draft J-10 Proposal Cross Reference Matrix 20240305.xlsx
XLSX spreadsheet 27 KB Posted
- Attached to
- Base Infrastructure Modernization (BIM) IDIQ RFP Federal contract opportunity
- Solicitation number
- FA872623RB001
About this file
This document contains a draft proposal cross reference matrix and related federal contract opportunity notice for the Base Infrastructure Modernization (BIM) IDIQ solicitation. The solicitation will establish a pool of contractors to modernize, operate, and maintain network infrastructure across all Department of the Air Force locations globally. It will have a basic ordering period of five years plus an optional five-year extension and a total program ceiling of $12.5 billion. The solicitation seeks proposals to provide site surveys, network operations, design and architecture, modernization installation, and network operations. It will utilize firm-fixed-price, cost-plus-incentive-fee, cost-plus-fixed-fee, and cost reimbursement contract types on resultant task orders. Awards will include small business set asides.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| draft J-3 Prior Experience Scorecard 20240205.xlsx | XLSX spreadsheet | |
| draft J-4 Sample Base Prompt PWS 20240110.pdf | ||
| draft J-6 BIM IDIQ PWS 20240305.pdf | ||
| draft J-7 Section L Instructions to Offerors 20240305.pdf | ||
| draft Solicitation - FA872623RB001 20240305.pdf | ||
| draft J-1 Abbreviations 20231130.pdf | ||
| draft J-2 Proposal Cover Sheet 20240201.pdf | ||
| draft J-8 Section M Evaluation Criteria 20240305.pdf | ||
| draft J-5 Small Business Participation Commitment Document 20240229.xlsx | XLSX spreadsheet | |
| draft J-9 BIM IDIQ DD 254 20240229.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Factor 3 Subfactor 1
| Base Infrastructure Modernization (BIM) |
| FA8726-23-R-B001 |
| J-10 Proposal Cross Reference Matrix (5 March 2024) (DRAFT) |
| Factor 3, Subfactor 1 - Global Management Support Plan | ||
| Sec. M Reference | Requirement | Proposal Vol, Page, Para |
2.4.1.a A Capability Statement and Operational Plan to demonstrate how the Offeror will handle the breadth and scale of transformational tasks across multiple locations with minimal risks to the Government.
2.4.1.b For teaming arrangements, a breakout of the responsibilities of the team members.
2.4.1.c A Staff Management Plan which addresses:
2.4.1.c.1 The approach for personnel recruitment, training, and retaining qualified personnel.
2.4.1.c.2 The approach for obtaining, maintaining, and managing security clearances of personnel.
2.4.1.c.3 The approach to provide personnel to support multiple geographical CONUS and OCONUS locations, to include how travel and/or telework technology would be utilized to maximize the use of centralized Network Operations Centers (NOCs).
2.4.1.d A Supply Chain Risk Management (SCRM) plan which addresses:
2.4.1.d.1 Evaluation, full examination, or implementation of its full spectrum supply chain.
2.4.1.d.2 Identification, assessment, planning, and mitigation of actual and potential threats vulnerabilities, and disruptions to the supply chain.
2.4.1.d.3 Application of supply chain protection and counterfeit protection.
2.4.1.d.4 Identification, assessment, planning, and mitigation of Cybersecurity SCRM (CSCRM).
2.4.1.d.5 How the Offeror will ensure that the inventory management system is 98% accurate for Unclassified and 100% for Classified.
&KFF0000DRAFT DOCUMENT
POSTED TO SAM.GOV 11 MARCH 2024
Factor 3 Subfactor 2
| Base Infrastructure Modernization (BIM) |
| FA8726-23-R-B001 |
| J-10 Proposal Cross Reference Matrix (5 March 2024) (DRAFT) |
| Factor 3, Subfactor 2 - Task Order Support Plan | ||
| Sec. M Reference | Requirement | Proposal Vol, Page, Para |
2.4.2.a The Offeror’s quality control plan that addresses:
2.4.2.a.1 The Offeror’s plan for Comprehensive Threat Analysis for cyber threats.
2.4.2.a.2 How the Offeror intends to schedule sustainment services at all locations simultaneously for a five-year period of performance.
2.4.2.a.3 How the Offeror intends to effectively implement equipment management, respond to emergencies, hazardous materials, and safety programs.
2.4.2.a.4 How the Offeror will respond to problems and deficiencies.
2.4.2.a.5 How the Offeror will handle challenging problems.
2.4.2.a.6 How the Offeror will perform inspections and the frequency of the inspections.
2.4.2.a.7 How the Offeror will sustain the network to ensure SLA performance.
2.4.2.b The Offeror’s schedule for all 5 phases of performance for the Sample Base Prompt.
2.4.2.c The Offeror’s management plan for the responsibilities identified in Sections 2 and 3 of the BIM IDIQ PWS (Attachment J-6) in consideration of the Sample Base Prompt.
2.4.2.d The Offeror’s plan to execute the following phases in performing on the Sample Base Prompt:
2.4.2.d.1 Phase 1 – The Offeror’s approach to conducting a site survey, to include:
2.4.2.d.1.A Labor skill mix involved.
2.4.2.d.1.B Equipment/software used.
2.4.2.d.1.C Timelines and durations.
2.4.2.d.1.D Use of subcontractors and the roles of team members (as applicable where the Offeror is using teaming arrangements).
2.4.2.d.2 Phase 2 – The Offeror’s approach to operating the Government’s network, to include:
2.4.2.d.2.A Labor skill mix involved with normal operations.
2.4.2.d.2.B Labor skill mix involved with contingency operations.
2.4.2.d.2.C Use of subcontractors and the roles of team members (as applicable where the Offeror is using teaming arrangements).
2.4.2.d.2.D List and quantity of equipment provided and/or used by the offeror to operate the network.
2.4.2.d.3 Phase 3 – The Offeror’s approach to delivering a design and architecture to the Government, to include how the Offeror will coordinate with the Government to ultimately provide an acceptable design and architecture of a modernized network, to include:
2.4.2.d.3.A Labor skill mix involved.
2.4.2.d.3.B Use of subcontractors and the roles of team members (as applicable where the Offeror is using teaming arrangements).
2.4.2.d.3.C Unique spectrum and connection challenges.
2.4.2.d.3.D Notional NIPR architecture that meets the SLA requirements identified in the BIM IDIQ PWS (Attachment J-6).
2.4.2.d.3.E Notional SIPR architecture that meets the SLA requirements identified in the BIM IDIQ PWS (Attachment J-6).
2.4.2.d.3.F A list, including quantities, of the equipment required to implement the architecture.
2.4.2.d.3.G Clear articulation of how the notional solution increases network efficiency, network effectiveness, quality of service, and quality of experience.
2.4.2.d.4 Phase 4 – The Offeror’s approach to installing and otherwise implementing the accepted design, to include:
2.4.2.d.4.A Managing the installation of systems and subsystems including coordination with DAF organizations and local staffing, which are impacted by planned outages and turnover.
2.4.2.d.4.B The use of the Offeror’s Network Operations Center (NOC) for initial provisioning of systems and subsystems.
2.4.2.d.4.C Labor skill mix involved with normal operations.
2.4.2.d.4.D Labor skill mix involved with contingency operations.
2.4.2.d.4.E Use of subcontractors and the roles of team members (as applicable where the Offeror is using teaming arrangements).
2.4.2.d.4.F Timelines and durations.
| 2.4.2.d.5 | Phase 5 – The Offeror’s approach to operating the modernized network, to include: | |
| 2.4.2.d.5.A | How the Offeror’s Network Operations Center (NOC) will be staffed, to include labor skill mix, for normal day-to-day operations and for contingency (beyond normal) operations. |
2.4.2.d.5.B How the Offeror will staff on-site support, to include labor skill mix, for normal day-to-day operations and for contingency (beyond normal) operations.
2.4.2.d.5.C List of quantity and equipment provided and/or used by the offeror to operate the network.
2.4.2.d.5.D Use of subcontractors and the roles of team members (as applicable where the Offeror is using teaming arrangements).
Factor 4
| Base Infrastructure Modernization (BIM) |
| FA8726-23-R-B001 |
| J-10 Proposal Cross Reference Matrix (5 March 2024) (DRAFT) |
| Factor 4 - Small Business Participation Commitment | ||
| Sec. M Reference | Requirement | Proposal Vol, Page, Para |
2.5.a - e Completion of the Small Business Participation Commitment Document (Attachment J-5)
2.5.f Relevant supporting documentation demonstrating a substantive commitment of a variety of complex work allocated to small businesses.
File details come from the government source that posted it. Updated .