Q&A_Extreme_Computing_Facility_Part_4.docx

DOCX document 13 KB Posted

Attached to
Alter Building 3 for Extreme Computing Facility Federal contract opportunity
Solicitation number
FA875119BA001
Issued by
Department of the Air Force Materiel Command Research Laboratory

View the file

Other files for this federal contract opportunity

Other files attached to Alter Building 3 for Extreme Computing Facility, newest first.
File Type Posted
Q&A_Extreme_Computing_Facility_Part_5.docx DOCX document
Solicitation_Amendment_FA875119BA0010001_SF_30.pdf PDF
Q&A_Extreme_Computing_Facility_Part_3.docx DOCX document
Q&A_Extreme_Computing_Facility_Part_2.docx DOCX document
FINAL_SUBMISSION_SUBMITTAL_REGISTRY.pdf PDF
Colden_17641_Rome_AF_asbestos_lead_report.pdf PDF
Q&A_1_-__Extreme_Computing_Facility.docx DOCX document
Solicitation_-_FA875119BA001.pdf PDF
Attach_4_RRS_Form_31_Request_for_Visit_Authorization.pdf PDF
Attach_3_Wage_Decision_NY20190013.pdf PDF
Attach_1_Specifications.pdf PDF
Attach_2_Drawings.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Alter Building 3 for Extreme Computing Facility

FA8751-19-B-A001

Q&A Part 4

Q1. On drawing E501, Detail 5, Note 3, a ground bus that is ¼”x2” of continuous copper has to be securely mounted to the side of the cable tray system every 15.” Could I see a detail on how that should be done and with the specific hardware the engineer would like to be used to mount the copper bus to the cable tray?

A1. The contractor will need to bid the project as they see it now as detailed on the drawings and in the specs. Further mounting can be discussed with successful bidder.

Q2. It does not seem that the demolition scope provides for any exterior wall removal beyond the locations at the louver openings. Ref. Dwg. S-502, it does show a garage door, please verify size of door. We would need full depth wall removal to get our steel and equipment into the building.

The other issue would be the venting of propane exhaust gases for our carry deck crane.

A2. Overhead door opening is 7'-3"x11''-0" (w x h). Any alterations to the building not called for in the project documentation will need to be restored to original conditions.

Q3. 230713-10 3.8 Calls for 3# Mineral Fiber Blanket on concealed duct. 3# is not made. The highest density Blanket made is 1 1/2#. Can we use 1 1/2# Blanket on the concealed duct?

A3. 1 ½ lb/cu.ft fiber blanket is acceptable for the concealed ductwork.

Q4. Is the duct in the Mezzanine considered Exposed or Concealed?

A4. The Mezzanine area is considered exposed.

Q5. Is the use of propane equipment inside this project area allowed?

A5. Use of propane equipment is allowed in the project area as long as OSHA regulations are not violated.