This is a Questions and Answers document issued by the Air Force Life Cycle Management Center (AFLCMC), Operational Contracting Division, dated 29 April 2026, addressing contractor inquiries regarding Task 4 of an electrical installation project at Wright-Patterson Air Force Base, Ohio.

Question 1 addresses the scope and specifications for reinstallation and power connectivity work involving new wiring installation between Room 128A and Room 134. The answer clarifies that wiring will originate from a junction box in Room 134, be pulled into Room 128A, and terminate at PDU 8 with proper phasing. The required materials include 160 feet of 3/0 THHN copper stranded wire in three colors (brown, orange, and yellow), six BISR-250 250MCM in-line splice burners, and six BIT-250 Burndy uni-tap terminal connectors rated for 10-250MCM with two-entry capability. The document specifies that work on PDU 8 is limited to labeling only, with contractors required to ensure label information is correct and observe labels at both ends in the electrical room. Curtis V. Thomas III, Contracting Officer for AFLCMC/PZIBB, issued this clarification.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE AIR FORCE

HEADQUARTERS 88TH AIR BASE WING (AFLCMC)

WRIGHT-PATTERSON AIR FORCE BASE OHIO

29 April 2026

Strength Through Support

Questions and Answers Document

CONTRACTING ACTIVITY/AGENCY: Operational Contracting Division, Directorate of

Contracting, Air Force Life Cycle Management Center (AFLCMC), Air Force Material Command

(AFMC), Department of the Air Force.

AFLCMC/PZIBB

2275 D Street, Area B, Bldg. 16 Room 150

Wright-Patterson AFB, OH 45433

QUESTIONS

QUESTION 1: On task 4 you stated: "Task 4: Reinstallation and Power Connectivity: Install new wiring in the existing conduit between Room 128A and Room 134." Q: What will this new set of wires feed?

What is the length of the raceway and the size of the wires we need to source? The only thing we have to do with the PDU 8 is labeling, Right?

ANSWER: What will this new set of wires feed? The wiring will come from the junction box in RM 134, connect there and pull the wire into RM 128A, Terminate wire at PDU 8. Ensure wiring is phased correctly.

What is the length of the raceway and the size of the wires we need to source? 160 ft, 3/0

160ft

2428868 CUT 3/0 THHN CU STRD

BROWN WIRE .. Cuts: 1@ 160 ft

160ft

2428871 CUT 3/0 THHN CU STRD

ORANGE WIRE .. Cuts: 1@ 160 ft

160ft

2428872 CUT 3/0 THHN CU STRD

YELLOW WIRE .. Cuts: 1@ 160 ft

6ea

2023799 BISR-250 250MCM IN-LINE

SPLICE BUR

6ea

2017805 BIT-250 BURNDY UNI-TAP

TERM. CONN.

10-250MCM TWO-

ENTRY

Above is a BOM.

The only thing we have to do with the PDU 8 is labeling, Right? Label only. Ensure label information is correct. Visit electrical room and observe labels at both ends.

Curtis V. Thomas III

Contracting Officer

AFLCMC/PZIBB