19ba3_Attach_2_Project_Drawings.pdf
PDF 14 MB Posted
- Attached to
- Modernize C4 Restrooms/Break Area Federal contract opportunity
- Solicitation number
- FA875119BA003
About this file
Attachment 2 - Project Drawings
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 221316_FL_-_Sanitary_Waste_and_Vent_Piping_RFI_5.pdf | ||
| 19ba3_Additional_Information_5.docx | DOCX document | |
| Solicitation_Amendment_2_FA875119BA0030002_SF_30.pdf | ||
| 19ba3_Additional_Information_4.docx | DOCX document | |
| Solicitation_Amendment_FA875119BA0030001_SF_30.pdf | ||
| 19ba3_Additional_Information_3.docx | DOCX document | |
| 19ba3_Additional_Information_2.docx | DOCX document | |
| A_-_18841_Rome_AF_B-3_asbestos_lead.pdf | ||
| 19ba3_Additional_Information_1.docx | DOCX document | |
| Solicitation_-_FA875119BA003.pdf | ||
| 19ba3_Attach_3_AFRL_RI_Suppl_Rqmts.pdf | ||
| 19ba3_Attach_5_RRS_Visit_Authorization_Rqst.pdf | ||
| 19ba3_Attach_4_Wage_Decision.pdf | ||
| 19ba3_Attach_1_Project_Specifications.pdf | ||
| 19ba3_Attach_1a_Project_Specs_Addendum_1.doc | DOC document |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NKB
N. .______________________________________________________
ARCHITECTURE & ENGINEERING, PC..
K BHANDARI
SHEET SIZE: 24" x 36"
DESIGN FIRM NKB# 16340.09
NYS Education Law, Section 7209 Prohibits any person to alter these drawings other than a licensed architect or the design engineer. Information on these drawings remainsthe property of the licensed professionals who prepared them and may only be used on the project identified below.
Copyright 2019 N.K. BHANDARI, Architecture & Engineering, P.C.
DRAWING NO: SHEET: FACILITY NO:
OF
SHEET TITLE:
PROJECT TITLE:
Rev. Date Description Drawn Approved
DATE:
BUILDING 3
PROJECT MGR:
PROJECT
NO:
DRAFTER:
Rome Research Site
Air Force Research Laboratory
Rome Research Site, New York
RIO:
RIOCC:
RIOS:
66abw/def:
RIOC:
RIOCO:
RIOF:
USER:
RIOCC:
RIOCV:
DET 4/SE:
USER:DATE
DATE
DATE
DATE
DATE
DATE
DATE
DATE
DATE
DATE
DATE
DATE
DESIGNER:
CONSULTANT:
2/25/2019 12:05:09 PM
1 30G-001 02/22/2019
COVER SHEET
MODERNIZE C4
RESTROOMS AND BREAK
ROOM BUILDING 3
FA8751-18-F-AS08
AAT
AAT
DBH
AIR FORCE RESEARCH LABORATORY
ROME RESEARCH SITE
ROME, NEW YORK 13441
AE SERVICES TO MODERNIZE
C4 RESTROOMS BUILDING 3
DRAWING LIST
SHEET NUMBER SHEET NAME DRAWING NO.
G-001 COVER SHEET 1
A-001 GENERAL NOTES, SYMBOLS, & ANNOTATIONS 2
A-002 PARTITION TYPES 3
AD100 DEMOLITION PLANS 4
AE101 CONSTRUCTION PLAN 5
AE102 REFLECTED CEILING PLAN 6
AE103 AXONS 7
AE401 INTERIOR ELEVATIONS 8
AE402 INTERIOR ELEVATIONS 9
AE501 DETAILS 10
AE502 DETAILS 11
AE600 DOOR SCHEDULE 12
AE601 FINISH SCHEDULE 13
FP001 DETAILS, NOTES & SYMBOLS 14
FPD101 FIRST FLOOR DEMOLITION PLAN 15
FP101 FIRST FLOOR PLAN 16
M-001 NOTES, SYMBOLS AND ABBREVIATIONS 17
MD101 FIRST FLOOR DEMOLITION PLAN 18
M-101 FIRST FLOOR PLAN AND SCHEDULES 19
M-501 DETAILS 20
P-001 SYMBOLS, NOTES, SCHEDULES AND ABBREVIATIONS 21
PD101 FIRST FLOOR DEMOLITION PLAN 22
P-101 FIRST FLOOR PLUMBING PLAN 23
P-501 DETAILS 24
E-001 ELECTRICAL SYMBOLS, GENERAL NOTES AND
ABBREVIATIONS
ED101 FIRST FLOOR DEMOLITION PLAN 26
E-101 FIRST FLOOR PLAN 27
FA001 NOTES AND SYMBOLS 28
FAD101 FIRST FLOOR DEMOLITION PLAN 29
FA101 FIRST FLOOR PLAN 30
Grand total: 30
PROJECT NO. ULDF 18-0023 AE A/E CONTRACT NO. FA8751-18-F-AS08
SENSITIVE BUT UNCLASSIFIED (SBU)
PROPERTY OF THE UNITED STATES GOVERNMENT
COPYING, DISSEMINATION, OR DISTRIBUTION OF THIS DOCUMENT
TO UNAUTHORIZED RECIPIENTS IS PROHIBITED
Do not remove this notice Properly destroy or return documents when no longer needed.
PROJECT CERTIFICATION:
TO THE BEST OF MY KNOWLEDGE, BELIEF AND PROFESSIONAL
JUDGMENT, THE DRAWINGS AND SPECIFICATIONS WHICH COMPRISE
THE CONSTRUCTION DOCUMENTS FOR THE PROJECT ARE IN
COMPLIANCE WITH APPLICABLE CODES, INCLUDING THE LATEST
EDITIONS OF THE INTERNATIONAL BUILDING CODE AND NFPA 101.
ARCHITECT, SITE/ CIVIL ENGINEER, & STRUCTURAL ENGINEER:
MECHANICAL, ELECTRICAL, PLUMBING, & FIRE PROTECTION ENGINEER:
N.K. BHANDARI,
ARCHITECTURE & ENGINEERING, P.C.
1005 W. FAYETTE STREET, SUITE 4A
SYRACUSE, NEW YORK 13203
315.428.1177
C&S COMPANIES
499 COL. EILEEN COLLINS BLVD
SYRACUSE, NEW YORK 13212
315.455.2000
LOCATION MAP:PROJECT IMAGE:
1/8" = 1'-0"A0102 A0101
1 View Name
ROOM NAME
150 SF
901bs
ZZZ
ROOM TAG
VIEW TAG
BUILDING SECTION
WALL SECTION
FLOOR LEVEL
COLUMN GRID
METAL PANEL /
CURTAIN WALL
PANEL TAG
ITEM TAG
KEYED NOTE
REVISION TAG
DEMOLITION TAG
PARTITION TAG
ITEMS TO BE
DEMOLISHED
NEW CONSTRUCTION
EXISTING / NIC /
PREVIOUS WORK
SHEET
NUMBER OF
VIEW
SHEET NUMBER
OF VIEW
ORIGINATION
SHEET
NUMBER OF
VIEW
SECTION NUMBER
BREAK LINE
ALIGN
ALIGN ELEMENTS
DOOR TAG
P R
E
FLOOR
ELEVATION
FLOOR NAME
EXTERIOR ELEVATION
CALLOUT
ELEVATION
NUMBER
AE001
SIM
DETAIL CALLOUT
SHEET
NUMBER OF
VIEW
DETAIL NUMBER
ROOM NAME
ROOM NUMBER
ROOM AREA
FIRE/SMOKE
RATING
WALL
TYPE
AE001
AE001
INTERIOR ELEVATION
CALLOUT
NORTH ARROW
MAGNETIC
NORTH
PROJEC
T NORTH
TP1
SHEET
NUMBER OF
VIEW
SECTION NUMBER
SHEET
NUMBER OF
VIEW
ELEVATION
NUMBER
SHEET
NUMBER OF
VIEW
AE001
SIM
AE001
SIM
Name Elevation
NKB
N. .______________________________________________________
ARCHITECTURE & ENGINEERING, PC..
K BHANDARI
SHEET SIZE: 24" x 36"
DESIGN FIRM NKB# 16340.09
NYS Education Law, Section 7209 Prohibits any person to alter these drawings other than a licensed architect or the design engineer. Information on these drawings remainsthe property of the licensed professionals who prepared them and may only be used on the project identified below.
Copyright 2019 N.K. BHANDARI, Architecture & Engineering, P.C.
DRAWING NO: SHEET: FACILITY NO:
OF
SHEET TITLE:
PROJECT TITLE:
Rev. Date Description Drawn Approved
DATE:
BUILDING 3
PROJECT MGR:
PROJECT
NO:
DRAFTER:
Rome Research Site
Air Force Research Laboratory
Rome Research Site, New York
RIO:
RIOCC:
RIOS:
66abw/def:
RIOC:
RIOCO:
RIOF:
USER:
RIOCC:
RIOCV:
DET 4/SE:
USER:DATE
DATE
DATE
DATE
DATE
DATE
DATE
DATE
DATE
DATE
DATE
DATE
DESIGNER:
CONSULTANT:
2/25/2019 11:04:24 AM
2 30A-001 02/22/2019
GENERAL NOTES,
SYMBOLS, & ANNOTATIONS
MODERNIZE C4
RESTROOMS AND BREAK
ROOM BUILDING 3
FA8751-18-F-AS08
AAT
AAT
DBH
ABBREVIATIONS
SC SOLID CORE
SCH SCHEDULE
SCW SOLID CORED WOOD
SDT STATIC DISSIPATIVE TILE
SECT SECTION
SF SQUARE FOOT (FEET)
SG SPANDREL GLASS
SHT SHEET
SHWR SHOWER
SIM SIMILAR
SP SPECIAL
SPEC SPECIFICATION (S)
SPKR SPEAKER
SPL SPANDREL PANEL
SQ SQUARE
SS SOLID SURFACE
SST STAINLESS STEEL
ST STREET
STD STANDARD
STL STEEL
STOR STORAGE
STR STRUCTURE (AL)
SURF SURFACE
SUSP SUSPENDED
SW SWITCH
SY SQUARE YARD
SYM SYMMETRY (ICAL)
SYS SYSTEM
T
T TREAD
T&B TOP & BOTTOM
T&G TONGUE & GROOVE
T&P TAPE & PRIME
TBD TO BE DETERMINED
TEL TELEPHONE
TEMP TEMPORARY
TERR TERRAZZO
THK THICK (NESS)
TO TOP OF
TOL TOLERANCE
TOS TOP OF STEEL
TP TOILET PARTITION
TPH TOILET PAPER HOLDER
TRANS TRANSVERSE
TS TERMINATION STRIP
TV TELEVISION
TYP TYPICAL
TYPOS TYPICAL OTHER SIDE
U
UC UNDERCUT
UH UNIT HEATER
UL UNDERWRITERS'
LABORATORIES
UNEX UNEXCAVATED
UNF UNFINISHED
UON UNLESS OTHERWISE
NOTED
UR URINAL
V
VAR VARIES (ABLE)
VB VINYL BASE
VC VINYL COVE
VCT VINYL COMPOSITION TILE
VERT VERTICAL
VEST VESTIBULE
VG VISION GLASS
VIF VERIFY IN FIELD
VWC VINYL WALL COVERING
W
W WEST
W/ WITH
W/O WITHOUT
WC WATER CLOSET
WD WOOD
WNCT WAINSCOTING
WP WATERPROOFED (ING)
WT WEIGHT
WWF WELDED WIRE FABRIC
WWM WELDED WIRE MESH
X
XPS EXTRUDED POLYSTYRENE
INSULATION
ABBREVIATIONS
MTL METAL
MULL MULLION
N
N NORTH
NAT NATURAL
NF NEAR FACE
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NORM NORMAL
NTS NOT TO SCALE
O
OA OVERALL
OBS OBSCURE
OC ON CENTER (S)
OD OUTSIDE DIAMETER
OFF OFFICE
OH OVERHEAD
OPNG OPENING
OPP OPPOSITE
P
P LAM PLASTIC LAMINATE
P&R PATCH & REPAIR
PAVMT PAVEMENT
PC PLUMBING CONTRACTOR
PCC PRECAST CONCRETE
PCF POUNDS PER CUBIC FOOT
PERF PERFORATED
PERM PERMANENT
PL PLATE
PLAS PLASTER
PLAST PLASTIC
PLBG PLUMBING
PLYWD PLYWOOD
PNL PANEL
PNT PAINT
POLYIS
O
POLYISOCYANURATE
INSULATION
PR PAIR
PREP PREPARE (ATION)
PROJ PROJECT (ION)
PROP PROPERTY
PRTN PARTITION
PSF POUNDS PER SQUARE
FOOT
PSI POUNDS PER SQUARE
INCH
PT PRESSURE TREATED
PTD PAINTED
PVC POLYVINYL CHLORIDE
Q
QTY QUANTITY
R
R RISER, RADIUS
RA RETURN AIR
RAD RADIUS
RB RUBBER BASE
RD ROOF DRAIN
RECP RECEPTICLE
REF REFERENCE
REFL REFLECT (ED), (IVE), (OR)
REFR REFRIGERATOR,
REFRIGERATION
REINF REINFORCE (D), (ING)
REQD REQUIRED
RES RESILIENT
RET RETURN, RETAINING
REV REVISION (S), REVISED
RH RIGHT HAND
RI RIGID INSULATION
RM ROOM
RO ROUGH OPENING
ROW RIGHT-OF-WAY
RUBR RUBBER
S
S SOUTH
SA SUPPLY AIR
SAD SADDLE
SAN SANITARY
ABBREVIATIONS
H
H/C HANDICAPPED
HB HOSE BIB
HC HOLLOW CORE
HD HAND
HDR HEADER
HDWE HARDWARE
HGT HEIGHT
HM HOLLOW METAL
HMI HOLLOW METAL
INSULATED
HORIZ HORIZONTAL
HP HIGH POINT
HR HANDRAIL, HOUR
HTG HEATING
HTR HEATER
HVAC HEATING/VENTILATING/AIR
CONDITIONING
HW HOT WATER
I
ID INSIDE DIAMETER
IN INCH OR INCHES
INCL INCLUDE (ING)
INSUL INSULATE (D), (ION)
INT INTERIOR
INV INVERT
J
J JOIST
JAN JANITOR
JCT JUNCTION
JT JOINT
K
KD KNOCKED DOWN
KIT KITCHEN
L
L LENGTH, LONG
LAB LABORATORY
LAM LAMINATE (D)
LAV LAVATORY
LF LINEAR FOOT (FEET)
LH LEFT HAND
LIN LINEAR
LL LIVE LOAD
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
LONG LONGITUDINAL
LOUV LOUVER
LP LOW POINT
LT LIGHT
LW LONG WAY
M
MAG MAGNETIC
MAR MARBLE
MAS MASONRY
MAX MAXIMUM
MBD MARKER BOARD
ME MATCH EXISTING
MECH MECHANICAL
MED MEDIUM
MEM MEMBER
MEMB MEMBRANE
MEP MECHANICAL,
ELECTRICAL, PLUMBING
MEPFP MECHANICAL,
ELECTRICAL, PLUMBING,
FIRE PROTECTION
MET METAL
MEZZ MEZZANINE
MFR MANUFACTURER
MH MANHOLE
MIN MINIMUM
MIRR MIRROR
MISC MISCELLANEOUS
MLDG MOULDING
MO MASONRY OPENING
MR
GWB
MOISTURE RESISTANT
GYPSUM WALL BOARD
MTD MOUNTED
MTG MOUNTING
ABBREVIATIONS
DOM DOMESTIC
DR DOOR
DS DOWNSPOUT
DWG DRAWING
E
E EAST
EA EACH
EC ELECTRICAL
CONTRACTOR
EF EACH FACE
EIFS EXTERIOR INSULATION
FINISH SYSTEM
EJ EXPANSION JOINT
EJCP EXPANSION JOINT COVER
PLATE
EL ELEVATION
ELEC ELECTRIC (AL)
ELEV ELEVATOR
EMER EMERGENCY
ENCL ENCLOSURE
EP ELECTRICAL PANEL
EPDM ETHYLENE PROPYLENE
DIENE MONOMER
EPS EXPANDED POLYSTYRENE
INSULATION
EQ EQUAL
EQUIP EQUIPMENT
ES EXPOSED SLAB
EST ESTIMATE (D)
ETR EXISTING TO REMAIN
EXH EXHAUST
EXIST EXISTING
EXP EXPANSION, EXPAND
EXPO EXPOSED
EXT EXTERIOR
EXTR EXTRUDED
F
FA FIRE ALARM
FAB FABRICATE
FAP FIRE ALARM CONTROL
PANEL
FD FLOOR DRAIN
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER
CABINET
FF FINISHED FLOOR
FH FLOOR HATCH
FHC FIRE HOSE CABINET
FIG FIGURE
FIN FINISH (ED)
FIXT FIXTURE
FL FLANGE
FLASH FLASHING
FLEX FLEXIBLE
FLR FLOOR (ING)
FLUOR FLUORESCENT
FM FLOOR MOUNTED
FNDN FOUNDATION
FO FACE OF
FP FIRE PROTECTION
FR FRAME (ING)
FRP FIBERGLASS REINFORCED
PANEL
FT FOOT OR FEET
FTG FOOTING
FURR FURRING
FUT FUTURE
G
GA GAUGE
GAL GALLON
GALV GALVANIZED
GB GRAB BAR
GC GENERAL CONTRACTOR
GEN GENEARL
GL GLASS / GLAZING
GR GUARDRAIL
GRG GLASS REINFORCED
GYPSUM
GT GLAZED TILE
GWB GYPSUM WALL BOARD
GYP GYPSUM
ABBREVIATIONS
A
A/C AIR CONDITIONING
AB ANCHOR BOLT
ACC ACCESS
ACOUS ACOUSTIC (AL)
ACT ACOUSTICAL CEILING TILE
ADD ADDENDUM
ADJ ADJACENT
ADJUST ADJUSTABLE
AFF ABOVE FINISHED FLOOR
AGGR AGGREGATE
ALT ALTERNATE
ALUM ALUMINUM
AP ACCESS PANEL
APPRO
X
APPROXIMATE (LY)
ARCH ARCHITECTURAL
ASPH ASPHALT
AVG AVERAGE
B
BD BOARD
BET BETWEEN
BIT BITUMINOUS
BLDG BUILDING
BLK BLOCK
BLKG BLOCKING
BM BENCHMARK
BN BULLNOSE
BO BOTTOM OF
BOD BASIS OF DESIGN
BRD BOARD
BSMT BASEMENT
BUR BUILT-UP-ROOF
C
CAB CABINET
CB CATCH BASIN
CEM CEMENT
CER CERAMIC
CF CUBIC FOOT (FEET)
CFMF COLD FORMED METAL
FRAMING
CG CORNER GUARD
CI CAST IRON
CIP CAST IN PLACE
CJ CONTROL JOINT
CKBD CORKBOARD
CL CLOSET
CLG CEILING
CLKG CAULKING
CLL CONTRACT LIMIT LINE
CLR CLEAR
CM CEILING MOUNTED
CMU CONCRETE MASONRY
UNIT
CO CLEANOUT
COL COLUMN
CONC CONCRETE
CONN CONNECTION
CONST CONSTRUCTION
CONT CONTINUE (OUS)
CONTR CONTRACTOR
CPT CARPET
CR CHAIR RAIL
CT CERAMIC TILE
CTR CENTER
CW COLD WATER
CY CUBIC YARD (S)
D
DBL DOUBLE
DEG DEGREES
DEMO DEMOLITION
DEPT DEPARTMENT
DET DETAIL
DF DRINKING FOUNTAIN
DH DOUBLE HUNG
DIA DIAMETER
DIAG DIAGONAL
DIM DIMENSION
DIV DIVISION
DL DEAD LOAD
DN DOWN
DO DOOR OPENING
GENERAL CONSTRUCTION NOTES
1 DESIGN CONSTRUCTION AND SAFETY SHALL CONFORM TO ALL LOCAL, STATE AND OWNER SPECIFIC CODES, INCLUDING (BUT NOT LIMITED TO) THE “INTERNATIONAL BUILDING CODE 2015 (IBC)", THE NFPA 101 LIFE SAFETY CODE, LATEST REVISION, ANSI A117.1 - LATEST REVISION, OSHA, "DoD MINIMUM ANTITERRORISM STANDARDS FOR BUILDINGS" - LATEST REVISION, AND ANY OTHER CODES GOVERNED BY THE JURISDICTION IN WHICH THIS PROJECT IS BEING CONSTRUCTED
2 THIS CONTRACT REQUIRES COMPLETE, FINISHED WORKABLE PROJECT OF THE AREAS INDICATED BY THE CONTRACT DOCUMENTS, AND SHALL INCLUDE ALL MATERIALS AND LABOR NECESSARY TO COMPLETE, REGARDLESS OF WHETHER OR NOT ALL WORK OR EACH ITEM IS SPECIFICALLY INDICATED ON ANY OTHER PORTION OF THE DRAWINGS AND/OR NOTES.
3 WHERE MATERIALS REFERENCED ON DRAWINGS, OR NECESSARY TO COMPLETE THE WORK OF THIS CONTRACT ARE NOT SPECIFIED HEREIN, PROVIDE BEST QUALITY MATERIAL. WHERE MATERIALS ARE INTENDED TO MATCH EXISTING, PROVIDE CLOSEST POSSIBLE MATCH, SUBJECT TO OWNER'S APPROVAL. ALL ITEMS AND WORK ON DRAWINGS ARE NEW, UNLESS INDICATED EXISTING. ALL WORK WHICH HAS BEEN DAMAGED SHALL BE REPAIRED TO A “NEW CONDITION,” OR WHERE THE STRUCTURAL INTEGRITY HAS BEEN AFFECTED, ITEMS SHALL BE REPLACED AT NO
COST TO THE OWNER.
4 CONTRACTOR IS RESPONSIBLE TO VERIFY ALL SITE, FIELD AND BUILDING CONDITIONS PRIOR TO SUBMITTING BIDS AND COMMENCING WORK. IF THERE ARE ANY DISCREPANCIES BETWEEN DRAWINGS AND FIELD CONDITIONS, NOTIFY THE CONSTRUCTION MANAGER AND ARCHITECT/ENGINEER AND REQUEST CLARIFICATION.
5 DRAWINGS MAY NOT INDICATE ALL DEMOLITION/ REMOVALS. CONTRACTOR SHALL REFER TO DRAWINGS, SPECIFICATIONS AND VERIFY FIELD CONDITIONS TO DETERMINE FULL SCOPE AND PARTICULARS OF REMOVALS AS REQUIRED FOR AND COORDINATED WITH THE NEW WORK PRIOR TO BIDDING WORK. VERIFY AND CONFIRM WITH OWNER WHICH ITEMS ARE TO BE SAVED FOR
OWNER’S USE OR REINSTALLATION BY CONTRACTOR.
6 WHERE CONSTRUCTION OR ITEMS HAVE BEEN INFILLED, REMOVED AND/OR DISTURBED FOR INSTALLATION OF NEW WORK, CAUSING THE EXPOSURE OF UNFINISHED AND/OR DAMAGED SURFACES, RESULTING SURFACES AND INFILLED SURFACES SHALL BE RECONSTRUCTED WITH MATERIALS TO MATCH FINISHED AREAS. ALL ABANDONED OPENINGS (I.E., DUCT/PIPE REMOVALS, ETC.) AT WALLS, ROOF OR FLOOR TO BE INFILLED SOLID.
7 WHERE CONSTRUCTION RESULTS IN DEPRESSIONS AND/OR UNEVEN FLOOR CONDITIONS, PATCH, LEVEL AND FEATHER AREAS AS REQUIRED TO PROVIDE UNIFORMITY OF NEW FLOORING.
8 WORK IS REQUIRED IN VARIOUS PORTIONS OF THE FACILITY TO EXECUTE WORK OF OTHER TRADES (I.E. ELECTRICAL, MECHANICAL). ALTHOUGH NOT NECESSARILY SHOWN ON DRAWINGS, WORK IS REQUIRED IN THESE AREAS CONSISTING OF PLACEMENT OF CEILINGS, WALLS, FINISHES, PAVEMENT AND OTHER CONSTRUCTION AS NECESSARY TO PERFORM WORK AND RESTORE THESE
SPACES OR AREAS TO ORIGINAL CONDITIONS.
9 CONTRACTOR SHALL OBTAIN FROM OWNER ALL REQUIREMENTS FOR INSTALLATION OF OWNER PROVIDED EQUIPMENT INCLUDING ROUGHING DIAGRAMS, INSTALLATION INSTRUCTIONS, ELECTRICAL SCHEMATICS, TEMPLATES, LAYOUTS AND DIMENSIONS AND ALL OTHER INFORMATION NECESSARY FOR A PROPER, WELL COORDINATED INSTALLATION. PRIOR TO ROUGH-IN OF
SERVICES, CONFER WITH OWNER EXACT LOCATION OF ALL ITEMS.
10 CONTRACTOR SHALL COORDINATE THE WORK WITH EACH TRADE SO THAT THE WORK AND SCHEDULE ARE NOT IMPEDED. SCHEDULE WORK PROGRESS THROUGHOUT THE ENTIRE PROJECT TO PREVENT CONFLICTS AND INTERFERENCES. OBTAIN ALL NECESSARY INFORMATION SUCH AS SIZES, LOCATIONS, TEMPLATES, LAYOUT, DIMENSIONS AND ALL OTHER INFORMATION NECESSARY FOR A PROPER AND WELL COORDINATED INSTALLATION. PRIOR TO INSTALLATION OF ITEMS, VERIFY AND CONFIRM WITH EACH TRADE EXACT LOCATION OF ALL ITEMS
11 ALL PENETRATIONS THROUGH FLOORS AND FULL HEIGHT WALLS TO BE FIRE STOPPED. ALL GAPS AND JOINTS AT RATED FLOORS, ROOFS AND WALL TO BE FIRE AND SMOKE STOPPED. GAPS AND JOINTS INCLUDE (BUT ARE NOT LIMITED TO) TOP OF WALL TO FLOOR OR ROOF DECK WALL TO BEAMS, AND CONTROL OR EXPANSION JOINTS. FIRE STOPPING INCLUDES BOTH FORM OR
PACKING MATERIAL AND THE FILL, VOID OR CAVITY MATERIAL.
12 ITEMS INSERTED IN AN EXTERIOR WALL SHALL BE SEALED WEATHER TIGHT WHETHER INDICATED ON DRAWINGS OR NOT.
13 NOT USED
14 FINISHED DOOR OPENINGS SHALL BE NOMINAL 6" FROM FINISHED CORNER OF ROOM AT HINGE SIDE, EXCEPT WHERE DIMENSIONED OTHERWISE, ON THE ‘PULL’ SIDE OF A DOOR OPENING , THE STRIKE SIDE SHALL BE NOMINAL 18" FROM A PERPENDICULAR WALL ON THE ‘PUSH’ SIDE OF A DOOR OPENING EQUIPPED WITH BOTH A CLOSER AND LATCH, THE STRIKE SIDE SHALL BE NOMINAL
12” FROM A PERPENDICULAR WALL.
15 SUSPENDED GRID CEILINGS SHALL BE ARRANGED SO THAT A GRID IS SPACED EQUALLY FROM EACH MOST REMOTE WALL IN EACH DIRECTION, WITH NO TILE LESS THAN 6” UNLESS OTHERWISE INDICATED. CEILING MOUNTED ITEMS TO BE CENTERLINE OF CEILING TILES, UNLESS OTHERWISE NOTED.
16 CONCRETE SLABS SHALL BE SEPARATED FROM ANY VERTICAL SURFACE WITH AN ISOLATION JOINT. ALL SLAB ON-GRADE (CONTROL, EXPANSION, CONSTRUCTION (COLD), ETC.) JOINTS TO RECEIVE SEALANT. ALL EXTERIOR SLABS TO SLOPE TO DRAIN AWAY FROM BUILDING AT 1/8” PER 1’-0” UON.
17 ALL DRAWINGS INDICATED AS GENERAL APPLY TO ENTIRE PROJECT, INCLUSIVE OF ALL BUILDINGS.
18 ALL TRADES ARE RESPONSIBLE FOR REVIEWING AND BECOMING FAMILIAR WITH THE ENTIRE SET OF CONTRACT DOCUMENTS PRIOR TO THE START OF ANY WORK. NO ADDITIONAL COSTS WILL BE ALLOWED FOR LACK OF COORDINATION WITH THE ENTIRE BID DOCUMENTS. ANY WORK WHICH IS REQUIRED TO BE CORRECTED OR REPLACED DUE TO LACK OF COORDINATION WITH THE ENTIRE CONTRACT DOCUMENTS WILL BE DONE SO AT THE CONTRACTOR'S SOLE EXPENSE, NOT THE OWNER'S.
TYPICAL SYMBOLS
5 1/2" NOMINAL
WALL TYPE 411:
UL --
RATING 0 HOUR
STC ---
CMU
5 5/8" CMU
REINFORCING PER
STRUCTURAL
NOTCHED STUD TRACK, MIN 20
GA.
V A
R
IE
S S
E E
D E
T A
IL
S
PROVIDE BLOCKING WHERE FASTENERS ARE
LOCATED AT WALL MOUNTED ITEMS (TYPICAL).
SECURE BLOCKING W/ 2 SCREWS PER STUD
SCHEDULED PARTITION FRAMING
SCHEDULED PARTITION
SHEATHING
WALL TYPE 980:
UL --
RATING 0 HOUR
STC ---
METAL STUD / GYPSUM WALL BOARD
3 5/8" 20 GAUGE
CORROSION-PROTECTED
STEEL STUDS AT 16" O.C.
(MAX)
(1) LAYER 5/8" GWB ONE
SIDE
3 5/8" 20 GAUGE
CORROSION-PROTECTED
STEEL RUNNERS
WALL TYPE 920:
UL U419
RATING 0 HOUR
STC 49
METAL STUD / SOUND INSULATION / GYPSUM WALL BOARD
5" NOMINAL
3 5/8" 25 GAUGE
CORROSION-PROTECTED
STEEL STUDS AT 24" O.C.
(MAX)
ACOUSTIC INSULATION
3 5/8" 25 GAUGE
CORROSION-PROTECTED
STEEL RUNNERS
(1) LAYER 5/8" GWB EACH
SIDE
NKB
N. .______________________________________________________
ARCHITECTURE & ENGINEERING, PC..
K BHANDARI
SHEET SIZE: 24" x 36"
DESIGN FIRM NKB# 16340.09
NYS Education Law, Section 7209 Prohibits any person to alter these drawings other than a licensed architect or the design engineer. Information on these drawings remainsthe property of the licensed professionals who prepared them and may only be used on the project identified below.
Copyright 2019 N.K. BHANDARI, Architecture & Engineering, P.C.
DRAWING NO: SHEET: FACILITY NO:
OF
SHEET TITLE:
PROJECT TITLE:
Rev. Date Description Drawn Approved
DATE:
BUILDING 3
PROJECT MGR:
PROJECT
NO:
DRAFTER:
Rome Research Site
Air Force Research Laboratory
Rome Research Site, New York
RIO:
RIOCC:
RIOS:
66abw/def:
RIOC:
RIOCO:
RIOF:
USER:
RIOCC:
RIOCV:
DET 4/SE:
USER:DATE
DATE
DATE
DATE
DATE
DATE
DATE
DATE
DATE
DATE
DATE
DATE
DESIGNER:
CONSULTANT:
2/25/2019 11:04:25 AM
3 30A-002 02/22/2019
PARTITION TYPES
MODERNIZE C4
RESTROOMS AND BREAK
ROOM BUILDING 3
FA8751-18-F-AS08
AAT
AAT
DBH
GENERAL PARTITION NOTES - CMU
1 INTERIOR PARTITIONS OF CONCRETE MASONRY UNITS (CMU) ARE
SPECIFICALLY INDICATED ON FLOOR PLANS. ALL PARTITIONS TO BE 8” CMU
UNLESS OTHERWISE NOTED. ALL DIMENSIONS ARE NOMINAL TO FACE OF CMU.
2 PROVIDE JOINT REINFORCEMENT EVERY TWO COURSES, 16" OC, PROVIDE
VERTICAL ROD REINFORCEMENT IN GROUTED CORES WHERE INDICATED BY
STRUCTURAL SPECIFICATIONS AND DRAWINGS AND AT ALL WALL
INTERSECTIONS AND OPENINGS (DOORS, WINDOWS, NICHES, PASSAGES, ETC.).
3 ALL PARTITIONS TO EXTEND FULL HEIGHT TO UNDERSIDE OF DECK UNLESS
OTHERWISE NOTED. PROVIDE PARTITION TOP ANCHORS, 24” OC WHERE
PARTITIONS ARE NOT BRACED BY STRUCTURAL FRAMING (HOHMANN BARDARD
PTA SERIES TO SUIT JOB CONDITION OR EQUAL) TO STABILIZE PARTITIONS AT
TOP OF WALL.
4 PROVIDE FIRE RATED PARTITIONS WHERE INDICATED. FIRE STOP/FIRE SAFE
AND SMOKE STOP ALL PENETRATIONS THROUGH PARTITIONS, GAPS AND
JOINTS. ALL FIRE RATED PARTITION ASSEMBLIES SHALL EXTEND FULL HEIGHT
FROM FLOOR TO UNDERSIDE OF METAL DECK ABOVE. ALL OTHER PARTITIONS
TO EXTEND FULL HEIGHT UNLESS OTHERWISE NOTED. FIRE RATED PARTITION
TERMINATIONS SHALL BE FIRE STOPPED/FIRE SAFED TO PROVIDE THE
SCHEDULED FIRE RESISTANCE RATING. REFER TO BUILDING CODE REVIEW
PLAN(S).
5 PROVIDE ACOUSTICAL SEALANT AT ALL ELECTRICAL OUTLETS, PENETRATIONS,
CAPS AND OPENINGS.
6 ALL EXPOSED CMU CORNERS TO BE BULL-NOSED UNLESS OTHERWISE NOTED.
7 ALL MASONRY OPENINGS TO RECEIVE LINTELS. SEE LINTEL SCHEDULE FOR
TYPES. SEE ARCHITECTURAL, MECHANICAL, PLUMBING AND ELECTRICAL
DRAWINGS FOR OPENING LOCATIONS.
GENERAL PARTITION NOTES - GWB
1 ALL DIMENSIONS ARE NOMINAL TO FACE OF GWB. WHERE CERAMIC TILE IS
SCHEDULED, DIMENSIONS ARE TO FACE OF GWB.
2 ALL METAL FRAMING TO BE 3 5/8” UNLESS OTHERWISE NOTED. METAL
STUDS TO BE PLACED 16” ON CENTER. WHERE REQUIRED STUD WIDTH
CANNOT BE INSTALLED, PROVIDE STUD WIDTH, FRAMING OF SUITABLE
GAGE AND STYLE TO SUIT JOB CONDITION.
3 ALL GYPSUM BOARD (GWB) TO BE 5/8” TYPE-X 1 HOUR FIRE RATED. AT
SHOWER, TUB, LOCKER ROOM OR WET AREAS ALL GWB (CEILINGS OR
PARTITIONS) TO BE MOISTURE RESISTANT TYPE. AT CERAMIC TILE AREAS
PROVIDE CEMENT BACKER UNIT (CEMENT BOARD) IN LIEU OF GWB TO
RECEIVE CERAMIC TILE.
4 PROVIDE ACOUSTICAL SEALANT AT ALL PARTITIONS, PERIMETERS,
RUNNERS, ELECTRICAL OUTLETS, PENETRATIONS AND OPENINGS, TO
MINIMIZE SOUND TRANSMISSION. ELECTRICAL OUTLETS SHALL BE
SEPARATED BY MINIMUM ONE STUD, BACK TO BACK RECEPTACLES ARE
NOT ACCEPTABLE.
5 ALL PARTITIONS TO RECEIVE 3” SOUND ATTENUATION BLANKET UNLESS
INDICATED IN PARTITION REMARKS SECTION OF PARTITION SYMBOL.
6 PROVIDE FIRE RATED PARTITIONS WHERE INDICATED. FIRE STOP/FIRE
SAFE AND SMOKE STOP ALL PENETRATIONS THROUGH PARTITIONS, GAPS
AND JOINTS. ALL FIRE RATED PARTITION ASSEMBLIES SHALL EXTEND FULL
HEIGHT UNLESS OTHERWISE NOTED. FIRE RATED PARTITION
TERMINATIONS SHALL BE FIRE STOPPED/FIRE SAFED TO PROVIDE THE
SCHEDULED FIRE RESISTANCE RATING. REFER TO BUILDING CODE REVIEW
PLAN(S).
7 WHERE GWB PARTITION EDGE ALIGNS WITH CMU PARTITION EDGE, ADJUST
ALIGNMENT SO THAT GWB SURFACE LAMINATES OVER CMU, EXTEND GWB
TO CORNER.
8 METAL STUDS IN CHASE PARTITIONS TO BE BRACED TO EACH OTHER AT 1/3
POINTS.
9 PROVIDE SOLID BLOCKING AT ALL WALLS RECEIVING WALL MOUNTED
EQUIPMENT AND/OR ACCESSORIES. COORDINATE WITH ALL TRADES AND
OWNERS EQUIPMENT/FURNITURE LAYOUTS.
10 ALL RECESSED ITEMS SUCH AS ELECTRICAL PANELS, FIRE HOSE AND
EXTINGUISHER CABINETS, ETC., LOCATED IN FIRE RATED PARTITION
ASSEMBLIES SHALL BE BACKED W/ GWB AS REQUIRED TO MAINTAIN FIRE
RESISTANCE RATING.
11 WHERE INSULATION EXTENDS FULL HEIGHT AND IS NOT CONCEALED BY
GYPSUM BOARD, PROVIDE COMPRESSION RODS OR SUITABLE FRAMING TO
SUPPORT INSULATION.
12 GWB CONSTRUCTION SHALL BE ISOLATED WITH CONTROL JOINTS WHERE:
- PARTITIONS OR CEILINGS OF DISSIMILAR CONSTRUCTION MEET AND
REMAIN IN THE SAME PLANE.
- WHERE WINGS OF “L”, “U”, & “T” SHAPED CEILING AREAS ARE JOINED.
- EXPANSION OR CONTROL JOINTS OCCUR IN THE BUILDING STRUCTURE OR
WALL CONSTRUCTION. PROVIDE CONTROL JOINTS IN THE FACE OF GWB
PARTITIONS AND CEILINGS WHEN THE SIZE OF THE SURFACE EXCEEDS THE
FOLLOWING CONTROL JOINT SPACING:
- PARTITIONS: 30’ MAXIMUM IN EITHER DIRECTION.
- INTERIOR CEILINGS: 50’ MAX IN EITHER DIRECTION (W/PERIMETER
RELIEF). 30’ MAX IN EITHER DIRECTION (W/O PERIMETER RELIEF).
13 PARTITION TYPES ARE INDICATED ON FLOOR PLANS. EACH PARTITION TYPE
SCHEDULED PROVIDES A COMPLETE ASSEMBLY DESCRIPTION INCLUDING
METAL STUD SIZE, THICKNESS AND NUMBER OF LAYERS OF GWB REQUIRED.
SOUND ATTENUATION BLANKET, AND OTHER DATA, WHERE PARTITION
TYPES ARE NOT INDICATED ON FLOOR PLANS, PROVED THE FOLLOWING:
- 3 5/8” METAL STUDS, (MIN GAUGE OF 20)
- (1) LAYER 5/8” GWB (BOTH SIDES).
- SOUND ATTENUATION BLANKET IN STUD CAVITY.
1" = 1'-0"A-002
1 WALL TYPE 411
3/4" = 1'-0"A-002
3 TYPICAL BLOCKING DETAIL
1" = 1'-0"A-002
5 WALL TYPE 980
1" = 1'-0"A-002
2 WALL TYPE 920
WH
DEMO
50' - 6"
/2
3 3 3 3
76 SF
JANITOR'S
CLOSET
C4-D
AD100
115 SF
ELECTRIC ROOM
D3-C
14 14
16 16
AD100
12 11 V
IF
88 9
9 9 9
NKB
N. .______________________________________________________
ARCHITECTURE & ENGINEERING, PC..
K BHANDARI
SHEET SIZE: 24" x 36"
DESIGN FIRM NKB# 16340.09
NYS Education Law, Section 7209 Prohibits any person to alter these drawings other than a licensed architect or the design engineer. Information on these drawings remainsthe property of the licensed professionals who prepared them and may only be used on the project identified below.
Copyright 2019 N.K. BHANDARI, Architecture & Engineering, P.C.
DRAWING NO: SHEET: FACILITY NO:
OF
SHEET TITLE:
PROJECT TITLE:
Rev. Date Description Drawn Approved
DATE:
BUILDING 3
PROJECT MGR:
PROJECT
NO:
DRAFTER:
Rome Research Site
Air Force Research Laboratory
Rome Research Site, New York
RIO:
RIOCC:
RIOS:
66abw/def:
RIOC:
RIOCO:
RIOF:
USER:
RIOCC:
RIOCV:
DET 4/SE:
USER:DATE
DATE
DATE
DATE
DATE
DATE
DATE
DATE
DATE
DATE
DATE
DATE
DESIGNER:
CONSULTANT:
2/25/2019 11:04:32 AM
4 30AD100 02/22/2019
DEMOLITION PLANS
MODERNIZE C4
RESTROOMS AND BREAK
ROOM BUILDING 3
FA8751-18-F-AS08
AAT
AAT
DBH
DEMO PLAN- KEYED NOTES- SHEET AD100
NUMBER DESCRIPTION
1 REMOVE AND DISCARD FULL HEIGHT MASONRY AND/OR STUD
WALLS.
2 REMOVE ALL PLUMBING FIXTURES AND EQUIPMENT, EXISTING
SINKS, WATER CLOSETS, URINALS, MOP SINKS AND RELATED
PLUMBING. SEE PLUMBING DRAWINGS FOR SCHEDULED WORK.
3 REMOVE AND DISCARD DOORS, FRAMES AND HARDWARE.
4 REMOVE AND DISCARD TOILET PARTITONS IN THEIR ENTIRETY.
5 REMOVE AND DISCARD ALL WALL MOUNTED EQUIPMENT IN THEIR
ENTIRETY.
6 REMOVE AND DISCARD WATER HEATERS. SEE PLUMBING PLANS
FOR SCHEDULED WORK.
7 REMOVE AND DISCARD EXISTING CASEWORK AND COUNTERTOPS
IN THEIR ENTIRETY.
8 REMOVE AND DISCARD ALL CEILING MOUNTED EQUIPMENT IN
THEIR ENTIRETY.
9 REMOVE AND DISCARD ALL CEILING TILE AND GRID IN THEIR
ENTIRETY.
10 REMOVE AND DISCARD GYPSUM AND SOFFITS IN THEIR ENTIRETY.
11 CARFULLY REMOVE AND DISCARD CONCRETE "TABLE"
STRUCTURE IN ITS ENTIRETY IN SEGMENTS AND SHORE UP AS
NEEDED.
12 AFTER REMOVING THE CONCRETE STRUCTURE IN ITS ENTIRETY,
FLUSH CUT THE REMAINS BACK TO EXISTING CMU WALLS AND
FLOORS.
13 REMOVE AND DISCARD ALL SHEETROCK AND/ OR TILES FROM
WALLS.
14 REMOVE AND DISCARD EXISTING GLASS BLOCK AND TRIM PIECES.
PREPARE EXISTING OPENING FOR INFILL. SEE CONSTRUCTION
PLANS FOR SCHEDULED WORK.
15 REMOVE AND STORE IN SAFE PLACE, EXISTING WALL DISPLAY.
REINSTALL ON EAST WALL OPPOSITE FROM THE RENOVATED
TOILET ROOMS.
16 SAW-CUT EXISTING CONCRETE SLAB IN PREPARATION FOR NEW
ELECTRICAL TO BREAK ROOM ISLAND. REFER TO ELECTRICAL
DRAWINGS FOR SHEDULED WORK AND EXTENTS OF REQUIRED
SAW-CUTTING.
17 REINSTALL WALL DISPLAY ON EAST SIDE OF MAIN CORRIDOR,
OPPOSITE FORM RESTROOM OPENING.
GENERAL DEMOLITION NOTES
1 ANY ITEM NOT SPECIFICALLY IDENTIFIED BUT REQUIRED TO BE REMOVED OR REPAIRED TO
PREPARE THE BUILDING FOR THE NEW WORK OR TO OTHERWISE PRODUCE THE FINISHED
PRODUCT SHOWN IN THE CONTRACT DOCUMENTS, IS THE RESPONSIBILITY OF THE GENERAL
CONTRACTOR. SOME ITEMS REQUIRING REMOVALS ARE NOT VISIBLE AT THIS TIME, DUE TO
EXISTING CONSTRUCTION.
2 DEMOLITION WORK SHALL BE SCHEDULED AT ALL TIMES AND BE SUBJECT TO THE DIRECTION
AND APPROVAL OF THE OWNER.
3 EXISTING CONSTRUCTION TO REMAIN SHALL BE PRESERVED AND PROTECTED DURING
CONSTRUCTION. DAMAGE TO EXISTING CONSTRUCTION TO REMAIN SHALL BE PATCHED AND
REPAIRED TO MATCH EXISTING CONDITIONS AT NO ADDITIONAL COST TO THE OWNER,
INCLUDING THE MAINTENANCE OF ALL FIRE RATINGS AT STRUCTURAL MEMBERS, FLOORS,
WALLS, CEILINGS, ETC.
4 PRIOR TO ANY DEMOLITION, THE GENERAL CONTRACTOR SHALL COORDINATE BRACING TO
MAINTAIN THE STRUCTURAL INTEGRITY OF THE REMAINING ELEMENTS OF THE BUILDING AS
REQUIRED.
5 CONTRACTOR SHALL REMOVE ALL MATERIALS IN A WORKMAN-LIKE MANNER APPROVED BY THE
OWNER AND DISPOSE OF ALL MATERIALS PER APPLICABLE CODES.
6 COMPLY WITH GOVERNING REGULATIONS PERTAINING TO ENVIRONMENTAL PROTECTION FOR
POLLUTION CONTROL & HAZARDOUS MATERIALS.
7 REMOVE AND DISPOSE OF ALL EXISTING CASEWORK AND ACCESSORIES. FILL ANY OPENINGS IN
FLOOR AND CEILING SLAB TO MATCH EXISTING.
8 REFER TO M/E/P DEMOLITION DRAWINGS FOR REMOVAL OF EXISTING ELECTRICAL,
TELECOMMUNICATION, DATA, WALL-MOUNTED CONDUITS, MEDICAL GAS OUTLETS, LINES,
METERS, DUCT WORK, PLUMBING.
9 EXISTING CEILING SYSTEM AND FIXTURES TO BE REMOVED THROUGHOUT. COORDINATE
DISCONNECTION OF SERVICES WITH OTHER TRADES PRIOR TO REMOVAL.
10 EXISTING FLOOR FINISHES TO BE REMOVED DOWN TO EXISTING SOUND SUBSTRATE AND
PREPARED TO RECEIVE NEW FLOORING AS SCHEDULED.
1/4" = 1'-0"AD100
1 DEMOLITION - FLOOR PLAN
1/4" = 1'-0"AD100
2 CEILING DEMOLITION PLAN
1/4" = 1'-0"AD100 AD100
3 DEMOLITION SECTION AT RESTROOMS
AD100
4 3D DEMOLITION VIEW
EXISTING CONCRETE "TABLE"
STRUCTURE ABOVE RESTROOM
CEILINGS TO BE REMOVED IN ITS
ENTIRETY, INCLUDING, VERTICAL
"LEGS" AND FLOOR "BULKHEADS".
M ic ro w a v e
M ic ro w a v e
AE4026
AE401XX 5
AE502
65 SF
VESTIBULE
C4-VEST
52 SF
ADA TOILET
C4-C
54 SF
ADA TOILET
C4-A
440 SF
EMPLOYEE
BREAK ROOM
B4-E
AE402
AE402
AE402
AE4016 2
4C4-B4
C4-B3
C4-B2
C4-B1 C4-B5
C4-B6
C4-B7
C4-B8
76 SF
JANITOR'S
CLOSET
C4-D
AE4011
AE501
AE501
AE501
AE501
EQ. EQ.
980980
920 920 920
920920920
AE401
1 1
AE502
13' - 4"
OPENING
3' - 6" 19' - 2 1/2"
OPENING
6' - 0"
VIF
8' - 5 1/2" +/-
4 1/2"
V
IF
2' - 0"
ALIGN
ALIGN
2' - 0" 5' - 1" 2' - 6" 10' - 5"
VIF
1' - 4 1/2" +/-
NIC
NIC
NIC
NIC
NIC
NIC
115 SF
ELECTRIC ROOM
D3-C
/2
/2
ALIGN
CLEAR
5' - 1 1/2" 5' - 9"
CLEAR
5' - 1 1/2"A L
IG
N
A L
IG
N
4 4
5 5
8 8
LED LINE
LIGHTING LED LINE
LIGHTING
LED LINE LIGHTINGLED LINE LIGHTING
11 11
439 SF
SHARED
RESTROOM
C4-B
AE402
6' - 5" 4' - 5" 3' - 10" 4' - 1" 4' - 1" 6' - 5"
.0
A L
IG
N
A L
IG
N
A L
IG
N
A L
IG
N
MIN.
4' - 0"
9 13
9 13
9 13
9 13
9 13
980980
11" 1' - 3" 4' - 9" 1' - 2" 5' - 0" 3' - 6" 5' - 1" 1' - 2" 4' - 9" 1' - 3" 8"
4' - 0"
.0
6 6
NKB
N. .______________________________________________________
ARCHITECTURE & ENGINEERING, PC..
K BHANDARI
SHEET SIZE: 24" x 36"
DESIGN FIRM NKB# 16340.09
NYS Education Law, Section 7209 Prohibits any person to alter these drawings other than a licensed architect or the design engineer. Information on these drawings remainsthe property of the licensed professionals who prepared them and may only be used on the project identified below.
Copyright 2019 N.K. BHANDARI, Architecture & Engineering, P.C.
DRAWING NO: SHEET: FACILITY NO:
OF
SHEET TITLE:
PROJECT TITLE:
Rev. Date Description Drawn Approved
DATE:
BUILDING 3
PROJECT MGR:
PROJECT
NO:
DRAFTER:
Rome Research Site
Air Force Research Laboratory
Rome Research Site, New York
RIO:
RIOCC:
RIOS:
66abw/def:
RIOC:
RIOCO:
RIOF:
USER:
RIOCC:
RIOCV:
DET 4/SE:
USER:DATE
DATE
DATE
DATE
DATE
DATE
DATE
DATE
DATE
DATE
DATE
DATE
DESIGNER:
CONSULTANT:
2/25/2019 11:04:33 AM
5 30AE101 02/22/2019
CONSTRUCTION PLAN
MODERNIZE C4
RESTROOMS AND BREAK
ROOM BUILDING 3
FA8751-18-F-AS08
AAT
AAT
DBH
GENERAL FLOOR PLAN NOTES
1 FURNITURE TO BE BY OWNER UNLESS SPECIFICLY SCHEDULED.
2 PATCH , REPAIR, AND LEVEL EXISTING CONCRETE FLOOR AS REQUIRED TO RECEIVE
SCHEDULED FINISHES.
1/2" = 1'-0"AE101
1 CONSTRUCTION FLOOR PLAN
FLOOR PLAN - KEYED NOTES- A101
NUMBER DESCRIPTION
1 CASED OPENING TO RECIEVE DRYWAL RETURNS AND TRANSITION TYPE T5. OPENING HEIGHT TO BE 7'-0"
2 INSTALL NEW MOP SINK AS SCHEDULED. SEE PLUMBING PLANS FOR SCHEDULED WORK.
3 EXISTING CONCRETE SLAB TO REMAIN. GRIND SMOOTH, PATCH, LEVEL AND REPAIR AS REQUIRED IN
PREPARATION FOR NEW FLOOR FINISHES.
4 INSTALL NEW MIRROR, WITH LED BACK-LIGHTING, ABOVE COUNTER. SEE DETAIL FOR SHEDULED WORK.
5 INSTALL NEW TROUGH STYLE SINKS WITH INTEGRATED FAUCET, SOAP DISPENSERS AND COUNTERTOP.
6 CONTINUE MATCHING COUNTERTOP MATERIAL AND MATCHING TROUGH SINK APRON TO WALL.
7 INSTALL NEW WATER CLOSETS. SEE PLUMBING DRAWINGS FOR SCHEDULED WORK.
8 INSTALL NEW TOILET COMPARTMENT DOORS, FRAMES, AND HARDWARE. SEE DOOR AND HARDWARE
SCHEDULES.
9 INSTALL NEW TOILET ROOM ACCESSORIES AND GRAB BARS WHERE INDICATED. SEE ACCESSORIES
SCHEDULE AND ELEVATIONS FOR DETAILS.
10 INSTALL NEW CONTINUOUS BRUSHED STAINLESS STEEL ACCESSORY SHELF BELOW MIRROR.
11 INFILL WINDOW OPENINGS FLUSH WITH LIKE ADJACENT MATERIALS.
12 PREPARE EXISTING MASONRY WALL FOR NEW FINISHES. APPLY 1/2" CEMENT BOARD SUBSTRATE AND
FINISH WITH CERAMIC PER ELEVATION AND FINISH SCHEDULE.
13 INSTALL CERAMIC TILE ON NEW PARTITIONS. SEE ELEVATIONS AND FINISH SCHEDULE FOR DETAILS.
14 BOX OUT EXISTING CASED OPENING. INFILL WITH CUSTOM GLASS DISPLAY CASE, SEE ELEVATIONS AND
DETAILS.
15 PROVIDE FIRE-RETARDANT-TREATED WOOD BLOCKING FOR TV/ GLASS MARKER BOARDS. COORDINATE
BLOCKING LOCATIONS WITH PRODUCT SPECS AND OWNER.
ANGLE MOLDING
HANGER WIRE
MAIN BEAM
ACOUSTICA
L PANEL
CROSS TEE
4' & 2' RECESSED CLICK
LIGHTING
SPRINKLER HEAD
MECHANICAL
SUPPLY
DIFFUSER
MECHANICAL
RETURN
REGISTER
NOTE: REFER TO MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE PROTECTION DRAWINGS
FOR FURTHER DETAILS AND LOCATIONS
PHOTOCELL PC
OCCUPANCY
SENSOR
FIRE SYSTEM SPEAKER
(CEILING MOUNTED)
S
A / V SPEAKER
(WALL
MOUNTED)
S
RECESSED LIGHTING
FIXTURE
EXHAUST AIR GRILL
UNDER CABINET LED
LIGHTING
LED LINE FIXTURE
AE502
2' - 9 1/2"
1' - 1"
2' - 1"
/2
AE502
65 SF
VESTIBULE
C4-VEST
76 SF
JANITOR'S
CLOSET
C4-D
440 SF
EMPLOYEE
BREAK ROOM
B4-E
AE501
TYP
AE501
TYP
54 SF
ADA TOILET
C4-A
52 SF
ADA TOILET
C4-C
AE102
TYP
EXISTING ACT
2 1
1 1
AE501
TYP
AE502
Sim
A.F.F.
2' x 4' ACT System
9' - 1"
A.F.F.
2' x 4' ACT System
9' - 0"A.F.F.
2' x 4' ACT System
9' - 0"A.F.F.
2' x 4' ACT System
9' - 0"
A.F.F.
2' x 4' ACT System
8' - 0"
(TYP. OF ALL)
A.F.F.
GWB on Mtl. Stud
8' - 0"
(TYP. OF EACH)
A.F.F.
GWB on Mtl. Stud
7' - 0"
VENDING MACH.
BELOW
1' - 10 1/2" 10"10" 1' - 10"
439 SF
SHARED
RESTROOM
C4-B 2
3 3
NKB
N. .______________________________________________________
ARCHITECTURE & ENGINEERING, PC..
K BHANDARI
SHEET SIZE: 24" x 36"
DESIGN FIRM NKB# 16340.09
NYS Education Law, Section 7209 Prohibits any person to alter these drawings other than a licensed architect or the design engineer. Information on these drawings remainsthe property of the licensed professionals who prepared them and may only be used on the project identified below.
Copyright 2019 N.K. BHANDARI, Architecture & Engineering, P.C.
DRAWING NO: SHEET: FACILITY NO:
OF
SHEET TITLE:
PROJECT TITLE:
Rev. Date Description Drawn Approved
DATE:
BUILDING 3
PROJECT MGR:
PROJECT
NO:
DRAFTER:
Rome Research Site
Air Force Research Laboratory
Rome Research Site, New York
RIO:
RIOCC:
RIOS:
66abw/def:
RIOC:
RIOCO:
RIOF:
USER:
RIOCC:
RIOCV:
DET 4/SE:
USER:DATE
DATE
DATE
DATE
DATE
DATE
DATE
DATE
DATE
DATE
DATE
DATE
DESIGNER:
CONSULTANT:
2/25/2019 11:04:36 AM
6 30AE102 02/22/2019
REFLECTED CEILING PLAN
MODERNIZE C4
RESTROOMS AND BREAK
ROOM BUILDING 3
FA8751-18-F-AS08
AAT
AAT
DBH
NO SCALEAE102
1 TYPICAL ACT CEILING DETAIL
REFLECTED CEILING PLAN FIXTURES
1/2" = 1'-0"AE102
2 CEILING DEMOLITION PLAN(1)
GENERAL REFLECTED CEILING NOTES
1 MECHANICAL, ELECTRICAL, AND FIRE PROTECTION WORK SHOWN ON
REFLECTED CEILING PLAN IS SHOWN FOR REFERENCE ONLY. REFER TO M. E.
FP. DRAWINGS FOR MORE INFORMATION ON THE SCOPE OF THIS WORK.
2 SUSPENSION WIRES TO STRUCTURE ABOVE IF NEED PROVIDE ADDITIONAL
STRUCTURAL CROSS SUPPORTS AS REQUIRED
RCP - KEYED NOTES- AE102
NUMBER DESCRIPTION
1 INSTALL 2x4 ACOUSTIC CEILING TILE PER MANUFATURER RECOMMENDATIONS
2 INSTALL LIGHTING FIXTURES AS SHOWN, ELECTRCAL DRAWINGS
3 INSTALL SUSPENDED GWB SOFFIT PER DETAIL. PAINT PER FINISH SCHEDULE.
NKB
N. .______________________________________________________
ARCHITECTURE & ENGINEERING, PC..
K BHANDARI
SHEET SIZE: 24" x 36"
DESIGN FIRM NKB# 16340.09
NYS Education Law, Section 7209 Prohibits any person to alter these drawings other than a licensed architect or the design engineer. Information on these drawings remainsthe property of the licensed professionals who prepared them and may only be used on the project identified below.
Copyright 2019 N.K. BHANDARI, Architecture & Engineering, P.C.
DRAWING NO: SHEET: FACILITY NO:
OF
SHEET TITLE:
PROJECT TITLE:
Rev. Date Description Drawn Approved
DATE:
BUILDING 3
PROJECT MGR:
PROJECT
NO:
DRAFTER:
Rome Research Site
Air Force Research Laboratory
Rome Research Site, New York
RIO:
RIOCC:
RIOS:
66abw/def:
RIOC:
RIOCO:
RIOF:
USER:
RIOCC:
RIOCV:
DET 4/SE:
USER:DATE
DATE
DATE
DATE
DATE
DATE
DATE
DATE
DATE
DATE
DATE
DATE
DESIGNER:
CONSULTANT:
2/25/2019 11:04:38 AM
7 30AE103 02/22/2019
AXONS
MODERNIZE C4
RESTROOMS AND BREAK
ROOM BUILDING 3
FA8751-18-F-AS08
AAT
AAT
DBH
AE103
1 AXON EMPLOYEE BREAK ROOM 106
AE103
2 AXON SHARED RESTROOM
AE501
AE501
AE501
3' - 0" 3' - 0" 1' - 6 1/2" 2' - 6"
3' - 0" 3' - 0" 1' - 6 1/2" 2' - 6"
FACE AND UNDER SIDE
OF SOFFIT, PNT2
CASEWORK,
SOLID WOOD CONST.,
MAPLE, SLAB STYLE,
FULL OVETLAY
ANODIZED ALUM. PULL
CT1
PTH2
MICROWAVES BY OWNER
PNT1
RB1
PNT2
/2
AE501
3' - 0" 3' - 0" 1' - 6" 1' - 6"2' - 2 1/2"
RB1
CASEWORK,
SOLID WOOD CONST.,
MAPLE, SLAB STYLE,
FULL OVETLAY
CT1
SSM1REF. BY OWNER
COFFEE MAKERS
BY OWNER
RB
SSM1
PNT
1" 2' - 7 1/2" 1"
PNT
RB
TV BY OWNER,
INSTAL. BY
CONTRACTOR
EGAN, EGANAERO
HOVER GLASS
BOARD,
78"W X 48"H
EGAN, EGANAERO
HOVER GLASS
BOARD,
60"W X 48"H
ALIGN ALIGN
PNT
RB1
SSM1
12' - 0"
AE502
WOOD FACADE, PNT
1/2" TEMPERED GLASS
SLIDING DOOR
1/2" TEMPERED GLASS
SHELF
EXISTING WALL
FINISH TO REMAIN
WOOD TOEKICK, PNT
TRACK, SATIN ALUM.
TRACK, SATIN ALUM.
WOOD FACADE, PNT
CT1
GB2 TPD1
US1
NOTE: GRAB BARS ARE ONLY IN ROOM C4-B8
CT2
CTB1
S E
A T
2' - 7"
GRAB BARS AT
AMBULATORY
STALL TYP.
CT1
NOTE: GRAB BARS ARE ONLY
IN ROOM C4-B8
CT2
CTB1
GB2
NOTE: GRAB BARS ARE ONLY IN ROOM C4-B8
CT1
CT2
CTB1
RH1
NOTE: GRAB BARS ARE ONLY
IN ROOM C4-B8
CT1
CT2
CTB1
NKB
N. .______________________________________________________
ARCHITECTURE & ENGINEERING, PC..
K BHANDARI
SHEET SIZE: 24" x 36"
DESIGN FIRM NKB# 16340.09
NYS Education Law, Section 7209 Prohibits any person to alter these drawings other than a licensed architect or the design engineer. Information on these drawings remainsthe property of the licensed professionals who prepared them and may only be used on the project identified below.
Copyright 2019 N.K. BHANDARI, Architecture & Engineering, P.C.
DRAWING NO: SHEET: FACILITY NO:
OF
SHEET TITLE:
PROJECT TITLE:
Rev. Date Description Drawn Approved
DATE:
BUILDING 3
PROJECT MGR:
PROJECT
NO:
DRAFTER:
Rome Research Site
Air Force Research Laboratory
Rome Research Site, New York
RIO:
RIOCC:
RIOS:
66abw/def:
RIOC:
RIOCO:
RIOF:
USER:
RIOCC:
RIOCV:
DET 4/SE:
USER:DATE
DATE
DATE
DATE
DATE
DATE
DATE
DATE
DATE
DATE
DATE
DATE
DESIGNER:
CONSULTANT:
2/25/2019 11:04:43 AM
8 30AE401 02/22/2019
INTERIOR ELEVATIONS
MODERNIZE C4
RESTROOMS AND BREAK
ROOM BUILDING 3
FA8751-18-F-AS08
AAT
AAT
DBH
1/2" = 1'-0"AE101 AE401
XX SOUTH ELEVATION 2 EMPLOYEE BREAK ROOM 105
1/2" = 1'-0"AE101 AE401
5 NORTH ISLAND ELEVATION EMPLOYEE BREAK ROOM 105
1/2" = 1'-0"AE101 AE401
4 WEST ISLAND ELEVATION EMPLOYEE BREAK ROOM 105
1/2" = 1'-0"AE101 AE401
2 NORTH ELEVATION EMPLOYEE BREAK ROOM 105
1/2" = 1'-0"AE101 AE401
6 SOUTH ISLAND ELEVATION EMPLOYEE BREAK ROOM 105
1/2" = 1'-0"AE101 AE401
1 SOUTH ELEVATION COORIDOR
1/2" = 1'-0"AE101 AE401
7 WEST ELEVATION TOILET STALL, TYP.
1/2" = 1'-0"AE101 AE401
8 NORTH ELEVATION TOILET STALL, TYP.
1/2" = 1'-0"AE101 AE401
9 EAST ELEVATION TOILET STALL, TYP.
1/2" = 1'-0"AE101 AE401
10 SOUTH ELEVATION STOILET STALL, TYP.
CT1
SOFFIT, PNT2
CT2
CTB2
TPD1
US1
3' - 5"
3' - 6"1' - 0"
2' - 7"
3' - 0"
/2
3' - 2"
CT1
CT2
CTB1
CT1
SOFFIT, PNT2
CT2
CTB1
PTD1
D
IS
P E
N S
E R
CT1
CT2
MIRROR
SHELF
SOFFIT, PNT2
AUTOMATIC
FAUCET
AE502
R E
F L E
C T
IV
E
S U
R F
A C
E
M A
X
SD1
3' - 5 1/2"
2' - 0" 1' - 0"
S E
A T
AE502
CT1
MIRROR
BRUSHED
STAINLESS
STEEL SHELF
SOFFIT, PNT2
AUTOMATIC
FAUCET
SD1 SD1 SD1
CT2
CT1
CTB1
CT1
CT2
CTB1
CT1
CT2
CTB1
OPEN TO
VESTIBULE C4-VEST
BEYOND
CT1
CT2
PTD1 HD1 PTD1HD1
CTB1
OPEN TO
SHARED
RESTROOM C4-B
BEYOND
CT2
CT1
CTB1
CT1
CT2
CTB1
MR1 MR1
EQ EQ EQ EQ
NKB
N. .______________________________________________________
ARCHITECTURE & ENGINEERING, PC..
K BHANDARI
SHEET SIZE: 24" x 36"
DESIGN FIRM NKB# 16340.09
NYS Education Law, Section 7209 Prohibits any person to alter these drawings other than a licensed architect or the design engineer. Information on these drawings remainsthe property of the licensed professionals who prepared them and may only be used on the project identified below.
Copyright 2019 N.K. BHANDARI, Architecture & Engineering, P.C.
DRAWING NO: SHEET: FACILITY NO:
OF
SHEET TITLE:
PROJECT TITLE:
Rev. Date Description Drawn Approved
DATE:
BUILDING 3
PROJECT MGR:
PROJECT
NO:
DRAFTER:
Rome Research Site
Air Force Research Laboratory
Rome Research Site, New York
RIO:
RIOCC:
RIOS:
66abw/def:
RIOC:
RIOCO:
RIOF:
USER:
RIOCC:
RIOCV:
DET 4/SE:
USER:DATE
DATE
DATE
DATE
DATE
DATE
DATE
DATE
DATE
DATE
DATE
DATE
DESIGNER:
CONSULTANT:
2/25/2019 11:04:49 AM
9 30AE402 02/22/2019
INTERIOR ELEVATIONS
MODERNIZE C4
RESTROOMS AND BREAK
ROOM BUILDING 3
FA8751-18-F-AS08
AAT
AAT
DBH
1/2" = 1'-0"AE101 AE402
2 WEST ELEVATION ADA TOILET 102
1/2" = 1'-0"AE101 AE402
3 NORTH ELEVATION ADA TOILET 102
1/2" = 1'-0"AE101 AE402
4 EAST ELEVATION ADA TOILET 102
1/2" = 1'-0"AE101 AE402
5 SOUTH ELEVATION ADA TOILET 102
1/2" = 1'-0"AE101 AE402
6 SOUTH ELEVATION SHARED RESTROOM 104
1/2" = 1'-0"AE101 AE402
7 NORTH ELEVATION SHARED RESTROOM 104
1/2" = 1'-0"AE101 AE402
8 WEST ELEVATION SHARED RESTROOM 104
1/2" = 1'-0"AE101 AE402
9 EAST ELEVATION SHARED RESTROOM 104
1/2" = 1'-0"AE101 AE402
1 EAST ELEVATION VESTIBULE 101
1/2" = 1'-0"AE101 AE402
10 WEST ELEVATION 2 SHARED RESTROOM 104
6" CABINET PULL
1/4" (6 ) HOLES AT 2" O.C. FOR
SHELF SUPPORTS
CT BACKSPLASH AS SCHEDULED
6" CABINET PULL
RB
UNDERMOUNT STAINLESS
STEEL SINK AND TRIM. SEE
PLUMBING DRAWINGS AND
SPECS.
SSM COUNTERTOP OVER 3/4"
EXTERIOR GRADE PLYWOOD AT
SINK, TYP.
SOLID WOOD INTERIOR,
STAINED TO FINISH EXTERIOR
3/4" SOLID WOOD SLAB DOOR
EUROPEAN HINGES
(SOFT CLOSE)
SOLID WOOD INTERIOR,
STAINED TO FINISH EXTERIOR
3/4" SOLID WOOD SLAB DOOR
FAUCET. SEE PLUMBING
DRAWINGS AND SPECS.
METAL BLOCKING, TYP.
SOFFIT
/2
/2
2' - 0"
1' - 0 1/2" LED LINEAR LIGHTING
UNDER CABINET
6" CABINET PULL
1/4" (6 ) HOLES AT 2" O.C. FOR
SHELF SUPPORTS
CT BACKSPLASH AS SCHEDULED
6" CABINET PULL
RB
SSM COUNTERTOP OVER 3/4"
PLYWOOD
SOLID WOOD INTERIOR,
STAINED TO FINISH EXTERIOR
3/4" SOLID WOOD SLAB DOOR
EUROPEAN HINGES
(SOFT CLOSE)
SOLID WOOD INTERIOR,
STAINED TO FINISH EXTERIOR
3/4" SOLID WOOD SLAB DOOR
METAL BLOCKING, TYP.
SOFFIT
2' - 0"
LED LINEAR LIGHTING
UNDER CABINET
DRAWER SLIDES 100LB.
PULL EXTENSION BALL
BEARING SLIDES, SOFT
CLOSE
6" CABINET PULL
1/4" (6 ) HOLES AT 2" O.C. FOR
SHELF SUPPORTS
6" CABINET PULL
RB
SOLID WOOD BACK AND
INTERIOR, STAINED TO FINISH
EXTERIOR
3/4" SOLID WOOD SLAB
DRAWER FRONT
EUROPEAN HINGES
(SOFT CLOSE)
SOLID WOOD INTERIOR,
STAINED TO FINISH EXTERIOR
3/4" SOLID WOOD SLAB DOOR
METAL BLOCKING, TYP.
SOFFIT
1/2" SOLID WOOD FIXED SHELF
W/ SOLID WOOD AT EXPOSED
EDGES
/2
/2
1' - 10 1/2"
6" CABINET PULL
METAL
BLOCKING, TYP.
CUT OUT
7 1/2" 7 1/2"9"
SSM COUNTERTOP
OVER 3/4" PLYWOOD
3/4" SOLID WOOD
SLAB DOOR
RB
DRAWER SLIDES
100LB. RULL
EXTENSION BALL
BEARING SLIDES,
SOFT CLOSE
CT AS
SCHEDULED
SSM CAP OVER
3/4" PLYWOOD
CEILING MAIN BEAM
CROSS TEE
SCHEDULED
CEILING
SUSPENSION WIRES TO
STRUCTURE ABOVE
CHANNEL MOLDING
5/8" GWB
5/8" GWB W/ CORNER
BEAD
M A
X
MAX 8"
5/8" GWB W/ CORNER
BEAD
BRACING AS REQUIRED
MFR TRANSITION CLIP
NKB
N. .______________________________________________________
ARCHITECTURE & ENGINEERING, PC..
K BHANDARI
SHEET SIZE: 24" x 36"
DESIGN FIRM NKB# 16340.09
NYS Education Law, Section 7209 Prohibits any person to alter these drawings other than a licensed architect or the design engineer. Information on these drawings remainsthe property of the licensed professionals who prepared them and may only be used on the project identified below.
Copyright 2019 N.K. BHANDARI, Architecture & Engineering, P.C.
DRAWING NO: SHEET: FACILITY NO:
OF
SHEET TITLE:
PROJECT TITLE:
Rev. Date Description Drawn Approved
DATE:
BUILDING 3
PROJECT MGR:
PROJECT
NO:
DRAFTER:
Rome Research Site
Air Force Research Laboratory
Rome Research Site, New York
RIO:
RIOCC:
RIOS:
66abw/def:
RIOC:
RIOCO:
RIOF:
USER:
RIOCC:
RIOCV:
DET 4/SE:
USER:DATE
DATE
DATE
DATE
DATE
DATE
DATE
DATE
DATE
DATE
DATE
DATE
DESIGNER:
CONSULTANT:
2/25/2019 11:04:51 AM
10 30AE501 02/22/2019
DETAILS
MODERNIZE C4
RESTROOMS AND BREAK
ROOM BUILDING 3
FA8751-18-F-AS08
AAT
AAT
DBH
1 1/2" = 1'-0"AE101 AE501
1 Section 2
1 1/2" = 1'-0"AE101 AE501
2 SECTION AT TYPICAL BREAK ROOM CABINET
1 1/2" = 1'-0"AE101 AE501
3 SECTION AT BREAK ROOM MICROWAVE CABINET
1 1/2" = 1'-0"AE101 AE501
4 SECTION AT BREAK ROOM ISLAND CABINET
3" = 1'-0"AE102 AE501
5 CEILING TRANSITION 4 SOFFIT
/2
/2
CERAMIC TILE AS
SCHEDULED
CERAMIC TILE AS SCHEDULED
BRUSHED STAINLESS
STEEL SHELF
TROUGH SINK, COORDINATE
W/ PLUMBING DRAWINGS
LINEAR BACK-LIGHT,
COORDINATE
W/ ELECTRICAL DRAWINGS
CUSTOM MIRROR
LINEAR BACK-LIGHT, COORDINATE
W/ ELECTRICAL DRAWINGS
SOFFIT, PNT
ALL EXPOSED EDGES TO BE
WRAPPED IN BRUSHED
ALUMINUM
SD1
CERAMIC TILE, START FULL
TILE AT OUTSIDE CORNER
CERAMIC TILE AS SCHEDULED
AE502
CERAMIC TILE AS SCHEDULED
STAINLESS STEEL SHELF
TROUGH SINK, COORDINATE
W/ PLUMBING DRAWINGS
RECESSED LIGHTING, COORDINATE
W/ ELECTRICAL DRAWINGS
MIRROR
SOFFIT, PNT
ALL EXPOSED EDGES TO BE WRAPPED ALUMINUM ALL EXPOSED EDGES TO BE
WRAPPED IN ALUMINUM
RECESSED LIGHTING, COORDINATE
W/ ELECTRICLA DRAWINGS
M
IN
H O
L D
M
IN
R E
F L E
C T
IV
E
S U
R F
A C
E
11" MIN
8" MIN
HARDWOOD EDGE AT CORNERS
3/4" WOOD VENEER PLYWOOD, PAINT GRADE
1/2" TEMPERED GLASS SLIDING DOORS, LOCKING
HARDWARE TO BE SIMILAR TO RICHELIEU
"HARDWARE SET FOR SHOWCASE DISPLAY"
(#BP15510), FINISH TO BE SATIN ALUM.
TRACK SIMILAR TO RICHELIEU,
"TRACK SET FOR DISPLAY GLASS SLIDING
DOORS" (#1551210), FINISH TO BE SATIN ALUM.
HOLES AT "6 O.C.FOR SHELF SUPPORTS,
COORDINATE DIAMETER WITH SHELF SUPPORT,
SHELF SUPPORTS TO BE SIMILAR TO RICHELIEU,
K LINE GLASS SHELF PIN (#BP328180)
1/2" TEMPERED GLASS SHELF W/ BEVELED EDGES,
CONTRACTOR TO PROVIDE (6) SHELVES)
3/4" WOOD VENEER PLYWOOD, PAINT GRADE
WALL CONSTRUCTION AS SCHEDULED
RECESSED LIGHTING, COORDINATE
W/ ELECTRICAL DRAWINGS
3/4" WOOD VENEER PLYWOOD,
PAINT GRADE
WOOD BLOCKING AT (2) LOCATIONS TO SECURE DISPLAY
CASE TO WALL CONSTRUCTION
3/4" WOOD VENEER PLYWOOD, PAINT GRADE
/2
/2
TRACK SIMILAR TO RICHELIEU,
"TRACK SET FOR DISPLAY GLASS SLIDING
DOORS" (#1551210), FINISH TO BE SATIN ALUM.
RETURN EXISTING ACT CEILING TO NEW
DRYWAL SOFFIT
DRYWALL SOFFIT, HEIGHT TO MATCH EXISTING
ACT CEILING
SHELF WRAPED WITH 16 GUAGE
BRUSED STAINLESS STEEL SHEET
MECHANICALLY FASTEN SHELF TO
BASE OF MIRROR STRUCTURE,
ALL HARDWARE TO BE HIDDEN
LINEAR BACK-LIGHT, COORDINATE
W/ ELECTRICAL DRAWINGS
MIRROR
CERAMIC TILE AS SCHEDULED
HOLD
4"
HOLD
1 1/2" NKB
N. .______________________________________________________
ARCHITECTURE & ENGINEERING, PC..
K BHANDARI
SHEET SIZE: 24" x 36"
DESIGN FIRM NKB# 16340.09
NYS Education Law, Section 7209 Prohibits any person to alter these drawings other than a licensed architect or the design engineer. Information on these drawings remainsthe property of the licensed professionals who prepared them and may only be used on the project identified below.
Copyright 2019 N.K. BHANDARI, Architecture & Engineering, P.C.
DRAWING NO: SHEET: FACILITY NO:
OF
SHEET TITLE:
PROJECT TITLE:
Rev. Date Description Drawn Approved
DATE:
BUILDING 3
PROJECT MGR:
PROJECT
NO:
DRAFTER:
Rome Research Site
Air Force Research Laboratory
Rome Research Site, New York
RIO:
RIOCC:
RIOS:
66abw/def:
RIOC:
RIOCO:
RIOF:
USER:
RIOCC:
RIOCV:
DET 4/SE:
USER:DATE
DATE
DATE
DATE
DATE
DATE
DATE
DATE
DATE
DATE
DATE
DATE
DESIGNER:
CONSULTANT:
2/25/2019 11:04:52 AM
11 30AE502 02/22/2019
DETAILS
MODERNIZE C4
RESTROOMS AND BREAK
ROOM BUILDING 3
FA8751-18-F-AS08
AAT
AAT
DBH
1 1/2" = 1'-0"AE101 AE502
1 SECTION AT LAVATORY
1 1/2" = 1'-0"AE101 AE502
2 SECTION AT ACCESSIBLE LAVATORY
1 1/2" = 1'-0"AE401 AE502
3 SECTION AT GLASS DISPLAY CASE
3" = 1'-0"AE502 AE502
4 SECTION AT BATHROOM MIRROR
TYPE H1
HOLLOW METAL
WELDED FRAME
0' - 2" 0' - 2"
DOOR WIDTH
TYPE F
FLUSH
NOTE: DOOR TYPES ARE
GENERALLY BASED ON STEEL
DOOR INSTITUE STANDARD
STYLES
T5
• INTERIOR
• MARBLE THRESHOLD
SCHEDULED WALL
CONSTRUCTIONDOUBLE METAL
STUD HEADER
HOLLOW METAL
FRAME
SCHEDULED
DOOR
JAMB BEYOND
DOUBLE METAL
STUD, FULL HEIGHT
HOLLOW METAL
FRAME
SCHEDULED
DOOR
S E
E P
L A
N S
V A
R R
IE
S
C .L
T
Y P
IC
A
L L
O C
K S
E T
/1
C .L
D
E A
D B
O L T
FINISH FLOOR
NKB
N. .______________________________________________________
ARCHITECTURE & ENGINEERING, PC..
K BHANDARI
SHEET SIZE: 24" x 36"
DESIGN FIRM NKB# 16340.09
NYS Education Law, Section 7209 Prohibits any person to alter these drawings other than a licensed architect or the design engineer. Information on these drawings remainsthe property of the licensed professionals who prepared them and may only be used on the project identified below.
Copyright 2019 N.K. BHANDARI, Architecture & Engineering, P.C.
DRAWING NO: SHEET: FACILITY NO:
OF
SHEET TITLE:
PROJECT TITLE:
Rev. Date Description Drawn Approved
DATE:
BUILDING 3
PROJECT MGR:
PROJECT
NO:
DRAFTER:
Rome Research Site
Air Force Research Laboratory
Rome Research Site, New York
RIO:
RIOCC:
RIOS:
66abw/def:
RIOC:
RIOCO:
RIOF:
USER:
RIOCC:
RIOCV:
DET 4/SE:
USER:DATE
DATE
DATE
DATE
DATE
DATE
DATE
DATE
DATE
DATE
DATE
DATE
DESIGNER:
CONSULTANT:
2/25/2019 11:04:53 AM
12 30AE600 02/22/2019
DOOR SCHEDULE
MODERNIZE C4
RESTROOMS AND BREAK
ROOM BUILDING 3
FA8751-18-F-AS08
AAT
AAT
DBH
DOOR SCHEDULE
DOOR NUMBER ROOM NAME
ROOM
NUMBER
DOOR FRAME
THRESHOLD
FIRE
RATING REMARKS
HARDWARE
SET
DOOR
NUMBERWIDTH HEIGHT THICKNESS LEAF SIZE TYPE
DOOR
MATERIAL FINISH
FRAME
TYPE
FRAME
MATERIAL FRAME FINISH
FRAME
DETAIL
C4-B1 SHARED RESTROOM C4-B 2' - 6" 7' - 0" 0' - 1 3/4" 2' 6" F HM WD H1 HM PNT 4&5 / AE600 --- --- 1 C4-B1
C4-B2 SHARED RESTROOM C4-B 2' - 6" 7' - 0" 0' - 1 3/4" 2' 6" F HM WD H1 HM PNT 4&5 / AE600 --- --- 1 C4-B2
C4-B3 SHARED RESTROOM C4-B 2' - 6" 7' - 0" 0' - 1 3/4" 2' 6" F HM WD H1 HM PNT 4&5 / AE600 --- --- 1 C4-B3
C4-B4 SHARED RESTROOM C4-B 2' - 6" 7' - 0" 0' - 1 3/4" 2' 6" F HM WD H1 HM PNT 4&5 / AE600 --- --- 1 C4-B4
C4-B5 SHARED RESTROOM C4-B 2' - 6" 7' - 0" 0' - 1 3/4" 2' 6" F HM WD H1 HM PNT 4&5 / AE600 --- --- 1 C4-B5
C4-B6 SHARED RESTROOM C4-B 2' - 6" 7' - 0" 0' - 1 3/4" 2' 6" F HM WD H1 HM PNT 4&5 / AE600 --- --- 1 C4-B6
C4-B7 SHARED RESTROOM C4-B 2' - 6" 7' - 0" 0' - 1 3/4" 2' 6" F HM WD H1 HM PNT 4&5 / AE600 --- --- 1 C4-B7
C4-B8 SHARED RESTROOM C4-B 2' - 6" 7' - 0" 0' - 1 3/4" 2' 6" F HM WD H1 HM PNT 4&5 / AE600 --- --- C4-B8
C4-B17 ADA TOILET C4-C 3' - 0" 7' - 0" 0' - 1 3/4" 3' 0" F HM WD H1 HM PNT 4&5 / AE600 --- --- 1 C4-B17
C4-B19 ADA TOILET C4-A 3' - 0" 7' - 0" 0' - 1 3/4" 3' 0" F HM WD H1 HM PNT 4&5 / AE600 --- --- 1 C4-B19
DOOR SCHEDULE NOTES
1 ALL DOORS TO BE 1 ¾” THICK X 84” HIGH UON. ALL FRAMES TO BE 16 GA FULLY WELDED HOLLOW METAL. PROVIDE ANCHORAGE TYPE TO SUIT WALL CONSTRUCTION.
ALL FRAMES TO OVERLAP WALL FINISH. PROVIDE 20 GA STUDS AT JAMBS IN GYPSUM BOARD WALLS.
2 “EX” AT SCHEDULE DENOTES EXISTING. VERIFY HEIGHT & WIDTH IN FIELD.
3 DOOR WIDTH IS INDICATED IN INCHES. TWO NUMBERS SEPARATED BY A SLASH (/) INDICATES DOUBLE DOORS.
4 FINISHED DOOR OPENINGS SHALL BE NOMINAL 6” FROM FINISHED CORNER OF ROOM AT HINGE SIDE, EXCEPT WHERE DIMENSIONED OTHERWISE. ON THE “PULL” SIDE OF A DOOR OPENING, THE STRIKE SIDE SHALL BE NOMINAL 18” FROM A PERPENDICULAR WALL. ON THE “PUSH” SIDE OF A DOOR OPENING EQUIPPED WITH BOTH A CLOSER AND LATCH, THE STRIKE SIDE SHALL BE NOMINAL 12” FROM A PERPENDICULAR WALL.
5 ALL STALL DOORS IN SHARED RESTROOM C4 TO BE INSTALLED WITH 1" UNDERCUT
1/4" = 1'-0"AE600
1 DOOR FRAME TYPES
1/4" = 1'-0"AE600
2 DOOR TYPES
6" = 1'-0"AE600
3 THRESHOLDS
1 1/2" = 1'-0"AE600
4 DOOR HEAD DETAIL (GWB)
1 1/2" = 1'-0"AE600
5 DOOR JAMB DETAIL (GWB)
DOOR HARDWARE SCHEDULE
QTY ITEM BOD MFR DESCRIPTION FINISH
SET1
2 Spring Hinges Stanley 2060R, 4 1/2" x 4 1/2" Satin Finish
1 Occupancy Indicator Deadbolt Falcon D271 Medium Duty 626 Satin Chrome
1 Kickplate Ives 8400 8" x 1.5" LDW 633 633 (US10)
1 Wall Stop Ives WS407CCV 633 (US10)
1 5 Knuckle Full Mortise Hinges Stanley fbb199, 4 1/2" x 4 1/2" Satin Finish
1 Lockset Privacy Best 9K Series 9K4-7L-15L-S3 x 626 626 Satin Chrome
3/4" = 1'-0"AE600
6 TYPICAL DOOR HARDWARE HEIGHTS
M ic ro w a v e
M ic ro w a v e
PPT1 PPT2 PPT1 PPT2 PPT1 LVT1
3' - 6 1/2" 3' - 5 1/2"
AD100
NKB
N. .______________________________________________________
ARCHITECTURE & ENGINEERING, PC..
K BHANDARI
SHEET SIZE: 24" x 36"
DESIGN FIRM NKB# 16340.09
NYS Education Law, Section 7209 Prohibits any person to alter these drawings other than a licensed architect or the design engineer. Information on these drawings remainsthe property of the licensed professionals who prepared them and may only be used on the project identified below.
Copyright 2019 N.K. BHANDARI, Architecture & Engineering, P.C.
DRAWING NO: SHEET: FACILITY NO:
OF
SHEET TITLE:
PROJECT TITLE:
Rev. Date Description Drawn Approved
DATE:
BUILDING 3
PROJECT MGR:
PROJECT
NO:
DRAFTER:
Rome Research Site
Air Force Research Laboratory
Rome Research Site, New York
RIO:
RIOCC:
RIOS:
66abw/def:
RIOC:
RIOCO:
RIOF:
USER:
RIOCC:
RIOCV:
DET 4/SE:
USER:DATE
DATE
DATE
DATE
DATE
DATE
DATE
DATE
DATE
DATE
DATE
DATE
DESIGNER:
CONSULTANT:
2/25/2019 11:04:55 AM
13 30AE601 02/22/2019
FINISH SCHEDULE
MODERNIZE C4
RESTROOMS AND BREAK
ROOM BUILDING 3
FA8751-18-F-AS08
AAT
AAT
DBH
FINISH LEGEND
MARK SPEC. DESCRIPTION MANUFACTURER SERIES/ MODEL…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.