REQUEST FOR INFORMATION #1

DOORS & HARDWARE

Q1. Door Schedule has Door Material as HM. Door Schedule has Finish as Wood. Are the doors Wood or HM?

A1. All Door Frames are to be Hollow Metal. All doors are to be wood.

Q2. Is there a HM door spec.?

A2. No Q3. Does Door C4-8B have Hardware Set 1?

A3. Yes. Door C4-8B is to have Hardware Set 1.

Q4. Best Lock 9K-4 is a 3 ¾” backset. Is this correct?

A4. No. A 2 ¾” backset is standard.

Q5. Is there a reason why the Hardware has 2 different finishes? (US10 & 626) A5. All Hardware is to be 626 or US26D - Satin Chrome