EXHIBIT_A_-DIB_Development_5th_Edition_-CDRLs-_Final.pdf

PDF 339 KB Posted

Attached to
DIB Development 5th Edition FINAL RFP FA873017R0024 Federal contract opportunity
Solicitation number
FA873017R0024
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hanscom Air Force Base

About this file

Exhibit A- DIB Development 5th Edition CDRLs-Final

View the file

Other files for this federal contract opportunity

Other files attached to DIB Development 5th Edition FINAL RFP FA873017R0024, newest first.
File Type Posted
DIB_RFP_Questions_and_Answers_27_Sept_17.xlsx XLSX spreadsheet
Model_Contract-_DIB_Development_5th_Edition_-_FA8730-17-R-0024_Final.pdf PDF
Attachment_5-_DIB_Development_5th_Edition_-_Section_L_-Final.pdf PDF
Attachment_3_-_DIB_Development_5th_Edition_-Labor_Category_Descriptions-Final.pdf PDF
Attachment_5_-_DIB_Development_5th_Edition_-_Section_L_-Final.pdf PDF
Attachment_7_-_DIB_Development_5th_Edition_-Cost_Format_-Final.xlsx XLSX spreadsheet
Attachment_6_-_DIB_Development_5th_Edition_-_Section_M_-_Final.pdf PDF
Attachment_1-_DIB_Development_5th_Edition_-_SOW-_Final.pdf PDF
Attachment_5_-_DIB_Development_5th_Edition_-_Section_L_-Final.pdf PDF
Attachment_4_-_DIB_Development_5th_Edition_-DD_Form_254-Final.pdf PDF
Attachment_3_-_DIB_Development_5th_Edition_-Labor_Category_Descriptions-Final.pdf PDF
Attachment_2_-DIB_Development_5th_Edition_-TRN_Instructions-Final.pdf PDF
Model_Contract-_DIB_Development_5th_Edition_-FA8730-17-R-0024.pdf PDF
Attachment_7_-_DIB_Development_5th_Edition_Section_L_Cost_Format_-Final.pdf PDF
20170920_DIB_Development_5th_Edition_RFP_Cover_Letter.pdf PDF
Reference_-_DIB_Development_5th_Edition-_High_Level_Roadmap_-_Subject_to_Change.pdf PDF
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contract Data Requirements List (CDRLs) FA8730-17-R-0024, Exhibit A

RFP EXHIBIT A - CONTRACT DATA REQUIREMENTS LISTS

GENERAL INSTRUCTIONS

FOR

DISTRIBUTED COMMON GROUND/SURFACE SYSTEM (DCGS)

INTEGRATION BACKBONE (DIB) DEVELOPMENT 5th Edition

1 September 2017

Original

Configuration and Data Management for AFLCMC/HBBI

Hanscom AFB, MA 01731-5000

DISTRIBUTION:

Further dissemination only as directed by the Government Program Office, AFLCMC/HBBK

SECTION 1

TABLE OF CONTENTS

EXHIBIT A

SECTION 1 TABLE OF CONTENTS 2

SECTION 2 EXPLANATION OF CDRL (DD FORM 1423-1) 3

SECTION 3 CDRL ADDRESSEE LIST 6

SECTION 4 CDRL NOTES 7

SECTION 5 CDRL/DID INDEX 10

SECTION 6 CDRLs 12

SECTION 2

EXPLANATION OF CDRL FORM

1. Item A. Contract Line Item Number (CLIN): Contract CLIN associated with CDRL.

2. Item B. Exhibit Number: Exhibit associated with CDRL.

3. Item C. Category: Category of CDRL Data Type. Data Types fall into three categories:

TDP – Technical Data Package TM – Technical Manual Other – Self-Explanatory

4. Item D. System/Item: Name of system/item being acquired that data will support.

5. Item E. Contract/PR Number: Self-Explanatory. To be completed after award.

6. Item F. Contractor: Self-Explanatory. To be completed after award.

7. Block 1. Data Item Number: Identifying number (sequence number) used when referring to data delivered.

8. Block 2. Title of Data Item: The title as it appears in Item 1 of the Data Item Description (DID), DD Form 1664.

9. Block 3. Subtitle: Optional entry. Utilized if title requires further identification/clarification of data to be delivered.

10. Block 4. Authority: The DID number listed in DOD 5010.12L (AMSDL), or one-time DID number. The DID defines data content and format requirements.

11. Block 5. Contract Reference: Reference to tasking in contract that generates requirement for the data item (paragraph numbers that identify the task or requirement – contract clause, statement of work paragraph, etc.).

12. Block 6. Requiring Office: Activity/Office responsible for the accuracy and adequacy of the data submitted.

13. Block 7. DD Form 250 Required: The following codes are utilized when formal Government inspection and acceptance of this data item are required at a designated Government location.

Code Inspection Acceptance

SS Source Source DD Destination Destination SD Source Destination DS Destination Source

LT Letter of Transmittal Only NO Inspection or Acceptance Not Required XX Inspection and Acceptance Requirements Specified Elsewhere in Contract

Legend Source = A.C.O.

Destination = P.C.O.

14. Block 8. Approval Code: An “A” in this block indicates written Government approval is required prior to preparation of the final data item. Written Government approval is required prior to proceeding to next milestone, i.e., a test plan would require Government approval prior to the actual test being conducted. An “N” indicates no Government approval is required.

15. Block 9. Distribution Statement Required: This block contains the letter of the distribution statement to be affixed to the deliverable. For technical data, contractor required to make the appropriate distribution statement of the data. (See DD Form 254/See CDRL Notes).

16. Block 10. Frequency: The following character abbreviations show how often a data item is to be submitted:

Abbreviation Definition DAILY Daily WKLY Weekly BI-WE Each 2 Weeks MTHLY Monthly BI-MO Each 2 Months QRTLY Quarterly ANNLY Annually SEMIA Each 6 Months ATIME One Time ONE/R One Time and Revisions R/ASR Revisions as Required ASREQ As Required DFDEL Deferred Delivery ONE/P One-Time Preliminary Draft WTIME Two Separate Submittals

17. Block 11. As of Date: The reporting period cut-off date, if applicable.

18. Block 12. Date of First Submission: Self-Explanatory. The date by which the requiring office is to receive the data. AOC = Award of Contract; ARO = After Receipt of Order.

19. Block 13. Date of Subsequent Submissions: Self-Explanatory. The date by which the requiring office is to receive subsequent submissions of the data.

20. Block 14. Distribution: Represents minimum distribution. Addresses and number of draft/final copies, regular/reproducible, to be delivered to each addressee. Additional Adressees will be provided 14 days ARO of delivery orders. Unless specified,all data will be provided via electronic media by posting on Government provided website. When specified, reproducible copies will be delivered on CD or other softcopy media.

LT = Letter of Transmittal only (not the actual deliverable item)

21. Block 15. Total: Total number of copies required.

22. Block 16. Remarks: This space is utilized to provide further explanation of any of the blocks on the CDRL, DD Form 1423-1.

23. Blocks 17 and 18. Price Group – to be competed by the contractor (if applicable): Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.

Group I. Definition – data which is not otherwise essential to the contractor’s performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price – Costs to be included under Group I are those applicable to preparing and assembling the data item in conformation of Government requirements, administration and other expenses related to reproducing and delivering such data items to the Government.

Group II. Definition – Data which is essential to the performance of the primary contracted effort but the contract is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control or quality of the data item.

Estimated Price – Costs to be included under Group II are those incurred over and above the cost of essential data item administrative and other expenses related to reproducing and delivering such data items to the Government.

Group III. Definition – Data which the contractor must develop for his internal use in performance of primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control and quality of the data item.

Estimated Price – Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data items to the Government.

24. Items G, H, I and J. Prepared/Approved by: Self-Explanatory.

SECTION 3

CDRL ADDRESSEE LIST

CDRL Distribution addresses are as follows:

AFLCMC/HBBI Emily Coppin (emily.coppin@us.af.mil)

AFLCMC/HBBK Daniel Dornfeld (daniel.dornfeld.1@us.af.mil)

DCMA ACO Address provided at award.

DCAA Address provided at award.

SECTION 4

CONTRACT DATA REQUIREMENTS LIST (CDRL) NOTES

1. The following documents and regulations were used in the preparation of the CDRLs and are identified below for guidance and information purposes only - Marking of Technical Data IAW DD Form 254 contained within the contract modification. DoDD 5230.24, Distribution Statements on Technical Documents (18 Mar 97) (Reference)DoDD 5000.1, The Defense Acquisition System

2. The CDRL includes a complete list of data deliverables required for its related Contract Line Item Number(s) (CLINS).

3. Unless otherwise specified, references to award of contract for data deliverables shall be interpreted as the mailing date of the contract. In those instances where days are not identified as working days, they shall be considered calendar days.

4. Data shall be submitted for receipt by the Government in accordance with (IAW) the delivery schedule specified on the DD Form 1423-1. Delivery dates are interpreted to be the date of arrival at the Program Office or posting on the Government owned data site as required by the CDRL.

Distribution shall be made to allow arrival of the data on or before the date specified.

5. Format and preparation instructions of the data item are provided in the Data Item Description (DID), DD Form 1664, which is referenced in Block 4 of the DD Form 1423-1. DIDs can be as follows:

a. Standard DID: A DID, cleared by OMB for use in defense contracts, as listed in the Acquisition Management System and Data Requirements Control List (AMSDL), DoD 5010.12-L (e.g., DI-MISC-80711).

b. Tailored DID: A standard DID having specific tailoring applied. Tailoring can be found in Block 16 of the DD Form 1423-1 (e.g., DI-MISC-80711/T).

6. When required, a DD Form 250 shall be submitted at contract closeout. All submissions, outlines, drafts, review copies, etc., shall be submitted by transmittal letter addressed to the PCO.

Final submission to recipients other than the OPR shall be by transmittal letter. The DD Form 250 will be signed by the appropriate Government authority for inspection and acceptance.

7. An “A” in Block 8 of the DD Form 1423-1 indicates that the contractor requires formal written approval of the data item by the Government; this includes draft submittals prior to final publication. The Government retains the right to approve/disapprove data delivered which does not meet the requirements of the DID, regardless of the coding of this block. Resubmissions of CDRLs in response to Government comments or disapproved/unaccepted data deliveries shall be submitted within 30 calendar days of receipt of Government comments unless otherwise specified on the DD Form 1423 or as separately directed by the Procuring Contracting Officer

(PCO).

8. The Distribution Statements C or F, DoDD 5230.24, as documented below is applicable. The controlling Office for all Data Items is ESC/HSJK.

The following distribution statement(s) shall be conspicuously placed on deliverables required by this contract in accordance with CDRL item Block 9:

“Distribution Statement C. Distribution authorized to U.S. Government Agencies and their contractors (Critical Technology) (16 September 2005). Other requests for this document shall be referred to ESC/HSJK.”

“Distribution Statement F. Further dissemination only as directed by the Government Program Office or higher DoD authority.”

All technical documents that are determined to contain export-controlled classified and technical data shall be marked IAW DD Form 254.

All technical documents with distribution statements other than “A” (reference DoDD 5230.24), shall be marked:

“DESTRUCTION NOTICE – For classified and unclassified documents, follow the procedures in ….(See DD Form 254)….”

9. Unless otherwise stated, distribution for preliminary or draft and final documents shall be the same.

10. The transmittal letter for each data submittal shall be addressed to the PCO (AFLCMC/HBBK) and submitted, along with the data. This submittal will then be provided to the Program Office, Data Manager, for correct distribution. Transmittal letters must clearly identify the documents being delivered. Final delivery of each data item shall also be annotated on the transmittal letter.

Actual transmittal of data to be IAW DD Form 254 (See #11).

11. As stated in the DD Forms 1423, the Government preference is for electronic distribution of data wherever practicable.

a. Electronic Submission of Data: Documentation to be delivered electronically must be submitted in Government acceptable format (e.g., “deliver on electronic media compatible with Microsoft Office 2003 or Adobe .pdf format”) and in accordance with DD Form 254. Transmittal letters shall be signed and delivered in .pdf format only.

b. Government Owned Data Site: Electronic submissions will be posted to the Government owned data site. The contractor will have access to the Government Owned Data Site.

The Government will review for approval requests for access. The Government will provide access for requests it determines are valid. The Government will provide access instructions upon request. No classified information shall be posted. Classified data will be posted to a specified Governmant classified website based – to be provided upon request.

c. Paper distribution will be made when specified from the Government

12. Unless specified otherwise in the CDRLs/DIDs, data submitted in response to these requirements shall be identified with the following elements:

a. Contractor

b. Contractor’s Identification and/or Letter Number

c. Contract number

d. CDRL Sequence Number/Title

e. Revision Identification

f. Date of Document

Web Site Addresses utilized for Above Referenced Documents:

DoD Documents: http://deskbook.dau.mil/jsp/default.jsp

CM/DM Web Site: www.acq.osd.mil/io/se/cm&dm/index.htm

Data Item Descriptions (DIDs):

https://www.afmc-mil.wpafb.af.mil/HQ-AFMC/EN/enp/dids/didspage.htm

SECTION 5

CDRL/DID INDEX

CDRL/Data Item Description Documents

Data Item No.

Authority (Data Acquisition Document No.)

Title Due Date/

A001 DI-ADMN-81373/T Presentation Materials - PMR/Kickoff/ Weekly Status Telecons/In Person Meetings

As required

A002 DI-MGMT-8146/T Cost Performance Report Monthly

A003 DI-AVCS-80700A Computer Software Product End Items (Executables)

At conclusion of each development cycle (Sprint)

A004 DI-AVCS-80700A Computer Software Product End Items (Software Source Code)

At conclusion of each development cycle (Sprint)

A005 DI-AVCS-80700A

DI-NDTI-80566A/

DI-NDTI-80603A/

DI-MISC-80508B/

DI-NDTI-85066A/

DI-MISC-80809B

DI-MISC80508B

DIB Documentation Set (incorporates Source Code Build Guide, Installation Guides, Administration/Configuration Guide, Security Hardening Guide, Software Version Description Document, Release Notes, Test Plans and Procedures, Test Scripts, Test Results, Test Reports, Analysis Reports, Programmer’s Guide, Integration Guide, Database Design Document, Quick Start Guide, Security Certification Documents, and Capability Description Package (provide sufficient detail to be include in the CDP. Sufficiency will be determined by appropriate government oversight))

At conclusion of each development cycle (Sprint) and as required.

A006 DI-AVCS-80700A

Software Development Kit

At conclusion of each development cycle (Sprint)

A007 DI-MISC-80508B/T

Technical Report - Study/Services

As required

SWA004 DI-NDTI-81351

Software Assurance, Security Test Plan

At contract kickoff

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701- 0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302. Respondents should be aware that not withstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM

NO.

B. EXHIBIT C. CATEGORY:

0002 A Other: ADMIN

D. SYSTEM/ITEM

DCGS INTEGRATION BACKBONE

(DIB) Development 5th Edition

E. CONTRACT/PR NO

FA8730-17-R-0024

F. CONTRACTOR

1. DATA ITEM

NO.

2. TITLE OF DATA ITEM 3. SUBTITLE

A001 Presentation Materials Presentation Materials - PMR/Kickoff/ Status Telecons/In Person Meetings

4. AUTHORITY (Data Acquisition Document No.)

5. CONTRACT REFERENCE

SOW Paragraph 3.4.2.8 and 4.9

6. REQUIRING OFFICE

DI-ADMN-81373/T AFLCMC/HBBI

7. DD 250 REQ 9. DIST

STATEMENT

10.

FREQUENCY

12. DATE OF FIRST

SUBMISSION

14. DISTRIBUTION

LT REQUIRED ASREQ ARO b. COPIES

8. APP CODE

C

11. AS OF

DATE

13. DATE SUBSEQUENT

SUBMISSION

a. ADDRESSEE Final

N As Required Draft Re g

Repro

16. REMARKS AFLCMC/HBBI 1

BLK 4: Presentation material will be provided for all presentations to the

Government.

BLK 14: Provide electronic copy of document CDRL submittal and transmittal letter to Program Manager. Documents shall be submitted in Microsoft Office 2003 or later.

AFLCMC/HBBK LT

DCMA ACO LT

15. TOTAL →

G. PREPARED BY H. DATE I. APPROVED BY

J. DATE

Ms. Emily Coppin, AFLCMC/HBBI 17AUG17 Ms. Emily Coppin, AFLCMC/HBBI 1SEP17 Program Manger Program Manger

DD FORM 1423-1, FEB 2001 Computer Generated PREVIOUS EDITION MAY BE USED. Page __ of __ Pages

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302. Respondents should be aware that not withstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

0002 A Other: MGMT

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2978459

. TITLE OF DATA ITEM

3. SUBTITLE

A002 Cost Performance Report (CPR) Financial Execution Status

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-MGMT-81468/T SOW Paragraph 4.0 AFLCMC/HBBI

7. DD 250 REQ 9. DIST STATEMENT 10.

FREQUENCY

12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

LT REQUIRED MTHLY ARO + b. COPIES

8. APP CODE

F

a. ADDRESSEE Final

N Monthly Dr aft

Reg Repro

16. REMARKS AFLCMC/HBBI 1

BLK 4: Contract Funds Status Report (CFSR) will be provided to the government at a minimum every quarter. More frequent requests will be made at the government’s discretion.

BLK 14: Provide information via Microsoft Power Point and Microsoft Excel Documents shall be submitted in Microsoft Office 2003 or later.

DD FORM 1423-1, FEB 2001 Computer Generated PREVIOUS EDITION MAY BE USED. Page __ of __ Pages

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302. Respondents should be aware that not withstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

0002 A TDP

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO.

A003

2. TITLE OF DATA ITEM

Computer Software Product End Items (Executables)

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-AVCS-80700A SOW Paragraph 3.10 AFLCMC/HBBI

7. DD 250 REQ 9. DIST STATEMENT 10.

FREQUENCY

12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

LT REQUIRED As Required b. COPIES

8. APP CODE

C

a. ADDRESSEE Final

N At conclusion of each development cycle (Sprint) Dr aft Reg Repro

16. REMARKS AFLCMC/HBBI 1

BLK 14: Computer Software Product End Items (Executables) shall be posted to DI2E Agile DevTools (Confluence, Jira, Nexus, etc) IAW Agile development cycle

DD FORM 1423-1, FEB 2001 Computer Generated PREVIOUS EDITION MAY BE USED. Page __ of __ Pages

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302. Respondents should be aware that not withstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

0002 A TDP

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A004 Computer Software Product End Items (Software Source Code)

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE DI-AVCS-80700A SOW Paragraph 3.10 AFLCMC/HBBI

7. DD 250 REQ 9. DIST STATEMENT 10.

FREQUENCY

12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

LT REQUIRED As Required b. COPIES

8. APP CODE

C

a. ADDRESSEE Final

N At conclusion of each development cycle (Sprint) Dr aft

16. REMARKS AFLCMC/HBBI 2

BLK 14: Computer Software Product End Items (Executables) shall be posted to DI2E Agile DevTools (Confluence, Jira, Nexus, etc) IAW Agile development cycle.

DD FORM 1423-1, FEB 2001 Computer Generated PREVIOUS EDITION MAY BE USED. Page __ of __ Pages

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302. Respondents should be aware that not withstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

0002 A Other: MGMT

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

A005 DIB Documentation Set

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-AVCS-80700A DI-NDTI-80566A/

DI-NDTI-80603A/DI-MISC-

80508B/DI-NDTI-85066A/DI-MISC-

80809B/DI-MISC80508B

SOW Paragraph 3.10

AFLCMC/HBBI

7. DD 250 REQ 9. DIST STATEMENT 10.

FREQUENCY

12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

LT REQUIRED As Required b. COPIES

8. APP CODE

C

a. ADDRESSEE Final

N

At conclusion of each development cycle (Sprint) and as required

Dr aft

BLK 2: DIB Documentation Set (incorporates Source Code Build Guide, Installation Guides, Administration/Configuration Guide, Security Hardening Guide, Software Version Description Document, Release Notes, Test Plans and Procedures, Test Scripts, Test Results, Test Reports, Analysis Reports, Programmer’s Guide, Integration Guide, Database Design Document, Quick Start Guide, and Security Certification Documents), Capability Description Package (provide sufficient detail to be include in the CDP. Sufficiency will be determined by appropriate government oversight)

BLK 14: Documents shall be posted to DI2E Agile DevTools (Confluence, Jira, Nexus, etc) IAW Agile development cycle.

DD FORM 1423-1, FEB 2001 Computer Generated PREVIOUS EDITION MAY BE USED. Page __ of __ Pages

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302. Respondents should be aware that not withstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

0002 A Other: MGMT

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

A006 Software Development Kit

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE DI-AVCS-80700 SOW Paragraph 3.10 AFLCMC/HBBI

7. DD 250 REQ 9. DIST STATEMENT 10.

FREQUENCY

12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

LT REQUIRED As Required b. COPIES

8. APP CODE

C

a. ADDRESSEE Final

N At conclusion of each Major

Release (second digit release) Dr aft

BLK 14: Documents shall be posted to DI2E Agile DevTools (Confluence, Jira, Nexus, etc) IAW Agile development cycle.

DD FORM 1423-1, FEB 2001 Computer Generated PREVIOUS EDITION MAY BE USED. Page __ of __ Pages

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302. Respondents should be aware that not withstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

0002 A Other: MGMT

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

FA8730-17-0024

A007 Technical Report – Study/Services

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE DI-MISC-80508B/T SOW Paragraph 3.4.2, 3.5.1.3, and 3.5.1.4 AFLCMC/HBBI

7. DD 250 REQ 9. DIST STATEMENT 10.

FREQUENCY

12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

LT REQUIRED As Required b. COPIES

8. APP CODE

C

a. ADDRESSEE Final

N As required Dr aft

Reg Repro

16. REMARKS AFLCMC/HBBI 1

BLK 4: The Technical Report-Study/Services report will also be provided electronically to the

Program Manager. Documents shall be submitted in Microsoft Office 2003 or later.

BLK 14: Provide electronic copy of document CDRL submittal and transmittal letter to Program Manager. Documents shall be submitted in Microsoft Office 2003 or later.

DD FORM 1423-1, FEB 2001 Computer Generated PREVIOUS EDITION MAY BE USED. Page __ of __ Pages

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302. Respondents should be aware that not withstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

0002 A Other: MGMT

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

FA8730-17-0024

SWA004 Software Assurance, Security Test Plan

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE DI-NDTI-81351 SOW Paragraph 3.5 AFLCMC/HBBI

7. DD 250 REQ 9. DIST STATEMENT 10.

FREQUENCY

12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

LT

REQUIRED At contract kickoff

b. COPIES

8. APP CODE

C

a. ADDRESSEE Final

N At contract kickoff Dr aft

BLK 14: Provide electronic copy of document CDRL submittal and transmittal letter to Program Manager. Documents shall be submitted in Microsoft Office 2003 or later.

DD FORM 1423-1, FEB 2001 Computer Generated PREVIOUS EDITION MAY BE USED. Page __ of __ Pages

TABLE OF CONTENTS
EXPLANATION OF CDRL FORM
B. EXHIBIT
B. EXHIBIT
B. EXHIBIT
B. EXHIBIT
BLK 14: Computer Software Product End Items (Executables) shall be posted to DI2E Agile DevTools (Confluence, Jira, Nexus, etc) IAW Agile development cycle.
B. EXHIBIT
B. EXHIBIT
B. EXHIBIT
B. EXHIBIT
2017-09-01T11:25:50-0400
COPPIN.EMILY.1454208885
2017-09-01T11:26:03-0400
COPPIN.EMILY.1454208885
2017-09-01T11:26:15-0400
COPPIN.EMILY.1454208885
2017-09-01T11:26:26-0400
COPPIN.EMILY.1454208885
2017-09-01T11:26:39-0400
COPPIN.EMILY.1454208885
2017-09-01T11:26:53-0400
COPPIN.EMILY.1454208885
2017-09-01T11:27:07-0400
COPPIN.EMILY.1454208885
2017-09-01T11:27:22-0400
COPPIN.EMILY.1454208885

File details come from the government source that posted it. Updated .