19ba3_Additional_Information_4.docx

DOCX document 12 KB Posted

Attached to
Modernize C4 Restrooms/Break Area Federal contract opportunity
Solicitation number
FA875119BA003
Issued by
Department of the Air Force Materiel Command Research Laboratory

About this file

RFI #4

View the file

Other files for this federal contract opportunity

Other files attached to Modernize C4 Restrooms/Break Area, newest first.
File Type Posted
221316_FL_-_Sanitary_Waste_and_Vent_Piping_RFI_5.pdf PDF
19ba3_Additional_Information_5.docx DOCX document
Solicitation_Amendment_2_FA875119BA0030002_SF_30.pdf PDF
Solicitation_Amendment_FA875119BA0030001_SF_30.pdf PDF
19ba3_Additional_Information_3.docx DOCX document
19ba3_Additional_Information_2.docx DOCX document
A_-_18841_Rome_AF_B-3_asbestos_lead.pdf PDF
19ba3_Additional_Information_1.docx DOCX document
Solicitation_-_FA875119BA003.pdf PDF
19ba3_Attach_3_AFRL_RI_Suppl_Rqmts.pdf PDF
19ba3_Attach_4_Wage_Decision.pdf PDF
19ba3_Attach_5_RRS_Visit_Authorization_Rqst.pdf PDF
19ba3_Attach_1_Project_Specifications.pdf PDF
19ba3_Attach_1a_Project_Specs_Addendum_1.doc DOC document
19ba3_Attach_2_Project_Drawings.pdf PDF
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA875119BA003

REQUEST FOR INFORMATION #4 – POSTED 22 AUGUST 2019

Question:

On Drawing AD-100 the existing concrete table dimension is listed as 1’-¼” ±; what is the tolerance on this?

Answer:

The current conditions for accurately measuring the existing concrete table dimensions is not practical at this time due to structural obstructions and obstacles, and mathematical assumptions had to be made based on observable structures and existing drawing documentation.

Therefore, the exact thickness of the concrete table is presumed to be approximately 12" but can be thicker by as much as another 4".