2"

OPENING

6' - 0"

VIF

8' - 5 1/2" +/-

4 1/2"

V

IF

2' - 0"

ALIGN

ALIGN

2' - 0" 5' - 1" 2' - 6" 10' - 5"

VIF

1' - 4 1/2" +/-

NIC

NIC

NIC

NIC

NIC

NIC

115 SF

ELECTRIC ROOM

D3-C

/2

/2

ALIGN

CLEAR

5' - 1 1/2" 5' - 9"

CLEAR

5' - 1 1/2"A L

IG

N

A L

IG

N

4 4

5 5

8 8

LED LINE

LIGHTING LED LINE

LIGHTING

LED LINE LIGHTINGLED LINE LIGHTING

11 11

439 SF

SHARED

RESTROOM

C4-B

AE402

6' - 5" 4' - 5" 3' - 10" 4' - 1" 4' - 1" 6' - 5"

.0

A L

IG

N

A L

IG

N

A L

IG

N

A L

IG

N

MIN.

4' - 0"

9 13

9 13

9 13

9 13

9 13

980980

11" 1' - 3" 4' - 9" 1' - 2" 5' - 0" 3' - 6" 5' - 1" 1' - 2" 4' - 9" 1' - 3" 8"

4' - 0"

.0

6 6

NKB

N. .______________________________________________________

ARCHITECTURE & ENGINEERING, PC..

K BHANDARI

SHEET SIZE: 24" x 36"

DESIGN FIRM NKB# 16340.09

NYS Education Law, Section 7209 Prohibits any person to alter these drawings other than a licensed architect or the design engineer. Information on these drawings remainsthe property of the licensed professionals who prepared them and may only be used on the project identified below.

Copyright 2019 N.K. BHANDARI, Architecture & Engineering, P.C.

DRAWING NO: SHEET: FACILITY NO:

OF

SHEET TITLE:

PROJECT TITLE:

Rev. Date Description Drawn Approved

DATE:

BUILDING 3

PROJECT MGR:

PROJECT

NO:

DRAFTER:

Rome Research Site

Air Force Research Laboratory

Rome Research Site, New York

RIO:

RIOCC:

RIOS:

66abw/def:

RIOC:

RIOCO:

RIOF:

USER:

RIOCC:

RIOCV:

DET 4/SE:

USER:DATE

DATE

DATE

DATE

DATE

DATE

DATE

DATE

DATE

DATE

DATE

DATE

DESIGNER:

CONSULTANT:

2/25/2019 11:04:33 AM

5 30AE101 02/22/2019

CONSTRUCTION PLAN

MODERNIZE C4

RESTROOMS AND BREAK

ROOM BUILDING 3

FA8751-18-F-AS08

AAT

AAT

DBH

GENERAL FLOOR PLAN NOTES

1 FURNITURE TO BE BY OWNER UNLESS SPECIFICLY SCHEDULED.

2 PATCH , REPAIR, AND LEVEL EXISTING CONCRETE FLOOR AS REQUIRED TO RECEIVE

SCHEDULED FINISHES.

1/2" = 1'-0"AE101

1 CONSTRUCTION FLOOR PLAN

FLOOR PLAN - KEYED NOTES- A101

NUMBER DESCRIPTION

1 CASED OPENING TO RECIEVE DRYWAL RETURNS AND TRANSITION TYPE T5. OPENING HEIGHT TO BE 7'-0"

2 INSTALL NEW MOP SINK AS SCHEDULED. SEE PLUMBING PLANS FOR SCHEDULED WORK.

3 EXISTING CONCRETE SLAB TO REMAIN. GRIND SMOOTH, PATCH, LEVEL AND REPAIR AS REQUIRED IN

PREPARATION FOR NEW FLOOR FINISHES.

4 INSTALL NEW MIRROR, WITH LED BACK-LIGHTING, ABOVE COUNTER. SEE DETAIL FOR SHEDULED WORK.

5 INSTALL NEW TROUGH STYLE SINKS WITH INTEGRATED FAUCET, SOAP DISPENSERS AND COUNTERTOP.

6 CONTINUE MATCHING COUNTERTOP MATERIAL AND MATCHING TROUGH SINK APRON TO WALL.

7 INSTALL NEW WATER CLOSETS. SEE PLUMBING DRAWINGS FOR SCHEDULED WORK.

8 INSTALL NEW TOILET COMPARTMENT DOORS, FRAMES, AND HARDWARE. SEE DOOR AND HARDWARE

SCHEDULES.

9 INSTALL NEW TOILET ROOM ACCESSORIES AND GRAB BARS WHERE INDICATED. SEE ACCESSORIES

SCHEDULE AND ELEVATIONS FOR DETAILS.

10 INSTALL NEW CONTINUOUS BRUSHED STAINLESS STEEL ACCESSORY SHELF BELOW MIRROR.

11 INFILL WINDOW OPENINGS FLUSH WITH LIKE ADJACENT MATERIALS.

12 PREPARE EXISTING MASONRY WALL FOR NEW FINISHES. APPLY 1/2" CEMENT BOARD SUBSTRATE AND

FINISH WITH CERAMIC PER ELEVATION AND FINISH SCHEDULE.

13 INSTALL CERAMIC TILE ON NEW PARTITIONS. SEE ELEVATIONS AND FINISH SCHEDULE FOR DETAILS.

14 BOX OUT EXISTING CASED OPENING. INFILL WITH CUSTOM GLASS DISPLAY CASE, SEE ELEVATIONS AND

DETAILS.

15 PROVIDE FIRE-RETARDANT-TREATED WOOD BLOCKING FOR TV/ GLASS MARKER BOARDS. COORDINATE

BLOCKING LOCATIONS WITH PRODUCT SPECS AND OWNER.

ANGLE MOLDING

HANGER WIRE

MAIN BEAM

ACOUSTICA

L PANEL

CROSS TEE

4' & 2' RECESSED CLICK

LIGHTING

SPRINKLER HEAD

MECHANICAL

SUPPLY

DIFFUSER

MECHANICAL

RETURN

REGISTER

NOTE: REFER TO MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE PROTECTION DRAWINGS

FOR FURTHER DETAILS AND LOCATIONS

PHOTOCELL PC

OCCUPANCY

SENSOR

FIRE SYSTEM SPEAKER

(CEILING MOUNTED)

S

A / V SPEAKER

(WALL

MOUNTED)

S

RECESSED LIGHTING

FIXTURE

EXHAUST AIR GRILL

UNDER CABINET LED

LIGHTING

LED LINE FIXTURE

AE502

2' - 9 1/2"

1' - 1"

2' - 1"

/2

AE502

65 SF

VESTIBULE

C4-VEST

76 SF

JANITOR'S

CLOSET

C4-D

440 SF

EMPLOYEE

BREAK ROOM

B4-E

AE501

TYP

AE501

TYP

54 SF

ADA TOILET

C4-A

52 SF

ADA TOILET

C4-C

AE102

TYP

EXISTING ACT

2 1

1 1

AE501

TYP

AE502

Sim

A.F.F.

2' x 4' ACT System

9' - 1"

A.F.F.

2' x 4' ACT System

9' - 0"A.F.F.

2' x 4' ACT System

9' - 0"A.F.F.

2' x 4' ACT System

9' - 0"

A.F.F.

2' x 4' ACT System

8' - 0"

(TYP. OF ALL)

A.F.F.

GWB on Mtl. Stud

8' - 0"

(TYP. OF EACH)

A.F.F.

GWB on Mtl. Stud

7' - 0"

VENDING MACH.

BELOW

1' - 10 1/2" 10"10" 1' - 10"

439 SF

SHARED

RESTROOM

C4-B 2

3 3

NKB

N. .______________________________________________________

ARCHITECTURE & ENGINEERING, PC..

K BHANDARI

SHEET SIZE: 24" x 36"

DESIGN FIRM NKB# 16340.09

NYS Education Law, Section 7209 Prohibits any person to alter these drawings other than a licensed architect or the design engineer. Information on these drawings remainsthe property of the licensed professionals who prepared them and may only be used on the project identified below.

Copyright 2019 N.K. BHANDARI, Architecture & Engineering, P.C.

DRAWING NO: SHEET: FACILITY NO:

OF

SHEET TITLE:

PROJECT TITLE:

Rev. Date Description Drawn Approved

DATE:

BUILDING 3

PROJECT MGR:

PROJECT

NO:

DRAFTER:

Rome Research Site

Air Force Research Laboratory

Rome Research Site, New York

RIO:

RIOCC:

RIOS:

66abw/def:

RIOC:

RIOCO:

RIOF:

USER:

RIOCC:

RIOCV:

DET 4/SE:

USER:DATE

DATE

DATE

DATE

DATE

DATE

DATE

DATE

DATE

DATE

DATE

DATE

DESIGNER:

CONSULTANT:

2/25/2019 11:04:36 AM

6 30AE102 02/22/2019

REFLECTED CEILING PLAN

MODERNIZE C4

RESTROOMS AND BREAK

ROOM BUILDING 3

FA8751-18-F-AS08

AAT

AAT

DBH

NO SCALEAE102

1 TYPICAL ACT CEILING DETAIL

REFLECTED CEILING PLAN FIXTURES

1/2" = 1'-0"AE102

2 CEILING DEMOLITION PLAN(1)

GENERAL REFLECTED CEILING NOTES

1 MECHANICAL, ELECTRICAL, AND FIRE PROTECTION WORK SHOWN ON

REFLECTED CEILING PLAN IS SHOWN FOR REFERENCE ONLY. REFER TO M. E.

FP. DRAWINGS FOR MORE INFORMATION ON THE SCOPE OF THIS WORK.

2 SUSPENSION WIRES TO STRUCTURE ABOVE IF NEED PROVIDE ADDITIONAL

STRUCTURAL CROSS SUPPORTS AS REQUIRED

RCP - KEYED NOTES- AE102

NUMBER DESCRIPTION

1 INSTALL 2x4 ACOUSTIC CEILING TILE PER MANUFATURER RECOMMENDATIONS

2 INSTALL LIGHTING FIXTURES AS SHOWN, ELECTRCAL DRAWINGS

3 INSTALL SUSPENDED GWB SOFFIT PER DETAIL. PAINT PER FINISH SCHEDULE.

NKB

N. .______________________________________________________

ARCHITECTURE & ENGINEERING, PC..

K BHANDARI

SHEET SIZE: 24" x 36"

DESIGN FIRM NKB# 16340.09

NYS Education Law, Section 7209 Prohibits any person to alter these drawings other than a licensed architect or the design engineer. Information on these drawings remainsthe property of the licensed professionals who prepared them and may only be used on the project identified below.

Copyright 2019 N.K. BHANDARI, Architecture & Engineering, P.C.

DRAWING NO: SHEET: FACILITY NO:

OF

SHEET TITLE:

PROJECT TITLE:

Rev. Date Description Drawn Approved

DATE:

BUILDING 3

PROJECT MGR:

PROJECT

NO:

DRAFTER:

Rome Research Site

Air Force Research Laboratory

Rome Research Site, New York

RIO:

RIOCC:

RIOS:

66abw/def:

RIOC:

RIOCO:

RIOF:

USER:

RIOCC:

RIOCV:

DET 4/SE:

USER:DATE

DATE

DATE

DATE

DATE

DATE

DATE

DATE

DATE

DATE

DATE

DATE

DESIGNER:

CONSULTANT:

2/25/2019 11:04:38 AM

7 30AE103 02/22/2019

AXONS

MODERNIZE C4

RESTROOMS AND BREAK

ROOM BUILDING 3

FA8751-18-F-AS08

AAT

AAT

DBH

AE103

1 AXON EMPLOYEE BREAK ROOM 106

AE103

2 AXON SHARED RESTROOM

AE501

AE501

AE501

3' - 0" 3' - 0" 1' - 6 1/2" 2' - 6"

3' - 0" 3' - 0" 1' - 6 1/2" 2' - 6"

FACE AND UNDER SIDE

OF SOFFIT, PNT2

CASEWORK,

SOLID WOOD CONST.,

MAPLE, SLAB STYLE,

FULL OVETLAY

ANODIZED ALUM. PULL

CT1

PTH2

MICROWAVES BY OWNER

PNT1

RB1

PNT2

/2

AE501

3' - 0" 3' - 0" 1' - 6" 1' - 6"2' - 2 1/2"

RB1

CASEWORK,

SOLID WOOD CONST.,

MAPLE, SLAB STYLE,

FULL OVETLAY

CT1

SSM1REF. BY OWNER

COFFEE MAKERS

BY OWNER

RB

SSM1

PNT

1" 2' - 7 1/2" 1"

PNT

RB

TV BY OWNER,

INSTAL. BY

CONTRACTOR

EGAN, EGANAERO

HOVER GLASS

BOARD,

78"W X 48"H

EGAN, EGANAERO

HOVER GLASS

BOARD,

60"W X 48"H

ALIGN ALIGN

PNT

RB1

SSM1

12' - 0"

AE502

WOOD FACADE, PNT

1/2" TEMPERED GLASS

SLIDING DOOR

1/2" TEMPERED GLASS

SHELF

EXISTING WALL

FINISH TO REMAIN

WOOD TOEKICK, PNT

TRACK, SATIN ALUM.

TRACK, SATIN ALUM.

WOOD FACADE, PNT

CT1

GB2 TPD1

US1

NOTE: GRAB BARS ARE ONLY IN ROOM C4-B8

CT2

CTB1

S E

A T

2' - 7"

GRAB BARS AT

AMBULATORY

STALL TYP.

CT1

NOTE: GRAB BARS ARE ONLY

IN ROOM C4-B8

CT2

CTB1

GB2

NOTE: GRAB BARS ARE ONLY IN ROOM C4-B8

CT1

CT2

CTB1

RH1

NOTE: GRAB BARS ARE ONLY

IN ROOM C4-B8

CT1

CT2

CTB1

NKB

N. .______________________________________________________

ARCHITECTURE & ENGINEERING, PC..

K BHANDARI

SHEET SIZE: 24" x 36"

DESIGN FIRM NKB# 16340.09

NYS Education Law, Section 7209 Prohibits any person to alter these drawings other than a licensed architect or the design engineer. Information on these drawings remainsthe property of the licensed professionals who prepared them and may only be used on the project identified below.

Copyright 2019 N.K. BHANDARI, Architecture & Engineering, P.C.

DRAWING NO: SHEET: FACILITY NO:

OF

SHEET TITLE:

PROJECT TITLE:

Rev. Date Description Drawn Approved

DATE:

BUILDING 3

PROJECT MGR:

PROJECT

NO:

DRAFTER:

Rome Research Site

Air Force Research Laboratory

Rome Research Site, New York

RIO:

RIOCC:

RIOS:

66abw/def:

RIOC:

RIOCO:

RIOF:

USER:

RIOCC:

RIOCV:

DET 4/SE:

USER:DATE

DATE

DATE

DATE

DATE

DATE

DATE

DATE

DATE

DATE

DATE

DATE

DESIGNER:

CONSULTANT:

2/25/2019 11:04:43 AM

8 30AE401 02/22/2019

INTERIOR ELEVATIONS

MODERNIZE C4

RESTROOMS AND BREAK

ROOM BUILDING 3

FA8751-18-F-AS08

AAT

AAT

DBH

1/2" = 1'-0"AE101 AE401

XX SOUTH ELEVATION 2 EMPLOYEE BREAK ROOM 105

1/2" = 1'-0"AE101 AE401

5 NORTH ISLAND ELEVATION EMPLOYEE BREAK ROOM 105

1/2" = 1'-0"AE101 AE401

4 WEST ISLAND ELEVATION EMPLOYEE BREAK ROOM 105

1/2" = 1'-0"AE101 AE401

2 NORTH ELEVATION EMPLOYEE BREAK ROOM 105

1/2" = 1'-0"AE101 AE401

6 SOUTH ISLAND ELEVATION EMPLOYEE BREAK ROOM 105

1/2" = 1'-0"AE101 AE401

1 SOUTH ELEVATION COORIDOR

1/2" = 1'-0"AE101 AE401

7 WEST ELEVATION TOILET STALL, TYP.

1/2" = 1'-0"AE101 AE401

8 NORTH ELEVATION TOILET STALL, TYP.

1/2" = 1'-0"AE101 AE401

9 EAST ELEVATION TOILET STALL, TYP.

1/2" = 1'-0"AE101 AE401

10 SOUTH ELEVATION STOILET STALL, TYP.

CT1

SOFFIT, PNT2

CT2

CTB2

TPD1

US1

3' - 5"

3' - 6"1' - 0"

2' - 7"

3' - 0"

/2

3' - 2"

CT1

CT2

CTB1

CT1

SOFFIT, PNT2

CT2

CTB1

PTD1

D

IS

P E

N S

E R

CT1

CT2

MIRROR

SHELF

SOFFIT, PNT2

AUTOMATIC

FAUCET

AE502

R E

F L E

C T

IV

E

S U

R F

A C

E

M A

X

SD1

3' - 5 1/2"

2' - 0" 1' - 0"

S E

A T

AE502

CT1

MIRROR

BRUSHED

STAINLESS

STEEL SHELF

SOFFIT, PNT2

AUTOMATIC

FAUCET

SD1 SD1 SD1

CT2

CT1

CTB1

CT1

CT2

CTB1

CT1

CT2

CTB1

OPEN TO

VESTIBULE C4-VEST

BEYOND

CT1

CT2

PTD1 HD1 PTD1HD1

CTB1

OPEN TO

SHARED

RESTROOM C4-B

BEYOND

CT2

CT1

CTB1

CT1

CT2

CTB1

MR1 MR1

EQ EQ EQ EQ

NKB

N. .______________________________________________________

ARCHITECTURE & ENGINEERING, PC..

K BHANDARI

SHEET SIZE: 24" x 36"

DESIGN FIRM NKB# 16340.09

NYS Education Law, Section 7209 Prohibits any person to alter these drawings other than a licensed architect or the design engineer. Information on these drawings remainsthe property of the licensed professionals who prepared them and may only be used on the project identified below.

Copyright 2019 N.K. BHANDARI, Architecture & Engineering, P.C.

DRAWING NO: SHEET: FACILITY NO:

OF

SHEET TITLE:

PROJECT TITLE:

Rev. Date Description Drawn Approved

DATE:

BUILDING 3

PROJECT MGR:

PROJECT

NO:

DRAFTER:

Rome Research Site

Air Force Research Laboratory

Rome Research Site, New York

RIO:

RIOCC:

RIOS:

66abw/def:

RIOC:

RIOCO:

RIOF:

USER:

RIOCC:

RIOCV:

DET 4/SE:

USER:DATE

DATE

DATE

DATE

DATE

DATE

DATE

DATE

DATE

DATE

DATE

DATE

DESIGNER:

CONSULTANT:

2/25/2019 11:04:49 AM

9 30AE402 02/22/2019

INTERIOR ELEVATIONS

MODERNIZE C4

RESTROOMS AND BREAK

ROOM BUILDING 3

FA8751-18-F-AS08

AAT

AAT

DBH

1/2" = 1'-0"AE101 AE402

2 WEST ELEVATION ADA TOILET 102

1/2" = 1'-0"AE101 AE402

3 NORTH ELEVATION ADA TOILET 102

1/2" = 1'-0"AE101 AE402

4 EAST ELEVATION ADA TOILET 102

1/2" = 1'-0"AE101 AE402

5 SOUTH ELEVATION ADA TOILET 102

1/2" = 1'-0"AE101 AE402

6 SOUTH ELEVATION SHARED RESTROOM 104

1/2" = 1'-0"AE101 AE402

7 NORTH ELEVATION SHARED RESTROOM 104

1/2" = 1'-0"AE101 AE402

8 WEST ELEVATION SHARED RESTROOM 104

1/2" = 1'-0"AE101 AE402

9 EAST ELEVATION SHARED RESTROOM 104

1/2" = 1'-0"AE101 AE402

1 EAST ELEVATION VESTIBULE 101

1/2" = 1'-0"AE101 AE402

10 WEST ELEVATION 2 SHARED RESTROOM 104

6" CABINET PULL

1/4" (6 ) HOLES AT 2" O.C. FOR

SHELF SUPPORTS

CT BACKSPLASH AS SCHEDULED

6" CABINET PULL

RB

UNDERMOUNT STAINLESS

STEEL SINK AND TRIM. SEE

PLUMBING DRAWINGS AND

SPECS.

SSM COUNTERTOP OVER 3/4"

EXTERIOR GRADE PLYWOOD AT

SINK, TYP.

SOLID WOOD INTERIOR,

STAINED TO FINISH EXTERIOR

3/4" SOLID WOOD SLAB DOOR

EUROPEAN HINGES

(SOFT CLOSE)

SOLID WOOD INTERIOR,

STAINED TO FINISH EXTERIOR

3/4" SOLID WOOD SLAB DOOR

FAUCET. SEE PLUMBING

DRAWINGS AND SPECS.

METAL BLOCKING, TYP.

SOFFIT

/2

/2

2' - 0"

1' - 0 1/2" LED LINEAR LIGHTING

UNDER CABINET

6" CABINET PULL

1/4" (6 ) HOLES AT 2" O.C. FOR

SHELF SUPPORTS

CT BACKSPLASH AS SCHEDULED

6" CABINET PULL

RB

SSM COUNTERTOP OVER 3/4"

PLYWOOD

SOLID WOOD INTERIOR,

STAINED TO FINISH EXTERIOR

3/4" SOLID WOOD SLAB DOOR

EUROPEAN HINGES

(SOFT CLOSE)

SOLID WOOD INTERIOR,

STAINED TO FINISH EXTERIOR

3/4" SOLID WOOD SLAB DOOR

METAL BLOCKING, TYP.

SOFFIT

2' - 0"

LED LINEAR LIGHTING

UNDER CABINET

DRAWER SLIDES 100LB.

PULL EXTENSION BALL

BEARING SLIDES, SOFT

CLOSE

6" CABINET PULL

1/4" (6 ) HOLES AT 2" O.C. FOR

SHELF SUPPORTS

6" CABINET PULL

RB

SOLID WOOD BACK AND

INTERIOR, STAINED TO FINISH

EXTERIOR

3/4" SOLID WOOD SLAB

DRAWER FRONT

EUROPEAN HINGES

(SOFT CLOSE)

SOLID WOOD INTERIOR,

STAINED TO FINISH EXTERIOR

3/4" SOLID WOOD SLAB DOOR

METAL BLOCKING, TYP.

SOFFIT

1/2" SOLID WOOD FIXED SHELF

W/ SOLID WOOD AT EXPOSED

EDGES

/2

/2

1' - 10 1/2"

6" CABINET PULL

METAL

BLOCKING, TYP.

CUT OUT

7 1/2" 7 1/2"9"

SSM COUNTERTOP

OVER 3/4" PLYWOOD

3/4" SOLID WOOD

SLAB DOOR

RB

DRAWER SLIDES

100LB. RULL

EXTENSION BALL

BEARING SLIDES,

SOFT CLOSE

CT AS

SCHEDULED

SSM CAP OVER

3/4" PLYWOOD

CEILING MAIN BEAM

CROSS TEE

SCHEDULED

CEILING

SUSPENSION WIRES TO

STRUCTURE ABOVE

CHANNEL MOLDING

5/8" GWB

5/8" GWB W/ CORNER

BEAD

M A

X

MAX 8"

5/8" GWB W/ CORNER

BEAD

BRACING AS REQUIRED

MFR TRANSITION CLIP

NKB

N. .______________________________________________________

ARCHITECTURE & ENGINEERING, PC..

K BHANDARI

SHEET SIZE: 24" x 36"

DESIGN FIRM NKB# 16340.09

NYS Education Law, Section 7209 Prohibits any person to alter these drawings other than a licensed architect or the design engineer. Information on these drawings remainsthe property of the licensed professionals who prepared them and may only be used on the project identified below.

Copyright 2019 N.K. BHANDARI, Architecture & Engineering, P.C.

DRAWING NO: SHEET: FACILITY NO:

OF

SHEET TITLE:

PROJECT TITLE:

Rev. Date Description Drawn Approved

DATE:

BUILDING 3

PROJECT MGR:

PROJECT

NO:

DRAFTER:

Rome Research Site

Air Force Research Laboratory

Rome Research Site, New York

RIO:

RIOCC:

RIOS:

66abw/def:

RIOC:

RIOCO:

RIOF:

USER:

RIOCC:

RIOCV:

DET 4/SE:

USER:DATE

DATE

DATE

DATE

DATE

DATE

DATE

DATE

DATE

DATE

DATE

DATE

DESIGNER:

CONSULTANT:

2/25/2019 11:04:51 AM

10 30AE501 02/22/2019

DETAILS

MODERNIZE C4

RESTROOMS AND BREAK

ROOM BUILDING 3

FA8751-18-F-AS08

AAT

AAT

DBH

1 1/2" = 1'-0"AE101 AE501

1 Section 2

1 1/2" = 1'-0"AE101 AE501

2 SECTION AT TYPICAL BREAK ROOM CABINET

1 1/2" = 1'-0"AE101 AE501

3 SECTION AT BREAK ROOM MICROWAVE CABINET

1 1/2" = 1'-0"AE101 AE501

4 SECTION AT BREAK ROOM ISLAND CABINET

3" = 1'-0"AE102 AE501

5 CEILING TRANSITION 4 SOFFIT

/2

/2

CERAMIC TILE AS

SCHEDULED

CERAMIC TILE AS SCHEDULED

BRUSHED STAINLESS

STEEL SHELF

TROUGH SINK, COORDINATE

W/ PLUMBING DRAWINGS

LINEAR BACK-LIGHT,

COORDINATE

W/ ELECTRICAL DRAWINGS

CUSTOM MIRROR

LINEAR BACK-LIGHT, COORDINATE

W/ ELECTRICAL DRAWINGS

SOFFIT, PNT

ALL EXPOSED EDGES TO BE

WRAPPED IN BRUSHED

ALUMINUM

SD1

CERAMIC TILE, START FULL

TILE AT OUTSIDE CORNER

CERAMIC TILE AS SCHEDULED

AE502

CERAMIC TILE AS SCHEDULED

STAINLESS STEEL SHELF

TROUGH SINK, COORDINATE

W/ PLUMBING DRAWINGS

RECESSED LIGHTING, COORDINATE

W/ ELECTRICAL DRAWINGS

MIRROR

SOFFIT, PNT

ALL EXPOSED EDGES TO BE WRAPPED ALUMINUM ALL EXPOSED EDGES TO BE

WRAPPED IN ALUMINUM

RECESSED LIGHTING, COORDINATE

W/ ELECTRICLA DRAWINGS

M

IN

H O

L D

M

IN

R E

F L E

C T

IV

E

S U

R F

A C

E

11" MIN

8" MIN

HARDWOOD EDGE AT CORNERS

3/4" WOOD VENEER PLYWOOD, PAINT GRADE

1/2" TEMPERED GLASS SLIDING DOORS, LOCKING

HARDWARE TO BE SIMILAR TO RICHELIEU

"HARDWARE SET FOR SHOWCASE DISPLAY"

(#BP15510), FINISH TO BE SATIN ALUM.

TRACK SIMILAR TO RICHELIEU,

"TRACK SET FOR DISPLAY GLASS SLIDING

DOORS" (#1551210), FINISH TO BE SATIN ALUM.

HOLES AT "6 O.C.FOR SHELF SUPPORTS,

COORDINATE DIAMETER WITH SHELF SUPPORT,

SHELF SUPPORTS TO BE SIMILAR TO RICHELIEU,

K LINE GLASS SHELF PIN (#BP328180)

1/2" TEMPERED GLASS SHELF W/ BEVELED EDGES,

CONTRACTOR TO PROVIDE (6) SHELVES)

3/4" WOOD VENEER PLYWOOD, PAINT GRADE

WALL CONSTRUCTION AS SCHEDULED

RECESSED LIGHTING, COORDINATE

W/ ELECTRICAL DRAWINGS

3/4" WOOD VENEER PLYWOOD,

PAINT GRADE

WOOD BLOCKING AT (2) LOCATIONS TO SECURE DISPLAY

CASE TO WALL CONSTRUCTION

3/4" WOOD VENEER PLYWOOD, PAINT GRADE

/2

/2

TRACK SIMILAR TO RICHELIEU,

"TRACK SET FOR DISPLAY GLASS SLIDING

DOORS" (#1551210), FINISH TO BE SATIN ALUM.

RETURN EXISTING ACT CEILING TO NEW

DRYWAL SOFFIT

DRYWALL SOFFIT, HEIGHT TO MATCH EXISTING

ACT CEILING

SHELF WRAPED WITH 16 GUAGE

BRUSED STAINLESS STEEL SHEET

MECHANICALLY FASTEN SHELF TO

BASE OF MIRROR STRUCTURE,

ALL HARDWARE TO BE HIDDEN

LINEAR BACK-LIGHT, COORDINATE

W/ ELECTRICAL DRAWINGS

MIRROR

CERAMIC TILE AS SCHEDULED

HOLD

4"

HOLD

1 1/2" NKB

N. .______________________________________________________

ARCHITECTURE & ENGINEERING, PC..

K BHANDARI

SHEET SIZE: 24" x 36"

DESIGN FIRM NKB# 16340.09

NYS Education Law, Section 7209 Prohibits any person to alter these drawings other than a licensed architect or the design engineer. Information on these drawings remainsthe property of the licensed professionals who prepared them and may only be used on the project identified below.

Copyright 2019 N.K. BHANDARI, Architecture & Engineering, P.C.

DRAWING NO: SHEET: FACILITY NO:

OF

SHEET TITLE:

PROJECT TITLE:

Rev. Date Description Drawn Approved

DATE:

BUILDING 3

PROJECT MGR:

PROJECT

NO:

DRAFTER:

Rome Research Site

Air Force Research Laboratory

Rome Research Site, New York

RIO:

RIOCC:

RIOS:

66abw/def:

RIOC:

RIOCO:

RIOF:

USER:

RIOCC:

RIOCV:

DET 4/SE:

USER:DATE

DATE

DATE

DATE

DATE

DATE

DATE

DATE

DATE

DATE

DATE

DATE

DESIGNER:

CONSULTANT:

2/25/2019 11:04:52 AM

11 30AE502 02/22/2019

DETAILS

MODERNIZE C4

RESTROOMS AND BREAK

ROOM BUILDING 3

FA8751-18-F-AS08

AAT

AAT

DBH

1 1/2" = 1'-0"AE101 AE502

1 SECTION AT LAVATORY

1 1/2" = 1'-0"AE101 AE502

2 SECTION AT ACCESSIBLE LAVATORY

1 1/2" = 1'-0"AE401 AE502

3 SECTION AT GLASS DISPLAY CASE

3" = 1'-0"AE502 AE502

4 SECTION AT BATHROOM MIRROR

TYPE H1

HOLLOW METAL

WELDED FRAME

0' - 2" 0' - 2"

DOOR WIDTH

TYPE F

FLUSH

NOTE: DOOR TYPES ARE

GENERALLY BASED ON STEEL

DOOR INSTITUE STANDARD

STYLES

T5

• INTERIOR

• MARBLE THRESHOLD

SCHEDULED WALL

CONSTRUCTIONDOUBLE METAL

STUD HEADER

HOLLOW METAL

FRAME

SCHEDULED

DOOR

JAMB BEYOND

DOUBLE METAL

STUD, FULL HEIGHT

HOLLOW METAL

FRAME

SCHEDULED

DOOR

S E

E P

L A

N S

V A

R R

IE

S

C .L

T

Y P

IC

A

L L

O C

K S

E T

/1

C .L

D

E A

D B

O L T

FINISH FLOOR

NKB

N. .______________________________________________________

ARCHITECTURE & ENGINEERING, PC..

K BHANDARI

SHEET SIZE: 24" x 36"

DESIGN FIRM NKB# 16340.09

NYS Education Law, Section 7209 Prohibits any person to alter these drawings other than a licensed architect or the design engineer. Information on these drawings remainsthe property of the licensed professionals who prepared them and may only be used on the project identified below.

Copyright 2019 N.K. BHANDARI, Architecture & Engineering, P.C.

DRAWING NO: SHEET: FACILITY NO:

OF

SHEET TITLE:

PROJECT TITLE:

Rev. Date Description Drawn Approved

DATE:

BUILDING 3

PROJECT MGR:

PROJECT

NO:

DRAFTER:

Rome Research Site

Air Force Research Laboratory

Rome Research Site, New York

RIO:

RIOCC:

RIOS:

66abw/def:

RIOC:

RIOCO:

RIOF:

USER:

RIOCC:

RIOCV:

DET 4/SE:

USER:DATE

DATE

DATE

DATE

DATE

DATE

DATE

DATE

DATE

DATE

DATE

DATE

DESIGNER:

CONSULTANT:

2/25/2019 11:04:53 AM

12 30AE600 02/22/2019

DOOR SCHEDULE

MODERNIZE C4

RESTROOMS AND BREAK

ROOM BUILDING 3

FA8751-18-F-AS08

AAT

AAT

DBH

DOOR SCHEDULE

DOOR NUMBER ROOM NAME

ROOM

NUMBER

DOOR FRAME

THRESHOLD

FIRE

RATING REMARKS

HARDWARE

SET

DOOR

NUMBERWIDTH HEIGHT THICKNESS LEAF SIZE TYPE

DOOR

MATERIAL FINISH

FRAME

TYPE

FRAME

MATERIAL FRAME FINISH

FRAME

DETAIL

C4-B1 SHARED RESTROOM C4-B 2' - 6" 7' - 0" 0' - 1 3/4" 2' 6" F HM WD H1 HM PNT 4&5 / AE600 --- --- 1 C4-B1

C4-B2 SHARED RESTROOM C4-B 2' - 6" 7' - 0" 0' - 1 3/4" 2' 6" F HM WD H1 HM PNT 4&5 / AE600 --- --- 1 C4-B2

C4-B3 SHARED RESTROOM C4-B 2' - 6" 7' - 0" 0' - 1 3/4" 2' 6" F HM WD H1 HM PNT 4&5 / AE600 --- --- 1 C4-B3

C4-B4 SHARED RESTROOM C4-B 2' - 6" 7' - 0" 0' - 1 3/4" 2' 6" F HM WD H1 HM PNT 4&5 / AE600 --- --- 1 C4-B4

C4-B5 SHARED RESTROOM C4-B 2' - 6" 7' - 0" 0' - 1 3/4" 2' 6" F HM WD H1 HM PNT 4&5 / AE600 --- --- 1 C4-B5

C4-B6 SHARED RESTROOM C4-B 2' - 6" 7' - 0" 0' - 1 3/4" 2' 6" F HM WD H1 HM PNT 4&5 / AE600 --- --- 1 C4-B6

C4-B7 SHARED RESTROOM C4-B 2' - 6" 7' - 0" 0' - 1 3/4" 2' 6" F HM WD H1 HM PNT 4&5 / AE600 --- --- 1 C4-B7

C4-B8 SHARED RESTROOM C4-B 2' - 6" 7' - 0" 0' - 1 3/4" 2' 6" F HM WD H1 HM PNT 4&5 / AE600 --- --- C4-B8

C4-B17 ADA TOILET C4-C 3' - 0" 7' - 0" 0' - 1 3/4" 3' 0" F HM WD H1 HM PNT 4&5 / AE600 --- --- 1 C4-B17

C4-B19 ADA TOILET C4-A 3' - 0" 7' - 0" 0' - 1 3/4" 3' 0" F HM WD H1 HM PNT 4&5 / AE600 --- --- 1 C4-B19

DOOR SCHEDULE NOTES

1 ALL DOORS TO BE 1 ¾” THICK X 84” HIGH UON. ALL FRAMES TO BE 16 GA FULLY WELDED HOLLOW METAL. PROVIDE ANCHORAGE TYPE TO SUIT WALL CONSTRUCTION.

ALL FRAMES TO OVERLAP WALL FINISH. PROVIDE 20 GA STUDS AT JAMBS IN GYPSUM BOARD WALLS.

2 “EX” AT SCHEDULE DENOTES EXISTING. VERIFY HEIGHT & WIDTH IN FIELD.

3 DOOR WIDTH IS INDICATED IN INCHES. TWO NUMBERS SEPARATED BY A SLASH (/) INDICATES DOUBLE DOORS.

4 FINISHED DOOR OPENINGS SHALL BE NOMINAL 6” FROM FINISHED CORNER OF ROOM AT HINGE SIDE, EXCEPT WHERE DIMENSIONED OTHERWISE. ON THE “PULL” SIDE OF A DOOR OPENING, THE STRIKE SIDE SHALL BE NOMINAL 18” FROM A PERPENDICULAR WALL. ON THE “PUSH” SIDE OF A DOOR OPENING EQUIPPED WITH BOTH A CLOSER AND LATCH, THE STRIKE SIDE SHALL BE NOMINAL 12” FROM A PERPENDICULAR WALL.

5 ALL STALL DOORS IN SHARED RESTROOM C4 TO BE INSTALLED WITH 1" UNDERCUT

1/4" = 1'-0"AE600

1 DOOR FRAME TYPES

1/4" = 1'-0"AE600

2 DOOR TYPES

6" = 1'-0"AE600

3 THRESHOLDS

1 1/2" = 1'-0"AE600

4 DOOR HEAD DETAIL (GWB)

1 1/2" = 1'-0"AE600

5 DOOR JAMB DETAIL (GWB)

DOOR HARDWARE SCHEDULE

QTY ITEM BOD MFR DESCRIPTION FINISH

SET1

2 Spring Hinges Stanley 2060R, 4 1/2" x 4 1/2" Satin Finish

1 Occupancy Indicator Deadbolt Falcon D271 Medium Duty 626 Satin Chrome

1 Kickplate Ives 8400 8" x 1.5" LDW 633 633 (US10)

1 Wall Stop Ives WS407CCV 633 (US10)

1 5 Knuckle Full Mortise Hinges Stanley fbb199, 4 1/2" x 4 1/2" Satin Finish

1 Lockset Privacy Best 9K Series 9K4-7L-15L-S3 x 626 626 Satin Chrome

3/4" = 1'-0"AE600

6 TYPICAL DOOR HARDWARE HEIGHTS

M ic ro w a v e

M ic ro w a v e

PPT1 PPT2 PPT1 PPT2 PPT1 LVT1

3' - 6 1/2" 3' - 5 1/2"

AD100

NKB

N. .______________________________________________________

ARCHITECTURE & ENGINEERING, PC..

K BHANDARI

SHEET SIZE: 24" x 36"

DESIGN FIRM NKB# 16340.09

NYS Education Law, Section 7209 Prohibits any person to alter these drawings other than a licensed architect or the design engineer. Information on these drawings remainsthe property of the licensed professionals who prepared them and may only be used on the project identified below.

Copyright 2019 N.K. BHANDARI, Architecture & Engineering, P.C.

DRAWING NO: SHEET: FACILITY NO:

OF

SHEET TITLE:

PROJECT TITLE:

Rev. Date Description Drawn Approved

DATE:

BUILDING 3

PROJECT MGR:

PROJECT

NO:

DRAFTER:

Rome Research Site

Air Force Research Laboratory

Rome Research Site, New York

RIO:

RIOCC:

RIOS:

66abw/def:

RIOC:

RIOCO:

RIOF:

USER:

RIOCC:

RIOCV:

DET 4/SE:

USER:DATE

DATE

DATE

DATE

DATE

DATE

DATE

DATE

DATE

DATE

DATE

DATE

DESIGNER:

CONSULTANT:

2/25/2019 11:04:55 AM

13 30AE601 02/22/2019

FINISH SCHEDULE

MODERNIZE C4

RESTROOMS AND BREAK

ROOM BUILDING 3

FA8751-18-F-AS08

AAT

AAT

DBH

FINISH LEGEND

MARK SPEC. DESCRIPTION MANUFACTURER SERIES/ MODEL…