Window Washing - Round 2 QA.pdf
PDF 114 KB Posted
- Attached to
- AFIT Window Washing
- Solicitation number
- FA860126Q0112
About this file
This is a Questions and Answers document for the AFIT Window Washing – Round 2 solicitation, a small-business set-aside contract for exterior window cleaning services at Wright-Patterson Air Force Base (WPAFB). The requirement covers approximately 1,500 window assemblies across six buildings on the AFIT campus. The performance period is September 25–30, with weekend work permitted on September 26–27 subject to 72-hour advance written approval and base access capability. Contractors may use professional purified-water, water-fed pole systems as the primary cleaning method provided finished work meets Performance Work Statement requirements, with articulating lift equipment available where needed. AFIT has no known areas with significant hard-water buildup, etched glass, or paint overspray beyond normal mineral spotting. Windows on the front of building 20642 were cleaned last year; there is no known date all campus windows were cleaned. Pricing should be based on current PWS requirements without assuming specific prior-cleaning history.
Subcontracting requirements apply under FAR 52.219-14, with prime contractors prohibited from paying more than 50 percent of the total government payment to non-similarly situated subcontractors. If a subcontractor processes, stores, or transmits Federal Contract Information on their own systems, separate CMMC Level 1 certification and UID in SPRS are required; however, the CMMC requirement always applies to the prime contractor. Quotes are due September 8. WPAFB Form 1440 access requests must be submitted 10–15 business days before the September 25 start date; if awarded with tight turnaround, the Contracting Officer Representative will coordinate temporary commercial visitor passes or sponsor escort access while permanent credentials process. Ground conditions should support articulating boom lift travel absent heavy rain, with trees and bushes across campus generally avoidable. This is a new requirement with no known prior contract vehicle used for window cleaning.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AFIT WINDOW WASHING – ROUND 2 Q&A
1. Would weekend work on September 26–27 be permitted with the required advance approval?
• Yes, but you also must be able to get on base.
2. May we use a professional purified-water, water-fed pole system as the primary cleaning method where practical, provided the finished work meets the PWS requirements? We would still provide articulating lift equipment where needed.
• Yes
3. Are there any known areas with significant hard-water/mineral buildup or etched glass beyond the normal mineral spotting addressed in the Q&A?
• None that AFIT is aware of.
4. Are there any known areas with significant paint overspray? If so, is specialized paint removal/restoration expected, or is the requirement limited to conditions removable through normal commercial window cleaning?
• None that AFIT is aware of.
5. If the Government does not have a known prior-cleaning date, please confirm whether offerors should price based on the current PWS requirements without assuming a specific prior-cleaning history.
• Windows on the front of 20642 were cleaned last year. There is no known date that all campus windows were cleaned.
6. Does FAR 52.219-14, Limitations on Subcontracting, apply to this acquisition? The posted Q&A asks this question, but the response only restates that the acquisition is a small-business set-aside. If it applies, what portion of the on-site window-cleaning work must the prime contractor self-perform?
• Prime contractors cannot pay more than 50% of the total amount paid by the Government to subcontractors that are not similarly situated entities.
7. If a small-business prime uses a window-washing subcontractor for the field work, must that subcontractor separately have CMMC Level 1 status/UID in SPRS, or is the CMMC requirement applicable only to the prime contractor for this effort?
• If the subcontractor does process, store, or transmit Federal Contract Information (FCI) on their own information systems, then they will need to be CMMC Level 1 certified in SPRS. The CMMC requirement will always apply to the Prime Contractor.
8. 3. The PWS requires WPAFB Form 1440 access requests 10–15 business days before the
September 25 start date, while quotes are due September 8. What is the anticipated award timing, and will the Government accommodate or expedite credential processing for the awardee and its personnel if necessary?
• If awarded with tight turnaround, request that the Contracting Officer Representative (COR) coordinate temporary commercial visitor passes or sponsor escort access while permanent Form 1440 credentials process.
9. 4. The performance period is September 25–30. May the contractor plan to perform work on Saturday/Sunday, September 26–27, subject to the PWS requirement for written approval at least 72 hours in advance, or should pricing and staffing assume weekday work only?
• Yes.
10. Previous Contract Number(s) The Q&A indicates this is a “new” requirement. For market research accuracy, can the Government confirm whether AFIT exterior window cleaning has ever been performed under any prior contract vehicle (e.g., custodial, grounds, facilities support)? If so, please provide the previous contract number(s).
• There has been no known contract used for window cleaning in the past.
11. Final Window Assembly Count The Q&A references approximately 1,500 window assemblies. Can the Government confirm the final count for pricing purposes? A Power Point slide deck was provided that shows all the windows on campus. Please refer to that.
12. 3. Lift Access Restrictions Can the Government confirm whether any turf, landscaping, or soft ground areas around the six buildings have weight or access restrictions that would limit articulating boom lift travel? As long as we don’t get a heavy rain, the ground should be firm enough to support a lift. There are trees, bushes, etc., across campus, most of which should be easy enough to get around.