Attachment 1_Statement Of Work_RevA_220309.pdf

PDF 316 KB Posted

Attached to
Rwanda C208B EX Aircraft Contractor Logistics Support (CLS)
Solicitation number
FA8625-22-Q-2033
Issued by

About this file

This combined synopsis and solicitation requests quotes for contractor logistics support services for two Cessna 208B Grand Caravan EX aircraft operated by the Rwanda Air Force. The Air Force Life Cycle Management Center seeks a firm-fixed-price contract to provide maintenance publications, maintenance tracking software subscriptions, and two contractor logistics support personnel for one base year plus four option years. Quotes are due by March 29, 2022 and must include pricing for technical manuals, software, and maintenance support as specified in the statement of work and price schedule attachments. The requirement is set aside for small businesses and will result in a single award to the responsible quoter providing the lowest-priced technically acceptable offer.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK (SOW)

FOR

ACQUISITION OF CONTRACTOR LOGISTICS SUPPORT FOR

C208B GRAND CARAVAN EX AIRCRAFT

Rwanda Air Force (RAF)

09 March 2022

Revision A

CASE: P7-D-QAA

PREPARING ORGANIZATION

AFLCMC/WLI

2240 B Street, Bldg. 11, Room B01

WPAFB, OH 45433

Distribution Statement C

Distribution authorized to U.S. Government Agencies and their contractors, Administrative or

Operational Use, 4 Mar 2022. Other requests for this document shall be referred to

AFLCMC/WLI, Wright-Patterson AFB, OH 45433. Export Control Warning and Destruction notices are also applicable and shall be applied in accordance with DODD 5230.24.

RECORD OF CHANGES TO SOW DOCUMENT AS FOLLOWS

Revision Date Comment

A

09 Mar 22 Section 3 CLS: Specify the requirement to provide two (2) Maintenance

CLS Personnel per period of performance

Table of Contents

1. Scope

2. Publications

3. Contractor Logistics Support (CLS)

1. Scope:

This Statement of Work (SOW) provides deliverable and task requirements for the sustainment of two (2) Textron Aviation Inc. (TAI) C208B Grand Caravan EX (C208B

EX) aircraft by the United States Government (USG) for the benefitting country of

Rwanda, In Accordance With (IAW) Foreign Military Sales (FMS) Case P7-D-QAA.

The primary mission for this aircraft is Aerial Patient Movement (APM) on rapidly evolving Peacekeeping Operations (PKO). Aircraft utilization rate will be 1200 hours per aircraft per year. The Contractor shall comply with requirements specified within this

SOW. The contractor shall provide the Publications in Section 2 and Contractor Logistics

Support (CLS), Section 3.

2. Publications: The contractor shall provide subscriptions and updates to technical publications and documentation to include, but not be limited to, the following manuals:

documentation as listed below. One (1) additional electronic copy shall be provided in

DVD format to the AFLCMC/WLI program office. All manuals, technical publications, and technical documentation shall be delivered in the English language. The contractor shall provide subscriptions within the first 60 days after contract award, and any updates within 7 days of official notice of change.

2.1.Two (2) years CAMP Maintenance Tracking Software with Engine Health

Monitoring. (A001, DI-TMSS-81815/T)

2.1.1. The subscriptions will include the following components of the CAMP Suite:

MTX—Aircraft Maintenance Tracking Software

EHM—Engine Health Monitoring

2.1.2. The contractor shall provide electronic CAMP subscriptions to continue maintenance tracking currently being utilized by the RAF. Previous CAMP data input will be available as part of these subscriptions.

2.1.3. The contractor shall provide the license numbers as proof of delivery for each subscription. Additionally, the contractor shall provide the subscription information via email to the respective Office of Security Cooperation (OSC) and courtesy copy the USG Program Management Office (PMO).

2.2.Period of Performance (2 years): Subscription and Hardcopy Updates to Aircraft (C-

208 Grand Caravan EX) Technical Publications after 24 Nov 23. (A002, DI-TMSS-

81815/T)

Avionics Wiring Diagram Manual (custom design of the actual avionics installation)

Service Maintenance Manual

CesNav Weight and Balance (CLCalc)

Illustrated Parts Catalogue -Airframe

Service Bulletins and Service Letters – Airframe

Structural Repair Manual

2.2.1. The contractor shall provide updates in the form of one (1) hardcopy (paper) reference manuals per aircraft and/or one (1) per aircraft CD, digital video disc (DVD) or memory stick containing the manuals.

2.2.2. RAF currently has hardcopy Aircraft Technical manuals, but requires updated hardcopy changes after 24 Nov 23. Additionally, RAF utilizes their own computer resources to access the electronic subscriptions.

2.3.Period of Performance (2 years): Subscription and Hardcopy Updates to Aircraft

Engine (PT6A-140) Technical Publications after 22 Jul 23. (A003, DI-TMSS-

81815/T)

Illustrated Parts Catalogue – Engine

Maintenance Manual – Engine

Service Bulletins and Service Letters – Engine

2.3.1. The contractor shall provide updates in the form of one (1) hardcopy (paper)

2.3.2. RAF currently has hardcopy Aircraft Engine Technical manuals, but requires updated hardcopy changes after 22 Jul 23. Additionally, RAF utilizes their own computer resources to access the electronic subscriptions.

2.4.Two (2) years subscription Jeppesen Chart View, digital maps visible on MFD with maps of the continent of Africa and aviation data with associated Jeppesen Database

Subscription Service. (A004, DI-TMSS-81815/T)

2.4.1. The contractor shall provide electronic subscriptions along with a softcopy

(electronic version) via CD, digital video disc (DVD) or memory stick containing the data.

2.5.Two (2) year subscription to C-208 Grand Caravan EX (TAI) Pilot’s Operating

Handbook/Airplane Flight Manual to include Weight/Balance Manual with updates after 22 Jul 23. (A005, DI-TMSS-81815/T)

2.5.1. The contractor shall provide updates in the form of one (1) hardcopy (paper)

2.5.2. RAF currently has hardcopy Flight Manuals, but requires updated hardcopy changes after 22 Jul 23. Additionally, RAF utilizes their own computer resources to access the electronic subscriptions.

2.6.Rwanda C208B Aircraft Serial/Tail Numbers

Aircraft 1: 208B5607 RAF 1808

Aircraft 2: 208B5608 RAF 1812

3. Contractor Logistics Support (CLS): The contractor shall provide two (2) Maintenance

CLS Personnel for a period of performance of one (1) year as well as four (4) pre-priced option years.

3.1.Duties: The contractor shall perform advisory services to include but not limited to support of:

3.1.1. Pre-flight and post-flight maintenance inspections, launch, recovery, cleaning, towing, servicing, and fault isolation, including actions required for operating and maintaining the aircraft and all aircraft subsystems at Kigali Air Force

Base, Rwanda.

3.1.2. Aircraft conversion to the passenger, cargo and APM mission configurations.

3.1.3. Operation and maintenance of all associated ground support equipment.

3.1.4. Scheduled and unscheduled maintenance in accordance with the FAA-approved Original Equipment Manufacturer (OEM) and Instructions for

Continued Airworthiness (ICA) maintenance program.

3.1.5. Use of FAA/EASA approved commercial practices to maintain the aircraft airworthiness certification for each aircraft.

3.1.6. Maintenance of all aircraft and equipment in accordance with the OEM's FAA approved instructions for continued airworthiness (including service bulletins and ICAs) as applicable to the configuration purchased.

3.1.7. The contractor shall assist Rwandan personnel in forecasting spares resupply, and scheduling maintenance activities.

3.2. OPERATIONS

3.2.1. The contractor shall support a forty (40) hour work week for a period of one year, and four pre-priced options in Rwanda. The work schedule may vary due to mission requirements, but will not exceed 40 hours during a seven (7) day period. The contractor shall observe the fourteen (14) nationally recognized

Rwanda holidays.

3.2.2. The contractor shall assist RAF in coordinating scheduled maintenance requirements with the operations flight schedule to minimize interference with the operations tempo.

3.2.3. The contractor shall be responsible for lodging, transportation, meals and any medical requirements while at Kigali Air Force Base, Rwanda.

3.2.4. The Contractor shall be responsible for timely and complete submittal of the necessary information and forms directly to the Government of Rwanda for the required passports, visas, licenses or permits. The contractor will be given a temporary badge to access the job site. The badge will be returned on completion of his/her contract at the job site.

3.2.5. The contactor shall provide FAA Airframe and Powerplant (A&P) licensed/certified personnel for proper task performance or records entry.

3.2.6. The contractor activities shall be in compliance with applicable U.S. Federal, Rwanda, and Local occupational safety and environmental laws and regulations.

3.2.7. The contractor shall obtain any and all export/import related licenses in support of this contract.

3.2.8. The contractor shall maintain reach back support for engineering and product support to the OEM of the applicable systems for the duration of this contract.

3.2.9. All on-site personnel assigned to this contract shall have the ability to speak, read, and write the English language.

3.3.MAINTENANCE DATA

3.3.1. The contractor shall assist RAF in documenting maintenance actions in the aircraft logbooks and maintenance data forms IAW current FAA standards.

3.3.2. The contractor shall assist RAF in documenting forms and discrepancy report forms for the life of this contract.

3.3.3. The contractor shall assist RAF in maintaining aircraft and engine historical records using CAMP Maintenance Management and engine monitoring system (or another applicable maintenance tracking system) for the life of this contract.

3.3.4. The contractor shall assist in RAF’s tool control program.

File details come from the government source that posted it. Updated .