About this file

This request for proposal solicits offers for mechanized material handling systems at three Air Force bases. The solicitation seeks the design, fabrication, installation, and testing of materials handling systems at Little Rock AFB, AR; an aerial delivery pallet handling system at Altus AFB, OK; and a storage aids system at Minot AFB, ND. Proposals are due by June 15, 2020 and awards will be made within 180 days for Little Rock, 240 days for Altus, and 270 days for Minot. The evaluation will be based on lowest price technically acceptable with FOB destination. The small business set-aside has a NAICS code of 333922 and size standard of 500 employees.

View the file

Other files

File Type Posted
Set 5RP.pdf PDF
FA860420R8116003.pdf PDF
Instructions for DOD SAFE Proposal Submission.pdf PDF
SET 4.pdf PDF
FA860420R8116AMD002.pdf PDF
SET 3final.pdf PDF
Contractor InformationMinot.pdf PDF
Contractor InformationAltus.pdf PDF
Contractor InformationLR.pdf PDF
Questions Set 1.pdf PDF
FA860420R81160001.pdf PDF
DFARS 252.226-7001.docx DOCX document
FA860420R8116_0430.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA8604-20-R-8116

Question Set 2

Q1. Which drawing (or attachment #) goes with attachment 2, the gravity conveyor?

A1. Please review Amendment 1 to the solicitation. The amendment includes a reworking of the Little Rock requirements documents. Notably, attachment 2 is removed.

Q2. Is there an attachment 15 missing?

A2. Drawing BLR908-01 is included to describe the project at Little Rock AFB. The list in Section J assigns the drawing to attachment 15. However, a numbering error on the attachment header inadvertantly describes the drawing as attachment 16.The drawing on page 374 is the correct drawing for the Little Rock AFB project. Please disregard the error in the headings and confirm the drawing numbers on the drawings. The headers on attachments 16-20 seem to have been inadvertantly inflated. The drawings are correct, as amended.

Q3. Should we quote the transfer cart?

A3. Yes. The Transfer Cart requirements for the Altus project are described by CLIN 0012.