Requests for Information_Answered_20JUL2020.xlsx
XLSX spreadsheet 14 KB Posted
- Attached to
- WPAFB Basewide Paint IDIQ Federal contract opportunity
- Solicitation number
- FA8601-20-R-0017
View the file
Other files for this federal contract opportunity
Show all 37
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Solicitation FA8601-20-R-0017 | |
| RFI's Submitted | Government Responses |
| What is the cut-off for questions/RFI’s? | 31-Jul-20 |
| Is there a scheduled site visit for bidders? | 28-Jul-20 |
| Could a drawing be provided for PN-201700 which would graphically identify the work? | Currently there are no drawings available. We could provide pictures if necessary. |
| Is it permissible for bidders to visit F/30001 and F/30003 to inspect the SEED Task Order work areas? | Site Visit for F30001 on 28 July 2020 |
| On Attachment 8 the following LI’s are described as “for work above 12' H" (0002, 0004, 0006, 0008, 0010, 0012, 0014, 0016, 0024, 0037, 0039, 0041, 0043, 0045, 0047, 0049, 0051, 0053, 0057, 0059, 0065, 0067, 0069, 0071, 0073, 0075, 0077, 0079, 0081, 0083, 0085, 0087, 0089, 0091, 0093, 0095, 0103, 0105, 0119, 0123, 0125, 0133, 0135). On Attachment 9 references to Attachment 8 Work Item #’s are described as “work above 12' H (RS Means +25% for equipment)”. Please clarify, are Attachment 8 and 9 LI’s 0002, 0004, 0006, 0008, 0010, 0012, 0014, 0016, 0024, 0037, 0039, 0041, 0043, 0045, 0047, 0049, 0051, 0053, 0057, 0059, 0065, 0067, 0069, 0071, 0073, 0075, 0077, 0079, 0081, 0083, 0085, 0087, 0089, 0091, 0093, 0095, 0103, 0105, 0119, 0123, 0125, 0133, and 0135 to include necessary equipment for working at elevations above 12FT? This cut-off is not reasonable: equipment cost for work on a 14’ interior wall or ceiling will be significantly less than equipment cost for exterior work at 20’+, or in unique areas, such as the dome roof/ceiling over F/30001 train rail area. Please consider allowing equipment and equipment related expenses to be priced with a separate coefficient when negotiating individual task orders, which could be priced/determined prior to the IDIQ program award? | Yes. Quotes will be in accordance with the equipment required to perform the work. Quote should reflect all costs whether interior or exterior project. |
| Please clarify the following language in window LI’s 0070, 0072, 0074 on Attachment 8/9: “Use window square footage"? On Attachment 9, what actual quantity of window frame should be included in 742SF? How many LF of window frame? | Total sqft of windows was calculated by taking total height x width, we did not subtract any amount for the glass. |
| Please clarify Attachment 9 LI#0070, are the frames steel, and what is the extent of “prepare window frames”? Are the steel frames rusting through which would require steel/welding modifications, or is preparation limited to cleaning off dirt/dust? | Preparing window frames should include removing loose paint, prep surface for paint. They will not be repairing any frames. |
| A pattern is noticed as I am developing a pricing scheme for the Attachment 8 Call Sheet: LI 0001 “prepare wall surface for painting…” vs. LI 0003 “remove loose and flaking paint on wall surfaces…”. This is repeated at LI’s 0009/0011 for ceilings, at LI’s 0036/0038 for exterior wood siding, at LI’s 0046/0048 for exterior stucco, concrete and CMU, at LI’s 0052/0054 for metal wall surfaces, at LI’s 0060/0061 for roof surfaces, at LI’s 0078/0080 for fascia/trim, at LI’s 0088/0090 for pipes, and at LI’s 0096/0097 for stairs. Is the intent for the combination of LI’s indicated here, that the first line “prepare surface” should be priced as a typical light wipe down/wash where the second line “remove loose and flaking paint” should be priced for a heavier scrape, sand and clean? There are many nuances to take into consideration when evaluating surface preparation which is not addressed well in Attachment 8 Call Sheet. Couple Examples: A: LI 0001 can be priced to repair imperfections left by wall hangings, dings, dents, scratches, gouges, etc., or LI 0001 can be priced as a simple wipe down prior to paint. By limiting task order scopes to LI’s from Attachment 8 Call Sheet, both the contractor and government are unable to apply the most effective Call Sheet scope lines to the specific work. B: LI 0046 can be priced using as a typical pressure wash of an exterior wall, but if CMU walls requires block filler or concrete walls are required to be rubbed out, or if there are other repairs to be made, the Call Sheet LI may not cover the true cost of preparing the wall surfaces “as specified by the Government for painting”. | The break-out is by types of surface and heights. |
I went through the 07JUL20 updated solicitation and wasn’t able to find that the bidder had to be located in Ohio. Can you please advise as to whether or not the bidder must be headquartered within the state of Ohio? : While it is not necessary that the bidder be headquartered in Ohio, the successful bidder(s) must be able to meet contract requirements such as (but not limited to) the following:·
| · 1.2 The Contractor shall provide all management, supervision, labor, materials, equipment, and transportation to accomplish multiple concurrent painting projects | |
| · 1.3 The contractors shall be required to manage and execute various fluctuations in the workload. | |
| · 2.2.1.1. Throughout the life of this contract, whenever there are active TOs, the CM shall be available to meet with the CO at Building 30001 promptly ** after notification by telephone during normal business hours. The CM shall be available to meet with the CO at Building 30001 within 24 hours when there are no active TOs. The CO must be able to contact the CM by phone at all times. The CM shall provide overall contract management, including full authority to develop TO proposals, negotiate and sign TOs, provide subcontract purchasing and administration, review material submittals and shop drawings, and shall attend all bi-weekly status meetings, site visits and pre-final/final inspections. Contractor should be able to remobilize within 24 hours. **Here, “promptly” can be reasonably inferred to mean less than 24 hours when there are active TOs. | |
| · 2.2.2 The CQCM shall visit each active project site daily to ensure full compliance with all safety requirements, and verify that the materials and workmanship are in accordance with the approved TO’s. | |
| · 2.2.3 Contractor’s Project Superintendent (PS): Provides on-site supervision. The PS cannot be the CQCM and subcontractors may not perform duties of the PS. | |
| · 3.2. Contractor shall be required to submit proposals on all Task Order Request for Proposal’s under the IDIQ Submittals. | |
| · 3.3. The site visit will be scheduled at the earliest possible time, but in most cases not more than ten (10) business days from the date of notification. | |
| · IAW FAR 52.219-14(c)(4), the concern will perform at least 25% of the cost of the contract, not including the cost of materials, with its own employees – on a per order basis. | |
| LI#0068 on Atch8 identifies Tex-Cote finish. Please clarify, what Tex-Cote product(s)/build-up specifically is to be priced on this LI? | Attachment 9 was updated. Line Items 68 and 69 should not have been included. |
| LI#0069 on Atch 8 identifies “for work above 12’H”. Please confirm that LI#0069 is for Tex-Cote applied above 12’, and clarify, what Tex-Cote product(s)/build-up specifically is to be priced on this LI? | Attachment 9 was updated. Line Items 68 and 69 should not have been included. |