Attachment_11_-_Cross_Reference_Matrix_(17_April_2014).xlsx
XLSX spreadsheet 18 KB Posted
- Solicitation number
- FA8730-14-R-0017
About this file
Attachment 11 - Cross Reference Matrix (17 April 2014)
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Cross Reference | PWS Para | RFP Section L&M | CLIN | CDRL | Proposal (Vol & Para) |
| Factor 1 – Technical Acceptability | L: 4.3 | ||||
| M: 4.3 | |||||
| Sub-Factor A – Technical Approach | 4, 5, 6, 7 | L: 4.3.1 | |||
| M: 4.3.1 | |||||
| Contractor Performance | 1.2, 2.1, 6.2 | L: 4.3.1.1 | CLIN X001 | A016, A017 | |
| M: 4.3.1.1 | |||||
| Helpdesk | 6.1 | L: 4.3.1.1 | CLIN X001 | ||
| M: 4.3.1.1 | |||||
| Reliability and Maintainability | 7 | L: 4.3.1.1 | CLIN X001, CLIN X004 | A001, B001 | |
| M: 4.3.1.1 | |||||
| resolution of obsolescence rational while meeting CLS | 7.2 | L: 4.3.1.1 | CLIN X001 | A001 | |
| M: 4.3.1.1 | |||||
| Spares | 6.3 | L: 4.3.1.1 | CLIN X001 | A003, A006, A008, A014 | |
| M: 4.3.1.1 | |||||
| Support Equipment | 6.3.1 | L: 4.3.1.1 | CLIN X001 | ||
| M: 4.3.1.1 | |||||
| Configuration Management | 6.6 | L: 4.3.1.1 | CLIN X001 | A001, A002, A003 | |
| M: 4.3.1.1 | |||||
| System Manuals/TOs | 6.7 | L: 4.3.1.1 | CLIN X006 | B001 | |
| M: 4.3.1.1 | |||||
| GFP Management | 6.9 | L: 4.3.1.1 | CLIN X001 | A003, A006 | |
| M: 4.3.1.1 | |||||
| ECPs/Special Projects | 7.2 | L: 4.3.1.1 | CLIN X004 | A001 | |
| M: 4.3.1.1 | |||||
| Training/Training Materials | 6.8 | L: 4.3.1.1 | CLIN X004 | A005 | |
| M: 4.3.1.1 | |||||
| Packaging, Handling, Storage & Transportation | 6.4 | L: 4.3.1.1 | CLIN X001 | ||
| M: 4.3.1.1 | |||||
| Computer Resource Support | 5.1 | L: 4.3.1.1 | CLIN X001 | A006 | |
| M: 4.3.1.1 | |||||
| Security Accreditation | 5.2 | L: 4.3.1.1 | CLIN X001 | A007, B003 | |
| M: 4.3.1.1 | |||||
| Time Compliance Network Orders | 5.3.5 | L: 4.3.1.1 | CLIN X002 | B003 | |
| M: 4.3.1.1 | |||||
| Laptop Option | 5.3 | L: 4.3.1.1 | CLIN X002 | B003 | |
| M: 4.3.1.1 | |||||
| Sub-Factor B – Management Approach | 3, 6, 7 | L: 4.3.2 | |||
| M: 4.3.2 | |||||
| (a) Program Management Plan | 3.1, 6.3 | L: 4.3.2.1(a) | CLIN X001 | A003, A006, A013 | |
| M: 4.3.2.1(a) | |||||
| (b) Transition Plan | 3.5.1 | L: 4.3.2.1(b) | CLIN 0003 | ||
| M: 4.3.2.1(b) | |||||
| (c) Configuration Management Plan | 6.6 | L: 4.3.2.1(c) | CLIN X001 | A001, A002, A003 | |
| M: 4.3.2.1(c) | |||||
| (d) Quality Assurance Program Plan | 3.3 | L: 4.3.2.1(d) | CLIN X001 | A004, A011, A016 | |
| M: 4.3.2.1(d) | |||||
| Sub-Factor C – Experience | L: 4.3.3 | ||||
| M: 4.3.3 | |||||
| Meteorological System Logistics Support | 6 | L: 4.3.3.1 | A001, A002, A003, A005, A006, A008, A012, A014, A017, B001 | ||
| M: 4.3.3.1 | |||||
| Reliability & Maintainability, Systems Engineering, and Configuration Management | 7 | L: 4.3.3.1 | A001, B001 | ||
| M: 4.3.3.1 | |||||
| Computer Resource Support | 5.1 | L: 4.3.3.1 | A006 | ||
| M: 4.3.3.1 | |||||
| Time Compliance Network Orders | 5.3.5 | L: 4.3.3.1 | B003 | ||
| M: 4.3.3.1 | |||||
| Security Accreditation - DIACAP | 5.2 | L: 4.3.3.1 | A007, B003 | ||
| M: 4.3.3.1 | |||||
| Factor 2 – Price | L: | ||||
| M: 5.0 | |||||
| (a) CLIN X001 Contract Logistics Support | 2, 3, 4, 5, 6 | L: 5.2 | X001 | ||
| M: 5.2(a) | |||||
| (b) CLIN X002 Laptop Option | 5.3 | L: 5.2 | X002 | B003 | |
| M: 5.2(b) | |||||
| (c) CLIN 0003 Transition | 3.5 | L: 5.2 | 0003 | A013, A016 | |
| M: 5.2(c) | |||||
| (d) CLIN X004 Special Projects/Engineering Change Proposals | 7 | L: 5.2 | X004 | A001, B001 | |
| M: 5.2(d) | |||||
| (e) CLIN X005 NSP Contract Delivery Requirements List | 8 | L: 5.2 | X005 | A001, A002, A003, A004, A005, A006, A007, A008, A009, A010, A011, A012, A013, A014, A015, A016, A017 | |
| M: 5.2(e) | |||||
| (f) CLIN X006 Separately Price Contract Delivery Requirements List | 8 | L: 5.2 | X006 | B001, B002, B003 | |
| M: 5.2(f) | |||||
| (g) CLIN X007 Travel | 3.4 | L: 5.2 | X007 | A015 | |
| M: 5.2(g) | |||||
| Factor 3 – Performance Confidence | L: 6.0 | ||||
| M: 6.0 | |||||
| Recency Assessment | L: | ||||
| M: 6.1.1 | |||||
| Relevancy Assessment | L: 6.3 | ||||
| M: 6.1.2 | |||||
| Performance Quality Assessment | L: | ||||
| M: 6.1.3 |
Sheet2
| Cross Reference | PWS Para | RFP Section L&M | CLIN | CDRL | Proposal (Vol & Para) |
| Transition Phase-in | SF1 | 1 | A00F | ||
| Element 1a – GFE Usage Plan | 1.2.2 | L: 4.1a | 1 | N/A | |
| M: 2.2.1a | |||||
| Element 1b – Repair Process Demonstrations | 1.2.1 | L: 4.1b | 1 | N/A | |
| M: 2.2.1b | |||||
| Element 1c – Hire/Retain Qualified Personnel | 1.2.3 | L: 4.1c | 1 | N/A | |
| M: 2.2.1c | |||||
| Element 1d – Facilities Plan | 1.2.4 | L: 4.1d | 1 | N/A | |
| M: 2.2.1d | |||||
| Element 1e – Data Reporting | 1.11 | L: 4.1e | 3 | A00A-A0AD | |
| M: 2.2.1e | |||||
| Supply Chain / Material Management | SF2 | Imbedded in overhaul / repair prices | A00C-A00E, A00G-H, A00N | ||
| Element 2a – Parts Forecasting and documentation of approved sources | 1.9, 1.5.4 | L: 4.2a | Imbedded in overhaul / repair prices | N/A | |
| M: 2.2.2a | |||||
| Element 2b – Material Storage, Packaging / Transportation | 1.3, 1.8, and 1.9 | L: 4.2b | Imbedded in overhaul / repair prices | A00D, A00E, A00G, A00H | |
| M: 2.2.2b | |||||
| Program Management | SF3 | Imbedded in overhaul / repair prices | A00C, A00E, A00R | ||
| Element 3a – Schedule / Produce Requirements, Surge Responsiveness, and O&A | 1.4.1.a, 1.15, and 1.16 | L: 4.3a | Imbedded in overhaul / repair prices, 0005 | A00C, A00E | |
| M: 2.2.3a | |||||
| Element 3b – Transition Phase-Out | 1.17 | L: 4.3b | 2 | N/A | |
| M: 2.2.3b | |||||
| Element 3c – Small Business Requirements | PWS: N/A | L: 4.3c | Imbedded in overhaul / repair prices | A00R | |
| Clause H002 | M: 2.2.3c |
Sheet3
File details come from the government source that posted it. Updated .